CCC Marking Process(Model 1)

advertisement
CCC Marking Process(Model 1)
CVC
Applicant
Submit:
1. Application Forms
(Online or Written)
2. Other documents
required
(Factory
self-inspection
included)
Test Lab
Check and verify application
materials (factory assessment
included)
Conduct tests on
samples
1. Assign tests to related labs
2. Send notices to applicant
and request product samples
N
and certification charge
1. Send samples to designated lab
Obtain test
result
2. Pay for certification (before
obtaining certificates)
Y
1. Receive type test reports
2.
Receive
payment
for
certification charge
Issue type test reports and
send to CVC
1. Review and assess type test reports
& factory inspection reports
2. Approve plans to issue CCC
1. Receive CCC certificates
certificates
2. Purchase the CCC mark
and use it legally
Within 3 months
内
Send notices
inspection
Receive factory inspection
(invitation
letters
are
necessary
for
foreign
factories inspection)
on
factory
N
Obtain test
result
Conduct Factory Inspection
Follow-up Inspection (The frequency
and
contents
are
detailed
Issue factory inspection
reports and keep in file
Y
in
CVC-Implementation Rules 7.4)
Notes:
1. Purchasing request for CCC mark 3C shall be submitted to CNCA’s Mark Application Column:
http://www.cnca.gov.cn/ywzl/rz/qzxcpzl/rzbz/
2. The process may vary as differences between factories and products, relevant instructions are detailed in the implementation
rules and instructions.
Address: No.3, Tiantaiyi Road, Kaitai Avenue, Science City, Guangzhou, 510663, P. R. China
www.cvc.org.cn
TEL:(86-20)3229 3888 FAX:(86-20)3229 3889
Page 1 of 4
Relevant Implementation Instructions:
3.1 Available Certification Models
Model 1: type testing + Follow-up inspection
Model 2: Type testing + Initial inspection of the factory + Follow-up inspection
Follow-up inspection refers to Follow-up Investigation & On-site Production Sampling Test,
Investigation & Selling Product Sampling Test and/or Investigation.
3.2 Select an appropriate model (For Household and Similar Electrical Appliances)
Products
Model 1
Model 2
Air Conditioners
Electric Motors
Compressors
Category I
Category II
(Note: Category I & II here can
select Model 2 as well)
Category III
Category IV
Household Refrigerators
Food Freezers
Electric Fans
Household Washing Machines
Storage Water Heaters
Instantaneous Water Heaters
Room Heaters
Vacuum Cleaners
Appliances For Skin and Hair Care
Electric Irons
Electromagnetic Ovens
Roasters
Electric Food Processors
Microwave Ovens
Cooking Ranges, Cooking Table, Ovens
And Similar Appliances
Range Hoods
Liquid Heaters
Cold and Hot-Type Water Dispensers
Electric Rice Cookers
Category I
Category II
Category III
Category IV
(Note: Category I here can
select Model 2 as well)
Classification of manufacturers is detailed in appendix 1 of the CVC implementation instructions.
3.2 Select an appropriate model (For Electrical Accessories and Small Power Motors)
Address: No.3, Tiantaiyi Road, Kaitai Avenue, Science City, Guangzhou, 510663, P. R. China
www.cvc.org.cn
TEL:(86-20)3229 3888 FAX:(86-20)3229 3889
Page 2 of 4
Model 1
Model 2
Category I
Category II
Category III
Category IV
(Note: Category I here can
select Model 2 as well )
Classification of manufacturers is detailed in appendix 1 of the CVC implementation instructions.
7.4 Frequency and Timing of Follow-up Inspection (For Household and Similar Electrical
Appliances)
There are three methods of follow-up inspection: Investigation & On-site Production Sampling Test,
Investigation & Selling Product Sampling Test or Investigation. Follow-up inspection can be performed
by adopting a single method or multiple methods therein.
Category
of
Frequency
Contents
At least once every
End-of-production-line sampling test OR follow-up
two years
investigation
Applicants
Category I
OR
selling
products
sampling
test/check
Category II
At least once a year
End-of-production-line sampling test OR follow-up
investigation
OR
selling
products
sampling
test/check
Category III
At least once a year
Follow-up investigation + End-of-production-line
sampling test AND/OR selling products sampling
test/check
Category IV
At least twice a
Follow-up investigation + End-of-production-line
year
sampling test AND/OR selling products sampling
test/check
For applicants adopting Model 1 for certification, in principle, initial factory inspection will be
conducted within 3 months after the products being certified.
7.4 Frequency and Timing of Follow-up Inspection (For Electrical Accessories and Small
Address: No.3, Tiantaiyi Road, Kaitai Avenue, Science City, Guangzhou, 510663, P. R. China
www.cvc.org.cn
TEL:(86-20)3229 3888 FAX:(86-20)3229 3889
Page 3 of 4
Power Motors)
Category of Applicants
Frequency
Contents
Category I
At least once
every two years
End-of-production-line sampling test/check
follow-up investigation (If necessary)
selling products sampling test/check (If necessary)
Category II
At least once a
year
End-of-production-line sampling test/check
follow-up investigation (If necessary)
selling products sampling test/check (If necessary)
Category III
At least once a
year
Follow-up investigation + End-of-production-line
sampling test/check AND/OR selling products
sampling test/check
Category IV
At least twice a
year
Follow-up investigation + End-of-production-line
sampling test/check AND/OR selling products
sampling test/check
For applicants adopting Model 1 for certification, in principle, initial factory inspection will be
conducted within 3 months after the products being certified.
Address: No.3, Tiantaiyi Road, Kaitai Avenue, Science City, Guangzhou, 510663, P. R. China
www.cvc.org.cn
TEL:(86-20)3229 3888 FAX:(86-20)3229 3889
Page 4 of 4
Download