Council Plan 2011-15 - Delivery Plan Progress Report Strategic Objective 1: Maintain a high quality, clean and green environment in the borough 1.1 Minimise waste and increase recycling Key project Action Code Action description Status Icon Reduce waste through higher levels of participation in the Increase number of households ESU01_C purple bag scheme, rolling out P served by kerbside collection of the scheme across the recyclates Borough Update date Due Date Action update 31-Mar2015 2881 properties in Workington Town Centre in St Michael's & St John's Wards have received purple 13-Sepsacks for glass, plastic and tin can 2011 recycling and hessian sacks for paper/card recycling. Responsible for Environmental Services Priority P 1.2 Reduce the environmental impact of the Council's activity and address the wider challenge of climate change Key project Action Code Action description Status Icon Update date Responsible for Due Date Action update Planning Services I Planning Services I Work with partners to deliver benefits of renewable energy projects without significant harm to the environment PLA02_CP Adopt Core Strategy 30-Apr2013 The receipt of the consultants report was delayed as a result of amendments required to the draft 17-Octbut was received on 1 August 2011 2011 and is currently under consideration Develop and implement a Climate Change Action Plan Agree Climate Change Action PLA01_CP Plan 30-Sep2011 Climate Change Action Plan agreed by SMT on 30 August 2011 17-Octsubject to amendments to pre2011 amble. 1 Priority 2010/11 Indicator Value Q1 Q2 Annual 2011/12 2011/12 Target Notes 2011/12 Value Value Managed by Reduction in energy usage in Council Buildings 9397016 449,684 kWh kWh 251,717 kWh Q1 and Q2 figures shown do not include buildings 8927165 operated by Carlisle Leisure. The reduction in kWh usage shown between Q1 and Q2 reflects seasonal variations in usage. Asset Management Reduction in Water usage in Council Buildings 26289 cubic metres 9292 cubic metres 25894 cubic metres Asset Management n/a This half yearly figure shows a reduction on previous years usage. 1.3 Improve the quality of neighbourhoods and open green spaces in response to local/community needs Key project Action Code Maintain a high level of street cleanliness with emphasis on reducing dog fouling and increasing enforcement ESU02_C Maintain a high level of street P cleanliness Action description Status Icon Due Date Action update Update date Responsible for 31-Mar2015 The second round of surveys have been completed for the new Local Environmental Quality PI's that replace the previous NI195's. 03-Nov2011 Environmental Services P 15-Nov2011 Environmental Services D 15-Nov2011 Environmental Services P Retain Green Flag status in Retention of Green Flag status parks and improve the quality ESU04_C for Vulcans Park and P of council owned/managed achievement of status at open spaces Derwentwater foreshore 31-Mar2012 Implement the Solway Coast AONB Management Plan 31-Mar2015 ESU03_C Implement the Solway Coast P AONB Management Plan 2 The appeal against the failure of Vulcan Park to attain Green Flag status is ongoing. Schemes and prices are being obtained for the de siltation of Harrington Nature Reserve. A survey has been sent to schools regarding the installation of play equipment for teenagers in Vulcan Park. Management Plan on track as reported to Joint Advisory Committee Priority Adopt a more proactive approach to untidy sites through enforcement and pursue unauthorised development Adopt a more proactive approach to untidy sites and PLA03_CP pursue unauthorised development 2010/11 Indicator Value Open spaces with Green Flag Status 1 31-Mar2015 Additional procedures have been introduced to monitor the discharge of planning conditions and 17-Octmonitoring of untidy sites. The 2011 effectiveness of these procedures will be reviewed in March 2012 Q1 Q2 Annual 2011/12 2011/12 Target Notes 2011/12 Value Value 1 1 P Managed by Green flag status achieved for Keswick Derwent foreshore, but not achieved for Vulcans Park Workington, an appeal is ongoing to challenge this decision regards Vulcans Park 2 Planning Services Environmental Services 1.4 Aid recovery from flooding and reduce the possibility and impact of any future floods Key project Action Code Work with partners to reduce the possibility and impact of future floods Participation in local multi ASM01_C agency groups to address P flooding issues Status Icon Update date Responsible for Due Date Action update 31-Mar2015 The Council continues to work with town councils, the 16-NovEnvironment Agency and the 2011 Rivers Authority to address local flooding issues. Asset Management P Provide the Cockermouth Town In conjunction with flood Centre Recovery Co-ordination recovery activities facilitate an REG01._C role. enhancement of Cockermouth P Improvements to the Townscape in partnership shopfronts/signage of targeted properties. 31-Mar2013 The Shopfronts scheme has been short-listed in the 'Restoration of a Georgian Building in an Urban Setting' category of the 2011 Georgian Group Architectural Awards 2011. Winners are announced 31 October 2011. 18-Oct2011 Regeneration D Safeguard flood plains and coastal margins from 30-Apr2013 Work on the Core Strategy is continuing along with the 17-Nov2011 Asset Management; P PLA04_CP Action description Safeguard flood plains and coastal margins 3 Priority inappropriate vulnerable development drafting of Development Management Policies Managed by Value Q1 Q2 Annual 2011/12 2011/12 Target Notes 2011/12 Value Value 2 0 0 2 Allerdale funding still to be identified Asset Management 0 0 25 Allerdale project still under development. Cumbria Community Foundation funding for flood affected properties now largely distributed. Asset Management 2010/11 Indicator Projects undertaken by Making Space for Water Group Planning Services Number of properties supported in installing 25 flood resilience products Strategic Objective 2: Ensure the right mix and quality of housing to meet local needs 2.1 Increase the availability of affordable, decent housing Key project Action Code Action description Develop and implement a new Develop and implement a new Housing Strategy covering the Housing Strategy covering the provision of affordable HOU01_C provision of affordable housing, P housing, empty homes and empty homes and the the prevention of prevention of homelessness homelessness Adopt a proactive approach to HOU04_C Develop and implement an bring more empty homes back P Empty Homes Strategy into use Status Icon Due Date Action update Update date Responsible for 30-Dec2011 Work has been prioritised to firstly implement the homeless prevention agenda and deliver financial savings, £60k handed back after Q1. The draft is 6 weeks behind forecast. 05-Oct2011 Housing Services P 01-Jan2012 All empty Homes have been inspected and priority scored. Officers continue to put empty home information onto the database. Letters and questionnaires will be sent to 100 empty home owners at a time on a rolling programme. The first batch will go out 12-Oct2011 Housing Services P 4 Priority before 31st October 2011. The initial draft of the Empty Homes Strategy is underway all be it not in line with milestone dates. This is mainly due to day to day statutory activities taking over. Develop a proactive approach to new housing delivery through development management Develop affordable housing policy and appropriate legal framework to maximise delivery opportunities from public and private sector partners. Develop spatial options for housing development through the core strategy PLA05._C Consider housing site P allocations through Development Plan Document (DPD) Review and introduce ‘template’ S106 agreement for affordable PLA06._C housing. P Review policy approach to affordable housing through core strategy. Indicator 2010/11 Value No of private sector vacant properties that are returned into occupation or demolished 31-Dec2014 Work on the Core Strategy is continuing along with development management policies 17-Nov2011 Planning Services P 30-Apr2013 Agreement on a Cumbria-wide model S106 agreement for affordable housing has been delayed. Further consultation with the Homes and Community Agency is required before the 02-Novmodel is agreed by Cumbria 2011 Housing Group Executive. The model can then be adopted by Allerdale Borough Council. The project timetable has been updated to reflect this. Planning Services I Q1 Q2 Annual 2011/12 2011/12 Target Notes 2011/12 Value Value 0 0 The empty Homes Policy is currently being developed, consequently there will be no homes returned to occupation in Q1-3 inclusive. An assessment of our indirect intervention via a mail shot to all such landlords and work in progress direct intervention will be assessed in Q4. Also direct intervention will commence from this date. 20 5 Managed by Housing Services 2.2 Work to reduce homelessness levels Key project Develop a preventative approach to homelessness through better partnership working and early interventions Action Code Status Icon Action description 31-Mar2015 The preventative approach continues to yield positive results in reducing temporary accommodation usage, with bed 14-Seponly accommodation reduced to 2011 minimal levels - with the associated cost savings - for this financial year. Housing Services P 31-Mar2015 A further temporary accommodation unit has been 18-Octagreed for handback at the end 2011 of October - bringing the number of units down to 14. Housing Services P working and early interventions Review the Council’s approach Review the Council’s approach HOU06_C to providing temporary to providing temporary P accommodation accommodation Indicator 2010/11 Value Responsible for Action update Develop a preventative HOU05_C approach to homelessness P through better partnership Update date Due Date Q1 Q2 Annual 2011/12 2011/12 Target Notes 2011/12 Value Value Managed by No of Temporary Accommodation Units 25 21 15 20 Continued preventative work has meant that a further two units of temporary accommodation are now agreed for hand back to the Registered Providers before the end of Qtr 2 - which will bring the units held down to 15. No of full duty homeless acceptances 103 20 17 90 Following the implementation of the prevention agenda we have actively reduced the number of full Housing Services duty homeless acceptances 6 Housing Services Priority Strategic Objective 3: Ensure that communities stay safe and feel safe in their everyday lives 3.1 Contribute to reducing the fear of crime and tackling anti-social behaviour Key project Action Code Build stronger links between the Council, police and business through locality working LOC01_C Allerdale in conjunction with the P Action description Develop Locality Plans across Police and Businesses Develop and implement with Establish West Cumbria partners the West Cumbria PPL01_CP Community Safety Partnership Community Safety Partnership (CSP) Plan Plan Establish and lead the Allerdale Safety Advisory Group RGS01_C Establish and lead the Allerdale P Safety Advisory Group Work with Carlisle Leisure to Work in partnership to provide provide leisure passes to activities for children and children and young people. ESU10_C young people at the weekend Provision of Parcs scheme in P and in school holidays to summer holidays providing free reduce anti-social behaviour activities for young people aged 7-14. Status Icon Update date Responsible for Due Date Action update 31-Mar2015 Development of Locality Plans being 15-Novprogressed through Locality Team. 2011 Strategic Manager (Places) P 31-Mar2012 The West Cumbria Community Safety Partnership (CSP) was officially launched at a Partnership event at the Wave on 7 October. The Allerdale and Copeland Strategic Assessments have now 17-Octbeen completed and will be used by 2011 the CSP over the next few months to establish the priority areas for the work of the CSP leading to the development and implementation of CSP Plan in the new year. Strategic Manager (People) I 31-Mar2015 Still awaiting County approval. Annual EAG review meeting held on 11/10/11 which reviewed problem 07-Octevents on 2012 and agreed actions 2011 to make improvements for same events for 2012. Further meeting planned for 10/01/2012. Regulatory Services P 31-Mar2012 Funding will be sought from the Leisure Partnership 'Joint Fund' to promote the Leisure Access Card scheme within the leisure facilities through new promotional banners and posters and externally through promotional literature delivered to Environmental Services D 7 18-Oct2011 Priority schools. The number of young people with Leisure Access cards has increased from 1,593 in quarter one to 2011/12 to 1,689 in quarter 2. Funding was agreed on 4 November 2011. Continue to utilise the planning system to promote Secure by Design in new developments Develop appropriate policy within Development Management Policies. PLA07._C Review and agree updated P consultation criteria with Cumbria Police and ensure consultation on all planning applications. Continue to develop relationships with registered social landlords to reduce incidents of anti-social behaviour HOU07_C Housing Forum meetings with P Co-ordinate and lead Strategic Registered Housing Providers 31-Mar2015 Revised consultation criteria have been agreed with Cumbria Police and have been implemented. Work on the scope of Development Management Policies has commenced. 31-Mar2012 Issues raised noise/additional street lighting/informal play areas/untidy 04-Octgardens/clean and green days/dog 2011 fouling initiatives. Way forward TBA. 17-Oct2011 Planning Services P Strategic Manager (Business) P 3.2 Protect the health, safety and welfare of our communities Key project Action Code Action description Status Icon Update date Responsible for Due Date Action update Undertake programme of Prevent food poisoning, food inspections of food premises. and water borne illnesses, and RGS03._C Continue implementation of 5 the sale of unfit food produced P year programme of private or consumed within the water supply sampling and borough assessment. 31-Mar2015 Private water supply target achieved for Q2. Data on food hygiene 29-Sepinspections not available until mid 2011 November. Regulatory Services P Improve health, safety and welfare in workplaces and at public events 30-Apr2012 63 visits carried out in Q 2 exceeding target. 60 inspections comprising of 40 HS64 New proprietor (including businesses Regulatory Services P RGS02_C Undertake programme of P inspections of workplaces 8 12-Oct2011 Priority which have reopened following the floods) 16 HS62 planned visits and 4 HS 63 risk rated revisits. 3 other visits Improve joint working with the police with regard to licensed Undertake programme of premises and the night RGS04_C inspections of licensed premises P economy through the in partnership with the police Responsible Authorities Partnership Value Q1 Q2 Annual 2011/12 2011/12 Target Notes 2011/12 Value Value 0 0 2010/11 Indicator Reported number of food poisoning traced to commercial properties 30-Mar2012 0 Quarter 2 targets achieved.116 inspections carried out. 14-Oct2011 P Managed by No food poisoning incidents traced to commercial properties so on target currently 0 Regulatory Services Regulatory Services Strategic Objective 4: Support and encourage health and well being across the borough for both residents and visitors 4.1 Reduce health inequalities across the borough by targeted activity in disadvantaged wards Key project Work with partners to plan and run activities for young people in targeted localities Action Code Action description Work with partners to plan and ESU05_C run activities for young people P in targeted localities Status Icon Due Date Action update Update date Responsible for 31-Mar2015 Action completed 27 July 2011 Q2 40 - 50 young people regularly attend the 'Just de it' session each week. The Police have now linked the scheme in with a stay safe project on 3 Fridays of the year. 15-Nov2011 Environmental Services 9 Priority I Youth anti social behaviour has been reduced by almost half in the last 12 months. Awaiting confirmation of new funding to enable the scheme to continue. Encourage recreational use of well managed open spaces and walking as a health improvement activity ESU06_C Development of Doorstep Walks P programme Work with partners to plan and run activities for young people in targeted localities REG02_C Partnership Steering Group P meetings and support post 31-Mar2015 Following Executive agreement of the new play area policy non strategic play areas will be replaced by the Council once they have reached the end of their life if other organisations will take over the insurance and maintenance/repair responsibilities. 29-SepDiscussions are taking place with 2011 Town Councils in Cockermouth and Maryport regarding this and a capital budget is identified to fund the replacement of equipment. The Councils eight strategic play areas will remain under the control of the Council and equipment will be replaced as and when required. Environmental Services D 31-Aug2012 The Arts Development Officer is no longer Charing the Steering Group meetings hence the milestones removed. Regeneration I Chair Arts Engagement holders to develop activity. 10 18-Oct2011 4.2 Provide support and recreation activities for all Key project Action Code Status Icon Action description Review leisure provision Development of options across the borough and deliver ESU08_C appraisal for Leisure provision in P a new leisure facility in Workington Workington Develop a programme of activities for older people in council facilities Develop a programme of ESU09_C activities for older people in P Indicator Total Allerdale Leisure Centre Usage council facilities Due Date 31-Mar2015 31-Mar2015 Value Q1 Q2 Annual 2011/12 2011/12 Target Notes 2011/12 Value Value 471,904 110,075 2010/11 123,791 241,623 11 Action update Update date Responsible for Carlisle Leisure will present designs and costs for a replacement leisure facility in Workington to the Chief and Deputy Chief Executive on 1 December 2011. Plans to extend the fitness suite, refurbish the sports 08-Novhall and dry side changing rooms at 2011 Cockermouth Leisure Centre are being finalised. Plan to extend Keswick Leisure Pool are also being finalised. New Fab & Fifty session starts at Cockermouth Leisure Centre on 1 November 2011 providing a range of activities for those aged 50+ from 9.30am to 3.0pm for £3. Activities 24-Octinclude circuits, Ab Attack, 2011 Badminton, Spinning, Tai Chi, Swimming, Table Tennis & Bowls. CLL hopes to extend the scheme to Workington Leisure Centre. Priority Environmental Services P Environmental Services D Managed by Total usage of the leisure facilities in September 2011 was 2% less that in 2010/11 and for the year Environmental Services to date is 6% less than in 2010/11. Indicator 2010/11 Value Provision of leisure passes 11-19 yrs. No of activities provided for older people in council facilities 2,070 10 Q1 Q2 Annual 2011/12 2011/12 Target Notes 2011/12 Value Value 1,593 12 1,689 13 Managed by As predicted the number of leisure access cards has dropped following the end of the Free Swimming programme. Carlisle Leisure Limited has funding from the Amateur Swimming Association to encourage Environmental Services greater participation in swimming and will promote leisure access cards to young people. Free cards will also be given to children during the summer holidays. 1,600 Currently the following activities are provided specifically for older people: Cockermouth Leisure Centre - Prime Time, University of the 3rd Age, Table Tennis, Carpet Bowls, 50+ swimming. Keswick Leisure Pool - Prime Time, Adults only swimming. Workington Leisure Centre - 50+ swimming, Aqua Fit, Prime Time, Nice & Easy Aerobics, Badminton. 12 Almost all activities at the Allerdale leisure facilities are open to any age group. Carlisle Leisure Limited is working to increase the range of activities provided specifically for older people. 12 Environmental Services 4.3 Increase tourism and improve access to cultural activities Key project Action Code Action description Encourage the growth of the Provide advice and support to tourism sector through the festivals. Provide advice and promotion of festivals, REG04._C support to arts and cultural sponsorship, arts and cultural P organisations who organise events such as the Lakes Alive events and activity for residents street theatre initiative and tourists. Review the Council’s three museums with a view to securing sustainable futures for them Keswick – Keswick Museum & Art Gallery (KMAG). REG05._C Workington – Helena Thompson P Museum (HTM). Maryport – Maryport Maritime Heritage Museum (MMHG). Status Icon Due Date Action update Update date Responsible for 31-Jul2014 A funding commitment has been made to support the Winter Wonderland in Workington during the Christmas period, and also to support the Paint the Town Red event in May 2012 18-Oct2011 Regeneration D 30-Apr2014 Keswick Museum & Art Gallery The VAT and procurement issues are now resolved and we will be seeking the main funder's permission to start. Once received, we can publicise the grant and proceed with the enhancement works. Helena Thompson Museum Staff in various service areas are providing practical guidance to WHG on their proposed enhancement scheme. WHG 18-Octproduced a draft business plan 2011 which we commented on. Once a final version is received, we can progress with drawing down funding for works. Maryport Heritage Museum Group are now seeking a 5 year lease in order to build upon their success. They have recruited volunteers and open the museum to the public as well as school groups. They held a successful Mitchell exhibition over the summer period. Regeneration D 13 Priority Key project Action Code Status Icon Update date Due Date Action update Provide the management function for the operation of the Carnegie Theatre and Arts Secure alternative delivery Venue. REG06._C arrangements for the Carnegie P Provide support for the Theatre and Arts Centre development of alternative management arrangements for the Carnegie Theatre and Arts Centre. 31-Mar2015 Work continues towards Profit & Loss management accounts. A separate staffing code has been 18-Octset up to assist with this, so that 2011 in the longer term achievement of the externalisation will be easier. Support the development of sustainable tourist facilities, attractions and accommodation through planning policy and decisions 30-Apr2013 Work continues on the Core Strategy and development Management policies 30-Mar2012 A commitment has been made to continue to fund the West Lakes Tourism Partnership until March 18-Oct2013. This funding supports other 2011 funding and is subject to Britain’s Energy Coast funding and delivery contract, and an ABC SLA. PLA08_CP Action description Develop tourism policies within the Core Strategy Work with partners to promote REG03_C Provide co-ordination role for Allerdale and the Western P borough-wide tourism projects Lakes as a tourist destination Responsible for Regeneration 17-Nov- Planning 2011 Services Priority D I Regeneration I Priority Strategic Objective 5: Attract and support new and existing business 5.1 Promote business growth Key project Action Code Action description Develop spatial options for Develop planning policies that employment land through core deliver the right type, location, PLA09._C strategy. quantity and flexibility of P Consider employment site employment land and allocations through premises Development Plan Document. Status Icon Due Date Action update Update date Responsible for 31-Dec2014 Work on the Core Strategy continues and development management policies 17-Nov2011 Planning Services 14 P Key project Action Code Support and enhance the vitality and viability of town centres Develop retail strategy within Core Strategy. Consider retail site allocations PLA11._C through Development Plan P Document. Update of town centre health checks. Identify funding opportunities that support business growth Action description Workington BID; Wigton BID; Regional Growth Fund; FLAG; REG07._C Coalfields Funding; Support the P development and operation of Enterprise Zones. Secure funding to support Work with partners to ensure Workington Interchange the delivery of Britain’s Energy Improvement project, Coast and the development of REG08._C commercial development at opportunities arising from the P Maryport Harbour, improved nuclear sector and the agreed infrastructure at Lillyhall. Masterplan Secure other funding to support projects under development. Status Icon Due Date Action update Update date Responsible for 31-Dec2014 Work on the Core Strategy continues as well as development management policies 17-Nov2011 Planning Services P 31-Mar2015 Funding availability and criteria is now becoming a little clearer, although still patchy. The team is developing a programme of potential projects which will include those in other service areas, and will try to match and 18-Octprioritise them with available 2011 funding. In this way there should be a corporate list of projects with funding which can be supported both with ABC cash and other ABC resources and members can ensure their objectives are being met. Regeneration P 31-Mar2015 The Blueprint is now out for final consultation and includes priorities covering the whole of West Cumbria. Once this is finally 18-Novsigned off it will provide a 2011 strategic focus for all economic growth bids for Energy Coast Funding. Regeneration P 15 Priority Key project Action Code Support and enhance the vitality and viability of town centres Town Centres' support. Support arts organisations in the delivery of the Empty Shops Programme. Manage the delivery of Street REG09._C Markets. P Support delivery of commercial and community events programme at The Hub, Workington. Continue to deliver Maryport Townscape Heritage Initiative. Facilitate the regeneration of the Derwent Forest major employment site Work with partners to secure the provision of advice and support to businesses Action description Secure the transfer of the site. REG10._C Support the development P proposals. Allerdale Business Initiative grants. REG11._C Review the operation of WCDA P programmes after merger with Britain’s Energy Coast. Status Icon Due Date Action update Update date Responsible for 31-Mar2015 Funding to support activity programming for the Hub is now secured and a local contractor is being sought. Street Markets continue to be vibrant, with Workington's new location proving popular. There has been some press coverage of the Empty shops initiative in Maryport. The Shop front scheme in Cockermouth is nominated for an award. 18-Oct2011 Regeneration P 31-Mar2015 A further extension has been agreed to end November 2011. Funding for the site holding could be a problem, as NWDA had indicated that all expenditure should be completed by end October 2011. There is to be final agreement 18-Octregarding the legal details of site 2011 disposal to Derwent Forest Developments Consortium at ABC Executive on 28 October 2011 and CCC cabinet on 17 November 2011. Final signing of the lease and transfer is therefore achievable by end November 2011 Regeneration P 31-Mar2015 We have now supported a total of 14 new businesses this financial year and the remaining £3,000 in the fund will be spent before the 18-Novend of the year bringing the 2011 probably total supported to approximately 20 new businesses assisted to start up in Allerdale in 2011/2012 Regeneration I 16 Priority Key project Support the Ways into Successful Enterprise scheme to develop business growth Support Partnership working on the proposed upgrade of the National Grid, including negotiating planning performance agreements, drafting Local Impact Reports and engaging with the planning process at national level Encourage the growth of Social Enterprises Action Code Action description Continue to support ‘Ways into Successful Enterprise’. REG12._C Secure funding for future years. P Transfer the project for future external delivery. Agree Planning Performance PLA10_CP Agreement for North West Coast Connection Project REG13_C Work with partners to secure P continuation or new funding Status Icon Update date Responsible for Due Date Action update 30-Mar2012 The work continues to go well, with additional interest from other districts to roll out the programme across Cumbria. The NEA clients 18-Novare steadily increasing in numbers 2011 and the team is kept fully occupied with both newly started businesses and those wishing to consider self employment. Regeneration D 30-Sep2014 Negotiations between the National Grid and the local planning authorities, including Allerdale Borough Council in respect of the 10-Octdetail of the Planning Performance 2011 Agreement are ongoing and are expected to be concluded by the end of October 2011. Planning Services P 30-Mar2012 Support for social enterprises is available via the Cumbria ISUS programme and through the WiSE team. The current ISUS programme ceases at the end of 18-NovDecember and there will be only 2011 Linkstart and WiSE support between then and the end of March, which is when the current funding for WiSE is due to finish Regeneration D 17 Priority Strategic Objective 6: Create an environment where business can flourish 6.1 Improve Local Infrastructure Key project Action Code Action description Develop a policy for use of developer contributions as a Develop Community PLA12_CP mechanism towards delivering Infrastructure Levy local infrastructure Maintain an up-to-date Infrastructure Deficit Plan Develop the Council’s role within, and support for, the Cumbria Local Enterprise Partnership PLA13_CP Update Infrastructure Deficit Plan Status Icon Responsible for Action update 31-Dec2014 Work is continuing on the 17-Novevidence base and viability work is 2011 to be completed by December Planning Services P 30-Mar2012 The next phase of the Infrastructure deficit plan is 04-Octawaiting new housing and 2011 employment growth levels coming from the economic blueprint Planning Services I 31-Mar2015 The Cumbria Enterprise Partnership is now meeting regularly, with CCC providing its secretariat. West Cumbria has a single representative - this is currently the leader of Copeland BC, with whom there are pre and post meetings to aid briefing. Regeneration P Provide information & support REG15_C to West Cumbrian P representative, in support of Update date Due Date Council Plan objectives 18 18-Nov2011 Priority 6.2 Raise skill levels of local people to reflect the needs of businesses Action Code Due Date Action update Update date Responsible for Maintain 'achieving' level of the Raise the skills of the Council's HRS01_C Skills Award. P workforce Attain 'excellent' level of the Skills Award 31-Mar2013 Achieving' level maintained for 2011/2012 - work has started on action plan to achieve 'Excellent' status for 2013 15-Nov2011 Human Resources P Develop planning policy that Develop policies within the core supports the provision and strategy to support the PLA14_CP expansion of education provision and expansion of facilities, in particular education facilities University of Cumbria campus 30-Apr2013 Work on the Core Strategy continues as well as development management policies 17-Nov2011 Planning Services I 30-Mar2012 Work continues towards the amalgamation of West Cumbria Development Agency and Fund and Properties into Energy Coast West Cumbria. The Blueprint which will provide the strategic focus for the work is underway and Dog Holden has now left WCDA, reducing the number of Chief Executives for the new organisation. Work has commenced into looking at how the staff will be transferred into the new entity. 18-Nov2011 Regeneration P Key project Action description Co-ordinate the skills needs of business, with training Support Routes 2 Work providers and other partners REG16_C financially and through in order to encourage lifelong P partnership links learning and the attainment of qualifications Status Icon 19 Priority Strategic Objective 7: Work with communities and partners to develop a flexible approach to delivering services to meet local needs 7.1 Work with partner agencies and communities to challenge conventional ways of delivering services to develop a pro-active approach to local issues Action Code Due Date Action update Update date Responsible for Establish effective partnership LOC02_C Develop Locality Plans across arrangements for the borough P Allerdale 31-Mar2015 Discussions over locality arrangements still ongoing with Cumbria CC. Members' concerns about arrangements are being addressed. 10-Nov2011 Strategic Manager (Places) P Adopt a locality working approach to all Council services LOC03_C discretion to tailor delivery to P 31-Mar2015 Review of services delivered at 10-Novlocality level is underway, with the 2011 involvement of the Locality Team Strategic Manager (Places) P Continue to examine shared services approaches with all partners including town and parish councils Review options for shared LOC04_C delivery of local services with P town and parish councils and other local partners 31-Mar2015 Workstream on holding pending outcome of discussions on related 10-Novservice reviews. Some work with 2011 parishes is ongoing on an ad hoc basis. Strategic Manager (Places) I Develop joint delivery of customer contact services with CUS01_C Provision of joint public sector other public service delivery P customer contact centres partners including the rationalisation of assets 31-Mar2015 A number of opportunities are actively being pursued to provide for the joint delivery of customer contact with other public service partners. When delivered these 17-Octwill provide for a more 2011 streamlined approach to customer contact and rationalise public assets providing essential efficiencies. Customer Services P Introduce locality working principles across the borough in partnership with 30-Apr2012 Scoping of suggested content agreed by working group on 4 August 2011. Drafting of the Planning Services P Key project Action description Review of all services to identify meet local needs Develop Neighbourhood PLA15_CP Development Order in conjunction with Cockermouth Status Icon 20 17-Oct2011 Priority communities and other organisations Town Council Neighbourhood Development Order has now commenced. Action Status Cancelled Overdue; No longer assigned Unassigned; Not Started; Check Progress Resuming; In Progress; Assigned Completed 21