Chapter 5 Activity-based Cost Systems See also: Kaplan/Atkinson 3rd ed. Ch.4 Cooper/Kaplan: Cost and Effect, Harvard Business School Press 1998 1 Example of misleading traditional cost system Cole Corporation manufactures two types of lenses for automobile rear lights out of plastic material – a normal lens (NL) and a complex lens (CL). lenses are molded using machines redesigned according to the requirements of the customers (model changes) To cost products, Cole currently uses a single indirect-cost rate job costing system. The cost objects are the total costs of manufacturing and distributing 80,000 normal lenses (NL) and 20,000 complex lenses (CL). 2 Application to two products Normal Lenses (NL) Complex Lenses (CL) Direct materials $1,520,000 $ 920,000 Direct mfg. labor 800,000 260,000 Total direct costs $2,320,000 $1,180,000 Direct cost per unit: $2,320,000 ÷ 80,000 $1,180,000 ÷ 20,000 = $29 = $59 total direct labor hrs. 36,000 14,000 Indirect costs direct manufacturing labor hrs. Indirect cost rate = $2,900,000 50,000 $2,900,000 ÷ 50,000 = $58 3 Product cost Normal Lenses (NL) Complex Lenses (CL) Direct costs + Allocated costs = cost per unit Selling price: Margin Margin %age $2,320,000 (= 36,000 × $58) $2,088,000 $4,408,000 $1,180,000 (=14,000 × $58) $ 812,000 $1,992,000 $4,408,000 ÷ 80,000 $1,992,000 ÷ 20,000 = $ 55.10 $ 60 $ 4.90 8.2% = $ 99.60 $142 $ 42.40 29.9% 4 Refining a Costing System Guidelines Direct-cost tracing – Classify as many of the total costs as direct costs as is economically feasible. Indirect-cost pools – Expand the number of cost pools until each of these pools is homogeneous. Cost-allocation basis – Identify the preferred costallocation base for each indirect-cost pool. 5 Activity-Based Costing System ABC systems refine costing systems by focusing on individual activities as the fundamental cost object they measure utilization of each activity by cost objects and assign the cost of the activity accordingly total cost of activity per period (“cost pool”) cost driver units used by cost object × total utilization of activity per period Cost driver rate = = Cost driver rate overhead cost assigned to cost object 6 Activity-based Costing: the fundamental idea: Indirect labor Resource: Prepare tooling # setups # setup hrs. Product, Customer: Set up machines # maint. hrs. Cost driver rate: Maintain machines # moves Activity cost driver: Move materials # receipts Activity: Inspect incoming materials 7 General Procedure Determine the set of activities j performed in each department (cost center) determine a Cost Driver for each activity j measuring the causal relationship between resource consumption of the activity and its utilization by products or customers assign (budgeted) resource costs to activities j each activity is assigned a cost pool Cj 8 General Procedure (cont’d) determine the total level xj of budgeted utilization of the activity C determine the cost driver rate = j xj Determine (actual) usage xjl of cost driver j by each user l Activity-based cost assignment to user l: Sj xjl Cj xj 9 Key step: Assigning resource costs to activities Resource costs per activity is an important piece of information to management This is usually done by interviews with department managers on activities performed the proportion of working time usually spent on each activity no excessive precision required 10 Separate cost driver rates for committed and flexible cost Resources Driver expense activity level rate Committed Flexible C1j C2j total C1j + C2j Budgeted xj = capacity C1j / xj C2j / xj xj (expected) C1j C2j xj + xj C1j + C2j xj + xj in general 11 Cost Hierarchies 1 2 3 4 ABC systems commonly use a four-level cost hierarchy to identify cost-allocation bases: Output unit-level cost Batch level costs Product-sustaining costs Facility-sustaining costs 12 Functions of activities Unit level activities (sales volume-related) batch level activities (related to # of batches of saleable output) product-sustaining (activities enabling the production of saleable output) • customer sustaining (activities enabling to sell products to individual customers or markets) (Costs that may be assigned only to broader output categories) 13 Cost hierarchy Output Unit-Level Costs Batch-Level Costs resources sacrificed on activities that are related to a group of units of product(s) or service(s) rather than to each individual unit of product or service. Setup hours Procurement costs Product-Sustaining or service-sustaining costs resources sacrificed on activities performed on each individual unit of product or service. Energy Machine depreciation Repairs resources sacrificed on activities supporting individual products or services. Design costs Engineering costs Facility-Sustaining Costs resources sacrificed on activities that cannot be traced to individual products or services but support the organization as a whole General administration Rent Building security 14 Types of activity cost drivers Accounting cost Number of transactions duration of transaction if time consumed varies among individual instances of the activity intensity or direct charging number of staff of different wage groups assigned to an activity per time unit resources actually used for the individual instance of an activity 15 Appropriate number of cost drivers Small cost pools do not alter unit costs much if additional information has to be acquired on a cost driver consider the information cost and compare it to the benefit of the better decision do not add a cost driver which is an approximate linear combination of cost drivers already used existing cost pools should share in the cost that would be assigned to that pool according to the weights of the linear combination 16 Implementing Activity-Based Costing Step 1: Identify the chosen cost objects. The objective is to calculate the total costs of designing, assembling, and distributing S and C. Step 2: Identify the direct costs of the product. Cole identifies direct materials costs and direct manufacturing labor as direct costs. Cleaning and maintenance costs of $360,000 are also identified as direct costs of the lenses. Cleaning and maintenance costs of $360,000 are direct batchlevel-costs. Why? Because these costs consist of workers’ wages for maintenance of machines after each batch of phones is run. The old cost system classified cleaning and maintenance costs as part of the $2,900,000 indirect costs. Recall that indirect costs were allocated to products using direct manufacturing labor-hours. 17 Primary purposes of Activity-based Cost Systems Analysis of decisions on the structure and design of productive system not used for management control purposes more transparency of the factors causing costs phasing out non-value-added activities sporadic stand-alone analyses, not integrated in on-line accounting system otherwise management will have an incentive to choose cost drivers strategically Decision facilitating for Activity-based Management (ABM) 18 Activity-Based Management ABM describes management decisions that use activity-based costing information to satisfy customers and improve profits. – Product pricing and mix decisions – Cost reduction and process improvement decisions – Design decisions 19 ABM decisions Product Pricing and Mix Decisions Cost Reduction and Process Improvement Decisions ABC gives management insight into the cost structures for making and selling diverse products. provides more accurate product cost information and more detailed information on costs of activities and the drivers of those costs. Manufacturing and distribution personnel use ABC systems to focus on cost reduction efforts. Managers set cost-reduction targets in terms of reducing the cost per unit of the cost-allocation base. Design Decisions Management can identify and evaluate new designs to improve performance by evaluating how product and process designs affect activities and costs. Companies can work with their customers to evaluate the costs and prices of alternative design choices. 20 Critique ABC systems are full cost systems they average fixed costs over products according to cost driver utilization: every individual unit carries the same cost per unit of driver utilized costs for which a cost driver is not available (e.g. leading a department) are allocated to cost pools of measurable activities For change management decisions an incremental costing approach is more adequate, when the size of the cost pool will not change proportionally with the cost driver (non-linearities in the cost function) due to fixed costs economies of scale economies of scope 21 CC-Problems 5-35 (=11), requirements 1.-3. (10%) 5-29 (=11.5-30) ( 5%) 5-31 (=11.5-32) ( 5%) 5-17 (=11.5-19) ( 5%) 5-19 (Excel)(=11.5-21,5-22) ( 8%) 5-23 (=11.5-24) ( 8%) 5-33 (10%) 22