University of California, San Francisco Utility Services Analysis and Rate Modeling UNIVERSITY OF CALIFORNIA FAMILIARITY Goss Engineering is very familiar with University of California (UC) Policies and Standards. Many of GEI’s projects are with our UC clients. For example, GEI has had the privilege to work with many UC clients such as UC Irvine, UC Riverside, UC Merced, UC Davis, and UC Los Angeles. GEI has the experience working with the UC Design and Construction Team designing new buildings and renovations as well as working with the UC Facilities and Maintenance Team working on retrofits and upgrades. GEI’s UC project experience includes studies (several cogeneration studies), design, master planning, peer review, forensic engineering, cost modeling, and construction administration. Through this experience GEI has become very familiar with various UCI standards and policies including procurement policies and design standards. Table 4-1 below shows some sample recent University of California, Irvine projects. One project not highlighted in the table was our cogeneration study and financial analysis that led to the recently constructed 20-MW cogeneration project. Table 4-2 shows some sample recent University of California, Riverside projects. Table 4-1: UCI Sample Projects Year Project Title 2008 Central Plant Air Compressors & Air Dryers Rep 2008 Steinhaus Hall Compressor 2008 Engineering Tower Energy Saving Study 2008 Engineering Tower Ventilation System Upgrade 2008 CCP Electric Chiller Add. Energy Study 2008 Energy Conservation Projects 2008 Satellite Chiller Plant Feasibility Study 2007 Natural Science Freezer HVAC Mods 2007 Supply AC Admin 115J 2007 Steinhaus Hall Teaching Labs HVAC Mods 2006 McGaugh Hall Energy Study 2006 McGaugh Hall and Reines Hall Energy Study 2006 Reines Hall Phoenix Valve Conversion 2006 McGaugh Hall AHU Retrofit 2006 Steinhaus Hall HVAC - Mech System Upgrade 2006 Steinhaus Hall HVAC Upgrade 2006 Steinhaus Hall HVAC - Mech System Upgrade 2005 Satellite Chiller Plant CHW 2005 Central Plant Energy 2005 Engineering Tower Ventilation Study 2004 Med Surge 2, Room 337 Renovation Prepared by Goss Engineering, Inc. Project Type Design Design Study Design Study Design Study Design Design Design Study Study Design Design Design Study Study Study Study Study Design 4-1 University of California, San Francisco Utility Services Analysis and Rate Modeling Table 4-1: UCI Sample Projects (continued) Year Project Title 2003 Rowland Hall HVAC Design 2002 Science Library Ductwork Replacement 2002 Micro-turbine Generator Facility 2002 Facility Utility/Central Plant Planning 2002 Rowland Hall Mechanical Study 2002 HTHW Pump Replacement 2002 Step 5 Planning Revision 2001 Step 4 Construction Management 2001 Cogen Cost Estimates 2001 Phase 5 Central Plant PPG 2001 CHW & HTHW Flow & Pressure Testing 2000 Central Plant Steam Turbine Replacement Project Type Design Design Design Master Planning Study Design Study Design Study Study Testing Design Table 4-2: UCR Sample Projects Date Project Title 2008 UCR Seitz’s Lab Remodel 2008 UCR Korzus’ Lab Remodel 2007 UCR Stat Comp HVAC Study 2007 Veitch HVAC Retrofit 2007 Pierce Hall HVAC Feasibility Study 2007 Boyce Hall Heat Recovery System 2003 Surge Building Peer Review 2001 Pierce Hall Laboratory Supply Air Mods III 2000 Campus Chilled Water Expansion 1 2000 Central Plant CHW Pump Modifications 2000 Pierce Hall Addition Laboratory Remodel 2000 Humanities/Olmstead Hall Peer Review 1999 Campus Chilled Water Master Plan Update 1999 Science Laboratory 1(New Construction) 1999 Pierce Hall Laboratory Supply Air Mods 1 1998 Central Plant 1,250-ton Chiller Addition 1998 Undergraduate Student Housing Exp.-Phase 1 1997 1997 1997 1996 1996 1996 1995 1994 Type of Service Design Design Study Design Study Design Peer Review Design Design Design Design Peer Review Master Planning Design Design Design Design Forensic Student Recreation Sports Complex Ice TES Engineering Pierce Hall Laboratory Addition (New Construction) Design Geology Bldg. HVAC Study Study CHW Master Plan Review Master Planning Geology/Entomology Bldg. HVAC Retrofit Study Spieth and Sproul Hall HVAC Retrofit Design Central Plant Condensate System Upgrade Design TES Commissioning Study Prepared by Goss Engineering, Inc. 4-2