CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES CONFIRMED MINUTES JUNE 25-28 2012 ESTEL HOTEL & CONVENTION CENTER BERLIN GERMANY These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency. MONDAY, 25-JUNE-12 to THURSDAY, 28-JUNE-12 1.0 OPENING COMMENTS The CHEMICAL PROCESSING TASK GROUP was called to order at 9:00 a.m., 25-Jun-12 Code of Ethics/Antitrust and Meeting Conduct presentations were reviewed. It was verified that only SUBSCRIBER MEMBERS were in attendance during the closed portion of the meeting. A quorum was established with the following representatives in attendance: Subscriber Members/Participants Present (* Indicates Voting Member) * * * * * * * * * * * * * * * * NAME Hal Olaf James Mailik Bob Terry Karyn Celine Peter Aleck Harold Alan Gerald Linda Marcos John Serge Nathalie Susan Nick Veronique Wang Ramalingam Hongli Robert Jerker Abel Adam Beavers Boutoba Cashman Curtland Deming Dorey Droste Featherston Finch Gilbert Harvey Hauknes Jaguaribe Koenig Labbe Le Pottier Lewis Magnapera Marcel Miao Ramalingam Niu Nixon Nordh COMPANY NAME Raytheon Co Premium AEROTEC Gmbh Eaton Aerospace Eurocopter Parker Aerospace Group Ball Aerospace & Technologies Corp Goodrich Corporation Eurocopter Airbus Bell Helicopter Textron Spirit AeroSystems Inc. Cessna Aircraft Company Triumph Aerostructures -VAD Volvo Aero Norge ELEB Equipamentos Ltda. The Boeing Company Heroux Devtek, Inc Eurocopter Lockheed Martin Corporation BAE Systems Inc SAFRAN Group Comac GE Aviation Goodrich Corporation Triumph Aerostructures -VAD Volvo Aero Corp 1 Vice Chairperson CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES * * * * * Clark Luis Gustavo Rainer Carl Josefa Ester Jerry Victor Torsten Mariusz Steven Mike Yuhui Zia Shawn Wei Grzegorz Sergey Okawa Pacheco Ricken Roche Rodriguez Sala Bosch Satchwell Schonberger Sprado Stanczyk Starr Stolze Sun Usmani Vierthaler Wang Wryk Yesilevich Pratt & Whitney Embraer Premium AEROTEC Gmbh Goodrich ISR EADS-MTAD Rolls-Royce PLC Rolls-Royce PLC Israel Aerospace Industries Airbus Lockheed Martin Corporation Honeywell Aerospace Northrop Grumman Corp Comac BAE Systems Air & Information Spirit AeroSystems Inc. Comac Goodrich Corporation Hamilton Sundstrand Other Members/Participants Present (* Indicates Voting Member) * * * * * * * * * * * * * NAME Tomohiko Lee Stephane Robert Petr Alex Paul Hirohiko Jonathan Bill Eric Thomas Bakhtiar Rosa Ian David Mike Patrick George Cindy Scott Vittorio Dariusz Uri Yoshiomi Jerry Soh Ashikaga Bruce Chaumeil Custer Dvorak French French Hattori Hebben Heeter Jacklin Jacob Kadri Martin McDonald Michaud Noettl O'Leary Petrescu Roth Singer Stana Stephen Sternberg Sukesada Wahlin Yong Hua COMPANY NAME Mitsubishi Heavy Industries Ltd Robert Stuart Ltd Galion AAA Plating & Inspection Inc Letov Letecká Výroba s.r.o. Aerofin Laboratories Inc Aerofin Laboratories Inc Mitsubishi Heavy Industries Ducommun AeroStructures Gardena Skills Inc F.M. Callahan & Sons Inc Praxair Surface Technologies GmbH CTRM Aero Composites Sdn Bhd Superior Plating Co Robert Stuart Ltd. Fountain Plating Magnetic Inspection Laboratory Nu-Pro Limited ULTRASPEC Team Industrial Services Imagineering Enterprises Avcorp Industries ATI ZOPS Machining CAAI Asahi Kinzoku Kogyo Co AAA Plating ACP Metal Finishing PTE Ltd 2 Chairperson CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES Staff Present Nigel William Mike 2.0 Cook Calvert Graham DELEGATION OVERSIGHT – (CLOSED) The delegation status of Mike Graham, Nigel Cook, William Calvert, Bill Dumas and Bob Lizewski were reviewed. All delegated staff engineers met the requirements for maintaining delegation. The Task Group was reminded that Jack Holman is presently reviewing audits, in the nondelegated status, as temporary cover for Sarah Jordan who has left PRI. 3.0 NUCAP – (CLOSED) Scope Exception #22: The affected Subscriber gave a presentation on how they were going to amend their system to meet the job paper content and buy-off requirements of AC7108. The Subscriber requested the Task Group assess their proposal to determine if it meets the requirements of AC7108 prior to implementing it. The Task Group agreed that the proposal met the requirements of AC7108. ACTION ITEM: Nigel Cook to arrange for the scope exception #22 status to be changed to “Internal Review” (Due Date: 15-Jul-12) Scope Exception #85: Subscriber requested that AC7108/2 para 4.4.9.c to be amended to allow alternative eyesight test requirements. A similar scope exception has been requested by SAFRAN and the Task Group agreed it will be included in the next ballot of AC7108/2. ACTION ITEM: Nigel Cook to include the amendment (to allow alternative eyesight test requirements per Scope Exception #85) to AC7108/2 para 4.4.9.c in the next revision of the checklist (Due Date: 30-Feb-13) 4.0 PROFICIENCY EXAMS – (CLOSED) The Anodize and Etch exams have been completed by most auditors. These exams will be updated once the Task Group has agreed that the further exams of present auditors are no longer required. This is a present RAIL item no further action required. Exams have been created for Plating, Painting/DFL, and Conversion Coating. Exams to be revised to meet the following requirements: Should not be specification specific. Should not have double negatives. Should have a single clear answer. Should be grouped per sub-process Should have US and international units, e.g. °C & °F. ` Auditors are to complete the Exams prior to October meeting. ACTION ITEM: William Calvert to review the Auditor’s exams with the Subteams to ensure that the established criteria are met before the final drafts of the auditor’s exams is posted. (0.0.: 31-AUG-12) 3 CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES ACTION ITEM: Once revised/updated, William Calvert to arrange for current auditors to take exams and tabulate data for review by the Task Group Primes in October 2012. (Due Date: 30-Sept-12) 5.0 AUDITOR OVERSIGHT – (CLOSED) Mike Graham and Mike Stolze gave a presentation on the auditor oversight process and present status, 9 of 16 of the targeted observation audits had been completed. Not all observers have completed the additional CP feedback form. ACTION ITEM: Michael Graham to arrange completion of the targeted observation audits and to remind observers to complete the additional feedback form (Due Date: 22-Oct-12) 6.0 OCTOBER 2012 AUDITOR CONFERENCE – (CLOSED) The only closed meeting item was the auditor oversight program and the presentation was reviewed as part of agenda item 5. 7.0 RESOLUTION BY TASK GROUP ISSUES – (CLOSED) MIL-DTL-5541 – Solution Analysis: Questions have been raised about the frequency of solution analysis for processing solutions that form part of the conversion coating line, e.g. degreasing solutions, de-oxidizing solutions. Robert Nixon (Triumph) obtained clarification from the specification owner, Julia Russell of the US Navy that all solutions, except rinses, are required to be analysed at least once per week. ACTION ITEM: William Calvert to draft and have posted an Auditor Advisory to inform the Auditors of the Mil-DTL-5541 interpretation decision. (Due Date: 17-JUL-12) Onsite Auditor Training: The NMC Auditor Consistency Team has requested each Task Group determine their specific training requirements. The Task Group reviewed the proforma used for the two day onsite training conducted by Staff Engineers and made a number of amendments. It was voted and carried that the Onsite Auditor Training should have a section on NCR writing. ACTION ITEM: Michael Graham to amend the proforma to include the required detail and implement its use for the 2 day onsite training of new Chemical Process auditors. (Due Date: 31-Aug-12) Auditor Conference October 2012: The Chemical Processing commodity specific sessions are Saturday Afternoon and Sunday (all day). No training will be performed on Monday. All primes are encouraged to attend this- not just the ones involved with presentations. Audit Duration: Nigel Cook reviewed s-frm-16, which provides the guidelines for duration of audits, and also reviewed the data being put into eAuditNet to allow for auto-scheduling of CP audits. Some tests are being run to compare the duration of a sample of present audits and the duration of the autoscheduled audits. ACTION ITEM: Nigel Cook to send out the auto-scheduling data being input into eAuditNet to the Subscriber representatives for review and feedback. (Due Date: 15-Jul-12) NMC Auditor Consistency Team: The NMC Consistency Team carried out a survey of the Nadcap auditors. The results from this survey suggest the auditors have a need for the following: 4 CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES Understanding of Prime Requirements: Auditors should have ready access (1 business day) to understand and clarify prime specification requirements. Clarity of Checklist Requirements: Nadcap should have a feedback mechanism where auditors can request clarification or changes to checklist requirements. Communication: Open communication needs to be maintained between Auditors, PRI Staff and TG Primes. The Primes present felt that they were already being contacted by the auditors, and/or the supplier during the audits for clarification of specification requirements. Due to the large size and diversity of many of the Primes it was not always possible to respond within the timeframe of an audit because the specification may be the technical responsibility of another division. With regard to checklist clarification and amendment, it was felt there was already an adequate process in place for this. In addition, the Chemical Process Audit Handbook is reviewed every meeting and Auditor Advisories are issued as required. ACTION ITEM: William Calvert to include the findings of the Auditor’s Survey as a 30 minute open discussion at the Auditor Conference for their feedback and input. Do they believe the current system is adequate? Are any improvements needed? If so, what are the recommendations? (Due Date: 18-Oct-12) 8.0 OPENING COMMENTS – (OPEN) 8.1 The Chemical Processing Task Group (CPTG) was called to order at 9:00AM and the CPTG Vision and Code of Ethics presentations were reviewed. 8.2 Introductions took place and quorum was established 8.3 Review and Accept Minutes from last meeting. Proposed: Jonathan Hebben Seconded: Jerry Wahlin All in favour 8.4 The meeting agenda was reviewed. 8.5 The current RAIL (Rolling Action Item List) was reviewed and updated. Row item 364: Re-establish team and gain clarification. Row item 381: To be raised at the October 2012 Task group meeting. Row item 494: Need to re-establish a team since; a number of the previous members are no longer in the Task group. ACTION ITEM: William Calvert to re-establish team to evaluate recommendations/requirements in Technical Data Sheets. (Due Date: 20-Oct-12) 9.0 COMPLIANCE WITH VOTING REQUIREMENTS – (OPEN) Compliance with attendance and voting requirements of present voting members was reviewed. One member had failed to meet the meeting attendance requirement and another member had failed to meet the ballot voting requirement. Due to the participation of the two members in the overall activities of the Task Group the Chairman agreed to them maintaining their voting rights. Requests to become a voting member were received from: 5 CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES Title Mr First Name Shawn Surname Vierthaler Company Spirit Aerosystems Voting Member Type UVM Meetings Attended Feb 12 Oct 11 The Task Group unanimously approved the above voting member application. ACTION ITEM: Nigel Cook to send completed m-frm-01 to Joyce Benkart. (Due Date: 31-Jul-12) In the February 2012 meeting, Task Group agreed to the following grant voting membership to the following people, however, that was put on hold due to an interpretation that NOP-001 restricted the number of voting members on the Task Group. Clarification of NOP-001 confirmed that the restriction only applied to NMC voting membership. The following supplier representatives will therefore be granted voting status. Lee Bruce Ian McDonald Ken Pham Warren De Cuir Tammi Schubert Jerker Nordh Julie Mahan Sarah Fuqua Greg Penny Robert Stuart Ltd Robert Stuart Ltd Lisi Aerospace Lisi Aerospace LMI Finishing Volvo Aero Unison Engine Components Kearfott Corporation Embee SVM ALT/SVM SVM ALT/SVM SVM SVM SVM SVM SVM Jun 2011, Oct 2011 Jun 2011, Oct 2011 Oct 2010, Oct 2011 Oct 2010, Oct 2011 Feb 2009, Oct 2011 Jun 2011, Oct 2011 Oct 2010, Oct 2011 Oct 2010, Oct 2011 Oct 2011, Feb 2012 ACTION ITEM: Nigel Cook to send completed m-frm-01s to Joyce Benkart. (Due Date: 31-Jul-12) 10.0 FRENCH TRANSLATION OF CHECKLISTS – (OPEN) An update was given on the status of the French Translation of the Checklists and Audit Handbook AC7108 Rev E AC7108 Rev F AC7108/1 Rev B AC7108/2 Rev B AC7108/3 AC7108/4 AC7108/5 AC7108/6 AC7108/7 Audit handbook 11.0 - August 2012 September 2012 Approved and to be posted. Completed and posted Not being translated, not sufficient demand. Not being translated, not sufficient demand. Not being translated, not sufficient demand. Not being translated, not sufficient demand. Not being translated, not sufficient demand. The Feb 2012 Handbook will be approved by the end of June. NMC METRICS & AUDITOR CAPACITY – (OPEN) The NMC Metrics were reviewed and all items were Green apart from Supplier Merit. The Supplier Merit data also appeared to be deviating away from meeting the goal but this was expected based on the latest revision of NOP-008, which introduced the number of Major NCRs and Total NCRs into the merit criteria. No action required at this time with regard to the merit goal but it is to be tracked. It was noted that the Task Group needs auditors in Asia. 12.0 CHEMICAL PROCESS AUDIT HANDBOOK APPROVAL – (OPEN) 6 CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES The Chemical Process Audit Handbook was reviewed and approved. ACTION ITEM: Nigel Cook to send the amended Audit Handbook to Joyce Benkart for posting on eAuditNet. (Due Date: 31-Jul-12) 13.0 COMMENT RESOLUTION AC7108 REV F DRAFT 2 – (OPEN) There were numerous ballot comments particularly regarding the change in wording to the scopes of sections 5.4 and 5.5 which concern the controls on ovens and other thermal processing equipment. The problem with these two sections is they need to be mutually exclusive and cover all the thermal processing used to support chemical processing. It was motioned that the Task Group incorporates the following wording for sections 5.4 and 5.5 to address the comments raised. Motion was carried 15:2. 5.4 Certified Ovens for Thermal Treatments at a set point above 250ºF (121ºC) where the thermal processing is defined by the specification, or, for Thermal Treatments at a set point above 250ºF (121ºC) where the thermal processing is not defined by the specification and the material being processed can be affected by temperatures up to 50ºF (28ºC) greater than the set point. Compliance Assessment Guidance: Where a supplier is using a thermal treatment above 250°F (121ºC) that has not been defined by the contract or specification then, the supplier is responsible to determine if the thermal treatment has potential to affect the material properties or coating properties. 5.5 Miscellaneous thermal equipment not covered by section 5.4. Compliance Assessment Guidance: NA applies if no miscellaneous thermal treatments are performed within the scope of the audit or if these treatments are performed in a certified oven that was audited per section 5.4. Equipment that is not fully enclosed but provides this type of thermal treatment shall be considered as thermal equipment for the purpose of the audit. It was agreed that there was still opportunity to improve the clarification of the sections but that it will be left until after the checklists are restructured. ACTION ITEM: Nigel Cook to amend the AC7108 paragraphs 5.4 and 5.5 and send for a 21 day NMC ballot. (000: 31-Jul-12) 14.0 COMMENT RESOLUTION AC7108/2 REV C – (OPEN) AC7108/2 is awaiting completion of the ballot process for AC7108 rev F before it can be amended and balloted. This is because AC7108/2 shares many of the requirements of AC7108. 15.0 AC7108/1 REVIEW – (OPEN) Karyn Deming gave a presentation regarding the Subteam activity on amendment of AC7108/1 to address automatic paint mixing, powder coatings and overlap with the Coatings Task Group. The presentation recommended postponing the amendment of the AC7108/1 checklist at this time but to review the Audit Handbook and incorporate guidance on how the present questions can be used to audit both automatic paint mixing and powder coatings. ACTION ITEM: Karyn Deming and Subteam to review the Audit Handbook and propose amendments to address the paint mixing methods and powder coatings. (Due Date: 31-Jul-12) 7 CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES With regard to the overlap with the Coatings Task Group, the Subteam recommended that Coatings Task Group amend the Title/Scope of their AC7109 checklist to be more specific, e.g. Thermal Spray, Vapour Deposition and Diffusion Coatings. ACTION ITEM: Nigel Cook to email the request (that Coatings Task Group amend the Title/Scope of their AC7109 checklist to be more specific) to the Coatings Task Group Staff Engineer and Chairman. (Due Date: 31-Jul-12) 16.0 SUPPLIER NOTIFICATION OF AUDITOR ADVISORY – (OPEN) Will Calvert reviewed the method that was developed to allow the Suppliers to view certain Auditor Advisories which have been reviewed by PRI Staff and deemed to not have business sensitive information in them. 16.A CREATE NMC REPORT OUT. (New Agenda Item) The NMC report out presentation slide was completed. 17.0 CHECKLIST STRATEGIC PLAN – (OPEN) Jerry Satchwell gave an update of the status of actions from the Checklist Strategic Plan. The plan is to have 14 Checklist slash sheets based on the technologies. The paragraph numbering of the slash sheet checklists should be kept consistent with the base checklist. Process Grouping: The proposal from the process grouping Subteam was reviewed. There were concerns on what constituted a Long and Short Job Audit and what questions would not be required to be answered for a short job audit. It was felt that the assessment of contract review and flowdown was required to some extent for all jobs. The need for accreditations of touch-up processes, e.g brush conversion coat of anodize contact points, is the Prime’s responsibility. None of the Primes present required Nadcap accreditation for touch-up. ACTION ITEM: Mike Stolze and Subteam to review proposal for Process Grouping and come back to the October 2012 Task Group Meeting with a recommendation. (Due Date: 22-Oct-12) Anodize checklist: Comments were received regarding the proposed Anodize Checklist. It was felt that questions should be in the pre job audit section if they were applicable to all job audits and not likely to change. ACTION ITEM: Jerry Satchwell and Subteam to review and make changes to the Anodize Checklist. (Due Date: 22-Oct-12) AC7108/3, /4 and /6: These checklists are presently in ballot. Assign next actions: Due to the work being done with the NDT Task Group regarding the amendment to the AC7108/2 checklist and the need to re-review some of the previous actions it was felt that no further actions should be assigned at this time. 8 CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES 18.0 CHEMICAL PROCESS AUDITOR INTERVIEW QUESTIONS/EXAM – (OPEN) The amended auditor interview questions were modified and unanimously approved. ACTION ITEM: Nigel Cook to email the amended auditor interview questions to Jennifer Eckels. (Due Date: 31-Jul-12) 19.0 NDT AC7108/2 PROPOSAL – (OPEN) Bob Koukol presented the proposal from the combined CP/NDT Subteam on a way forward to improve the effectiveness of the etch inspection audit. The basic elements of the proposal were: Create separate checklists for pre-penetrant etch and etch inspection. Etch inspection checklist to be done as part of an NDT audit if the supplier has an NDT accreditation. When a supplier does not have either a CP or NDT accreditation then it is to be done as an NDT audit. Pre-Penetrant Etch may be done with either a CP or NDT audit and the decision shall be left with the supplier. CP and NDT to each define their job audit requirements. If the NDT group develops supplement checklists then these shall be included, as applicable, whether done by CP or NDT. The Chemical Process Task Group unanimously approved this proposal. A Subteam of Karyn Deming (lead), Mike Noettl, Jonathan Hebben, Robert Nixon, Cynthia Roth, Bob Koukol, Sun Yuhui (COMAC), and Nigel Cook were appointed to review the AC7108/2 checklist. ACTION ITEM: Karyn Deming and Subteam to review and make changes to the AC7108/2 checklist based on Bob Koukol’s proposal to the CPTG during the June 2012 Meeting. (Due Date: 22-Oct-12) 20.0 OCTOBER 2012 AUDITOR CONFERENCE – (OPEN) Will Calvert gave a status update of the auditor conference presentations. ACTION ITEM: Will Calvert to ensure that the presentations are completed and posted on eAN for Task Group Review. (Due Date: 31-Aug-12) 21.0 COMMENT RESOLUTION NTGOP-001 APENDIX VIII – (OPEN) There were no comments to resolve. The document was approved by the Task Group and Nadcap Management Council (NMC) prior to this meeting. 22.0 PRIME AUDITS OF NADCAP SUPPLIERS – (OPEN) The CP-SAT meeting raised a concern in the October 2011 meeting regarding the number of Prime Audits of Nadcap approved process houses. The CP-SAT meeting was given the action to assess the situation and report back in the February 2012 meeting, however, there was insufficient time and it was postponed until this meeting. The review of 10 process facilities indicated that there were potentially 61 Prime audits (127 on site days) that appeared to repeat the Nadcap process. 9 CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES The Cessna representative reported that they had been asked to work towards a smaller number of supplier audits. The Boeing representative reported that they use a risk assessment approach. The Rolls-Royce plc representative reported that they do an audit for initial approval only. The General Electric representative reported that they do an audit for initial approval only. ACTION ITEM: Eric Jacklin, the Supplier Support Committee representative, was requested to address the issue of redundant prime audits through the NMC Steering Committee. (Due Date: 22-Oct-12) 23.0 RESOLUTION OF BALLOT COMMENTS FOR AC7108/3, /4 & /6 AS REQUIRED – (OPEN) The AC7108/3, /4 and /6 checklists are still in ballot. 24.0 FREQUENCY OF CHECKLIST REVISIONS – (OPEN) Nigel Cook gave a presentation on a proposal from Jim Cummings to amend NTGOP-001 to limit the frequency of checklist revision and create a Checklist Priority Change Notice system to address critical changes as and when required. Does the CP Task Group support the concept and agree to recommend it to Standardisation. The Task Group rejected the proposal. 25.0 OTHER BUSINESS – (OPEN) 3M 250 Tape Expiry Issue: There have been examples where the expiration date on the certificate of conformity is different to that printed on the core of the roll of tape (Julian calendar code). There has been an example of the actual 3M cert also being incorrect. ACTION ITEM: Nigel Cook to issue an Auditor Advisory and amend the Audit Handbook regarding expiration dates on 3m #250 tape. (Due Date: 22-Oct-12) Shelf Life of Lab Chemicals: The Task Group reviewed issues raised by one prime regarding a need for clarification of shelf life labeling and control of Laboratory Chemicals but did not feel there was a need to amend the checklist. The issue can be brought back to the October 2012 meeting if there is still a need. Prime Approval: A proposal was put forward to include questions in the checklist for the supplier to demonstrate they are approved by the relevant Prime for the applicable specification(s). The proposal was rejected. EC/LR and Job Audits: Raise the issue of standardization of Checklists in a manner to help prevent the inclusion of EC/LR information, and to identify the inconsistencies in what is and is not permitted as EC/LR data. The methodology on how PRI ensure EC/LR data is not included in the audit package is presently up to the commodity. 10 CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES ACTION ITEM: Michael Graham to take the issue to the NMC Standardization committee. (Due Date: 31Oct-12) Drying of Conversion Coatings: It was observed that a Supplier compressed air dried parts after the Chemical Conversion Coating process. A certain Prime’s procedure does not allow air pressure to be above 30PSI and an observation was written because the Supplier was blowing the parts at 130 PSI at the pressure gauge. The actual job being audited did not require BAC 5719. As the pressure at the pressure gauge is not necessarily representative of the actual pressure at the part surface, is it practical to have a question included in the checklist to require the compressed air used for drying after conversion coating to be below a defined pressure? No other Primes had a similar requirement. If there is a desire to include a pressure limit, then it should be submitted through the normal checklist change procedure. AC7108 5.3.14: The checklist question requires hoists and other lifting equipment to be electrically insulated from all aqueous immersion work, electrolytic or not. The disconnection of hoists from work is sufficient to meet this requirement, although this poses difficulty as some Suppliers routinely use the crane to promote solution movement inside tubes. The Task Group agreed that this is a technical change and should not be included in the Audit Handbook and a revision to the checklist is what will be required. ACTION ITEM: Nigel Cook to draft verbiage to AC 7108 paragraph 5.3.14 be included in the next ballot, clarifying that disconnecting hoists from work is sufficient to meet the requirement for hoists and lifting equipment to be electrically insulated . . . (Due Date: 22-Oct-12) AC7108/1 3.4.1: The checklist requires the supplier’s procedure to define reprocessing requirements when the time limit has been exceeded between surface preparation and coating application as required by the specification. The same question in AC7108, 3.4.5, has a Compliance Assessment Guidance that allows the rejection to be assessed and the rework planned on a job by job basis. The Task Group agreed that AC7108/1 should be consistent with the base checklist and it is an editorial difference. The Audit Handbook will be amended to include the same CAG against the AC7108/1 checklist. ACTION ITEM: Nigel Cook to issue an Auditor Advisory and amend the Audit Handbook to clarify that the AC 7108 paragraph 3.4.5 CAG applies to AC 7108/1 paragraph 3.4.1. (Due Date: 22-Oct-12) 26.0 REPORT OUTS: NMC (MICHAUD), SSC (JACKLIN), P&O/CLOSED, STEERING (LEWIS), CPSAT (CUMMINGS) Report outs were received from the Planning and Ops meeting, the Steering Committee, and the CP SAT meeting. A question was asked on the need to have an NMC and SSC report out because the Task Group meeting is postponed at these times to allow attendance at the NMC and SSC meetings. The Task Group felt that these report outs were duplication and questioned their need. NMC and SSC representatives will be spoken to regarding the need. 11 CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES The CP-SAT team requested the Chemical Process Task Group Agenda be amended to include a New Supplier Orientation item at the beginning of the Open Meeting. ACTION ITEM: Nigel Cook to amend agenda to include a “New Supplier Orientation” item. (Due Date: 20Jul-12) ACTION ITEM: Mike Noettl to create the New Supplier Orientation presentation. (Due Date: 15-Sept-12) 27.0 DEVELOP AGENDA FOR OCTOBER 2012 TASK GROUP MEETING Agenda items for the October meeting were reviewed. Additional items for the October 2012 meeting were identified. Presentation on the “Discovery Event” to be held in Dallas. (Eric Jacklin) Auditor Conference Feedback New Supplier Orientation (Mike Noettl) REACH (Jerry Wahlin and John Koenig to talk to NASF and Boeing with respect to delivering a 30 minute presentation on REACH) P&O on Tuesday NMC on Wednesday ADJOURNMENT – 28-Jun-12 – Meeting was adjourned at 1:00 p.m. to allow the AC 7108 Supplier Symposium to be conducted the remainder of the afternoon. Minutes Prepared by: William Calvert wcalvert@sae.org & Nigel Cook nigel.cook@pri-europe.org.uk 12 CHEMICAL PROCESSING JUNE 2012 CONFIRMED MINUTES Chemical Processing Steering Committee-Current Membership: Susan Lewis –Chair (Lockheed-Martin) Mike Stolze (Northrop Grumman) James Chan (Honeywell) Robert Nixon (Triumph-Vought) David Michaud (Fountain Plating)- CPTG Voting representative to the NMC and Task Group Supplier Voting Member James Cummings (Metal Finishing Company)- CPTG Supplier Voting Member and CP-SAT Chair Michael Graham- PRI Staff support for the CPTG Nigel Cook –Alternate PRI Staff Support ***** For PRI Staff use only: ****** Is procedural/form changes required based on changes/actions approved during this meeting? (select one) YES* NO *If yes, the following information is required: Documents requiring revision: Who is responsible: Amend the AC7108 checklist and send for 21 day NMC ballot Include the amendment to AC7108/2 para 4.4.9.c. Nigel Cook 31-JUL-12 Nigel Cook 28-FEB-13 13 Due date: