12-MLSP Project Assignment 5 Template

advertisement
[Insert your logo here, if desired]
CS640: Project Assignment 5
Gantt Chart and Staffing Profile
for
[name of your DSS project]
[name of your DSS company]
Submitted to
[insert the name of your instructor here]
by
[your name]
[date submitted]
MLSP Project Assignment 5
Prepared by D. Fairley
1 of 4
[your name]
Section 5 Gantt Chart and Staffing Profile for [name of your DSS project]
5.1 Gantt chart for [name of your DSS project]
[Allocate the schedule elements from the spreadsheet from the Development
Schedule Breakdown and the Additional Schedule Breakdown. Note that Project
Management, CM, and Technical Publications activities span the entire duration of
the project – I have used Xs to show that; you can use Xs to show the months in
which the other activities occur.]
[NOTE: construction of the Data Repository, Student Cabin, Instructor Station, and
Hydraulic System software must occur in the 4.5 months following Analysis & Design
and before Integration and Test. You can schedule them in any order and for any
part of the 4.5 months you choose, provided the total staffing level for the entire
project never exceeds 15 people in any time period.]
Project Activity
Project
Management
XX XX XX XX XX XX XX XX XX
XX
XX
XX
Configuration
Management
XX XX XX XX XX XX XX XX XX
XX
XX
XX
Technical
Publications
XX XX XX XX XX XX XX XX XX
XX
XX
XX
10
11
12
Analysis &
Design
Data
Repository
Student
Cabin
Instructor
Station
Hydraulic
System
Integration
and Test
System
V& V
Install
System
1
2
3
4
5
6
7
8
9
Schedule
(Months)
MLSP Project Assignment 5
Prepared by D. Fairley
2 of 4
[your name]
5.2 Staffing Profile
5.2.1 Staffing for the 4 major components of the DSS
[complete the following calculations, then delete this comment]
Instructor Station: [staff-months from WBS] / [months from Gantt chart] = xx Staff
Student Cabin: [staff-months from WBS] / [months from Gantt chart] = xx Staff
Repository: [staff-months from WBS] / [months from Gantt chart] = xx Staff
Hydraulics: [staff-months from WBS] / [months from Gantt chart] = xx Staff
5.2.2 Staffing Profile; Tabular Form
[Complete the staffing table using your Gantt chart from section 3.4, the
calculations from 5.2.1, and the estimation spreadsheet. For example, if there are 4
activities scheduled for months 5 & 6, sum up the effort for all 4 activities. If the
sum of the effort is 24 staff-months, you will need 12 people during months 5 & 6
(24/2). You must include the number of people needed for project management,
configuration management, and technical publications – as shown on the
spreadsheet and the Gantt chart.]
Month
Number of People
Month 1
Month 2
Month 3
Month 4
Month 5
Month 6
Month 7
Month 8
Month 9
Month 10
Month 11
Month 12
MLSP Project Assignment 5
Prepared by D. Fairley
3 of 4
[your name]
5.2.3 Staffing Profile; Graphical Form
[Plot the number of people in each month from the table in 3.5.2. The staffing profile is
constrained to a maximum of 15 people at all times. The staffing profile must be
consistent with your other estimation items, including the Gantt chart, the WBS, and the
estimation spreadsheet. You can indicate the number of people in each month’s column
with xx in the appropriate cell.]
Number of People
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
1
2
3
4
5
6
7
8
9
10
11 12
Schedule
(months)
MLSP Project Assignment 5
Prepared by D. Fairley
4 of 4
[your name]
Download