Resume:

advertisement
Resume:
Yousaf Arjumand A Shaikh
(EXPERIENCE OVER SEVEN YEARS)
DATE OF BIRTH
:
AUGUST 25, 1974
FATHER'S NAME
: ARJUMAND A SHAIKH
DOMICILE
:
PAKISTAN(PUNJAB)
MARITAL STATUS
:
MARRIED
E-MAIL ADDRESS
:
yousafshaikh87@gmail.com
PHONE NO.
:
+92 51 9100040
CELL NO.
:
+92 312 5102868
PERMANENT ADDRESS :
HOUSE NO. 27, STREET
NO. 37, SECTOR F/7-1, ISLAMABAD, PAKISTAN
ACADEMIC QUALIFICATION:
FROM-TO
INSTITUTION DEGREE
SPECIALIZATION
DISCIPLINE
1993-99 University College of Engineering & Technology, Mirpur, (A.J.K)Graduation
in Electrical Engineering (IST DIV) Electrical Engineering (Electronics)
EXPERIENCE: OVER NINE YEARS
Engineering Manager (Transmission)
ZTE (ZhongZhing Telecomunications),
www.zte.com.pk
June 2006.
Islamabad Pakistan
Telecom Manager
Areej Business Systems, Muscat Oman
www.omzest.com.om
Oct 2005 – May, 2006
Manager Coordination
2002
ZTE (ZhongZhing Telecomunications),
www.zte.com.pk
June 2001- August
Islamabad Pakistan
Manager Coordination
ZTE (ZhongZhing Telecomunications),
www.zte.com.pk
August 2002 - August 2003
Islamabad Pakistan
Product Manager (Transmission)
ZTE (ZhongZhing Telecomunications),
www.zte.com.pk
June 2001- August 2002
Islamabad Pakistan
Executive Engineer
Huawei Technologies, Islamabad Pakistan
www.huawei.com
June 1999 – May 2001
Internee
Pak Datacom
www.pakdatacom.com.pk
Nov 1999 – June 1999
Internee
National Telecommunication Corporation (NTC)
www.ntc.net.pk
June 1999 – November 1999
INTERNATIONAL EXPERIENCE:




Deputed for a Wireless Local Loop (WLL) Project for OMANTEL. Areej
Business System (ABS) partnering with Huawei Tech. Investment Co. Ltd.
Huawei Tech. Investment Co. Ltd. Has subcontracted Areej Business Systems
(ABS) for supervision of installation works. ABS has further subcontracted a
subcontractor for installation works.
Mainly I was responsible for supervising installation works of BTS & related
works, antenna installations in SOHAR comprising of 25 sites. Also compiling
project reports.
Responsible for receiving of equipment at sites and verifying the packing list.
I was active member of commissioning team for PABX Project for Sohar
Hospital, Ministry of Health (MOH). The project involved about 600 lines to be
shifted from NEC System to SOPHO Philip, Holland System.
NATIONAL EXPERIENCE







I was actively involved in execution and implementation of PTCL DWDM
40G Trial project and successfully achieved its recommendation for
issuance of certificate for successful completion from PTCL.
I had successfully achieved twelve month satisfactory performance
certification/recommendation for issuance of PAC from PTCL for a
Transmission Project.
I have been actively involved in four National Backbone Transmission
Projects and was responsible achieving/completing there PACs, BoQ
reconcilations, NDCs.
I have been selected SUCCESSOR FOR LEVEL 5 in my present
organization.
I was given “LETTERS OF APPRECIATION” for achieving PACs for
National backbone Projects of SDH / DWDM for Pakistan
Telecommunication Company Limited (PTCL).
I worked on SDH / DWDM National backbone of PTCL DWDM 1456,
1512 / 1492 Project for which PAC has already been issued to ZTE.
Successful handing over Test Equipment (3 Fiber Scopes, 4 E1 Testers, 1
ANT 10G SDH Analayser, 1 Optical Spectrum Analyser, 70 Patch cords)






Single Pair PCM Cable (220,846M) along with 3300 A8 & 275
D9Connectors, to PTCL for North Region.
On request of PTCL supported M/s Huawei for Huawei’s Network
Synchronous Project by provide 500M Single Pair Coaxial Cable along with
86 BNC Connectors.
Carried out Survey as Team Leader for North and Central Regions in year
2006.
Assisted in finalization of survey summaries and responsibility matrix.
Got approval of DG Sets for seven sites under scope of work.
Coordinated with sub contractor team and staff members deputed for the
works of transportation of equipment, renovation works, installation, power
works & DG Sets installation of 13 sites.
Coordinated for removal for discrepancies of 13 sites after PAT.
MANAGER COORDINATION (TECHNICAL)
As Manager Coordination Technical (Projects) I was able to deliver the following
works completed:




I led & supervised the survey team of Ring – 1 for Pre-bid Survey for 19 sites
for PTCL DWDM Project.
I was successful in getting 25 PAC from NTC for NTC Switch Projects (Phase
I, II & III)
I assisted in obtaining PAC for Transmission project of NTC.
Prepared & Approval of "Responsibility Matrix" & Site Survey Reports for
Projects of Video Conferencing (PTCL) & Transit Switch Project of NTC.
. Arranged recovery of Routers from PTCL Video Conferencing Project.
. Coordinated for Site Survey, transportation, Installation, Testing & Commissioning
works at Islamabad, Lahore and Karachi for the above stated project.
- Coordinated with sub-contractor for lightening systems, provision, installation of
Plasma Screens at Islamabad, Lahore & Karachi.
.. Coordination & Supervision for conduction of Site Survey for NTC Transit Switch &
Video Conferencing Project (PTCL).
 Coordinated & Supervised Installation & Testing of sites of NTC PCM
Interconnect Project.
 Coordination & Supervising Installation Materials for NTC Transit Switch &
PCM Interconnect Project.
 I coordinated for survey, installation all over Pakistan for Rectifier & Batteries
Project of PTCL.
 For the above project I got Survey Reports Approval of RTR, HTR, NTR-1 &
NTR – II Sites (40 sites).
 Coordinated for installation works and powering up of power plants at North,
Central & South Regions.
 Coordinated for approval of Delivery Challans.

I was successful in obtaining confirmation and nomination of trainees for the
above reference project.
. Verification of "Delivery Challan" of Equipment for NTC Transit Switch Project with
the customer.
. Attending various project coordination meetings & kick-off meetings of various
projects.

I was the pioneer to introduce ZTE (Chinese Company) Video Conferencing
Products in Pakistan. I was able to market & sell, promote ISDN Equipment
inclusive of 3 terminals & 1 MCU to sole Operator of Video Conferencing
"Universal Communication (Pvt.) Ltd”.
 I worked on another project for which my company “ZTE” on Special
Communication Organization (SCO) Project for 22 locations for STM – 1 link
and the distance for which equipment has to be laid was about 195 Km.
 I worked on Pakistan Telecommunication Company Limited (PTCL) Video
Conferencing Project on behalf of ZTE for three nodes which included three
nodes at Islamabad, Lahore & Karachi & one Multi Controller Unit (MCU). The
Video Conferencing for the referenced Project was on IP & ISDN Applications.
The project was awarded to ZTE from PTCL.
 I got a "LETTER OF APPRECIATION" from an "OPERATOR (NTC) in
Pakistan for my achievements performed according to the requirement of:
- designing, planning, cost estimation of cost analysis for their requirement of
PCM INTERNETWORK JUNCTION NETWORKS;
- Execution of project of SDH STM Link point to point, trouble shooting
problems on the network, Acceptance Testing performed to the best of their
satisfaction.

Hardware installation.
 Software testing including (Acceptance Test & Commissioning).
 Worked for Defense (Transmission Project, 622 Mbit, STM-4).
 Pre- Bid & Final Engineering Survey of DWDM system for PTCL Project in year
2002.
 Final Acceptance Testing of NLC Project from Multan - Rawalpindi.
 Coordinated & with Installation Team, performed Testing & Commissioning,
Maintenance etc for National Telecommunication Corporation (NTC).
 I prepared Bill of Quantities, Technical Proposal and other documents for SDH
(STM - 1) & PCM Equipment on which Contract was signed between National
Telecommunication Corporation (NTC) & Zhongxing Telecom Pakistan (Pvt.) Ltd,
(ZTE).
 Assisting in finalization & selection of Distributors for Power Series Products.
Also worked on legal matters (such as drafting and amendments of Legal
documents).
1.
PROJECT:
Design & Fabrication of Transceiver for Optical Fiber Link carried out in collaboration
with Central Telecomm: Research Laboratories(CTRL), Carrier Telephone Industries of
Pakistan (CTI), Islamabad, & National Institute of Electronics (NIE), Islamabad.
Experience of hardware installation.
2.
TRAINING:





Training in China (Shenzhen) from July to September, 2002:
Telecommunication Network General, SDH & DWDM
Transmission Systems, Power Supplies Systems & Video Conferencing Systems.
Trained on basic fundamental concepts on: GSM, CDMA, GPRS, Access Servers,
ADSL, Switching, Soft Switch, Intelligent Networking (IN).
Trained for Technical Marketing & preparation on Technical Bidding.
Training in China (Shenzhen) from August to November, 2000:
¨
Theoretical training of Synchronous Digital Hierarchy (SDH) in Evergreen
Resort China got trained on Network Manager (SBS Navigator)
¨
Advance training including command line of UNIX (Solaris) in Shan Shadi,
China.
¨
Power Supply Training in Chengu Menu, China.
¨
Documentation Training in Chengu Menu, China.
 Two weeks training of Access Network.

Participated in training of “Budget Estimation” of total Engineering Project
analysis.
3.
COURSES:






4.
Diploma in Computer application from Allama Iqbal Open University
Experience in working in Audocad.
Synchronous Digital Hierarchy (SDH) Training conducted by British Telecom:
U.K. during may-June, 1999 at Islamabad.
L.T Engineering & Trade Services (PVT) Limited (Hasanabdal) from August 1620, 1999.
Acceptance Testing SDH Training at CTI (Two Weeks)
EWSD Training at TIP in Haripur (Two weeks).
PRESENT STATUS:






Working in ZTE since 3rd June, 2006 as Engineering Manager North till to date.
Worked in Areej Business Systems (ABS) in Muscat, (Middle East) since 10th
October, 2005.
Worked in ZTE since June 17, 2002 to 10th August, 2005.
Worked for Huawei Tech. Co. from July, 2000 to 31st May 2002 as Transmission
Engineer.
Internee in National Telecommunication Corporation (NTC), (5 months) JuneNov 1999
Worked in Pak Data Com as Trainee Engineer (7 months) Nov-June (1999-2000)
5.
PARTICIPATION:




6.
Performed site survey of Dense Wave Division Multiplexing (DWDM) for
Pakistan Telecommunication Company Limited (PTCL).
Participated in STM-4 Link for Installation, Testing & Commissioning for
Defense Network
Participated in STM - 1 Link of NTC & performed Testing, Commissioning of the
link
Participated in establishing Video Conferencing Point - Point Link from
Islamabad (Sarena Hotel) - Gilgit.
SEMINARS PARTICIPATION:
Optical Fiber communication in 1998 arranged by PTCL 14th Annual Computer
Exhibition at Islamabad.
7.
MEMBERSHIP:
Membership of Institute of Telecommunication Engineers of Pakistan (INSTEP) in 1998.
8.
PAPER READ: (PRESENTATION)




Call Centers
STM - 1/ STM - 4 (SDH Compact System)
Video Conferencing
Power Series Products