CCC Marking Process(Model 1) CVC Applicant Submit: 1. Application Forms (Online or Written) 2. Other documents required (Factory self-inspection included) Test Lab Check and verify application materials (factory assessment included) Conduct tests on samples 1. Assign tests to related labs 2. Send notices to applicant and request product samples N and certification charge 1. Send samples to designated lab Obtain test result 2. Pay for certification (before obtaining certificates) Y 1. Receive type test reports 2. Receive payment for certification charge Issue type test reports and send to CVC 1. Review and assess type test reports & factory inspection reports 2. Approve plans to issue CCC 1. Receive CCC certificates certificates 2. Purchase the CCC mark and use it legally Within 3 months 内 Send notices inspection Receive factory inspection (invitation letters are necessary for foreign factories inspection) on factory N Obtain test result Conduct Factory Inspection Follow-up Inspection (The frequency and contents are detailed Issue factory inspection reports and keep in file Y in CVC-Implementation Rules 7.4) Notes: 1. Purchasing request for CCC mark 3C shall be submitted to CNCA’s Mark Application Column: http://www.cnca.gov.cn/ywzl/rz/qzxcpzl/rzbz/ 2. The process may vary as differences between factories and products, relevant instructions are detailed in the implementation rules and instructions. Address: No.3, Tiantaiyi Road, Kaitai Avenue, Science City, Guangzhou, 510663, P. R. China www.cvc.org.cn TEL:(86-20)3229 3888 FAX:(86-20)3229 3889 Page 1 of 4 Relevant Implementation Instructions: 3.1 Available Certification Models Model 1: type testing + Follow-up inspection Model 2: Type testing + Initial inspection of the factory + Follow-up inspection Follow-up inspection refers to Follow-up Investigation & On-site Production Sampling Test, Investigation & Selling Product Sampling Test and/or Investigation. 3.2 Select an appropriate model (For Household and Similar Electrical Appliances) Products Model 1 Model 2 Air Conditioners Electric Motors Compressors Category I Category II (Note: Category I & II here can select Model 2 as well) Category III Category IV Household Refrigerators Food Freezers Electric Fans Household Washing Machines Storage Water Heaters Instantaneous Water Heaters Room Heaters Vacuum Cleaners Appliances For Skin and Hair Care Electric Irons Electromagnetic Ovens Roasters Electric Food Processors Microwave Ovens Cooking Ranges, Cooking Table, Ovens And Similar Appliances Range Hoods Liquid Heaters Cold and Hot-Type Water Dispensers Electric Rice Cookers Category I Category II Category III Category IV (Note: Category I here can select Model 2 as well) Classification of manufacturers is detailed in appendix 1 of the CVC implementation instructions. 3.2 Select an appropriate model (For Electrical Accessories and Small Power Motors) Address: No.3, Tiantaiyi Road, Kaitai Avenue, Science City, Guangzhou, 510663, P. R. China www.cvc.org.cn TEL:(86-20)3229 3888 FAX:(86-20)3229 3889 Page 2 of 4 Model 1 Model 2 Category I Category II Category III Category IV (Note: Category I here can select Model 2 as well ) Classification of manufacturers is detailed in appendix 1 of the CVC implementation instructions. 7.4 Frequency and Timing of Follow-up Inspection (For Household and Similar Electrical Appliances) There are three methods of follow-up inspection: Investigation & On-site Production Sampling Test, Investigation & Selling Product Sampling Test or Investigation. Follow-up inspection can be performed by adopting a single method or multiple methods therein. Category of Frequency Contents At least once every End-of-production-line sampling test OR follow-up two years investigation Applicants Category I OR selling products sampling test/check Category II At least once a year End-of-production-line sampling test OR follow-up investigation OR selling products sampling test/check Category III At least once a year Follow-up investigation + End-of-production-line sampling test AND/OR selling products sampling test/check Category IV At least twice a Follow-up investigation + End-of-production-line year sampling test AND/OR selling products sampling test/check For applicants adopting Model 1 for certification, in principle, initial factory inspection will be conducted within 3 months after the products being certified. 7.4 Frequency and Timing of Follow-up Inspection (For Electrical Accessories and Small Address: No.3, Tiantaiyi Road, Kaitai Avenue, Science City, Guangzhou, 510663, P. R. China www.cvc.org.cn TEL:(86-20)3229 3888 FAX:(86-20)3229 3889 Page 3 of 4 Power Motors) Category of Applicants Frequency Contents Category I At least once every two years End-of-production-line sampling test/check follow-up investigation (If necessary) selling products sampling test/check (If necessary) Category II At least once a year End-of-production-line sampling test/check follow-up investigation (If necessary) selling products sampling test/check (If necessary) Category III At least once a year Follow-up investigation + End-of-production-line sampling test/check AND/OR selling products sampling test/check Category IV At least twice a year Follow-up investigation + End-of-production-line sampling test/check AND/OR selling products sampling test/check For applicants adopting Model 1 for certification, in principle, initial factory inspection will be conducted within 3 months after the products being certified. Address: No.3, Tiantaiyi Road, Kaitai Avenue, Science City, Guangzhou, 510663, P. R. China www.cvc.org.cn TEL:(86-20)3229 3888 FAX:(86-20)3229 3889 Page 4 of 4