Supplier Quality Manual Unit 5 & 6, 13th Floor, Riley House, 88 Lei Muk Road, Kwai Chung, Hong Kong. Confidential Document Number Rev This Document is the property of Global Solutions HK Ltd and contains information which is confidential and proprietary to Global Solutions. No part of this document may be copied, reproduced or disclosed to third parties without the written consent of Global Solutions HK Ltd. 533583987 00 Date Prepared by Approved by : Dec 24, 2009 : Alan Mak : John Violett Supplier Quality Manual Doc No Revision Date Page No : WI-PU-001 : 00 : Dec 24, 2009 : Page 2 of 10 1 Table of Contents 1 Table of Contents ............................................................................................................................ 2 2 Purpose ........................................................................................................................................... 3 3 Scope ............................................................................................................................................... 3 4 References ...................................................................................................................................... 3 5 Related Documents ......................................................................................................................... 3 6 Definition ........................................................................................................................................ 3 7 Supplier Self Evaluation .................................................................................................................. 4 8 First Article Submission Process...................................................................................................... 4 9 Contract Review .............................................................................................................................. 6 10 Quality Management ...................................................................................................................... 6 11 Environmental/ Chemical Substance Management ........................................................................ 6 12 Delivery & Packaging ....................................................................................................................... 7 13 Engineering Change Management .................................................................................................. 8 14 Handling of Nonconformance ......................................................................................................... 8 15 Revision History.............................................................................................................................. 10 Supplier Quality Manual Doc No Revision Date Page No : WI-PU-001 : 00 : Dec 24, 2009 : Page 3 of 10 2 Purpose The purpose of this manual is to establish Quality Assurance Requirements for selected suppliers of Global Solutions HK Ltd. This document is a supplement to and does not replace or alter conditions covered by the purchase agreement. Suppliers are required to comply with the requirements stated in this supplier quality manual, the purchase agreement, and other reference documents. 3 Scope This document is applicable to all suppliers providing direct production materials, parts, components and goods to Global Solutions HK Ltd. 4 References ISO 9001: 2008 Quality Management System – Requirements 5 Related Documents FN-SP-QC-740-01 Supplier Self Evaluation Form FN-SP-QC-730-01 Engineering Change Notice FN-SP-QC-740-06 Supplier Corrective Action Request FN-WI-PU-001-01 Supplier Deviation Request FN-WI-PU-001-02 Supplier Quality Manual Acknowledgement Form 6 Definition Supplier Assessment – Supplier Assessment is an activity performed to determine the capability of a supplier to meet certain criteria. Supplier assessments are performed for a number of reasons: to select a credible supplier for a further purchase, to select a supplier for a specific purchase, and to verify continued capability of an existing supplier. Direct Production Material – Direct Production Materials are all items including raw materials, parts, and sub-assemblies required to assemble or manufacture a complete product. First Article Submission Process - First Article Submission Process is intended to verify that products made from production materials, tools, and processes meet Global Solutions’ engineering requirements and that the production process has the potential to produce products meeting these requirements during an actual production run. Supplier Quality Manual Doc No Revision Date Page No : WI-PU-001 : 00 : Dec 24, 2009 : Page 4 of 10 Purchase Order Requirements – All documents including drawings and specifications issued by Global Solutions HK Ltd to the supplier are considered to be Purchase Order Requirements. 7 Supplier Self Evaluation 7.1 Suppliers are selected based on their ability to deliver purchased product in accordance with specified quality requirements. A supplier assessment shall be performed by Global Solutions HK Ltd prior to purchasing any product from the supplier. 7.2 As part of the supplier assessment, supplier is required to submit the Global Solutions’ Supplier Self Evaluation Form (FN-SP-QC-740-01). This is to grade the potential supplier’s capability of delivering the requested parts and/ or services. The evaluation form is assessed by purchasing department of Global Solutions HK Ltd. Qualified suppliers are put in the Approved Supplier List. 7.3 For high impact parts/ materials (i.e. parts or materials having high impact to the normal operation/ production of Global Solutions), a supplier on-site audit shall be arranged by Global Solutions to assess supplier’s compliance to the Global Solutions’ standards. 8 First Article Submission Process 8.1 Qualified supplier is required to obtain approval for mass production parts through the First Article Approval Process. Supplier shall conduct a First Article production run and produce parts utilizing normal production materials, tools and processes that are used in mass production. 8.2 First Article Submission Process should be carried out when: 1. A new part design is submitted for approval, 2. An existing part is introduced by a new supplier, and 3. Any change is made in the existing part, including dimension, process, raw material, or sub-supplier, either initiated by Global Solutions or proposed by the supplier. 8.3 The supplier then submits the sample parts from the First Article Run for approval by Global Solutions HK Ltd. Suppliers are required to submit the followings as part of the First Article Submissions. Doc No Revision Date Page No Supplier Quality Manual : WI-PU-001 : 00 : Dec 24, 2009 : Page 5 of 10 Table 8.3 Document List of First Article Submission No Requirement Status 1 Design Record (e.g. drawing etc) Required if supplier is responsible for part design/ development 2 Dimensional Results Required for all dimensions stated in the engineering drawings 3 Performance Test Report Required if applicable. All performance tests specified on drawings or technical requirements must be performed and recorded by the supplier 4 Initial Process Study Required for critical dimensions. Process capability studies shall be carried out on critical dimensions specified in Global Solutions’ drawings and those critical process parameters identified by the suppliers. Global Solutions requires a minimum of 1.67 Ppk and 1.33 Cpk for the initial process study approval. 100% inspection of parts is required if study results do not meet Global Solutions’ minimum Ppk/Cpk requirement. 5 Appearance Approval Report Required if applicable. Apply only to parts with appearance requirements stated in the drawings 6 Sample Product Required to submit 5 sample parts. Suppliers are required to submit 5 sample parts in minimum with each First Article Submission. Samples from tooling should be submitted for each mold or cavity. 7 Material Certificate Required. Supplier shall provide evidence of compliance to material specification (e.g. RoHS compliance report). Supplier shall submit Material Safety Data Sheet for any chemical product. Supplier Quality Manual Doc No Revision Date Page No : WI-PU-001 : 00 : Dec 24, 2009 : Page 6 of 10 9 Contract Review 9.1 Global Solutions HK Ltd issues purchase order to qualified supplier after the approval of its first part submission. The purchase order contains descriptions of ordered products, including part number, description, drawing number, quantity, delivery dates scheduled and other data. 9.2 The supplier shall review and approve the purchase order requirements prior to release for production. Incomplete or conflicting requirements shall be resolved with Global Solutions HK Ltd prior to release. All documents including drawings and specifications issued by Global Solutions HK Ltd to the supplier are part of the purchase order requirements. 9.3 Design requirements are specified in drawings and in technical specifications. All specified properties are essential and must be complied with. Properties that have severe impact to the performance and reliability of the final product are classified as Critical. Supplier is required to implement rigid control over these properties. 9.4 General quality requirements are stated in this supplier quality manual. Supplier shall also refer to specified quality requirements stated in product specifications and other documents. 9.5 For quality management system requirements please refer to section 10 of this manual. For environmental/ chemical substance management requirements please refer to Section 11. Supplier is also required to comply with applicable statutory and regulatory requirements. 10 Quality Management 10.1 Suppliers shall implement Quality Management System (QMS) based on ISO 9001 requirements and maintain procedures to ensure that its product conforms to the specified requirements. Global Solutions may request supplier to submit a copy of its ISO 9001 QMS certificate issued by an authorized certification body as a proof of its compliance to QMS requirements. 11 Environmental/ Chemical Substance Management 11.1 Suppliers shall implement control of Chemical Substances. All hazardous chemical substances listed in the table below shall be strictly controlled in the supplier’s production processes. Products supplied to Global Solutions shall be hazardous substances free. 11.2 Suppliers with Environmental Management System (EMS) based on ISO 14001 requirements are preferred. Doc No Revision Date Page No Supplier Quality Manual : WI-PU-001 : 00 : Dec 24, 2009 : Page 7 of 10 Table 11.1 List of Chemical Substances in Control No Substance Group CAS-No Classification Threshold Name 1 Lead and its -Prohibited 0.1% for impurities, any compounds intentional is prohibited 2 Mercury and its compounds -- Prohibited 0.1% for impurities, any intentional is prohibited 3 Cadmium and its compounds 7440-43-9 Prohibited 0.01% for impurities, any intentional is prohibited 4 Chromium (VI) salts 14977-61-8 Prohibited 0.1% for impurities, any intentional is prohibited 5 Polybrominated biphenyls (PBB) -- Prohibited 0.1% for impurities, any intentional is prohibited 6 Polybrominated diphenyl ethers (PBDE) Asbestos -- Prohibited 0.1% for impurities, any intentional is prohibited -- Prohibited Prohibited any intentional added content Ozone-depleting substances -- Prohibited Intentional use prohibited. 7 8 12 Delivery & Packaging 12.1 Suppliers are required to deliver purchased parts on time to Global Solutions’ facilities. Global Solutions demands a 100% delivery performance. It is also important that the supplier delivers the right quantity. 12.2 Suppliers shall have a clear and well documented First-In-First-Out FIFO process and follow-up delivery procedure. Global Solutions HK Ltd reserves the right to return the goods if First-InFirst-Out FIFO is not strictly followed by the supplier. 12.3 The goods shall be packed as per the packing instructions issued by Global Solutions HK Ltd unless otherwise specified. The goods shall be properly labeled according to Global Solutions’ instruction. Delivery documents must include all documentation specified by Global Solutions HK Ltd. Supplier Quality Manual Doc No Revision Date Page No : WI-PU-001 : 00 : Dec 24, 2009 : Page 8 of 10 13 Engineering Change Management Changes Proposed by the Supplier 13.1 Supplier is required to report any change in dimension, process, raw material, and subsupplier. Supplier shall submit a Supplier Engineering Change Request to Global Solutions’ purchasing department upon any change. The request will be reviewed and approved by the cross functional team of Global Solutions HK Ltd. None of the changes can be made prior to the approval of such changes by Global Solutions HK Ltd. Changes Initiated by Global Solutions 13.2 Changes initiated by Global Solutions or its customer will be sent to supplier for review. With the consensus of the supplier for the proposed change, Global Solutions HK Ltd issues Engineering Change Notice (FN-SP-QC-730-01) to the supplier specifying all necessary information for a correct implementation of the change. The supplier is responsible for the proper execution of the Engineering Change Notice. Note: First Article Approval Process has to be carried out in both of the situations. 14 Handling of Nonconformance Deviation Request 14.1 If the supplier manufactures product that does not conform to Global Solution’s specifications and lead-time does not allow permanent corrective action due to Global Solutions’ production requirements, a Supplier Deviation Request (FN-WI-PU-001-01) shall be submitted by the supplier to Global Solutions HK Ltd. No shipment is allowed without the approval of Global Solutions HK Ltd. Containment Action 14.2 When nonconformance in product or process is detected at the supplier’s facility, the supplier must determine immediately the extent of the problem and take prompt corrective action to prevent shipment of any nonconforming material. All suspect material shall be handled and contained as nonconforming material. 14.3 The supplier shall notify Global Solutions of any suspected quality problems in shipped products and the corrective action being taken to eliminate the condition for future shipments. If the problem cannot be corrected immediately, shipments must be held pending specific instructions from Global Solutions HK Ltd. Doc No Revision Date Page No Supplier Quality Manual : WI-PU-001 : 00 : Dec 24, 2009 : Page 9 of 10 Corrective and Preventive Action (CPAR) 14.4 If Global Solutions receives a delivery with nonconformities, the supplier will be informed of this through a Supplier Corrective Action Request (FN-SP-QC-740-06). The supplier shall provide a partial CPAR report which includes: 1. Required containment actions, 2. Short term corrective actions, and 3. Plan to replace non-conforming materials to Global Solutions within 24 hours. 14.5 A complete CPAR report must be sent to Global Solutions within 10 working days after the receipt of Supplier Corrective Action Request. The complete CPAR report shall include 1. Problem root causes, 2. Permanent corrective actions, and 3. Preventive actions. Cost Recovery and Claims 14.6 If a nonconformance occurs, Global Solutions may debit the supplier costs associated. For the first failure to meet approved standards and requirements, supplier is required to make replacement of product within 48 hours at their cost including shipping. 14.7 Any follow failure within 6 months, supplier shall replace the product within 48 hours and deduct 25% off the total cost of purchase. 14.8 Global Solutions may also debit the supplier other costs associated with the nonconformance. Cost categories include but not limited to the followings: Table 14.8 List of Cost Categories No. Cost Category No. Cost Category 1 Sorting cost 6 Administrative cost 2 Premium Freight cost 7 Scrap cost 3 Production Line down 8 -- 4 Customer Charges 9 -- 5 Rework 10 -- 14.9 All costs will be debited from the supplier’s account. Upon notification of the intent to debit, suppliers will have 10 days to appeal the charges. If Global Solutions HK Ltd does not hear from the supplier within 10 working days from the issuance of debit notification, Global Solutions assumes that the supplier accepts the nonconformance claim. Supplier Quality Manual Doc No Revision Date Page No : WI-PU-001 : 00 : Dec 24, 2009 : Page 10 of 10 15 Revision History Revision 00 Description First Issue Date Dec 24, 2009 Originator Alan Mak