.. .. .. .. .. New Mexico Department of Health Kronos – SHARE integrated time keeping solution . . . . . Project Management Plan . . . . . (This page has been left blank intentionality to facilitate two-sided printing.) ii TABLE OF CONTENTS TABLE OF CONTENTS ......................................................................................................................................... III EXECUTIVE SUMMARY .........................................................................................................................................4 INTRODUCTION: ..........................................................................................................................................................4 BACKGROUND: ...........................................................................................................................................................4 PROJECT DEFINITION: .................................................................................................................................................4 PROJECT STRATEGY: ..................................................................................................................................................4 INTRODUCTION: ......................................................................................................................................................6 PROJECT MANAGEMENT PLAN PURPOSE: ...................................................................................................................6 PROJECT MANAGEMENT POLICY: ...............................................................................................................................6 PMP STANDARDS: ......................................................................................................................................................7 BACKGROUND ..........................................................................................................................................................8 PRE-PROJECT ACTIVITIES: ..........................................................................................................................................8 POST-PROJECT PLANS: ...............................................................................................................................................8 PROJECT DEFINITION ...........................................................................................................................................9 SCOPE:........................................................................................................................................................................9 MILESTONES: ........................................................................................................................................................... 10 BUDGET: .................................................................................................................................................................. 10 QUALITY BASELINE:................................................................................................................................................. 10 GOVERNANCE: ......................................................................................................................................................... 11 ROLES & RESPONSIBILITIES ..................................................................................................................................... 11 RISK IDENTIFICATION: .............................................................................................................................................. 11 PROCUREMENT APPROACH:...................................................................................................................................... 12 PROJECT MANAGEMENT STRATEGY ............................................................................................................. 13 CHANGE MANAGEMENT PLAN: ................................................................................................................................ 13 SCOPE MANAGEMENT PLAN: .................................................................................................................................... 13 SCHEDULE MANAGEMENT PLAN: ............................................................................................................................. 13 QUALITY MANAGEMENT PLAN: ............................................................................................................................... 14 COMMUNICATIONS MANAGEMENT PLAN: ................................................................................................................ 15 RISK MANAGEMENT PLAN (RMP): .......................................................................................................................... 16 ISSUE MANAGEMENT PLAN: ..................................................................................................................................... 17 APPENDIX ................................................................................................................................................................ 18 A. GLOSSARY ........................................................................................................................................................... 18 B. WORK BREAKDOWN STRUCTURE ........................................................................................................................ 23 C. MS PROJECTS SCHEDULE .................................................................................................................................... 24 D. BUDGET-EXPENDITURE REPORT ......................................................................................................................... 25 E. ROLES AND RESPONSIBILITIES............................................................................................................................. 26 F. RISK REGISTER I: IDENTIFICATION ...................................................................................................................... 29 G. RISK REGISTER II: ANALYSIS .............................................................................................................................. 30 H. ISSUE LOG ........................................................................................................................................................... 31 iii Kronos – a SHARE integrated timekeeping solution Project Management Plan (PMP) Executive Summary Introduction: The purpose of this Project Management Plan is to provide a roadmap for the project team to successfully execute and deliver Kronos – SHARE integrated timekeeping solution to the Department of Health’s seven facilities. Background: The Offices of Facilities Management put together a team to document the current processes followed by the each facility for reporting time worked or leave taken and identify requirements for an electronic time keeping solution. This team was formed in 2007 and was comprised of representatives from each facility. Kronos was recommended as the solution due to the fact Kronos is in use at New Mexico Behavioral Health Institute and Sequoyah Adolescent Treatment Center. NMBHI integrated Kronos with SHARE during implementation of the SHARE system. A list of other pre- and post- project activities can be found in this section. The purpose of the project is to provide DOH 24/7 Healthcare facilities the ability to manage workforce staff to provide for adequate staffing that meet necessary ratios as required by Federal and State Agencies. This will include workforce planning activities to ensure proper acuity (Patient to Staff Ratio) rates to maintain patient safety. Office of Facilities Management (OFM) will standardize procedures and policy across the facilities for using Kronos time keeper software. Project Definition: This section defines the scope, milestones, budget, quality baseline, project governance, roles and responsibilities, initial risk identification and procurement approach. Project Strategy: This section describes the strategy that will be used to manage the various components of the project. These components include change, scope, schedule, quality, human resources, communications, risks and issues management. 4 . 5 Introduction: Project Management Plan Purpose: The Project Management Plan (PMP) is the guide for implementing the project known as Kronos – SHARE integrated time keeping solution for the Department of Health’s (DOH) seven facilities. The PMP documents assumptions and decisions regarding communication, management process, execution and overall project control. The ultimate purpose of the PMP is to clearly define the roles, responsibilities, procedures and processes that will result in the project being managed such that it is completed on time, within budget, with the highest degree of quality and in a manner in which the stakeholder trust, support and confidence in the project will be maintained. The PMP addresses all phases of the project life cycle and ensures that the project will be managed holistically and not incrementally as the project progresses over time. It is essential that the PMP establish the metrics by which the success of the project will be defined. Project Management Policy: Policy exists at the DOH Intranet site DOH PROJECT MANAGEMENT POLICY which states in part, “It is the policy of the New Mexico Department of Health (DOH) that all IT projects will be proposed, approved, planned and implemented in accordance with a project management methodology. All IT projects will be managed with sufficient formality by the DOH Information Technology Services Division (ITSD) to reasonably assure success.” The policy goes on to define several distinct phases as follows: 1. 2. 3. 4. 5. Origination; Initiation; Planning; Execution and Control; and Closing. In respect to the Planning Phase, the policy goes on to state, “After initiation the project manager will convene a project management team to develop the project management plan including project timeline and budget. Depending on the size and complexity of the project, the project management plan may include a project schedule, budget, communications plan, risk management plan, quality management plan and transition to operations plan. IT projects certified by the Department of Information Technology (DoIT) are required to have Independent Verification and Validation (IV&V).” The Execution and Control Phase component of the policy states, “Projects will be completed in accordance with the project plan. The project manager will report to the sponsor and other stakeholders. Projects will be monitored by the project manager to ensure compliance with the project management plan and to direct corrective action or approve changes. Corrective actions and changes will be controlled. 6 DoIT-certified projects will submit monthly status reports to DoIT.” PMP Standards: The fundamental product of the Planning Phase is a Project Management Plan (PMP). This PMP is a “formal, approved document that defines how the project will be executed, monitored and controlled.” This PMP follows the guidelines set forth by the NM Department of Health (DOH) IT Services Division, which in turn are compatible with A Guide to the Project Management Body of Knowledge, (PMBOK Guide), Third Edition, Project Management Institute, Newton Square, Pennsylvania. 7 Background Pre-Project Activities: Prior to the initiation of this project, several related events or efforts have occurred. These include the following: Activity 1. Complete and submit forms for DoIT certification 2. Complete Project charter 3. Meet with SHARE project team 4. DoIT certification presentation Date March 2008 March 2008 March 2008 March 2008 Post-Project Plans: Subsequent to the closing of this project, several related events or efforts have been planned. These include the following: Activity 1. Evaluate additional Kronos modules for future acquisition Date July 2009 8 Project Definition Scope: Purpose: The purpose of the project is to implement Kronos Timekeeper v.6.0. This encompasses installation of badge swipe terminals at the NMDOH Facilities and configuration of Kronos software as a service. Kronos Timekeeper will integrate with SHARE to provide accurate time reports and leave balances. Polices and procedures will also be created as part of this project. Objectives: Successfully executing this PMP will result in the following objectives being met: 1. Ability to manage workforce staffing to provide for adequate staffing to meet necessary ratios 2. Standardize time keeping policies and procedures for Facility staff 3. Use of Kronos by Facilities’ Human resources staff 4. Decrease manual processing for time keeping and reporting into SHARE 5. Manage work schedules to plan effectively and reduce the amount of unnecessary overtime. Deliverables: Executing this PMP will also result in the deliverance of the following products and/or services: 1. Configure and test Kronos software as a service at six NMDOH facilities and the Los Lunas Community Program 2. Provide integration with SHARE for uploading employee time records and leave balance reconciliation 3. Install swipe terminals in each facility 4. Create and deliver User Training Manuals 5. Document new policies and procedures Work Breakdown Structure (WBS) In the Appendix of this document, “Work Breakdown Structure” (WBS), has been included that displays the organization of project activities around deliverables in a hierarchical manner. 9 Milestones: Event: Initiation Phase Planning Phase Design Phase Construction Phase Acceptance Phase Deployment Phase Closeout Phase Budget: The Steering Committee has developed a detailed budget and included it in the Appendix of this document (see Budget-Expenditure Report). A summary of the budget is included below: Category: Staff: Contractual Services: Hardware: Software: Other: Total: Quality Baseline: Completion: June 2008 July 2008 August 2008 November 2008 December 2008 April 2009 May 2009 Amount: $0 268,750.00 182,000.00 323,000.00 $773,750.00 To provide quality benchmarks or baselines, several products have been developed or will be developed as project deliverables. These baselines will be used to guide the Project Execution. These baseline products are listed below. 1. 2. 3. 4. 5. 6. Requirements definition Project Management plan Implementation strategy Phase gate review strategy Acceptance deliverables Independent Verification and Validation 10 Governance: A hierarchical chart depicting “Project Governance” is included. Anita Westbrook Executive Sponsor IV &V Consultant Kronos Steering Committee Edna Ortiz Project Director TJ Montoya Project Manager Business Process Team Contract Project Manager Technical Team Roles & Responsibilities This Plan defines the roles of the project members and their respective responsibilities in the “Role Responsibility Matrix” on page of the appendix. Risk Identification: During Project Planning, several potential events have been identified that have potential significant, negative impacts upon time, cost, quality, or scope. These risks are listed below. Risks: 1. The creation of standard policies and procedures is important for the successful implementation of Kronos. 2. Availability of subject matter experts from OFM, DFA,ITSD 3. Network at NMBHI may not handle the addition of Kronos. 4. Network at FBMC may not handle the addition of Kronos. The risks identified above will be managed according to the Risk Management Plan located in the following “Project Management Strategy” section, using the documents located in the Appendix G. During Project Execution, additional risks may arise. These newly identified risks will also be managed according to this strategy. 11 Procurement Approach: The products or services required for the project are identified below and designated for purchase from the State Price Agreement, from a competitive proposal as a result of a Request for Proposals (RFP), or on a Sole Source basis. Product or Service: 1. IV&V Contract 2. Kronos – hw, sw, svcs 3. Peoplesoft integration Procurement Method: Statewide price agreement Working with SPD and DoIT Statewide price agreement 12 Project Management Strategy Change Management Plan: Other project changes, though not as critical to project stability will follow a decision making process. These changes include modifications to scope, schedule, budget, and quality. Significant changes of these planning components will be reviewed and approved or disproved by the steering committee. If a modification or enhancement to the project has been identified, a change request form must be filled out. The Steering Committee will review the request to determine impacts to scope, schedule, budget, quality and resources. The committee will recommend accepting the change or rejecting the change and will provide supporting information for the decision. The request will be documented by the Project Manager and appropriate changes will be made to the Project Management Plan. Scope Management Most changes to scope are those requests that add, change, or delete Plan: project objectives or deliverables. Changes in scope, if at all possible, will be avoided and any new objectives and/or deliverables deferred to a follow-on project. Any proposed changes in scope will be analyzed for impacts on the projects including these areas: schedule, budget and quality. The findings will be presented to the Steering Committee for approval or rejection. . Schedule Management Plan: Subsequent to the approval of this PMP, a project schedule will be developed that expands the deliverables oriented milestones and the WBS included in the previous section, “Project Definition.” This scheduling effort may require changes to the milestones in accordance with the “Change Management Plan” included in this section. Once the schedule has been approved, a baseline schedule will be created using MS Project. Once the baseline is established, the schedule will be modified as needed and as approved according to the “Change Management” plan included in this section. At regularly scheduled Steering Committee Meetings and in regularly distributed Status Reports, the Project Manager will review actual progress in respect to the plan. In particular, tasks on the project’s Critical Path will be emphasized. 13 Quality Management Plan: Quality Management is an important aspect of any project to ensure the product delivered is accepted and works as designed. There are number of ways that quality has been built into this project. The first is IV&V, which will verify the project meets it’s expected requirements through a third party evaluation of the project The second is the change management process, which assures that any issues or changes that are made to the project are executed in a structured manner. The most important of these is the change control process to minimize the change of scope to the project and if scope does change it is done knowing the impact to the project. The third process for quality management is the risk management plan which measures, mitigates and includes contingency plans for each risk. Another part of the quality management plan is the Acceptance phase. This phase includes testing of configured hardware and software. A select group of stakeholders will be responsible for testing the functionality and providing feedback to the Steering Committee. The Steering Committee will provide guidance to the Project Director and Sponsor on accepting or rejecting the deliverables of the Acceptance Phase. If a recommendation for rejection is received, the Steering Committee will work with the Stakeholders, Project Manager and Vendor to provide corrective actions. Any corrective actions will be tested and approved again by the stakeholders. Once approval is obtained by Project Director and Sponsor, the project will move to the Implementation Phase. At the end each phase of the project, lesson learned will be created. hese lessons learned will be incorporated into the next phase of the project and also be part of the project library which will be available for future projects to use. Each phase of the project will undergo a review by the Steering Committee to ensure the project remains on time, on schedule and within budget. If the Steering Committee votes a no-go, the committee will recommend corrective action to address those areas of the project that do not meet the project deliverables. All of these processes combined will create a product that has quality built in not tested in after the fact. This creates an environment minimizing the chaos that is normally a part of an IT implementation. 14 Communications Communication will be effected through the Management Plan: distribution of Project Management deliverables as specified below. This PMP and any changes to it constitute one of the deliverables. Status Reports will be distributed as indicated below, using the format specified in the Appendix J of this document. For other communication needs, Special Bulletins will be distributed as needed. Status, issues, and risks will also be discussed at regularly scheduled project meeting on a monthly basis, preceded by the distribution of an Agenda and followed by the distribution of Meeting Notes. Meetings Executive Sponsor: Steering Committee: Project Director: Technical Team: Business Process Team Stakeholders: Special Bulletins: As needed Monthly As needed Monthly Monthly Status Reports: Monthly Weekly Monthly Monthly As needed - As Needed As Needed As Needed As Needed As Needed As Needed 15 Risk Management Plan (RMP): Information technology (IT) projects have many inherent risks associated with them. The technology itself, risks associated with introduction of new and/or innovative ideas, organizational change issues, internal project issues, external issues such as politics and the economy not to mention social concerns around the introduction of technology. The list of potential risks is almost limitless. Risk management is the process of identifying potential project risk, assessing the probability and severity of risk events, and planning appropriate responses. Risk management is a priority task on any IT project and is managed just like cost, schedule, scope and quality. For this project, the Steering Committee has developed an approach that address the following questions: 1. 2. 3. 4. 5. 6. 7. As pertains to this project, what is a risk? Can the various risks for this project be classified? What generic strategies apply to this project’s risks? Can these risks be rated? How can these risks be “handled?” How will these risks be tracked? Who will manage the risks? Strategy Risk Identification – The process of identifying potential risks and documenting the specific characteristics of each. Risk Analysis – The process of determining the impact and likelihood of the identified risks. This process may employ both qualitative and quantitative techniques as deemed necessary to objectively evaluate potential risks to the project. Risk Mitigation – The process of mitigating the possibility of the risk and assigning responsible individuals to identified risks. All identified risks will have appropriate mitigation strategies/plans. For those risks that are highly probable and have significant impact to the project will develop contingency plans. Risk Monitoring and Control – The process of tracking, evaluating and responding to ongoing developments relative to project plans, risk mitigation plans and specific contingency plans. Risk management is an integral component of integrated project control. This is an ongoing process for the duration of the project and will be part of every project status meeting. 16 Issue Management Plan: With any project, no matter how comprehensive the planning process, issues will arise that need to be addressed. This section of the project management plan addresses how this process will be managed for the Kronos project. When an issue is identified, primarily by the project team, it will be added to the issue log stored in the project library. An issue can also be identified by anyone affiliated with the project although the project team will be primarily responsible for tracking issues through to resolution. The project team will review the issues list twice a month. Issues, which could negatively impact the project, will be brought to executive sponsor’s attention for resolution. The process of tracking an issue is below: 1) An issue is identified. 2) It is added to the issue document, assigned an issue number with a brief explanation of the issue and date entered. 3) The issue is assigned to someone and potential action to be taken. 4) As action is taken it is noted with the issue. 5) If possible, an estimated completion date is entered. 6) Upon completion of an issue the actual completion date is noted with the resolution. Listed below are examples of how an issue can be resolved: An issue can become a task added to the project plan with proper approval, if new, or within scope of the project. It could be resolved by an action taken. A document can be created which addresses the issue. A resolution could create new issues that need to be addressed. A new policy could be created which addresses the issue. 17 Appendix A. Glossary Assumptions “Assumptions” means factors that, for planning purposes, are considered to be true, real, or certain. Assumptions affect all aspects of project planning, and are part of the progressive elaboration of the project. Budget Management Plan “Budget Management Plan” means an approach to tracking expenditures in respect to the project’s approved budget. Change Management “Change Management” means identifying, documenting, approving or rejecting, and controlling changes to the project schedule, scope or budget. Change Management Plan “Change Management Plan” means a procedure for approving or disproving suggested changes to the Project Management Plan. CIO “CIO” means the Chief Information Officer of the Department of Health. Closing, Project “Project Closing” is the final phase of the project and consists of formal steps to declaring the project complete and no longer active. Communications Plan “Communications Plan” means a document that determines the information and communication needs of the project stakeholders: who needs what information, when they will need it, and how it will be given to them. Constraints “Constraints” means any restriction or limitation, either internal or external to the project, which will affect the performance of the project or a process. Corrective Action “Corrective Action” means changes made to bring expected future performance of the project in line with the project management plan. Deliverables “Deliverable” means any measurable, tangible, verifiable outcome, result, or item that must be produced to complete a project or part of a project. Often used more narrowly in reference to an external deliverable, being a deliverable that is subject to approval by the project sponsor or customer. DOH “DOH” means the Department of Health. 18 DoIT “DoIT” means the New Mexico Department of Information Technology. Execution and Control, Project “Project Execution and Control” means that phase of a project when the work identified in the Project Management Plan is carried out and monitored. Governance “Governance” means the human resource organizational structure that is applied to the project. Independent Verification & Validation “Independent Verification & Validation” means a review of project management deliverables and/or project deliverables by an independent entity not on the project team and not a project stakeholder. Initiation, Project “Project Initiation” means the phase that follows the Project Origination, sometimes referred to as the Project Proposal phase and consists primarily of organizing a project team prior to the Project Planning phase. ISB “ISB” means the Implementation Services Bureau of the Information Technology Services Division. Issue “Issue” means an existing condition or an arising event that is preventing successful completion of a project deliverable until the project team satisfactorily addresses the condition or event. Issue Management Plan “Issue Management Plan” means a method to identify, track, and address issues. IT “IT” means Information Technology. ITSD “ITSD” means the Information Technology Services Division of DOH. IV&V “IV&V” means Independent Verification & Validation Large Project “Large Project” means a project that scores 8 to 9 points on the Project Scoring Matrix and may require certification by DoIT. DoIT certification is required for projects that cost more than $100,000 per year and/or more than $1,000,000 over the life of the project. Maintenance and Support “Maintenance and Support” means the necessary day-by-day tasks required to keep a system operational. Medium Project “Medium Project” means a project that scores 5 to 7 points on the “Milestone” means a significant event in the project, usually completion of a major deliverable. 19 MS Projects Schedule “MS Projects Schedule” means a project schedule developed using Microsoft’s Project software. Origination, Project “Project Origination” means the first project phase and consists of obtaining management approval to start the Project Initiation phase. Planning, Project “Project Planning” means the work necessary to define project parameters and methods to manage work in respect to the parameters. PMP See Project Management Plan. Project “Project” means a planned undertaking for the design and application of information technology to an agency's mission through clearly defined goals and objectives within specific resource constraints. Project Charter “Project Charter” means a document approved by the project sponsor and/or senior management that formally authorizes the existence of a project. Project Governance “Project governance” means the governing body for the project. The committee should include the project sponsor, the project manager and key stakeholders. Project Management “Project Management” means the process of planning, monitoring, and evaluating the resources and timelines of a project and taking corrective action to ensure the successful completion and implementation of a project. Project Management Plan “Project Management Plan” or “Project Plan” means a formal, approved document used to guide both project execution and project control. A project management plan may be summary or detailed. Project Manager “Project Manager” means the individual assigned by DOH to achieve the project’s objectives. The project manager may be a contractor. Project Proposal “Project Proposal” means a business-based description of the project that provides information necessary to support the decision to approve the project. The project proposal must identify a business need and lay the foundation for developing a potential solution to meet that need. Project Schedule “Project Schedule” means the planned dates for performing activities and the planned dates for meeting milestones. 20 Project Sponsor “Project Sponsor” means the person representing the organizational group who will be the recipient of the project benefits, who will ensure the business objectives and needs are met and that funding for the project is made available. Project Team “Project Team” means those individuals who have responsibilities assigned in the Project Management Plan. Quality Management Plan “Quality Management Plan” means an approach to developing a quality plan or benchmark, assuring that the plan is adequate, and then the execution of the plan during the execution of the project. Risk “Risk” means a potential events that could have significant, negative impacts upon time, cost, quality, or scope Risk Management “Risk Management” means the systematic process of identifying, analyzing, and responding to project risk. It includes maximizing the probability and consequences of positive events and minimizing the probability and consequences of events adverse to project objectives. Risk Management Plan “Risk Management Plan” means an approach to identifying, analyzing, responding to or handling, and tracking risks. Role & Responsibility Matrix “Role & Responsibility Matrix” means a two-dimensional table with the roles shown in the first column and the responsibilities shown in the first row. Intersecting cells are “checked” or “x’d” ti indicate the responsibilities for each role. Schedule Management Plan “Schedule Management Plan” means the approach to scheduling, assigning, and track work defined by the Project Management Plan. Scope “Scope” means the work that must be done to deliver a product with the specified features and functions and includes means the definition of the project’s purpose, objectives, and deliverables. Scope Change “Scope Change” means any change to the project’s purpose, objectives, or deliverables. A scope change usually requires an adjustment to the project cost, schedule, or quality. A change management plan defines the process, authority and tracking of changes to project scope. Scope Management Plan “Scope Management Plan” means a process to ensure that the project’s purpose, objectives, and deliverables have been successfully accomplished and a process used to review and approve or disapprove changes to the scope. Server “Server” means a computer or device on a network that manages network resources. 21 Small Project “Small Project” means a project that scores 3 to 4 points on the Project Scoring Matrix. Software, Application “Application Software” means computer software that employs the capabilities of a computer directly and thoroughly to a task that the user wishes to perform See “Application Software.” “Windows Server Software” means a brand name for server operating systems released by Microsoft Corporation. “State CIO” means the State Chief Information Officer, a cabinetlevel officer. Software, Business Software, Windows Server State CIO Steering Committee “Steering Committee” means a group of managers or key personnel who have a vested interest in an IT project or in IT projects in general. WBS Work Breakdown Structure See “Work Breakdown Structure.” “Work Breakdown Structure” means a hierarchal chart that depicts the deliverables and the work required to produce them. Work Breakdown Structure “Work Breakdown Structure (WBS)” means a deliverableoriented grouping of project elements that organizes and defines the total work scope of the project. Each descending level represents an increasingly detailed definition of the project. 22 B. Work Breakdown Structure 0 WBS Kronos 1 Initiation Phase 2 Requirements/Analysis 3 Design Phase 4 Construction 5 Acceptance 6 Deploy 7 Closeout 1.1 Project Charter 2.1 Business Requirements 3.1 Design Environment 4.1 Establish test environme 5.1 Establish acceptance cri 6.1 Establish deployment env 7.1 Lessons Learned 1.2 Proposed Solution 2.2 Business Process Model 3.2 Technical Architecture 4.2 Refine System Standards 5.2 Review test results 6.2 Deploy operational syste 7.2 Sponsor Sign off 1.3 Timeline 2.3 Logical Data Model 3.3 System Standards 4.3 Configure software 5.3 Accept Test results 6.3 transition support respo 2.4 Functional Specification 3.4 Physical Database 4.4 Integration and System t 5.4 Update materials 3.5 System Prototype 4.5 User Training manuals 3.6 Technical Specifications 4.6 Technical documentation 23 C. MS Projects Schedule TO BE DETERMINED DURING PLANNING PHASE 24 D. Budget-Expenditure Report Category: Budgeted Contract Amount $0.00 (Over)/ Under $0.00 $268,750.00 $0.00 Date Staff: Contractual Services: 07012008 IV&V Contract $30,000.00 $30,589.00 % Exp. 0.0% ($589.49) 0.0% 3.4% Hardware: $182,000.00 $0.00 0.0% Software: $323,000.00 $0.00 0.0% Other: $0.00 $0.00 0.0% Total: $0.00 $0.00 0.0% 25 E. Roles and Responsibilities The role of the steering committee is to: provide strategic oversight for the project; maintain project focus and direction, ensuring that the project stays on track, according to defined goals, requirements and deliverables; resolve conflicts and make decisions regarding proposed changes to project scope and deliverables; provide management support, direction and advice to the project manager and the project management team; monitor project progress and respond to problems as needed on a management level; ensure that projects are in alignment with changing business circumstances and objectives; provide a global perspective that may not otherwise be available to an individual project team. Steering Committee Members Name Group Role Responsibility Anita Westbrook Office of Facilities Management Project Sponsor Steering Committee Member Participate in planning sessions, Ensure project staff availability, funding, and contract management Review and accept the initial risk assessment, management plan, project plan, and budget Provide management review and accept changes to project plan, contract or deliverables Attend executive requirements reviews and resolve requirements problems Empower the Project Manager Communicate with the Department of Health Champion the project Contribute to lessons learned Contact Information Email: Anita.Westbrook@state.nm.us Phone: 505.476.9055 Location: Runnels Bldg - SF 26 Edna Ortiz Office of Facilities Management Project Director Steering Committee Member Tammy Jo (TJ) Montoya Implementation Services Bureau Project Manager Facilitate Executive Committee Meetings Participate in planning sessions Ensure project staff availability, funding, and contract management Review and accept the initial risk assessment, management plan, project plan, and budget Appoint Committee and Team members Provide management review and accept changes to project plan, contracts or deliverables Ensure user and sponsor acceptance Attend executive requirements reviews and resolve requirements problems Adjudicate any appeals relative to Steering Committee decisions Cast the deciding vote where a consensus cannot be reached by the Steering Committee Empower the Project Manager Communicate with the Executive Sponsor and Department of Health Champion the project Contribute to lessons learned Develop initial management plan and project plan Provide leadership for a coordinated project effort Document project assumptions, constraints, and critical success factors Conduct initial risk assessment Facilitate project meetings Assign tasks Track schedules Develop detailed plans with project team for risk, change, quality Ensure project consensus Manage expectations Report on project status Maintain issues log Maintain action items log Promote and practice change management Close-out action items Email: Edna.Oritz1@state.nm.us Phone:505.827.2712 Location: Runnels Bldg - SF Email: Tammyjo.Montoya@state.nm.us Phone: 505.827.2540 Location: Runnel Bldg - SF 27 John Prihoda Department of Finance and Administration Steering Committee Member Robert Mayer Information Technology Services Division Steering Committee Member Value teamwork, cooperation, and planning Champion the project Facilitate lessons learned process Attend and participate in meetings Review and accept deliverables Review presented documentation Balance larger picture versus details of project Review project funding and expenditures Champion the project Attend and participate in meetings Review and accept deliverables Review presented documentation Balance larger picture versus details of project Review project funding and expenditures Champion the project Email: John.Pridoda@state.nm.us Phone: 505.476.7629 Location: Bataan Memorial Bldg - SF Email: Robert.Mayer@state.nm.us Phone: 505.827.0536 Location: Runnels Bldg - SF Business Process Team – This team will create policies and procedures based on Kronos technology capabilities and time reporting expectations of the Office of Facilities Management. The members of the team will consist of subject matter experts. These SMEs will be Hospital Administrators, Human Resources Managers, Payroll Clerks, SHARE and Kronos SMEs. The Project Direct and Project Manager will also serve on this team. A team leader will be identified. Responsibilities for the team members include: Produce the required deliverables according to plan; Use structured communication mechanisms (meetings, status reports and related practices) to promote information flow, informed consent, decision escalation and problem resolution; Cooperate and collaborate, treating all team members with courtesy and respect; To follow assigned work responsibilities, minimizing redundancies and leveraging complementary skills; Promote a positive work environment to encourage an open exchange of ideas, dissent and feedback Technical Team – This team will identify technical requirements for installation of hardware and network bandwidth. Technical support will be needed for SHARE integration. Members of this team will be assigned tasks with due dates. Responsibilities will be the same as the Business Process team. 28 F. Risk Register I: Identification ID # IDENTIFICATION: Potential Risk Event The creation of standard policies and procedures is important for 1 the sucessful implementation of Kronos 2 Availability of subject matter experts from OF, DFA ITSD 3 Newtowrk at NMBHI may not handle the additon of Kronos 4 Network at FBMC may not handle the addition of Kronos. Description This refers to OFM department policies that must be adapted to Kronos capabilities. Alll Facilities employees must be required to follow once they are created. Subject matter experts will be part of the Business Process and/or Technical team and are valuable to the success of this project. It will important to have the support of their functional managers to allocate time for the project. The network at NMBHI is not in the best condition. Bandwidth may not be sufficient to run Kronos. The network at FMBC is not in the best condition. Bandwidth may not be sufficient to run Kronos. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 29 Source 1 Polices created. X 2 Availability of Staff X 3 Network performance at NMBHI X X 4 Network performance at FBMC X X id an ce Tr an sfe re M nc it i e ga tio n Ac ce pt an ce t Impact (Hi, Lo, Med) Av o Q Co s Ti m e ab i Pr ob Prob ua lit y Sc op e lit y s es in hn i Bu s Te c te r In t ID # Ex er n al na l ANALYSIS: Potential Risk Event ca l G. Risk Register II: Analysis Strategy X L H L H H X X M M M H H X X H H M H L X H H M H L Lo Lo Lo Lo Lo Med Med Med Med Med Hi Hi Hi Hi Hi X X X 5 6 7 8 9 10 11 12 13 14 15 16 17 18 30 H. Issue Log Issue # Issue Mgr. Activity Date Activity Date Resolved 1 2 3 4 5 6 7 31