Vahid Ansari Personal Information Nationality: Iranian Marital Status: Married Date of Birth: 19/08/1980 Educations M.Sc., Petroleum Reservoir Engineering, Sharif University of Technology, Tehran, Iran, 2004 (Grade Point Average: 17.5, Rank: 2) B.Sc., Petroleum Production Engineering, Petroleum University of Technology (P.U.T), Ahwaz, Iran, 2002 (Grade Point Average: 18.4, Rank: 2) Positions From July, 2002 to June, 2005: Reservoir & Simulation Engineer (Full Time), Kish Petroleum Engineering Company (KPE), Tehran, Iran From June, 2005 to December, 2006: Reservoir & Simulation Engineer (Part Time), Kish Petroleum Engineering Company (KPE), Tehran, Iran Production Engineer (Military Services), Production Engineering Department of Aghar and Dalan Fields, South Zagros Oil and Gas Production Company, Shiraz, Iran From December, 2006 to September, 2007: Reservoir & Simulation Engineer (Full Time), Kish Petroleum Engineering Company (KPE), Tehran, Iran From September, 2007 until now: Reservoir & Simulation Engineer (Full Time), Petroiran Development Company (PEDCO), Tehran, Iran Work Experiences From July, 2002 to June, 2005: Reservoir & Simulation Engineer (Full Time), Kish Petroleum Engineering Company (KPE), Tehran, Iran Cooperation in Rag-e-Safid Full Field Study and Preparation of Master Development Plan: Performing Routine Core Analysis for the Field Cooperation in Karanj Full Field Study and Preparation of Master Development Plan: Performing Routine Core Analysis for the Field Cooperation in Aghar and Dalan Coarse Grid Field Studies: Performing Routine Core Analysis for Both Fields Analyzing Well and Field Production Data Providing Drilling, Completion, and Workover Reports for Field Wells Participating in Full Field Dynamic Model Construction & Initialization 1/3 Participating in Field Performance Simulation and History Matching Cooperation in Resalat Full Field Study and Preparation of Master Development Plan: Analyzing Well and Field Production Data Cooperation in Gathering and Feeding Technical Information into Iranian Central Oil Field Company’s Data Base: Working as the Project Manager From June, 2005 to December, 2006: Production Engineer (Military Services), Production Engineering Department of Aghar and Dalan Fields, South Zagros Oil and Gas Production Company, Shiraz, Iran Participating in Different Production Engineering Projects Such As: Test of wells or worked over ones by depth check, obstruction removing, static survey, flow to burning pit, sampling for salt content and water cut, and rate estimate Gas well periodic inhibitor injection to control corrosion and erosion Supervision of production logging operations for evaluating different layer’s contribution in production and detection of excess gas or water producing layers and cross flow between layers Supervision of setting or removing down hole equipments like plugs and subsurface safety valves Supervision of well acidizing operation to remove well damage and enhance well productivity Reservoir & Simulation Engineer (Part Time), Kish Petroleum Engineering Company (KPE), Tehran, Iran Cooperation in Mansuri Full Field Study and Preparation of Master Development Plan: Performing Decline Curve Analysis for the Field Performing Economical Calculations for All Forecast Scenarios From December, 2006 to September, 2007: Reservoir & Simulation Engineer (Full Time), Kish Petroleum Engineering Company (KPE), Tehran, Iran Cooperation in Agha Jari Full Field Study and Preparation of Master Development Plan: Analyzing Well and Field Production Data Providing Drilling, Completion, and Workover Reports for Field Wells Performing Decline Curve Analysis for the Field Constructing and Initializing Full Field Dynamic Model Performing Field Performance Simulation and History Matching Working as the Project Coordinator From September, 2007 until now: 2/3 Reservoir & Simulation Engineer (Full Time), Petroiran Development Company (PEDCO), Tehran, Iran Cooperation in Jufeyr Full Field Study & Preparation of Master Development Plan: Providing Drilling, Completion, and Workover Reports for Field Wells Performing Routine and Special Core Analysis for the Field Performing PVT Analysis for the Field Performing Well Test Analysis for the Field Determining Initial Reservoir Conditions Participating in Static Model Construction Constructing and Initializing Full Field Dynamic Model Performing Prediction Study Under Different Production Scenarios Computer Skills Fully Familiar with Microsoft Office (Microsoft Word, Excel, and Power Point) Fully Familiar with Visual Basic Programming Language and Writing Macro Files in Microsoft Excel Familiar with CMG Simulation Package (Builder, IMEX, GEM, WINPROP, and Results) Familiar with Geoquest Simulation Package (Eclipse, FloGrid, FloVis, PVTi, Office, and Schedule) Familiar with PanSystem Training Courses Graduation Thesis Contact Information Applied Reservoir Simulation Course, Presented by Schlumberger Company, Tehran, Iran, 2008 Reservoir Simulation Course, Presented by Shell Company, Kish Island, Iran, 2003 Production, Water Injection, and Processing Units, Lavan Island and Salman Platform, Iran, 2001 Distillation and Processing Units, Tehran Oil Refinery, Tehran, Iran, 2000 Application of Decline Curve Analysis in Reserve Estimation and Reservoir Drive Mechanism Determination, M. Sc. Thesis, 2005 Determination of Minimum Miscibility Pressure in Oil Fields, B. Sc. Thesis, 2002 Address: No. 102, Vahid Dastjerdi (Zafar) St., Shariati Ave., Tehran, Iran Telephone: +98 21 23302476 Mobile: +98 912 8135163 E-mail: v.ansari@petroiran.com 3/3