Week 21 Monday 13 x 2e10 per beam into physics for the first time Tuesday Stable beams (13 x 2e10 p per beam) Energy matching beam 1. Injection kicker studies beam 2. Nominal bunch studies: RF Ramp nominal bunch to 3.5 TeV & collide Wednesday Access Ramp nominal bunches – beam 2 lost (vacuum interlock) Nominal bunches to 3.5 TeV and collide/RF studies 18 kV glitch Thursday Sector 67 tripped again. Access. BLM problem. Power glitch affecting various systems: Recovery. Injection 7 x 1e11 per beam. Stable beams (450 GeV collisions). Sector 67 trip. Transverse damper studies. 31-05-10 LHC status - week 21 Week 21 Friday • BPMs versus intensity • Impedance measurements • Nominal intensity ramp & collide • 66 kV drop Saturday 66 kV drop recovery Sunday 66 kV drop recovery - cryogenics 31-05-10 LHC status - week 21 High intensity Single bunch ~1e11 per beam 3.5 TeV unsqueezed Weds a.m. Single beam looked stable. Collisions at injection tunes, no Q split. Beam lost to strong coherent instability Weds p.m. Collision tunes, tune split. Stable after going into collision, rocky before collision with some manual chromaticity and tune trims to keep the beam. Fri p.m. 31-05-10 Looked good longitudinally Transverse messy spectrum but OK Horns noted Single beam rocky – sensitive to tune, coupling LHC status - week 21 1e11 Observations Over-injection well established Emittance blow-up of B2V at 450 GeV well documented Big emittance blow-up in ramp although last time better Octupoles used systematically up to 40 A after 1 TeV Longitudinal “quadrupole” oscillations gone after use of increase longitudinal emittance from SPS and rematched voltage 31-05-10 transverse damper B2V chromaticity trimmed down in ramp ~0.7 eVs, 1.7 – 1.8 ns 3.5 MV at 450 GeV coming up to 5 MV in ramp 4 klystons per beam LHC status - week 21 1e11 Observations Chromaticity difficult to measure at flat top but around 6 Rocky before collision with some manual chromaticity, coupling & tune trims to help improve lifetime Tune split before going into collisions 31-05-10 Put an extra +3e-3 on beam 2 H and V Collisions at 10 m. looks OK with tune split and collision tunes LHC status - week 21 The horns at 450 GeV 31-05-10 LHC status - week 21 Emittance in ramp Big B1H to start with but overall actually the best we’ve seen 31-05-10 LHC status - week 21 Bunch length in ramp Ramp with larger longitudinal emittance (from SPS) : 0.7 eVs instead of 0.3 eVs 31-05-10 LHC status - week 21 Beam 1 at 3.5 TeV Beam intensity 31-05-10 Horizontal tune amplitude Collide LHC status - week 21 Beam 1 - coupling 31-05-10 LHC status - week 21 Beam 2 in collision Beam intensity 31-05-10 Horizontal tune amplitude LHC status - week 21 Vertical tune amplitude Colliding 13*2e10 31-05-10 LHC status - week 21 Orbit Feedback Two main problems: 31-05-10 Inappropriate behaviour on not receiving energy Oscillatory correction behaviour First problem solved by our man in Japan Stable after FGC loop period was changed to 80 ms (from 100) to be in phase with the FB. The FB survived an event without energy (due to the fact that the tune systems stopped for some time). It took some time to catch up the energy, but it eventually managed. Declare operational with some potential tuning to be performed LHC status - week 21 B2 injection oscillation for bucket one 31-05-10 LHC status - week 21 Bucket 1 – vertical kick ... For the moment, I have no explanation on how this is possible within our timing system as the bucket number is not taken into account at all....In order to see if it is a re-phasing issue within our 1ns fine delay module, I propose to reduce the kick delay by 20ns and see if it has an effect. 31-05-10 LHC status - week 21 Transverse dampers H.B1: V.B1: 31-05-10 All power amplifiers used with two pick-ups, works correctly :-) V.B2: Gain of two power amplifier chains is not correct; needs an intervention in UX45 (#5 and #6); problem most likely inUX45. V.B1 used with two power amplifiers (#7, #8) and two pick-ups works correctly in both modes (with and without FIR phase shifter) H.B2: A VME crate in SR4 needs a local intervention before further commissioning All power amplifiers used, but only with pick-up Q9; pick-up Q7 has a noisy electronics; intervention in SR4 required Multi-bunch mode needs to be tested. LHC status - week 21 Dampers on for Beam 2 Successfully used with 1*1e11 at injection and in ramp (and flat top) 31-05-10 LHC status - week 21 BPM Study – B2 (Ongoing) Average Orbit RMS Orbit High I High I Low I Low I 31-05-10 LHC status - week 21 BPM Study – B1 (Ongoing) Average Orbit RMS Orbit High I High I Low I 31-05-10 LHC status - week 21 Low I Power cut – late Friday evening 23:20:43 Lose 66 kV – major power cut across site 23:20:54 Fire alarm in building 958 (BE) where the breaker is situated 31-05-10 Circuit breaker trips, but fault also brings down 66kV transformer EHT7 EHT7 feeds North zone loop, SPS, LHC point 1 and the LHC loop Power was reestablished in 28 seconds following a successful auto-transfer Fire service intervene LHC status - week 21 Configuration 31-05-10 LHC status - week 21 Diagnosis The fault was on a cable terminal inside the 404 cabinet; it connects the BE9 bus bars to the North Area loop. An arc developed inside the cabinet and then a short between phases. The circuit breaker did not open on the short because of the arc; instead it opened on thermal protection after 250 ms; The 66 kV supply through cabinet 27 (which was saw the fault in cabinet 404) triggered, shutting down the PS, the SPS and the general services LHC loop. All the machine, experiments and infrastructure systems were affected. Francois Duval, Roberto Saban 31-05-10 LHC status - week 21 Saturday 18:00 After a long day… Back to the nominal configuration having by-passed cabinet 404 and the cable between it and BA80 (North Area loop is not a loop anymore.) EPC is switching on the SVCs. Another occurrence of a cable terminal fault. We are carefully analyzing these terminals and their screen connections; we will bring systematic consolidation when the findings are conclusive. Francois Duval, Roberto Saban 31-05-10 LHC status - week 21 QPS view of cut 29-05-10 LHC status Recovery - Saturday Major effort Saturday Booster back up early Saturday morning, PS Saturday afternoon AD still does not have beam – cooling pump problem target area – finally fixed Sunday evening SPS late Saturday evening 31-05-10 EL, SVC, Cooling, ventilation, vacuum, controls, BI, power converters, cryogenics, RF Access plus RP as required North area & CNGS back in operation LHC status - week 21 LHC recovery - Saturday Power cut caused 3 trips that required further investigation All Switches now closed and QPS reset for all circuits EPC had ~20 circuits that needed attention all fixed Saturday morning (Valerie Montabonnet) Collimators OK MKI8 power supply access required Access system: LHC Access system operational 31-05-10 RB.A45 (MB.B21R4) : heater discharge RB.A81(MB.C32L1) : heater discharge MQ.25L1 : Only 1 of 2 heaters fired has one 48V power supply warning LHC status - week 21 Full machine checkout RF – problem with one cavity – He level monitoring Transverse dampers Injection kickers Beam instrumentation Vacuum 31-05-10 All insulation vacuum equipment restarted and functioning. All beam vacuum equipment restarted/repaired. All beam vacuum sector valves reopened when the cryo temperature < 5K. SPS: All beam vacuum equipment functioning and sector valves open. Beam down transfer lines LHC status - week 21 Cryogenics – summary 1/2 P18 P2 QSCCA compressor station for 4.5K fridge and full stop on whole installation Full stop on cold compressor station Effected sector 2-3 P4 31-05-10 QSCB compressor station for 4.5 K and QSCCB upper compressor station for cold compressors Full stop on whole installation Effected sector 12 QSCCA compressor station for upper compressor station for cold compressors Full stop on cold compressor station Effected sector 3-4 LHC status - week 21 Cryogenics P4 P6 CS and CM for both sectors P8 31-05-10 QSCB compressor station for 4.5K fridge and QSCCB upper compressor station for cold compressor station Effect sector 4-5 QSCCB upper compressor station for cold compressor station Full stop for cold compressor station Effected sectors 7-8 and 8-1 LHC status - week 21 Status earlier this morning Prepared for 3 day technical stop 31-05-10 LHC status - week 21