The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Chemical Industry (20110509-20110513) Project Name: Annual 1 million tons 2 - carboxyethyl phosphonic acid phenyl sub-retardant technology projects .......................................................................................................... 7 Project Name: Luoyang Special Biological Technology Co., Ltd. in Europe disinfectant clean production projects .......................................................................................................... 8 Project Name: Annual 50,000 tons of tar into Clean Energy Utilization Project ..................... 8 Project Name: Nanzhao tile walk around -five mountains gas station project ....................... 9 Project Name: Annual 30,000 tons of compound microbial fertilizer project ........................10 Project Name: Using PVP and alkyl ether residue residue distilled water repellent construction of 5,000 tons annual output of the project ........................................................................11 Project Name: Hubei Yihua Chemical Industry Co., Ltd. with an annual output of 10,000 tons of chloral Project .............................................................................................................12 Project Name: Henkel Dragon project a project - an annual output of 29 million tons of industrial adhesives and metal surface treatment agent projects ......... Error! Bookmark not defined. Project Name: Hubei Chunxiang Chemical Co., Ltd. 100,000 t / year agricultural project powdered MAP ................................................................................................................14 Project Name: Hubei Science and Technology Co., Ltd. for Hair plastics calcium hypochlorite and an annual output of 20,000 tons annual output of 4,500 tons of PVC profile production line ................................................................................................................................15 Project Name: 40 000 t / a sodium metabisulfite, 2 million t / a refined ammonium chloride, 20,000 t / a sodium sulfite, 5000t / a loose agent production project .................................15 Project Name: phosphorus oxychloride and recovery of purified terephthalic acid -PTA technology projects .........................................................................................................17 Project Name: China Petroleum gas station project in Henan Dengfeng 9 ...........................17 Project Name: Nanzhao Chengguan Huang Yang Road North Post gas station ....................18 Project Name: Annual Production of 30,000 tons of concrete admixtures and efficient project ......................................................................................................................................19 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Sanmenxia Chemical Co., Ltd. in the series of polypropylene nucleating agent and rare metals extraction agent project ............................ Error! Bookmark not defined. Project Name: Yellow Phosphorus Co., Ltd. Jinning 4,000 tons / year of phosphorus pentoxide plant construction project .................................................................................20 Project Name: Sichuan Kaida Chemical Co., Yang Jiang, wire-bound branch expanded ammonium nitrate explosive drug packaging studio production transformation projects ......21 Project Name: Ji Lin Xinsheng Group annual output of 98,000 tons of refined wood fiber engineering ....................................................................................................................22 Project Name: Jilin Oilfield Company, 2011, the first exploratory well project Baicheng area 23 Project Name: Pesticide Co., Ltd. Jilin century, 5,000 tons / year Project agrochemical additives.........................................................................................................................24 Project Name: Siping Gao Xin Chemical Co., Ltd. with an annual output of 1,500 tons of construction projects initiator EHP ....................................................................................25 Project Name: Bayer -China Co., Ltd. PC compounding production line and supporting logistics ..........................................................................................................................26 Project Name: Zhaoqing Xinfeng annual output of 20,000 tons of environmental protection materials, acrylic acid emulsion, 0.4 tons of polypropylene acid resin New Project...............27 Project Name: 2000 tons of thermoplastic powder coating project .....................................28 Project Name: 20 tons / year sulfuric acid project .............................................................29 Project Name: Annual 50,000 tons of industrial-level MAP projects .....................................29 Project Name: Hubei Chu Kai Metallurgy Co., Ltd production of 60,000 tons of electrolytic lead project ....................................................................................................................30 Project Name: 1200t / a chlorinated phenol products and 3 - methyl -4-- nitrobenzoic acid project ...........................................................................................................................31 Project Name: Hubei Fertilizer Co., Ltd. Chung Chu 20 million tons / year of MAP projects ..32 Project Name: Taizhou East Petrochemical Co. expand the amount of heavy oil to olefin transformation project -update ........................................................................................33 Project Name: 150kt / a pyrite and 150kt / a MAP project .................................................34 Project Name: Xinjiang Xinhua Chemical Fertilizer Co., Ltd. technical transformation and liquid ammonia, Ammonia Tank Filling Station relocation project ........................................35 Project Name: Xishuangbanna day sea fertilizer plant with an annual output 10 million expansion project of technological transformation t fertilizer ..............................................36 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Multi-purpose general contractor technical transformation P -EPC projects ........................................................................................ Error! Bookmark not defined. Project Name: oil reconcile project ...................................................................................38 Project Name: annual 250,000 tons of adipic acid project ..................................................39 Project Name: Plastic Packaging Co., Ltd. Hebei, China is an annual output of 100 million new plastic technology projects .......................................................................................40 Project Name: Medical Technology Co., Ltd. Zhengzhou Goldman Sachs 500 tons and 500 tons of benzo-furanone production projects o hydroxybenzonitrile .....................................41 Project Name: Shanxi Orchid Science and Technology Venture Co., Ltd. nitro compound annual output of 300,000 tons 50,000 tons 70,000 tons of melamine project adipic acid .....41 Project Name: Shaanxi Science and Technology Co., Ltd. Po of construction projects persulfate .......................................................................................................................42 Project Name: 12 tons / year of caustic soda oxygen cathode high-tech energy-saving demonstration project .....................................................................................................43 Project Name: 15 tons / year of special solvent oil production project ................................44 Project Name: Seven tree oil SW8-SW10 Well Shahezi New ground reservoir construction projects ..........................................................................................................................45 Project Name: Jilin Oilfield Company, the British oil platform encryption capacity building projects ..........................................................................................................................46 Project Name: Air 五七 ○ four plants safety improvement projects and infrastructure upgrades ........................................................................................................................47 Project Name: Xiangtan - Loudi - Shaoyang gas pipeline project ........................................48 Project Name: Hancheng - Weinan - specifically for coalbed methane pipeline in Xi'an ........49 Project Name: Annual fifty thousand tons bio-organic fertilizer project ...............................50 Project Name: Industrial Group Shangrao City Huiquan annual 800,000 tons of sulfuric acid project ...........................................................................................................................51 Project Name: Shanxi Orchid Science and Technology Venture Corporation projects an annual output of 60,000 tons of POM ..........................................................................................52 Project Name: Guangxi Beihai Penshibao limited liability company annual output of the third generation Penshibao million bags project ........................................................................52 Project Name: Anhui Golden Source Chemical Co., Ltd. 10,000 tons / year project neopentyl glycol ............................................................................... Error! Bookmark not defined. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: V Longquan gas field development and construction of oil and gas exploration in 2010 project ...............................................................................................................54 Project Name: Jilin Sheng Jilin Chemical Industry Co., Ltd. with an annual output 30,000 tons of biological environment-friendly bio-diesel project ..........................................................55 Project Name: carbon fiber research and development of new materials production project 56 Project Name: two deep processing of agricultural products first phase of an annual output of 300,000 tons of organic fertilizer projects prime of life ......................................................57 Project Name: Chengde City Shuangluan Qu Heng Kun Oil Co. depot oil marketing new construction ....................................................................................................................58 Project Name: Bao carbon black -Florida Limited 4 tons / year of carbon black construction projects ..........................................................................................................................59 Project Name: Nine Dragon gas field gathering Link ..........................................................59 Project Name: Four Chuanda Xing Bao Chemical Co., Ltd. 150,000 t / a tar processing projects ..........................................................................................................................60 Project Name: Tangshan liquefied natural gas, pipeline projects ........................................61 Project Name: Shanxi Liheng annual output of 145 million tons of steel coking project ........62 Project Name: annual output of 120 tons of coking capacity replacement project ................63 Project Name: China Chemical Co., Ltd. Lai'an Race 50,000 tons annual output of renewable wafer cutting fluid mortar separation project ....................................................................64 Project Name: Huizhou City, a of the expansion project of the Green Ecological Technology Co., Ltd. .........................................................................................................................65 Stages of progress: environmental impact assessment ......................................................65 Project Name: valaciclovir hydrochloride production of new technology industry development projects ..........................................................................................................................66 Project Name: Puyang letter Yu Petroleum Machinery Co., Ltd. 3,000 tons of sulfur-methyl phenol formaldehyde resin, 3,000 tons of polymer fluid loss additive construction projects ..66 Project Name: Nanjing Airport State Oil Co. storage depot Nanjing airport expansion project ......................................................................................................................................67 Project Name: Elion Resources Group Co., Ltd. with an annual output 120 million tons of dimethyl oxalate project .................................................... Error! Bookmark not defined. Project Name: Economic Development Zone, Xi Wo Alashan Chemical Co., Ltd. with an annual output of 30,000 tons of chlorinated hydrocarbons project .....................................68 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: 50 × 104t / a non-mercury catalyst demonstration projects of industrial upgrading of PVC ............................................................................................................69 Project Name: Hebei International McKinnon Yuntianhua new annual 40 million tons of fertilizer Limited acid compound fertilizer project of Three Elements ...................................70 Project Name: Hebei Co., Ltd. Yu Wei food preparation projects built capacity of 4000 tons of inositol ...........................................................................................................................71 Project Name: Hebei Agricultural Development Group Co., Ltd. three high 200,000 tons annual output of slow-release fertilizer production line expansion project ...........................71 Project Name: Yangquan Jingcheng Chemical Co., Ltd. with an annual output of 50,000 tons of amino acid and related construction projects 20 million tons of sulfuric acid plant ...........72 Project Name: East Guangdong LNG project .....................................................................73 Project Name: Shanxi Desheng Chemical Co., Ltd. 10,000 tons / year anthracene series of products and 1000 tons / year production and construction projects Violet RL .............. Error! Bookmark not defined. Project Name: 80 tons / year vacuum salt corrosion engineering construction projects ........75 Project Name: China-Burma oil pipeline project .................................................................76 Project Name: China-Burma gas pipeline project ................. Error! Bookmark not defined. Project Name: Shiyou Yun Nan Anning 10 million tons / year refinery project ............... Error! Bookmark not defined. Project Name: Annual 10 million tons of green high-tech project of surfactant ....................80 Project Name: Xu Xin Petroleum Products Co., Ltd. Huanghua new oil logistics projects ......81 Project Name: Sartomer -Guangzhou Chemical Co., Ltd. Expansion Phase ..........................82 Project Name: Natural Gas Co., Ltd. Inner Mongolia States to 3 × 24 tons / year of LNG Clean Energy Project Civil ................................................................................................83 Project Name: 200 tons trityl losartan, 200 tons of the three intermediate benzyl 基厄贝沙坦 2 project with an annual output 150 tons of losartan potassium, irbesartan 150 tons, 100 tons Valerian losartan, 20 tons of candesartan cilexetil, olmesartan medoxomil 20 tons, 10 tons of non Masha Tan, 10 tons of non Busuo Tan seven fine, bake, package technology projects ..........................................................................................................................84 Project Name: Recycling 14,040 tons of anhydrous potassium fluoride, 5,100 tons of sulfuric acid 93% cleaner production project ................................................................................84 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: 100 tons T1-3, 60 吨 ketone ene sulfone, benzyl amine fluoride 100 tons, 100 tons CDT, 25 吨 DFPB, 60 吨 MFBA and TV flat panel display materials, 350 tons of high-tech industrialization project ...................................................................................................85 Project Name: Construction of an annual output of 44,000 tons of Phosphate Project .........86 Project Name: annual output of 5,000 tons of polyvinyl butyral resin project ......................87 Project Name: Hebei Agricultural Development Co., Ltd. Yu Chen corn straw utilization project ...........................................................................................................................87 Project Name: WEI Xian Schindler straw gas supply new energy Co., Ltd. New WEI Xian Wei joint urban household biogas Straw .................................................................................88 Project Name: Petroleum and Chemical Co., Ltd Puyang roads lead to 20,000 tons of annual output value of the project composite material blocking agent ...........................................89 Project Name: Puyang City, Oriental Bell Industrial Co., Ltd. with an annual output of 1,000 tons of phenolic resin construction projects ......................................................................89 Project Name: annual 15 million tons of construction projects green paint and resin ...........90 Project Name: Xingtai Coal Chemical Co., Ltd. Xuyang 10 million tons / year project cyclohexanone ................................................................................................................91 Project Name: Xingtai Blue Fine Chemical Co., Ltd. with an annual output 50,000 tons highperformance surfactant production line technological transformation project ......................91 Project Name: Henan Billions Chemicals Co., Ltd. 200,000 tons / year high-grade rutile titanium dioxide production line technological transformation project .................................92 Project Name: Puyang City, Yu Long Mechanical Chemical Co., Ltd. with an annual output of 8,000 tons of construction projects lubricant .....................................................................93 Project Name: Production of 200,000 tons of caprolactam project ......................................94 Project Name: Puyang City, Silver Tai Yuen Industrial Co., Ltd. with an annual output of 3,000 tons of construction projects dimethyl hydantoin .....................................................94 Project Name: The first gas station relocation project Guohong .........................................95 Project Name: Biological release fertilizer material projects ................................................96 Project Name: phosphate rock flotation agents and fertilizer production process agent project -update ..........................................................................................................................96 Project Name: Project cefixime active ester ......................................................................97 Project Name: Wan Rong Wansheng rubber industry agents Co., Ltd. 80,000 tons / year of formaldehyde Project Phase .............................................. Error! Bookmark not defined. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Annual 1 million tons 2 - carboxyethyl phosphonic acid phenyl sub-retardant technology projects Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project offices located in Fuling District, Shilong village Longqiao streets, annual output of 10,000 tons 2 - carboxyethyl phosphonic acid phenyl times retardant line. The total investment is about 19 million yuan. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel :******* Fax :******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Luoyang Special Biological Technology Co., Ltd. in Europe disinfectant clean production projects Progress stage: the record Construction period: May 2011 -2013 in March Major equipment: high pressure liquid, ultraviolet disinfection, the preparation of cans, efficient mixer, Automatic Packing machine -for reference Project: Project is located in Luoyang Airport Industrial cluster zone, Luoyang Special Biological Technology Co., Ltd. European disinfectant clean production projects, covering 15 acres, building workshop, office and other 8,000 square meters, the use of CDM's technology and the U.S. production of disinfectant liquid, process process: raw materials, liquid - sterilization - Laboratory - Weighing - Configuration - Mixed Weighing - Packaging - Inspection storage - the factory. Major equipment high pressure liquid, ultraviolet disinfection, preparation of cans, efficient mixer, Automatic Packing machine. After completion of the project, the production of 2000 pieces disinfectants, mainly used for livestock and family, schools, supermarkets and other public places better. The total investment is about 20 million yuan, 12 million yuan raised by the enterprise, domestic bank loans 8,000,000 yuan. Owner:******* Postal Address:******* Contact:******* Tel:******* Project Name: Annual 50,000 tons of tar into Clean Energy Utilization Project Progress stage: under construction Construction period: April 2011 -2011 in December Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: storage tank, storage tank, heating tank, distillation column, water pumps, fuel pumps, thermal oil heaters -for reference Project: The project is located north of the Cloud Gate Huixian Chemical Industrial Park, an annual output of 50,000 tons of tar into the comprehensive utilization of clean energy projects, the new annual output of 50,000 tons of tar into clean energy utilization project, hire the original old paper mill factory in Jinhua, not new land acquisition, no need for any land procedures. Closed the use of advanced production technology, to tar and oil additives as the main raw material, through the preheating, extraction and separation, reconciliation, fuel oil emulsion and other processes to produce clean fuel oil and solvent oil, and organic acids such as precision machining products. Major equipment storage tank, storage tank, heating tank, distillation column, water pumps, fuel pumps, thermal oil heaters. The total investment is about 68 million yuan, 30 million yuan raised by the company 38 million yuan of domestic bank loans. Owner:******* Post Code:******* Contact:******* Tel:******* Project Name: Nanzhao tile walk around -five mountains gas station project Progress stage: the record Construction period: May 2011 -2012 in March Major equipment: Spear, double pumps, the tanker -for reference Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in two high-speed Nanzhao five mountain wide exit, Nanzhao tile walk around -five mountains stations, a new gas station, the actual net area of 4788.4 square meters, the tent 600 square meters, the station house about 300 square meters, two guns, two pumps, the tanker 4, the annual output value of 1200 million. The total investment is about 10 million yuan, the enterprise itself. Construction unit:******* Postal Address:******* Contact:******* Tel :******* Project Name: Annual 30,000 tons of compound microbial fertilizer project Progress stage: under construction Construction period: April 2011 In April -2012 Main equipment: hot air furnace, belt conveyors, dryers, separators, mixers, dryers, cooling dust removal device, granulating machine, the screen cylinder, shredders, packaging and other measures -for reference only Project: Project is located in Sanyang village of Sanyang dial Wuzhi County Road, 500 meters north east, with an annual 30,000 tons of compound microbial fertilizer project, which covers about 10 acres and a building area of 5,000 square meters, the main construction plant and supporting facilities. Technology: mainly peat soil, humic acid, inorganic fertilizer type, bacteria and other raw materials, the carrier material - crushed vector base ingredients - mixing - even mixing - granulation - low temperature drying - test - weighing and packing - storage. Hot stove major equipment, belt conveyors, dryers, separators, mixers, dryers, cooling dust removal device, granulating machine, the screen cylinder, mill, measuring and packing machines. The total investment is about 500 million, 300 million raised by the enterprise 200 million domestic bank loans. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Owner:******* Post Code:******* Contact:******* Tel:******* Project Name: Using PVP and alkyl ether residue residue distilled water repellent construction of 5,000 tons annual output of the project Progress stage: the record Construction period: May 2011 -2011 in December Major equipment: dissolving tank, storage tanks, transport vehicles and analysis of laboratory equipment for reference only Project: Project is located in Jiaozuo City, Division of Resources Comprehensive Utilization of new R & D Co., Ltd. hospital, the use of PVP residues and alkyl vinyl ether distillation residue with an annual output of 5,000 tons of water repellent construction projects, with an annual output of 5,000 tons of water repellent construction projects, the use of open source companies love the new not currently in the synthesis of the rational use of polyvinylpyrrolidone -PVP PVP-product of the process residues -mainly distillation carbonization of PVP, asphalt-like solid and in the production of alkyl vinyl ether by-product of the process of distillation residue - The main components of organic polymers, by room temperature residue dissolved, and then by modified asphalt and waste polystyrene to make it into a good building waterproofing agent, using the original plant, only increased dissolution tank, storage tank, transport vehicles and analysis of laboratory equipment. The project is no process wastewater, waste gas, waste generation, all the ingredients are transformed into products, does not cause secondary pollution. The company has a full set of comprehensive utilization of qualified business PVC residue, with the accelerated pace of urbanization and the construction of the arrival of the South, construction waterproofing agent is in great demand. The total investment is about 15.5 million yuan, the enterprise itself. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Post Code:******* Contact:******* Tel:******* Project Name: Hubei Yihua Chemical Industry Co., Ltd. with an annual output of 10,000 tons of chloral Project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Xiao Ting Zone project is located in Yichang Park, chloral annual output of 1 million lines; building chloride plant, distillation plant, raw materials storage areas and other main and auxiliary works; construction of power supply, water supply systems, drainage systems, recycled water stations, fire water and other public works; construction of gas absorption tower, the accident pool, green and other environmental protection facilities. 10,000 tons of chloral project. The total investment is about 43.04 million yuan. Owner:******* Post Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Designer:******* Postal address:******* Post Code:******* Tel :******* Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: F6 project is located in Shanghai Chemical Industry Park Lot -Near East River Road, industrial adhesives and metal surface treatment plant and supporting facilities construction, EVA hot melt 60,000 tons / year hot-melt pressure-sensitive adhesive 60,000 tons / year, hot melt glue 36,000 tons Edge / year, 35,000 tons of water-based adhesive / year, 18,000 tons of water-based adhesive cigarettes / year polyurethane dispersions 03,000 tons / year, lubricants and release agents, etc. -Acheson products 10,000 tons / year of liquid metal pretreatment chemicals 60,000 tons / year, 10,000 tons of metal powder pretreatment / year. The total investment is unknown. Construction Unit:******* Post Code:******* Contact:******* Tel:******* Fax:******* Design:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Fax:******* Project Name: Hubei Chunxiang Chemical Co., Ltd. 100,000 t / year agricultural project powdered MAP Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: water treatment equipment, air separation equipment, blowers, electric furnace, the burning of sulfur furnace, converter, furnace, filter, powder tower, into the tower, drying and absorption towers -for reference Project: Baokang Xiangcheng Economic Development Zone project is located in Industrial Park, the new 100,000 tons / year production line of agricultural powdered MAP, supporting the construction of 80,000 tons / year -P2O5 phosphoric acid plant and machine repair and other engineering tests. The total investment is about 49.8 million yuan. Owner:******* Post Code:******* Contact:******* Tel :******* Design Units:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Hubei Science and Technology Co., Ltd. for Hair plastics calcium hypochlorite and an annual output of 20,000 tons annual output of 4,500 tons of PVC profile production line Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in Hubei Province should Mafang East City Industrial Park East, the new annual output of 20,000 tons of calcium hypochlorite and an annual output of 4,500 tons of PVC profile production line. The total investment is unknown. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Contact:******* Tel:******* Project Name: 40 000 t / a sodium metabisulfite, 2 million t / a refined ammonium chloride, 20,000 t / a sodium sulfite, 5000t / a loose agent production project Stages of progress: environmental impact assessment Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in City of East chemical industry should be Yuanyuan area, New: 40 000 t / a sodium metabisulfite, 2 million t / a refined ammonium chloride, 20,000 t / a sodium sulfite, 5000t / a loose agent in the production line. Sodium metabisulfite, mainly in chemical, pharmaceutical industry for the production of sodium hydrosulfite, sulfamethazine, metamizol, caprolactam, as well as chloroform, benzene, formaldehyde, styrene sulfone and purification. Ammonium chloride is mainly used for dry batteries, storage batteries, ammonium salt, leather tanning, electroplating, precision casting, medicine, photography, electrodes, adhesives, yeast nutrients and dough improving agent. Sodium sulfite as an oxygen scavenger in the printing industry and bleach, paper industry as lignin removal agent. Man-made fiber textile industry as a stabilizer. Electronics industry for the manufacture of photosensitive resistance. Water treatment industry for electroplating wastewater, drinking water treatment. The total investment is unknown. Construction Unit:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Fax :******* Designer:******* Postal Address:******* Contact:******* Tel :******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Fax :******* Project Name: phosphorus oxychloride and recovery of purified terephthalic acid -PTA technology projects Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project offices located in Fuling District, Shilong village Longqiao streets, annual output of 1,000 tons of phosphorus oxychloride, recovery of purified terephthalic acid -PTA 20000 tons of production lines. The total investment is about 10 million yuan. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel :******* Fax :******* Project Name: China Petroleum gas station project in Henan Dengfeng 9 Progress stage: the record Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: June 2011 -2011 in December Major equipment: tanks, 4 guns Fiscal tanker -for reference Project: Jun Zhao Dengfeng City project is located in the upper and lower speed rural population, China Petroleum gas station in Henan Dengfeng 9 projects with a total area of 3.58 acres, the main building of 800 square meters of tent gas stations, the station house is 360 square meters, the main tank equipment 4x30 m, 4 sets of 4 guns Fiscal tanker. 5,000 tons of refined oil sales, the sales income 45 million yuan, profits of 80 million. The total investment is about 7.5 million yuan, the enterprise itself. Owner:******* Postal Address:******* Contact:******* Tel:******* Project Name: Nanzhao Chengguan Huang Yang Road North Post gas station Progress stage: the record Construction period: May 2011 -2012 in March Major equipment: Spear, double pumps, the tanker -for reference Project: The project is located Nanzhao northbound Chengguan Huang Yang Gang, Huang Yang Road North post Chengguan Nanzhao gas stations, a new gas station, the actual net area of 2757.5 square meters, the canopy of 600 square meters, the station house about 300 square meters, Spear, double pumps, the tanker 4. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment is about 10 million yuan, the enterprise itself. Construction unit:******* Postal Address:******* Contact:******* Tel :******* Project Name: Annual Production of 30,000 tons of concrete admixtures and efficient project Progress stage: under construction Construction period: April 2011 -2011 in December Major equipment: spectrum analyzer, oven, micro mixers, precision balances, pressure tester, and other laboratory test equipment; storage tanks, mixers, pumps, reactor, etc. -for reference only Project: Project is located in Wen County north of the city industrial zone, with an annual output of 30,000 tons of high performance concrete admixtures, construction scale is 30,000 tons annual output of high concrete admixture, the project site on the company's use of the existing office building, workshops, warehouses and other infrastructure, Main process: self-made sodium gluconate, outsourcing Luoyang acrylic monomers, polyether, inhibitor, carrying agent and other raw materials - Ester - Configuration monomer solution aggregate - in and - finished - packaging and storage. Need to purchase spectrum analyzer, oven, micro mixers, precision balances, pressure tester, and other laboratory test equipment; storage tanks, mixers, pumps, reactor and other equipment. The project is widely used in high-speed rail construction, highways, major airports, giant dams, concrete high-rise buildings and other large infrastructure projects. The total investment is about 30 million yuan. Owner:******* Postal Address:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Progress stage: the record Construction period: May 2011 -2012 in July Major equipment: reactor, spray dryer, centrifuges, distillation reactor, from alcohol control, formylation and oxime reaction kettle, vacuum distillation kettle, etc. -for reference only Project: Project is located in Shan County gathering area, Sanmenxia Chemical Co., Ltd. in the series of polypropylene nucleating agent and rare metals extraction agent project is planned to build an annual output of 390 tons of polypropylene nucleating agent NP-508, NP-509, NB-328 and annual output of 3,300 tons metals extraction agent -ethylhexyl phosphate ester, 2 - ethylhexyl phosphoric acid 2 - ethylhexyl fat production, fat tributyl phosphate, copper extractant production plant; Process Technology: Catalytic nucleating agent used aqueous solution of formaldehyde and Lewis acid catalyzed phospholipid oxychloride method; extracting agent were used phosphorus oxychloride / iso-octanol esterification, phosphorus oxychloride / butanol esterification, alcohol magnesium / POM acid of the oxime and hydroxylamine hydrochloride method; main reactor equipment, spray dryer, centrifuges, distillation reactor, from alcohol control, formylation and oxime reaction kettle, vacuum distillation kettle and so on. The total investment is about 86 million yuan. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Project Name: Yellow Phosphorus Co., Ltd. Jinning 4,000 tons / year of phosphorus pentoxide plant construction project Stages of progress: environmental impact assessment Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 -2012 Major equipment: water treatment equipment, air separation equipment, blowers, electric furnace, the burning of sulfur furnace, converter, furnace, filter, powder tower, into the tower, drying and absorption towers -for reference Project: Jinning County Street project is located in Township Ping Jinning red to yellow phosphorus Co. plant in the region, the main construction content for the device infrastructure, transformation of the old plant, finished product warehouse construction, water supply system reconstruction and electricity, gas, environmental protection, fire and other auxiliary infrastructure. The production scale of 4,000 tons / year of phosphorus pentoxide, phosphoric acid by-product of 320 tonnes -equivalent to 85% H3PO4. The total investment is unknown. Owner:******* Post Code:******* Contact:******* Tel :******* Designer:******* Postal Address:******* Contact:******* Tel :******* Fax :******* Project Name: Sichuan Kaida Chemical Co., Yang Jiang, wire-bound branch expanded ammonium nitrate explosive drug packaging studio production transformation projects Stages of progress: environmental impact assessment Construction period: 2011 -2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: crushers, screw conveyor, the water phase cans, oil cans, emulsifier, automatic charging machine -for reference Project: Project is located in Luzhou City, Ocean Longmatan district town by the main works projects, aided engineering, public works, storage engineering, environmental engineering, and office and living facilities for composition. Charge the main project Studio Workshop packaging; aided engineering part of the use of the original buildings, including the control room, guard post, mechanic room. Utility use of the original boiler room, transformer substation, high pool, fire water, fire water pump house and so on. Ammonium nitrate storage projects are using the original database, comprehensive materials library, library materials, oil, packaging materials, libraries, transit package library, groceries libraries. Both office and living facilities for the use of existing facilities, only for the necessary repairs. The total investment is unknown. Construction Unit:******* Post Code:******* Contact:******* Tel:******* Design Units:******* Postal Address:******* Contact:******* Tel :******* Project Name: Ji Lin Xinsheng Group annual output of 98,000 tons of refined wood fiber engineering Stages of progress: environmental impact assessment Construction period: 2011 -2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: rejection machine, set cotton control, curing oven, bag filter, etc. -for reference only Project: Project is located in Jilin Province, mayor of White City Zhenlai Zhenlai Green Road on the 28th, the new annual output of 98,000 tons of refined wood fiber production line and auxiliary facilities put into operation an annual output of 98,000 tons of refined wood fibers. The total investment is unknown. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Designer:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Project Name: Jilin Oilfield Company, 2011, the first exploratory well project Baicheng area Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: drilling rig, derrick, diesel engine, generator, mud circulation reserve tank, etc. -for reference only Project: Daan is located within the White City project, a total of eight exploration wells deployment. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment is unknown. Construction Unit:******* Postal address:******* Post Code:******* Tel :******* Designer:******* Postal address:******* Post Code:******* Tel :******* Project Name: Pesticide Co., Ltd. Jilin century, 5,000 tons / year Project agrochemical additives Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Dawn project is located in Jilin City No. 38, the construction scale: 5,000 tons / year of agrochemicals additives -water emulsion special emulsifier 1,500 tons / year, suspended emulsion special emulsifier 2,000 tons / year, microemulsion special emulsifier 1,500 tons / years. The total investment is unknown. Owner:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Designer:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Project Name: Siping Gao Xin Chemical Co., Ltd. with an annual output of 1,500 tons of construction projects initiator EHP Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: The project is located north of Siping City, MTR Eastern Chemical -Ye Village, the new annual output of 1,500 tons of EHP initiator production line and auxiliary facilities, put into production scale: annual output of 1,500 tons EHP initiator. The total investment is unknown. Owner:******* Post Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Designer:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Project Name: Bayer -China Co., Ltd. PC compounding production line and supporting logistics Stages of progress: environmental impact assessment Construction period: 2011 -2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting -for reference Project: Project is located in Shanghai Chemical Industrial Park 82 Mu Hua Road, Lot F3, the project will be integration of Shanghai Chemical Industrial Zone, base of the Bayer polycarbonate blends the original plant, expansion of production lines and finished blends logistics packing facilities, not need to purchase land, public works and integrated facilities -including control building, laboratories, office buildings, etc., some rely on existing facilities. Project is expected to be completed the end of the first quarter of 2014 mechanical completion. The total investment is unknown. Owner:******* Post Code:******* Contact:******* Tel :******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Designer:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Project Name: Zhaoqing Xinfeng annual output of 20,000 tons of environmental protection materials, acrylic acid emulsion, 0.4 tons of polypropylene acid resin New Project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: High-tech project is located in Zhaoqing Wang Sha Lek large industrial park, planned area of 5462.8 m2, building area 4262.2m2. Annual output of 20,000 tons of polypropylene acid emulsion, 0.4 tons of polypropylene acid resin. The total investment is about 60 million yuan. Owner:******* Postal Address:******* Contact:******* Tel :******* Design by: Guangdong Provincial Environmental Protection Engineering Research and Design Institute EIA agencies Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Contact Person:******* Tel :******* Fax :******* Project Name: 2000 tons of thermoplastic powder coating project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: synthesis, synthesizer tank, sink, filter press, drying systems, air preheater, reactor -for reference Project: Project is located in the town of Sin City Jiangdu fairy Industrial Park, the project planning area of 3700m2, the new annual output of 2,000 tons of thermoplastic powder coating production lines. The total investment is about 50 million yuan. Owner:******* Postal address:******* Post Code:******* Contact person: Liu Bing Tel:******* Designer:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Fax :******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: 20 tons / year sulfuric acid project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: reactors, compressors, cracking furnace, dryer, granulator, extruder, water treatment equipment -for reference Project: Baokang Xiangcheng Economic Development Zone project is located in Industrial Park, 280 acres of land -two phases construction of phosphorus chemical production base, with an annual output of 20 tons of sulfur supporting the new acid plant and public works, low temperature heat recovery, heat power generation, machine repair tests, 10415m2. The total investment is about 49.9 million yuan. Owner:******* Post Code:******* Contact:******* Tel :******* Design Units:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Project Name: Annual 50,000 tons of industrial-level MAP projects Stages of progress: environmental impact assessment Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 -2012 Major equipment: water treatment equipment, air separation equipment, blowers, electric furnace, the burning of sulfur furnace, converter, furnace, filter, powder tower, into the tower, drying and absorption towers -for reference Project: The project is located in Xiangcheng Economic Development Zone, Xiangyang City Baokang Industrial Park, 280 acres of land -two phases of phosphorus chemical production base in the construction of which a new annual output of 50,000 tons of industrial grade MAP and public works, warehouse, staff shift housing, office buildings and so on. The total investment is about 49.9 million yuan. Owner:******* Post Code:******* Contact:******* Tel :******* Design Units:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Project Name: Hubei Chu Kai Metallurgy Co., Ltd production of 60,000 tons of electrolytic lead project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: roaster, multi chamber furnace, electrolytic cell, the frequency electric furnace, electrolyte cooling towers, corrosion resistant pumps, filter, air compressor, etc. -for reference only Project: Project is located in village of Laohekou fairy Du Zhen Wang, the project built structures for the frame 6800m2 production plant. And the main function of supporting the project and the actual needs, to be set to the drainage system: the production of process water systems, domestic water supply system, sewage disposal systems, fire hydrant water supply system, drainage system. Production of 60,000 tons of electrolytic lead. The total investment is about 30 million yuan. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Designer:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Project Name: 1200t / a chlorinated phenol products and 3 - methyl -4-- nitrobenzoic acid project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: The project is located Laohekou Chemical Road 32, New 1200t / a chlorinated phenol products and 3 methyl -4-- nitrobenzoic acid product line. The total investment is about 4.7 million yuan. Owner:******* Post Code:******* Contact:******* Tel :******* Designer:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Project Name: Hubei Fertilizer Co., Ltd. Chung Chu 20 million tons / year of MAP projects Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: water treatment equipment, air separation equipment, blowers, electric furnace, the burning of sulfur furnace, converter, furnace, filter, powder tower, into the tower, drying and absorption towers -for reference Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Thunder Creek project is located in the city should Dayan Industrial Park • The new levy of industrial land 65736.6m2, producing an annual output of 200,000 tons of a new line of MAP and its supporting utilities, use of existing public facilities, and supporting the construction of ancillary facilities. The total investment is about 48.5 million yuan -500 million working capital. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Designer:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Project Name: Taizhou East Petrochemical Co. expand the amount of heavy oil to olefin transformation project -update Progress in stages: approval approval Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, compression machine, granulating machine, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps , centrifugal fan, steam vacuum pumps, multistage pumps, liquid pumps, etc. -for reference only Project: Project is located in Taizhou City, Jiangsu Province Economic Development Zone, Riverside Industrial Park, including annual output of 100 tons of heavy oil to olefins unit -main unit, an annual output of 10,000 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. tons of sulfur recovery capacity of 40 tons of acid vapor time to mention the joint device -green device public works and ancillary works and some other systems. The total investment is 672.26 million yuan. Owner:******* Post Code:******* Contact:******* Tel :******* Project Name: 150kt / a pyrite and 150kt / a MAP project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: enamel reactor, stainless steel centrifuge, PTFE pump -for reference only Project: Project is located in Economic Development Zone, Xiangyang more than Xiangcheng Lake City Chemical Industrial Park, construction of the existing plant area 150kt / a pyrite and 150kt / a MAP expansion of the project, its part of the production equipment used by Tianshun the company's old equipment, lack of some of the new purchase. Raw material yard, finished product warehouse, factory water supply and drainage, electricity, communications, roads and other infrastructure used Zedonggongsi available. The total investment is about 48 million yuan. Owner:******* Postal address:******* Post Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel :******* Designer:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Project Name: Xinjiang Xinhua Chemical Fertilizer Co., Ltd. technical transformation and liquid ammonia, Ammonia Tank Filling Station relocation project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: gasifier, compressors, tanks, pipes, valves, tank, pressure vessel -for reference Project: Wulabo project is located in Urumqi, the main project for the construction of 2 sets of 400m3 liquid ammonia tank, ammonia filling station from the production area south of urea plant ammonia processing plant moved to ammonia storage tank area, and supporting construction of cofferdams, fire prevention and fire dike, monitoring system to ensure that tanks meet the safety requirements. The total investment is about 7.99 million yuan. Construction unit:******* Postal Address:******* Contact:******* Tel :******* Design unit: Xinjiang Chemical Engineering Design Institute -EIA agencies Postal Address:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel :******* Fax :******* Project Name: Xishuangbanna day sea fertilizer plant with an annual output 10 million expansion project of technological transformation t fertilizer Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: reactor, condenser, testing equipment, instruments, water treatment equipment, automatic control systems, compressors, heat exchangers -for reference Project: Project is located in the town of Jinghong City, Meng Yang Meng Yang farms, covering about 67 acres, the site coordinates: longitude 100 ° 52'06 .5 〃, 〃 latitude 22 ° 05'37 .2, altitude 790m, from the town government Mengyang 2.5 km away from Jinghong city level from about 23km. Annual output of 100,000 t of urea - ammonium phosphate - potassium fertilizer -the fertilizer. The total invested 800 million -of which, production equipment, plant and other investment of 7.17 million, 83 million investment in environmental protection, environmental protection investment in total investment of 10.38%.. Owner:******* Postal Address:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Title: Expansion of an annual output of 30,000 tons of sodium gluconate project Progress stage: under construction Construction period: April 2011 -2011 in December Major equipment: spectrum analyzer, ovens, precision of days equal laboratory equipment, autoclave and other equipment -for reference Project: Wen County Industrial Park located north of the project, the expansion project with an annual output of 30,000 tons of sodium gluconate, the construction scale for the expansion of annual production capacity of 30,000 tons of sodium gluconate, the project site on the company's use of the existing office building, workshops, warehouses and other infrastructure , the original 10,000 tons of sodium gluconate to transform the production line by tapping the potential of existing equipment and catalyst formulations to improve and increase delivery, especially in the aspects of the production process to speed up the oxidation reaction rate to achieve expansion of 20,000 tons, the main process : outsourcing Shanxi oral glucose - hydrolysis oxidation - Three Way - Concentration - Crystal - separation - drying - Laboratory - Finished - packaging and storage. Need to purchase spectrum analyzer, oven, Precision days equal laboratory equipment, autoclave and other equipment. The total investment is about 15 million yuan. Owner:******* Postal Address:******* Contact:******* Tel:******* Stages of progress: preliminary design Construction period: 2011 -2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: ball mill, reactors, vacuum filter, no cooling of the roll extrusion granulation of organic, automation control systems, water treatment equipment. -For reference Project: Project is located in Xining, Qinghai, Xining -national Gan River Economic Development Zone Industrial Park, about 35 kilometers from Xining city, county Huangzhong 6 km, about 2600 meters above sea level, defined as the production of ammonium phosphate sulfur based, compatible multi-purpose production of NPK fertilizer production plant, drum granulation process in the spray device, based on the configuration and process transformation through increased, while meeting the sulfur production of ammonium phosphate, NPK production needs. The total investment is not set, the enterprise itself, the bank loan. Owner:******* Postal Address:******* Tel :******* Fax :******* , Project Name: oil reconcile project Progress stage: under construction Construction period: April 2011 -2012 in December Major equipment: filter, fractionating tower, blending tanks, storage tanks, laboratory equipment, etc. -for reference only Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The project is located on the town Xichuan County Industrial Park, lubricants reconcile the project covers an area of 9.574 hectares, annual production capacity of 3,000 tons of various series of lubricants. Technology: the main raw material of lubricating oil -base oil and additives source: base oil from Xinjiang Karamay, Dushanzi, Lanzhou refinery; additives additives from Lanzhou professional manufacturer of standard blending, to reconcile. Major equipment filter, fractionating tower, blending tanks, storage tanks, laboratory equipment. The total investment is about 19.17 million yuan, the project is an investment of 9.17 million yuan, the second phase investment of 10 million yuan. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Project Name: annual 250,000 tons of adipic acid project Progress stage: the record Construction period: August 2011 In August -2014 Major equipment: reactors, towers, centrifuges, increase concentration, compressors, dryers, pumps, heat exchangers and so on. -For reference Project: Project is located in Pingdingshan chemical industry gathering area, annual 25 million tons of adipic acid project, which covers 800 acres, producing 25 million tons of adipic acid products. Construction Content: Annual output of 270,000 tons a nitric acid plant; annual output of 100,000 tons of cyclohexanol device sets; annual output of 125,000 tons of adipic acid plant sets; annual output of 125,000 tons of adipic acid plant two sets of drying; by-product of annual output of 10 million tons of cyclohexane cyclohexanone device set; supporting the construction of boilers, sewage treatment plants and other public works and auxiliary facilities. Constructed in two phases. Major equipment reactors, towers, centrifuges, increase Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. concentration, compressors, dryers, pumps, heat exchangers and so on. Centrifuge, a device such as thickening of imports, and the remaining equipment are made equipment. The total investment is about 3.21 billion yuan, of which 963 million yuan raised by the enterprise, domestic bank loans to 2.247 billion yuan. Construction Unit:******* Post Code:******* Contact:******* Tel:******* Project Name: Plastic Packaging Co., Ltd. Hebei, China is an annual output of 100 million new plastic technology projects Progress stage: construction started in Construction period: April 2011 -2011 in December Major equipment: saving drawing machine, frequency circular loom, automatic bag cutting machine, Cai Yinji and so on. -For reference Project: Project is located in Daming County Industrial Park, on the basis of the original construction, the new workshop area of 3,000 square meters, total construction area of 8,500 square meters, annual output of 100 million plastic bags production line technological transformation. The total investment is about 52.28 million yuan. Owner:******* Postal Address:******* Contact:******* Tel :******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Medical Technology Co., Ltd. Zhengzhou Goldman Sachs 500 tons and 500 tons of benzofuranone production projects o hydroxybenzonitrile Progress stage: the record Construction period: May 2011 -2011 in December Major equipment: reactors, thermal oil heaters, pipes, pumps, cooling towers -for reference Project: High Town project is located in the high mountain village Xingyang, Zhengzhou Medical Technology Co., Ltd. Goldman Sachs 500 tons and 500 tons of benzo-furanone o hydroxybenzonitrile production project, the project covers an area of 13,000 square meters, construction area of 4,000 square meters a second of 4,000 square meters. The main building workshop, office building, warehouse, environmental treatment pond. Annual output of 500 tons and 500 tons of benzo-furanone o hydroxybenzonitrile. Technology: benzo-furanone technology through catalytic reaction, neutralization, dehydration, filtration, washing, precipitation; o hydroxybenzonitrile process through the reaction, filtration, water separation, reaction, cooling, crystallization, centrifugation and drying. Major equipment, reactors, heat-conducting oil furnace, pipes, pumps, cooling tower. The total investment is 4,000 million. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Project Name: Shanxi Orchid Science and Technology Venture Co., Ltd. nitro compound annual output of 300,000 tons 50,000 tons 70,000 tons of melamine project adipic acid Progress stage: the record Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 -2012 Major equipment: acid tank, ammonia stations, boilers, granulator, drying tube, quantitative packing machine, etc. -for reference only Project: Project is located in Shanxi, Shanxi Orchid Science and Technology Venture Co., Ltd. nitro compound annual output of 300,000 tons 50,000 tons 70,000 tons of melamine adipic acid project, the purchase of installed 30 tons / year of nitro-compound fertilizer, 70,000 tons / year adipic acid plant, 50,000 tons / year melamine plant, supporting 27 million tons / year nitric acid plant, 25 tons / year ammonium nitrate plant, 60,000 tons / year and the corresponding cyclohexanone devices supporting public works and auxiliary facilities and so on. The total investment is about 2.05098 billion yuan -including foreign exchange 21.5 million euros, of which 1,990,980,000 yuan of fixed assets, working capital 60 million yuan. Sources of funding: apply for bank loans 1,435,680,000 yuan, 615,300,000 yuan raised by the enterprise. Construction Unit:******* Post Code:******* Contact:******* Tel :******* Project Name: Shaanxi Science and Technology Co., Ltd. Po of construction projects persulfate Progress stage: the record Construction period: July 2011-June 2013 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in Shanxi, Shaanxi Science and Technology Co., Ltd. Po of persulfate construction projects, building content for the 100 acres of land for the construction of the new persulfate projects; project production will become the world's largest production base of persulfate The total investment is about 230 million yuan, of which 150 million yuan raised by the enterprise to absorb investment of 8000 million. Owner:******* Post Code:******* Tel :******* Project Name: 12 tons / year of caustic soda oxygen cathode high-tech energy-saving demonstration project Progress stage: start construction in -EIA at the same time Construction period: 2011 -2012 Major equipment: filter press, dryers, chillers, automated instrumentation, pumps, water treatment equipment, cracking furnace, cracking the compressor, the polymerization reactor, extruder, heating system -for reference only Project: Project is located in the city of Hubei Shishou embankment Zhang Chu Yuan Group Industrial Park, the reserved space, the project oxygen cathode production capacity of caustic soda plant of 12 tons / year, while supporting the project construction of 3 million tons / year of chlorinated polyethylene rubber , 1 million tons / year of chlorinated polypropylene and 2 tons / year of chlorinated cyanuric acid and other downstream consumption of chlorine production plant. The total investment is about 886 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction unit:******* Contact:******* Tel:******* Designer:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Fax :******* Project Name: 15 tons / year of special solvent oil production project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Jingmen chemical recycling project is located in Park West Industrial Park to build a modern production line of special solvent oil, cleaning products for the aviation oil, mineral flotation oil, wax, asphalt products; production section in the main atmospheric and vacuum distillation, hydrogenation, desulfurization. The total investment is unknown. Construction Unit:******* Postal address:******* Post Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Designer:******* Postal Address:******* Contact:******* Tel 0724 -2351332 Fax 0724 -2360469 Project Name: Seven tree oil SW8-SW10 Well Shahezi New ground reservoir construction projects Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: electric heating, heating, pump, pump, in addition to coke pump, oil coke pump, valve, pipe network, traffic transmission, mass flow meter, level indicator, fire facilities, a positive crane, gantry crane, traction car tire hanging, container, crane, pressure vessel, spherical tank, remote control and data acquisition system, oil and gas recovery unit, pumping units, gas water separator, water meter, gas inventory, compressors, valve set group, sewage tanks, etc. -for reference only Project: Qin Jia Zhunzhen project is located in Gongzhuling, seven tree oil SW8-SW10 SW8 well take transfer station area New Block 1, the design size of incoming liquid handling 800m3 / d. New set of oil pipelines 11.7km, watered the new pipeline 11.7km. New transfer station stop SW8 access road 0.4km, cement concrete pavement; new well site road 6.5km, lime soil cinder road. The total investment is about 44,935,200 yuan. Construction Unit:******* Postal Address:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel :******* Designer:******* Postal Address:******* Contact:******* Tel :******* Project Name: Jilin Oilfield Company, the British oil platform encryption capacity building projects Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: electric heating, heating, pump, pump, in addition to coke pump, oil coke pump, valve, pipe network, traffic transmission, mass flow meter, level indicator, fire facilities, a positive crane, gantry crane, traction car tire hanging, container, crane, pressure vessel, spherical tank, remote control and data acquisition system, oil and gas recovery unit, pumping units, gas water separator, water meter, gas inventory, compressors, valve set group, sewage tanks, etc. -for reference only Project: The project is located within the White City Zhenlai, project planning and deployment of the 26 oil wells, of which 21 wells, wells 5, expected new production 1.26 × 104t. New Block 1 of the project elevated Transforming the station -including the water stations and 3 overhead valve between the measured and Block 1 substation, the laying of all kinds of new pipelines 73km, the new oil well roads between the main road and 9.4km. The total investment is about 48.85 million yuan. Construction Unit:******* Postal Address:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel :******* Designer:******* Postal Address:******* Contact:******* Tel :******* Project Name: Air 五七 ○ four plants safety improvement projects and infrastructure upgrades Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting -for reference Project: Project is located in Jilin City, Jilin Street, Double Changyi District 20 -the existing plant area, modified surface treatment plant -building area -same 7440 m2, ammunition -190 m2, gun test between -140 m2 dangerous goods warehouse -370 m2, chemical libraries -570 m2, acid tank Library -140 m2, pump house 160 m2, oil pump management space -70 m2, supporting oil depot fire pumping station - 110 m2 and the pool renovation project construction area of 9195m2; transformation of 8 to be the crater protection embankment -embankment height of 1.5m from the current heightened to 7m, to meet safety specifications, modified plating production line, gun tests, ACID-related process equipment supporting libraries; Add 1 set 10t / h coal-fired steam boiler and related facilities; new Block 2, vertical tank, horizontal tank update 5, while construction related to drainage, heating / ventilation / air conditioning, heating, power, electrical, telecommunications and other professional support conditions to meet the new plant's production and living needs. The total investment is about 79.2 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Owner:******* Postal address:******* Post Code:******* Tel :******* Designer:******* Postal Address:******* Tel :******* Fax :******* Project Name: Xiangtan - Loudi - Shaoyang gas pipeline project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Main equipment: hot simmer elbow, seamless steel pipe, tube, gas stove, gasifier, water, coal preparation system, air separation plants, pipelines, valves automatic control system, measurement systems, pressure systems, pipe cleaning equipment , high pressure natural gas pipelines, valves, automatic control system, storage tank, tank, pressure vessels, centrifugal pumps, in addition to coke pump, oil pump Coke -for reference only Project: The project is located in Hunan Province, gas pipeline began in camphor - Xiangtan Xiangtan contact line terminal station and ends at the end of Shaoyang station, the line length of 205km, diameter φ508mm, the design pressure of 6.3MPa, pipe L450. Xiangtan - Loudi - Shaoyang gas pipeline transmission stations were located Jiuhua points, sub-transmission station Xiang Shao, Loudi sub-transmission stations, subtransmission station and the Shaoyang Lianyuan end stations 5 stations; across the board a total of valve chamber 7, Block 1 in which control valve chamber, monitoring the valve chamber 4, Block 2 common valve chamber. PE pipes used gas anti-corrosion layer, the use of computer monitoring and data acquisition -SCADA system. Extension along the river were crossing the ditch 50, which streams through the large and medium-sized one, are used directional drilling; rivers, canals across 48 small, are using large excavation; Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. across the road with Grade 27 or above Department, including a high speed through the use of directional drilling, other methods are used across the top tube; crossing the railway line eight, are used way through the box culvert. The total investment is unknown. Owner:******* Postal Address:******* Tel :******* Designer:******* Postal Address:******* Tel :******* Fax :******* Project Name: Hancheng - Weinan - specifically for coalbed methane pipeline in Xi'an Progress stage: construction started in Construction period: 2010 -2013 years Main equipment: hot simmer elbow, seamless steel pipe, tube, gas stove, gasifier, water, coal preparation system, air separation plants, pipelines, valves automatic control system, measurement systems, pressure systems, pipe cleaning equipment , high pressure natural gas pipelines, valves, automatic control system, storage tank, tank, pressure vessels, centrifugal pumps, in addition to coke pump, oil coke pumps. -For reference Project: Project is located in Shaanxi Province, Han city, Weinan, Xi'an, trunk pipeline from the city since the Han Wei of Shaanxi Province is located in Togo's first stop Hancheng, the Korean city, Hopewell County, Chengcheng County, Dali County, Pucheng County, Weinan, Xi'an, Xi'an drug benefit ends at the terminal station of Xi'an township, 195 km long, diameter 559 mm, the design pressure of 4 MPa; involved in gas transmission capacity a 1.46 billion cubic meters / year. The first stop of a total of Hancheng trunk, co-subChinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. transmission station Yang, PV sub-transmission stations, sub-transmission pigging station in Dali, halogen Poyang Lake sub-transmission station, sub-transmission station Weinan, Xi'an at the end station 7 craft station, five intermediate valve chamber. Whitewater Extension Pucheng from Poyang Lake from the trunk of the halogen sub-transmission station, the sub-transmission station Pucheng, beyond the white water at the end station, 48 km, diameter 219.1 mm, design pressure 1.6 MPa. Valve chamber located between Block 1. Wei Tongguan Pro Line Route Dali points from input from pigging station, sub-transmission station by Huayin, two routes, all the way east to Hua Hin, beyond the terminal station Tongguan; another way west to the Weinan city, only Wei terminal station at the Council. 96 km length, diameter 273.1 mm, design pressure 1.6 MPa. Valve chamber located between Block 4. The total investment is about 1,035,490,000 yuan. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Project Name: Annual fifty thousand tons bio-organic fertilizer project Progress stage: the record Construction period: May 2011 -2013 in May Major equipment: granulating machine, packing machine, mixer, grinder, screening machine, filling machine and dust, furnace, laboratory equipment, etc. -for reference only Project: Project area is located in the southern suburbs who are mobility Willow Industrial Park, an annual output of fifty thousand tons organic fertilizer, construction of new properties, new standard plant 31,660 square meters, purchase of production equipment, 30 pieces -sets. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment is about 53 million yuan, of which 33 million yuan of funds owned enterprises, 20 million yuan of bank loans. Construction Unit:******* Postal Address:******* Tel :******* Fax :******* Project Name: Industrial Group Shangrao City Huiquan annual 800,000 tons of sulfuric acid project Progress stage: the record Construction period: 2011 -2012 Major equipment: reactors, compressors, cracking furnace, dryer, granulator, extruder, water treatment equipment -for reference Project: Project is located in Tuen Mun, Hong Dexing City Industrial Zone, Shangrao City Huiquan Industry Group annual 80 million tons of sulfuric acid project, the construction roasting plant, purification plant, absorption into the workshop, fuming sulfuric acid plant, thermal power plants, finished acid libraries, office buildings, etc. the acquisition of various production equipment 170 -sets, an annual production capacity of 800,000 tons of sulfuric acid. The total investment is about 1.51303 billion yuan, funded entirely by the enterprise itself to solve. Owner:******* Postal address:******* Post Code:******* Tel :******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Shanxi Orchid Science and Technology Venture Corporation projects an annual output of 60,000 tons of POM Progress stage: the record Construction period: 2011 -2012 Major equipment: formaldehyde reactor, POM reactor, solid-liquid separator, drying machine -for reference only Project: Project is located in Shanxi, Shanxi Orchid Science and Technology Venture Corporation projects an annual output of 60,000 tons of POM, purchase and install formaldehyde, trioxane, dioxolane, POM, burning and other devices, and tank farm, loading and unloading stations, packing floor, finished libraries and other auxiliary production facilities, supporting the construction of the control building, boiler room, circulating water stations, in addition to salt water stations, sewage treatment station and other public works, an annual 60,000 tons of POM loading capacity. The total investment is about 1.96 billion yuan -including foreign exchange $ 88,000,000, of which 1.93 billion yuan investment in fixed assets, working capital 30 million yuan. Source: The companies raised 588 million yuan bank loan of 1.372 billion yuan. Construction Unit:******* Post Code:******* Contact:******* Tel :******* Project Name: Guangxi Beihai Penshibao limited liability company annual output of the third generation Penshibao million bags project Stages of progress: environmental impact assessment Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 -2012 Major equipment: granulating machine, packing machine, mixer, grinder, screening machine, filling machine and dust, furnace, laboratory equipment. -For reference Project: The project is located north of Bay Road, Beihai, Guangxi, high East German junctions. Scale of construction projects annual output of the third generation Penshibao million bags, construction includes a raw material warehouse, materials storage, liquid preparation of the workshop, potting workshop, packaging workshop, finished product warehouse, office building, dormitory. The total investment is about 10,673,800 yuan. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Contact:******* Tel :******* Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: The project is located 127 East Avenue Lai'an, covers an area of 7875m2. Neopentyl glycol production project to isobutyraldehyde, formaldehyde, and caustic soda are products of neopentyl glycol, and formic acid oxidation of formaldehyde over the same time reacts with the alkaline sodium. After the completion of the project, the new diol reached an annual output 15000 t, the main building -structure covers an area of 2575 m2, add 2 cans of Taiwan isobutyraldehyde, formaldehyde, and caustic soda storage tank based on the original tank . The total investment is about 34.4 million yuan. Owner:******* Post Code:******* Tel:******* Design:******* Postal Address:******* Tel :******* Project Name: V Longquan gas field development and construction of oil and gas exploration in 2010 project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: electric heating, heating, pump, pump, in addition to coke pump, oil coke pump, valve, pipe network, traffic transmission, mass flow meter, level indicator, fire facilities, a positive crane, gantry crane, traction car tire hanging, container, crane, pressure vessel, spherical tank, remote control and data acquisition system, oil and gas recovery unit, pumping units, gas water separator, water meter, gas inventory, compressors, valve set group, sewage tanks, etc. -for reference only Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. County project is located in Changchun City, the territory of Agriculture, the project set new gas station, Block 2, the total number of six gas well drilling. The total drilling footage 7400m. Natural gas production capacity 0.396 × 108m3 / a. Ground construction works well gas field gathering pipeline route between the length of 10km. The total investment is about 50 million yuan. Construction:******* Postal Address:******* Tel :******* Designer:******* Postal Address:******* Tel :******* Fax :******* Project Name: Jilin Sheng Jilin Chemical Industry Co., Ltd. with an annual output 30,000 tons of biological environment-friendly bio-diesel project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: pretreatment equipment, filters, reactor, esterification reactor, distillation equipment, high vacuum system -for reference only Project: The project is located within the White City industrial park, the new annual output of 30,000 tons environmentally friendly bio-diesel production line, using corporate self-produced fatty acids as raw material to produce bio diesel. The total investment is unknown. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Fax:******* Designer:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Project Name: carbon fiber research and development of new materials production project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor -for reference Project: Project is located in Jiangyou City Industrial Park -Po Lun Road, building content for the production of plant 6,000 square meters, power system facilities, vacuum furnaces, non-woven production lines, annual output of hard surface processor board 36.7 tons of graphite felt, rigid graphite blanket cylinder 30.0 tons, with a conductive anode material for storage batteries 8.0 tons, 9.0 tons of graphite felt soft. The total investment is about 28.27 million yuan. Owner:******* Postal address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Post Code:******* Tel :******* Designer:******* Postal address:******* Post Code:******* Tel :******* Project Name: two deep processing of agricultural products first phase of an annual output of 300,000 tons of organic fertilizer projects prime of life Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: granulating machine, packing machine, mixer, grinder, screening machine, filling machine and dust, furnace, laboratory equipment. -For reference Project: After the project is located in Lake Management Area west of Xiang Yue Road, north of One irrigation channels. Main construction content: including new factories, warehouses and other auxiliary facilities of 84,000 square meters, purchase of equipment 260 -sets and construction of environmental protection facilities. The total investment is unknown. Owner:******* Postal Address:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Designer:******* Postal Address:******* Contact:******* Tel :******* Project Name: Chengde City Shuangluan Qu Heng Kun Oil Co. depot oil marketing new construction Stages of progress: preliminary design Construction period: June 2011 -2012 in November Major equipment: Target Flowmeter, valve, pump, valve, pipe network, traffic transmission, pump, pump than coke, oil coke pump, mass flow meter, level indicator, fire fighting facilities, a positive crane, gantry crane, tractor tire hanging, container, crane, pressure vessel, spherical tank, remote control and data acquisition system, oil and gas recovery. -For reference Project: Shuangluan Qu Shuang Tashan Town Project is located in Crossroads Village, a new 5,000 cubic meters of floating roof storage tank 6 -4 tank of diesel, gasoline storage tank Block 2, 3,000 cubic meters of diesel oil storage tank floating roof, Block 2, , 2000 m3 floating roof gasoline storage tanks Block 1; new 1100 m3 tank fire, Block 2; with special railway line construction of 1200 meters, the new railway bridge, unloading pump sheds, the oil kiosks, office building, operating rooms, fire pumping stations, power distribution room, guard room and other ancillary facilities and ancillary buildings. The planned land area of 74.31 acres, the new total capacity of 38,000 cubic meters a fuel depot. The total investment is about 88.75 million yuan. Owner:******* Post Code:******* Contact Person:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Bao carbon black -Florida Limited 4 tons / year of carbon black construction projects Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor -for reference Project: The project is located within the industrial zone of city, relying on the park upstream oil production of coal tar, anthracene oil as raw material to build 4 tons / year of carbon black production line. The total investment is unknown. Owner:******* Post Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Contact:******* Tel :******* Project Name: Nine Dragon gas field gathering Link Stages of progress: environmental impact assessment Construction period: 2011 -2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Main equipment: hot simmer elbow, seamless steel pipe, tube, gas stove, gasifier, water, coal preparation system, air separation plants, pipelines, valves automatic control system, measurement systems, pressure systems, pipe cleaning equipment , high pressure natural gas pipelines, valves, automatic control system, storage tank, tank, pressure vessels, centrifugal pumps, in addition to coke pump, oil pump Coke -for reference only Project: Project is located in Guangyuan City Cangxi, works mainly include: new gathering lines 99.8km -Ø457 × 8.0 pipeline 81km, Ø457 × 10 pipeline 18.8km, pipeline design pressure 8.5MPa; pipeline from the Guangyuan Cang River Dragon King County town of Nanchong City Langzhong way, Nanbu County, limited to gathering the town of Nanbu County, Yongding terminal station, in which the territory of Guangyuan City Cangxi pipe length 55.3km, Nanchong City Langzhong domestic pipeline length 38.0km, Nanbu County within the pipe length 6.5km. Gathering station, Block 2 -Dragon King gathering gathering the first station and the southern end of Station. Room 4 line block valve -valve chamber historians River, shop sub-beam valve chamber, valve chamber five Ma, Pa Temple in valve chamber. The total investment is 289.88 million yuan. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Designer:******* Postal Address:******* Contact:******* Tel :******* Fax :******* Project Name: Four Chuanda Xing Bao Chemical Co., Ltd. 150,000 t / a tar processing projects Stages of progress: environmental impact assessment Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporator -for reference Project: The project is located within the industrial zone of city, relying on the park for upstream raw material production and construction of the tar 15 million tons / year of tar processing project, the formation of light oil 750 tons / year, 2250 tons of oil off the phenol phenol / year, industrial naphthalene 135 million / year , 1,500 tons of crude phenol / year, 12,000 tons of wash oil / year, 68,550 tons of carbon black mixed oil / year, anthracene oil 15,450 tons / year and 34,500 tons of asphalt in the temperature / year production capacity. The total investment is unknown. Owner:******* Post Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Contact:******* Tel :******* Project Name: Tangshan liquefied natural gas, pipeline projects Stages of progress: environmental impact assessment Construction period: 2011 -2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Main equipment: hot simmer elbow, seamless steel pipe, tube, gas stove, gasifier, water, coal preparation system, air separation plants, pipelines, valves automatic control system, measurement systems, pressure systems, pipe cleaning equipment , high pressure natural gas pipelines, valves, automatic control system, storage tank, tank, pressure vessels, centrifugal pumps, in addition to coke pump, oil pump Coke -for reference only Project: Project is located in Tangshan City, Tangshan City Trunkline via Caofeidian Industrial Zone, South Fort zone, Tanghai County, Fengnan District, Lubei, Fengrun; extension through Fengnan main pipeline total length 136.7km . Projects include a trunk and a branch, that is, to the Tangshan Qing Caofeidian terminal gas pipe lines and sub-transmission station Ninghe Extension. The total investment is unknown. Owner:******* Postal Address:******* Contact:******* Tel :******* Designer:******* Postal Address:******* Contact:******* Tel :******* Project Name: Shanxi Liheng annual output of 145 million tons of steel coking project Progress stage: the record Construction period: 2011 -2012 Major equipment: coke quenching car crusher, blower, water pump and air compressor, etc. -for reference only Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Prince Edward County, Shanxi Province Beach Quwo ecological industrial zone, Shanxi Liheng annual output of 1.45 million tons of coking iron and steel project, the main construction contents are: coal preparation plant -blending tank, mill room, belt and Ramming solid points, coking plant -2 × 65 holes 6.25m tamping-type coke oven, coke quenching, coke storage and transfer station screen, belt conveyor, gas purification plant -cold drum, thiamine, PDS tannin desulfurization, Final wash cold benzene, benzene distillation, oil depots Section, etc., and other production facilities CDQ system and the corresponding public auxiliary facilities. The total investment is about 1.81 billion yuan. Construction Unit:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Project Name: annual output of 120 tons of coking capacity replacement project Stages of progress: preliminary design Construction period: 2011 -2012 Major equipment: coking plant, coke oven equipment, instruments, testing equipment, fans, fire fighting equipment, water treatment systems. -For reference Project: Project is located in the town of Xiaoyi City, Shanxi Xiaoyi Indus Economic Development Zone, with an annual 120 million tons of dry whole focus, supporting the building of annual output of 150 tons of heavy media preparation, preparation of coal, coke storage screen, cold drum electric fishing, sulfur Ammonium ammonia containing residual ammonia, elution benzene, desulfurization and sulfuric acid, wet quenching CDQ reserve position, sewage treatment station and the corresponding public works and auxiliary facilities. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Annual output of coke oven gas to be sent to the remaining 50,000 tons of magnesium alloy project for fuel gas. The total investment is about 1 billion yuan. Construction Unit:******* Post Code:******* Contact:******* Tel :******* Project Name: China Chemical Co., Ltd. Lai'an Race 50,000 tons annual output of renewable wafer cutting fluid mortar separation project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in the village Lai'an Zhang Shanyu with, the use of race Wah Group of Anhui existing plant space, building separation of silicon wafer recycling renewable liquid mortar production line, production scale: annual output of 50,000 tons. The total investment is about 10 million yuan. Construction Unit:******* Postal address:******* Post Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel :******* Designer:******* Postal Address:******* Contact:******* Tel:******* Project Name: Huizhou City, a of the expansion project of the Green Ecological Technology Co., Ltd. Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: granulating machine, packing machine, mixer, grinder, screening machine, filling machine and dust, furnace, laboratory equipment. -For reference Project: Project is located in Huizhou Huiyang Shatian Shaw estate, the project covers an area of 1200m2, building area of 2400m2, add organic fertilizer production line of lignin to lignin as a carrier to add nitrogen, phosphorus and potassium fertilizer granulation of three elements, the annual production 3500t. The main raw and auxiliary materials, including lignin 700t, K 700t, humic acid ammonium 300t, urea 700t, peat powder, 550t, bentonite 100t, MAP 100t, tea, cake meal and 250t, attapulgite 100t, wood 100t. The total investment is about 2.6 million yuan. Owner:******* Post Code:******* Contact:******* Tel :******* Design Units:******* Postal Address:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel :******* Fax :******* Project Name: valaciclovir hydrochloride production of new technology industry development projects Progress stage: the record Construction period: May 2011 -2012 in May Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, compression machine, granulating machine, dryer, mill -for reference Project: Project is located in county towns Dawu, valaciclovir hydrochloride industrial production of new technology development, construction, expansion properties, the production of bulk drugs valaciclovir 20 tons. Plant expansion of 2,600 square meters, purchase of production and testing equipment 77 sets. The total investment is about 16 million yuan, of which 10 million yuan of funds owned enterprises, bank loans, 6 million yuan. Owner:******* Postal Address:******* Tel :******* Project Name: Puyang letter Yu Petroleum Machinery Co., Ltd. 3,000 tons of sulfur-methyl phenol formaldehyde resin, 3,000 tons of polymer fluid loss additive construction projects Progress stage: the record Construction period: June 2011-May 2012 Major equipment: line reactor, reactor, centrifuge, drying room -for reference Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Industrial Cluster Project is located in Puyang City District, Puyang City letter Yu Petroleum Machinery Co., Ltd. with an annual output of 3,000 tons of sulfur-methyl phenol formaldehyde resin, 3,000 tons of polymer fluid loss additive construction projects, land acquisition of 50 acres, with an annual output of 3,000 tons of sulfur-methyl phenol resin, 3,000 tons of polymer fluid loss additive; sulfomethylation by the phenolic resin: phenol, formaldehyde, caustic soda, sodium sulfate anhydrous sodium sulfur, sodium metabisulfite, generated by the reactor polymer product. Synthesis of the main tower is equipped with lines, reactor, centrifuge, drying room. The total investment is about 75 million yuan, of which 45 million yuan raised by the enterprise, domestic bank loan 30 million yuan. Owner:******* Postal Address:******* Contact:******* Tel:******* Project Name: Nanjing Airport State Oil Co. storage depot Nanjing airport expansion project Progress stage: project Construction period: 2011 -2012 Major equipment: steel, tank, tank, pumps, valves, flow transmission, mass flow meter, level indicator, fire facilities, a positive crane, gantry crane, tractor, crane tires, containers, loading and unloading bridge. -For reference Project: Project is located in Nanjing Lukou International Airport, expansion of 5 * 10000m3 storage tanks, tank fabrication and installation, and the supporting pipelines and self-control and so on. The total investment is about about 58,609,600 yuan, self. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction:******* Post Code:******* Contact:******* Tel :******* Progress stage: the record Construction period: 2011 -2013 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Tara Hangjinqi your project is located in Industrial Park alone, Elion Resources Group Co., Ltd. with an annual output 1.2 million tons of dimethyl oxalate project. Annual output of 1.2 million tons of dimethyl oxalate. The total investment is about 6.51346 billion yuan -including foreign exchange $ 117,840,000, of which construction investment 6,074,520,000 yuan -including foreign exchange $ 117,840,000, interest of construction period is 419.92 million yuan, circulating fund is 19.01 million yuan. Source: 1,954,040,000 yuan raised by the enterprise, apply for bank loans to 4.55942 billion yuan. Owner:******* Post Code:******* Contact:******* Tel:******* Project Name: Economic Development Zone, Xi Wo Alashan Chemical Co., Ltd. with an annual output of 30,000 tons of chlorinated hydrocarbons project Stages of progress: environmental impact assessment Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in Alxa Economic Development Zone, the main product formed after completion of the project 30,000 tons / year chlorinated hydrocarbons, by-products 1,500 tons / year of iron chloride and 1,500 tons / year production capacity of sodium hypochlorite. The total investment is unknown. Construction Unit:******* Post Code:******* Contact Person:******* Tel :******* Design by: China Environmental Science and Technology Development and Investment Co., Ltd. Sheng EIA agencies Postal address:******* Post Code:******* Contact:******* Tel :******* Project Name: 50 × 104t / a non-mercury catalyst demonstration projects of industrial upgrading of PVC Progress stage: the record Construction period: 2011 -2013 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Dalate Banner in Ordos City Yili project energy and chemical industrial base of circular economy, 50 × 104t / a non-mercury catalyst polyvinyl chloride industrial upgrading demonstration projects, the construction scale: ethylene vinyl chloride manufacturing plant: 50 × 104t / a; ionic membrane caustic soda: 35 × 104t / a; PVC unit: 50 × 104t / a. The total investment is about 3.88611 billion yuan, among which construction investment 3,400,060,000 yuan, construction period interest is 244.02 million yuan, circulating fund is 242.03 million yuan. Source: Company self 1,092,629,000 yuan, and the remaining bank loan. Construction Unit:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Project Name: Hebei International McKinnon Yuntianhua new annual 40 million tons of fertilizer Limited acid compound fertilizer project of Three Elements Progress stage: construction design Construction period: June 2011 -2012 in April Major equipment: vertical crusher, conveyors, disc pelletizer, dryer -for reference Project: New projects are located in Gaocheng, building production facilities, with a total construction area of 32,300 square meters, annual output of 40 million tons of compound fertilizer three elements acid method. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment is about 150 million yuan. Owner:******* Postal Address:******* Contact:******* Tel :******* Project Name: Hebei Co., Ltd. Yu Wei food preparation projects built capacity of 4000 tons of inositol Progress stage: construction design Construction period: May 2011 -2012 in January Major equipment: tank class, towers, heat exchangers, reactors, pumps, return pumps. -For reference Project: Suning County of Hebei project is located in Township, Dawa, building warehouses, factories, raw materials library, testing center, cafeteria and offices, covering 17.5 acres, the annual output of 4,000 tons of inositol. The total investment is about 80 million yuan. Owner:******* Postal Address:******* Contact:******* Tel:******* Project Name: Hebei Agricultural Development Group Co., Ltd. three high 200,000 tons annual output of slow-release fertilizer production line expansion project Progress stage: construction started in Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: February 2011 -2011 in July Major equipment: Transforming cans, cans of mixed acid transition, granulator, pipe reactor, dryer, cooler, absorber, sulfuric acid tank, liquid ammonia storage tank, boiler and so on. -For reference Project: Granville County Economic Development Zone project is located east of National Highway 106, south of Open Road -Hebei Agricultural Development Group, three high Weng Fusheng Technology Co., Ltd. hospital property, a new slow-release fertilizer on the production line 4, the new single-layer light steel structure 14,000 square meters. 20 million tons annual output of slow-release fertilizer. The total investment is about 35 million yuan. Owner:******* Postal Address:******* Contact:******* Tel :******* Project Name: Yangquan Jingcheng Chemical Co., Ltd. with an annual output of 50,000 tons of amino acid and related construction projects 20 million tons of sulfuric acid plant Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in suburb of Yangquan City, Baiquan Industrial Park, south Von White Road, White Road, west of justice, building a set of amino acid annual output 50,000 tons of production equipment, Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. supporting the construction of annual output of 20 tons of sulfuric acid plant, the project uses Catalyst Transformation double-absorption -3 +2 sulfuric acid process -conversion rate of 99.7%, the absorption rate of 99.9% to prepare fuming sulfuric acid, fuming sulfuric acid and urea, liquid phase -also known as urea production sulfur amino acid, amino acid 50000t / a, fuming sulfuric acid 150 000 t / a. The total investment is about 98 million yuan. Owner:******* Post Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Contact:******* Tel:******* Project Name: East Guangdong LNG project Progress stage: construction started in Construction period: December 11, 2010 -2012 years Major equipment: steel, tank, tank, pumps, valves, flow transmission, mass flow meter, level indicator, fire facilities, a positive crane, gantry crane, tractor, crane tires, containers, loading and unloading bridge. -For reference Project: Project is located in Jieyang City, Guangdong Province, benefits to the county east of God springs 8km, about 5km west of the town forward Lu Park, near the coastal village of ditch dredging. Northwest from the benefits to the county of about 15km, south of Jieyang City, about 74km, northeast from Shantou City, about 70km. LNG projects include the LNG receiving terminal, LNG receiving terminal, construction of gas transmission lines and other content. Project in two phases, first phase construction scale is then Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. transferred LNG200 million tons, planned to build 3 160,000 m3 storage tanks, one berth 8-26.7 million cubic meters of LNG ship wharf, and gas Link and other related facilities; second phase of construction will be a scale of 200 tons / year rise to 400 million tons / year, while construction of Block 2 additional 160,000 m3 storage tanks. One will meet Shantou, Chaozhou, Jieyang, Meizhou city gas demand, a project completed in 2013 and put into operation, the second phase of long-term planning successful 2020 production. The total investment is about 10.3 billion, a total investment of about 75 million, funded ratio of CNOOC Gas & Power Group Co., Ltd. 100%. Owner:******* Postal Address:******* Contact:******* Tel :******* Fax :******* Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in Shanxi Province, South Wuxiang Wenshui County West Village, the nature of the new projects, planning acquisition of 100 acres of land, building area of 9419 square meters to be added, construction includes a series of product lines of anthracene, Violet product lines and office buildings and other facilities. The total investment is about 188.39 million yuan -120.49 million yuan of which apply for bank loans, the remaining funds by the enterprise itself. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Owner:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Contact:******* Tel :******* Project Name: 80 tons / year vacuum salt corrosion engineering construction projects Stages of progress: engineering design Construction period: 2011 -2011 Major equipment: reactor, condenser, testing equipment, instruments, water treatment equipment, automatic control systems, compressors, heat exchangers, anti-corrosion equipment -for reference Project: Project is located in Kunming, Yunnan natural peace of the town of Paradise City with the village within the boundary of Green Wu Shan, Yunnan, Kunming Salt Mine Salt new land west of the existing plant and the existing thermal power plant at the salt mines. Northeast from about 31 kilometers West of Kunming, about 3.5 km away from the peace of the urban area. Corrosion Engineering Section of the building is divided into three: a bid of: shop floor, salt and sodium, floors and walls, two tenders: shop floor, warehouse, floors and walls, three tenders: water tanks, cooling towers and other framework structures. The total investment is not detailed, self. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Owner:******* Post Code:******* Contact:******* Tel :******* Project Name: China-Burma oil pipeline project Stages of progress: engineering design Construction period: June 25, 2011 -2013 years Major equipment: pumps, valves, pipe network, traffic transmission, mass flow meter, level indicator, fire facilities, a positive crane, gantry crane, tractor, tire crane, pump, pump except coke, oil coke pumps, containers, loading and unloading bridges, pressure vessels, tank, remote monitoring and data acquisition system, oil and gas recovery, cracker, reactor, compressors, fans, instrumentation, atmospheric and vacuum distillation, residue hydrodesulfurization unit and other equipment. -For reference Project: Project located in Yunnan Province, Guizhou Province, Chongqing Municipality, China and Myanmar oil pipeline project is the implementation of energy strategy of China is one of the key projects is the Southwest of China's energy import channels. Pipeline from Myanmar to the west coast of Madeira since, from Ruili City, Yunnan, immigration, the end arrived in Chongqing City, crude oil pipeline project domestic section, including a dry one. Route 58 from Ruili City, Yunnan Province, pillar entry, and the Burma natural gas trunk pipelines in parallel, the Dehong, Baoshan, Dali, Chuxiong, Kunming, Qujing City, Anshun City, Guizhou Province and the separation of crude oil trunk pipelines, crude oil pipeline to the north line, the Guiyang, Zunyi City, arrived in Chongqing City. Route length 1631.1km, diameter 813mm/610mm/559mm, across the board with X70 grade steel; Route set process station 11, valve chamber 77. China-Burma oil pipeline design capacity of 2,200 tons / year of the extension for the peace of Extension, full-length 42.8km, diameter 610mm, use of X65 grade steel: Extension Set Station Block 1, Block 1 valve Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. chamber. Ruili - Lufeng input section of the pipeline design capacity 2000 × 104t / a, Lu Feng - Chongqing section of the pipeline design of transmission capacity 1000 × 104t / a; Lu Feng - peace Extension design transmission capacity 1000 × 104t / a. Link Ruili - Lufeng length 605.93km -in parallel with the natural gas pipeline, peace Extension 42.78km, 2011 年 6 月 25 construction commencement date, April 25, 2013 to complete line construction. The total investment is about 30.3 billion. Construction:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Fax :******* Construction:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Fax :******* Stages of progress: engineering design Construction period: June 25, 2011 -2013 on July 25 Major equipment: gas furnace, gasifier, water, coal preparation system, air separation plants, pipelines, valves automatic control system, measurement systems, pressure systems, pipe cleaning equipment, high pressure natural gas pipelines, valves, automatic control system, storage tank, tank, pressure vessels, centrifugal pumps, in addition to coke pump, oil pump Coke. -For reference Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project located in Yunnan Province, Guizhou Province, Guangxi Zhuang Autonomous Region, China and Myanmar gas pipeline project in China to implement one of the key energy strategy, southwest China's energy imports a large channel. Route starts from the west coast of Myanmar Kyaukpyu, immigration from Ruili City, Yunnan Province, the end to reach Guigang City. Natural Gas Pipeline Project -domestic section, including a dry 8. Burma gas pipeline project from Route 58, Ruili, Yunnan province pillar entry, and the China-Burma oil trunk pipeline in parallel, the Dehong, Baoshan, Dali, Chuxiong, Kunming, Qujing City, Anshun City, Guizhou, and crude oil pipe separation, natural gas pipeline to the south, the Guiyang City, Duyun City, Guangxi Hechi City, Liuzhou, and finally to Guigang. Route length 1726.8km, diameter 1016mm, the design pressure of 10MPa, across the board with X80, X70 grade pipe. Route setting process station 17, valve chamber 60. Burma gas pipeline design capacity of 120 billion cubic meters / year of natural gas extension for the extension of Lijiang, Yuxi Extension, Duyun Extension, Hechi Extension, Extension in Guilin, Qinzhou branch lines, the North Sea Line Extension and Fangchenggang; Extension length 855.6km. Feeder station 15, valve chamber 30. Link Ruili - Guiyang section June 25, 2011 started April 25, 2013 completed, Guiyang - Guigang paragraph 10 August 2011 started July 25, 2013 to complete. The total investment is about 42 billion yuan, self-financing. Construction:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Fax :******* Construction:******* Postal address:******* Post Code:******* Contact:******* Tel:******* Fax :******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction started in Construction period: September 10, 2010 -2013 years Major equipment: pumps, valves, pipe network, traffic transmission, mass flow meter, level indicator, fire facilities, a positive crane, gantry crane, tractor, tire crane, pump, pump except coke, oil coke pumps, containers, loading and unloading bridges, pressure vessels, tank, remote monitoring and data acquisition system, oil and gas recovery, cracker, reactor, compressors, fans, instrumentation, atmospheric and vacuum distillation, residue hydrodesulfurization unit and other equipment. -For reference Project: The project is located under the jurisdiction of Kunming Anning grass within Dipu Town, refining the project design capacity of 1,000 tons of crude oil, or about 200,822 barrels per day. The total selection process to produce clean fuel-based, taking into account the development of petrochemical processing programs, namely: crude distillation - gas oil hydrocracking - residue hydrodesulfurization - heavy oil catalytic cracking - the full hydrogenation hydrogenation process. The construction includes 1000 × 104t / a crude oil processing complete process plants and its accompanying oil storage and transportation, public works and ancillary works and other facilities, the factory internal and external plant area of two parts: -1 within the plant including the new 15 sets of main equipment, storage and transportation system -tank, truck loading and unloading facilities, oil and gas torch facilities and recycling facilities, etc., utilities -circulating water, power stations, air stations, the total substation, HVAC, communications, etc., auxiliary production facilities -control center, laboratory analysis, maintenance, office, etc. and environmental protection projects -sewage treatment plant, wastewater reuse treatment plant. -2 outside the factory, including some of the major new roads, drainage, electricity, communications sent to the plant boundary, the construction of the railway station to the unicorn. After completion of the project will achieve an annual 1,000 tons of crude oil refining, the production of 100 million tons of ethylene, natural gas 100 billion cubic meters. The total investment is about 230 billion yuan. Owner:******* Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel :******* Fax :******* Project Name: Annual 10 million tons of green high-tech project of surfactant Progress stage: under construction Construction period: April 2011 -2012 in October Major equipment: ethoxylated jet reactor, fuel sulfur furnace, into the tower, film sulfonation device, hydrolysis device, and in pumps, filters, electrostatic precipitator and so on. -For reference Project: The project is located south of Anyang City, the eastern section of the Yangtze River Road, an annual output of 100,000 tons of green high-tech surface-active agents project based on the original site warehouse of 17,000 square meters new workshop, built 3-5t / h multi-function devices a sulfonated sets, 5t / pot plant two sets of ethoxylation, a sulfonate processing device. Process: fatty alcohol ethoxylates and SO3 gas sulfonation → aging → hydrolysis → → and → in the filter. The main jet is equipped with ethoxylation reactors, fuel sulfur furnace, into the tower, film sulfonation device, hydrolysis device, and in pumps, filters, electrostatic precipitator and so on. Project uses advanced ethoxylated and SO3 sulfonation equipment and technology, good market prospects after the completion of economic and social benefits considerable. The total investment is about 130 million yuan. Owner:******* Postal Address:******* Contact:******* Tel:******* Project Title: Total-Sinochem Fuels Co., Ltd., Baoding, Hebei Branch Road gas station construction projects Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction design Construction period: May 2011 -2012 in May Major equipment: tanker 4. -For reference Project: The project is located south of Qingyuan County, Paul Heng Road, east of the project covers an area of 3504 square meters, set the oil tank 5, the canopy area of 277 square meters, the station building area 139.7 square meters, the annual capacity of 3,600 tons of fuel. The total investment is about 1.72 million. Owner:******* Postal Address:******* Contact:******* Tel:******* Project Name: Xu Xin Petroleum Products Co., Ltd. Huanghua new oil logistics projects Progress stage: construction design Construction period: June 2011 -2012 in April Major equipment: non-pressure boiler, HJ-type pumps. -For reference Project: Project is located in Huanghua Township, Yang Chun Teng Zhuang Zi, office and living areas, work areas, pumping stations, stations with a total area of 22.5 acres. 1 million tons of storage and transportation of asphalt residue. The total investment is about 10 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Owner:******* Postal Address:******* Contact:******* Tel:******* Project Name: Sartomer -Guangzhou Chemical Co., Ltd. Expansion Phase Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in Nansha District, Guangzhou Xiaohu Island, the company intends to set aside room in the factory location has been the expansion of 10,000 tons / year of polyester acrylic monomers -MFA production line; set aside land within the existing tank acrylic add a 140m3 storage polyol tank and a 60m3 storage tank, replace the original design of a storage tank for the 55m3 epoxy mesylate tank. The total investment is about 25 million yuan. Owner:******* Post Code:******* Contact:******* Tel :******* Fax :******* Design:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Fax :******* Project Name: Natural Gas Co., Ltd. Inner Mongolia States to 3 × 24 tons / year of LNG Clean Energy Project Civil Stages of progress: environmental impact assessment Construction period: 2011 -2012 Main Equipment: Single Shaft Gas - steam combined cycle generating units, gas turbine hair dryer, waste heat boiler, steam turbine, etc. -for reference only Project: Project is located in Twin Alashan ecological immigrant demonstration area well Alxa Beach Pier Park grapes, the construction scale is to dispose the feed gas 300 × 104Nm3, annual LNG output of liquid 72 × 104t, the plant covers an area of 35 × 104m2. Construction includes a feed gas metering regulator unit, gas purification units, natural gas liquefaction unit, refrigerant storage system, the refrigerant compression system, LNG storage units and other public assistance projects. The total investment is about 2,219,640,700 yuan. Construction Unit:******* Postal Address:******* Contact:******* Tel:******* Designer:******* Postal address:******* Post Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel :******* Project Name: 200 tons trityl losartan, 200 tons of the three intermediate benzyl 基厄贝沙坦 2 project with an annual output 150 tons of losartan potassium, irbesartan 150 tons, 100 tons Valerian losartan, 20 tons of candesartan cilexetil, olmesartan medoxomil 20 tons, 10 tons of non Masha Tan, 10 tons of non Busuo Tan seven fine, bake, package technology projects Progress stage: has the record Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in Huangyan District, Taizhou City Jiangkou light of the chemical area, annual output of 200 tons of trityl losartan, 200 tons of three-benzyl 基厄贝沙坦 two intermediate projects, with an annual output of 150 tons of losartan potassium, Irbesartan 150 tons, 100 tons of valsartan, 20 tons of candesartan cilexetil, olmesartan medoxomil 20 tons, 10 tons of non-Masha Tan, 10 tons of non Busuo Tan. The total investment is about 81.8 million yuan. Construction Unit:******* Post Code:******* Tel :******* Fax :******* Project Name: Recycling 14,040 tons of anhydrous potassium fluoride, 5,100 tons of sulfuric acid 93% cleaner production project Stages of progress: environmental impact assessment Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in Linhai, Zhejiang chemical raw materials base of the park, recycling 14,040 tons of anhydrous potassium fluoride, 93% of 5100 tons of sulfuric acid. The total investment is about 72.2 million yuan. Owner:******* Postal Address:******* Tel :******* Fax :******* Project Name: 100 tons T1-3, 60 吨 ketone ene sulfone, benzyl amine fluoride 100 tons, 100 tons CDT, 25 吨 DFPB, 60 吨 MFBA and TV flat panel display materials, 350 tons of high-tech industrialization project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Linhai, Zhejiang chemical raw materials base of the park, with an annual output of 100 tons T1-3, 60 吨 ketone ene sulfone, benzyl amine fluoride 100 tons, 100 tons CDT, 25 吨 DFPB, 60 吨 MFBA and 350 tons of TV flat panel display materials . The total investment is 137.53 million yuan. Owner:******* Postal Address:******* Tel :******* Fax :******* Project Name: Construction of an annual output of 44,000 tons of Phosphate Project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in Linhai, Zhejiang chemical raw materials base of the park, with an annual output of 15,000 tons of TCPP, 8000 吨 TDCPP, 8000 吨 504L, 5000 吨 RDP, 2000 吨 HF-4, 2000 吨 PX-220, and 4,000 tons / year intumescent flame retardant piperazine pyrophosphate salt. The total investment is about 180.6 million yuan. Construction:******* Post Code:******* Tel :******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Fax :******* Project Name: annual output of 5,000 tons of polyvinyl butyral resin project Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in Tiantai County Industrial Park, three blocks -ie, all eight blocks, with a total land area 13488.1m2. New annual output of 5,000 tons of polyvinyl butyral resin and related facilities. The total investment is about 50 million yuan. Construction Unit:******* Post Code:******* Tel :******* Fax :******* Project Name: Hebei Agricultural Development Co., Ltd. Yu Chen corn straw utilization project Progress stage: construction design Construction period: May 2011 -2011 in October Major equipment: forage processing equipment, cold storage equipment. -For reference Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Zhu Zi Teng township project is located in the port village, production and processing workshops, warehouse products, organic fertilizer plant, aided engineering facilities. Annual output of 2 million tons of organic feed, organic fertilizer 5,000 tons. The total investment is 9,000,000 yuan. Owner:******* Postal Address:******* Contact:******* Tel:******* Project Name: WEI Xian Schindler straw gas supply new energy Co., Ltd. New WEI Xian Wei joint urban household biogas Straw Progress stage: construction started in Construction period: April 2011 In April -2012 Major equipment: gas storage cabinets. -For reference Project: The project is located WEI Xian Feng Xin Wei Village town 300 meters of new residential areas west, covering 36 acres, building a large 2000 cubic meters of biogas digesters, gas cabinets, gas supply systems, water and gas purification systems, and related facilities. Construction of 2,000 cubic meters of biogas supply stations. The total investment is about 20 million yuan. Owner:******* Post Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Petroleum and Chemical Co., Ltd Puyang roads lead to 20,000 tons of annual output value of the project composite material blocking agent Progress stage: the record Construction period: June 2011-December 2011 Major equipment: shredders, degreasing agents, a variety of drying equipment, vibrating screen, packaging machines, etc. -for reference only Project: Industrial Cluster Project is located in Puyang City District, Puyang City roads lead Petrochemical Co., Ltd. 20,000 tons of annual output value of composite materials, sealing agent project, covering 40 acres, with an annual output of 20,000 tons; process technology: materials selection, and then re-drying after degreasing dry, then a certain percentage of mixture, then crushed, and then screening standards, measured by the test compound standards packaging, storage and sale. A variety of major equipment, shredders, degreasing agents, a variety of drying equipment, vibrating screen, packaging machines The total investment is about 62 million yuan, of which: 62 million yuan raised by the company. Owner:******* Post Code:******* Contact:******* Tel:******* Project Name: Puyang City, Oriental Bell Industrial Co., Ltd. with an annual output of 1,000 tons of phenolic resin construction projects Progress stage: the record Construction period: June 2011-June 2012 Major equipment: boiler, reactor, dryer, air compressor -for reference Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Industrial Cluster Project is located in Puyang City District, Puyang City, Oriental Bell Industrial Co., Ltd. with an annual output of 1,000 tons of phenolic resin construction projects, covering 30 acres, 1000 tons of phenolic resin; process technology: phenol, formaldehyde, sodium metabisulfite, sodium sulfite anhydrous polymerization , spray drying, packaging. Mainly equipped with boilers, reactors, drying tower, air compressor. The total investment is about 46.25 million yuan, of which: 46.25 million yuan raised by the company. Owner:******* Post Code:******* Contact:******* Tel:******* Project Name: annual 15 million tons of construction projects green paint and resin Progress stage: the record Construction period :2012-April -2013-04 months Major equipment: synthesis, synthesizer tank, sink, filter press, drying systems, air preheater, reactor -for reference Project: Project is located in Zhuhai Economic Zone Gaolan Fine Chemical Zone in Hong Kong Wei Shi Road Northeast, with an annual 15 million tons of construction projects green paint and resin to build the scale of 64,730.40 square meters, the main building a production plant and ancillary facilities. 8 million tons green interior wall paint, water-based wood coatings decoration 1 million tons, 10,000 tons of radiation curable coatings, high solids of the coating 1 million tons of green resin 4 million tons. The total investment is about 296,516,400 yuan, 128,386,700 yuan of which construction investment, equipment investment 9835.900000000001 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Contact:******* Tel :******* Project Name: Xingtai Coal Chemical Co., Ltd. Xuyang 10 million tons / year project cyclohexanone Stages of progress: preliminary design Construction period: October 2011 In October -2013 Major equipment: reactor, condenser, testing equipment, instruments, water treatment equipment, automatic control systems, compressors, heat exchangers. -For reference Project: Project is located in Xingtai County, West Village, Yan Jia Tunzhen rock phase, the new acquisition of 200 acres of land, the main building of cyclohexanol distillation plant, hydrogenation plant, cyclohexyl thin hydration workshop, cyclohexanol dehydrogenation plant, alcohol ketone refining plant, chemical warehouse and office laboratory building, with a total construction area of 20,062 square meters. Project covers an area of 200 mu, annual output of 10 million tons of cyclohexanone. The total investment is about 600 million yuan. Owner:******* Postal Address:******* Contact:******* Tel :******* Project Name: Xingtai Blue Fine Chemical Co., Ltd. with an annual output 50,000 tons high-performance surfactant production line technological transformation project Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction started in Construction period: April 2011 -2013 in May Major equipment: PI -Pressindustria process equipment. -For reference Project: Project is located in the county of Xingtai City, No. 8 Guanghua Street, -River Village North, annual production capacity of 50,000 tons high-performance surfactant production line, building area of 26,000 square meters, including building area of 18,000 square meters, auxiliary building area of 5,000 square feet m, the technology center of 3,000 square meters. Covers an area of 80 mu, building area of 26,000 square meters. The total investment is about 23,000 yuan. Owner:******* Postal Address:******* Contact:******* Tel :******* Project Name: Henan Billions Chemicals Co., Ltd. 200,000 tons / year high-grade rutile titanium dioxide production line technological transformation project Progress stage: the record Construction period: June 2011 In June -2013 Major equipment: acid hydrolysis reactor, the hydrolysis reactor, filter press, rotary kiln and imported sand mill, roller mill imports, import emulsion pump, etc. -for reference only Project: Project is located in Jiaozuo City, West Park, Industry Agglomeration, Henan Billions Chemicals Co., Ltd. 200,000 tons / year high-grade rutile titanium dioxide production line technological transformation Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. project, relying on the company's existing 60 million tons / year sulfuric acid, the use of sulfur in titanium joint production process titanium dioxide production capacity of the company from 8 million tons / year expansion to 20 tons / year, with production capacity 12 million tons / year. 200 mu, building area of 93,240 square meters. Major equipment, including acid hydrolysis reactor, the hydrolysis reactor, filter press, rotary kiln and imported sand mill, roller mill imports, import emulsion pumps. The total investment is about 540 million yuan, of which: domestic enterprises raised 190 million yuan of bank loans 350 million yuan. Construction Unit:******* Post Code:******* Contact:******* Tel :******* Project Name: Puyang City, Yu Long Mechanical Chemical Co., Ltd. with an annual output of 8,000 tons of construction projects lubricant Progress stage: the record Construction period: June 2011 -2011 in December Major equipment: centrifuges, mixers, reactors, and in kettle, pump -for reference Project: Industrial Cluster Project is located in Puyang City District, Puyang City, Yu Long Mechanical Chemical Co., Ltd. 8000 tons per lubricants construction projects, covering 20 acres, 8000 tons per year lubricant; process technology: dehydration grinding, emulsifying, and, testing, packaging, the main equipment centrifuges, mixers, reactors, and in kettle, pump The total investment is about 32 million yuan. Owner:******* Post Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Project Name: Production of 200,000 tons of caprolactam project Progress stage: the record Construction period: May 2011 to December 2014 Major equipment: reactors, extraction column, mold, thickener, feed pumps, etc. -for reference only Project: Project is located in the wine business Baofeng town business park recycling economy and build an annual output of 200,000 tons of caprolactam project. The main works construction projects, including cyclohexanone, hydrogen peroxide, ammonia, oxime, caprolactam, ammonium sulfate, hair nicotinic acid, hydrogen production, packaging and storage devices caprolactam, boilers and related public works and auxiliary facilities. Ammoximation caprolactam production by production technology. Ammoximation reactor, extraction column, mold, thickener, feed pumps and other equipment imports, and the remaining equipment are made equipment. The total domestic consumption in 2009 equivalent of caprolactam caprolactam, and polyamide 6 chips of 1.573 million tons, the domestic supply of 330,600 tons of caprolactam, 78.98% import dependence, the market demand. The total investment is about 4.2 billion yuan, of which 1.26 billion yuan raised by the enterprise, domestic bank loans to 2.94 billion yuan. Owner:******* Post Code:******* Contact:******* Tel:******* Project Name: Puyang City, Silver Tai Yuen Industrial Co., Ltd. with an annual output of 3,000 tons of construction projects dimethyl hydantoin Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: the record Construction period: June 2011-June 2013 Major equipment: Enamel Reactor -K5000-7.5-63.85-130, ammonia compressor, dryer -for reference Project: Industrial Cluster Project is located in Puyang City District, Puyang City Bank Pacific Industrial Co., Ltd. 3,000 tons of dimethyl hydantoin construction projects, covering 20 acres, producing 3,000 tons of dimethyl hydantoin; process technology: acetone cyanohydrin with ammonia mixed with liquid carbon dioxide and water to form dimethyl hydantoin; the main reaction vessel equipped with Enamel -K5000-7.563.85-130, ammonia compressor, dryer The total investment is about 32 million yuan, of which 15 million yuan raised by the enterprise, domestic bank loan 17 million yuan. Owner:******* Post Code:******* Contact:******* Tel :******* Project Name: The first gas station relocation project Guohong Progress stage: under construction Construction period :2011-4 to the 2012-11 Major equipment: tanker, buried oil tank and fire facilities, etc. -for reference Project: The project is located east to the open space, green belt south long waterway, west green belt spinning Rd, north to Matang Jing green belt, the first gas station Guohong Relocation Project, 100m3 oil reserves of natural gas at oil co for 20000m3 establishment of the station Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment is about 10 million yuan. Owner:******* Post Code:******* Contact:******* Tel :******* Project Name: Biological release fertilizer material projects Progress stage: the record Construction period: June 2012 In June -2013 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment -for reference only Project: Project is located in Sanhe City, Taiwan, should the city, sustained-release fertilizer materials with biological projects, new construction properties, with an annual output of 30,000 tons of fertilizer release of biological material. Content of civil building and equipment The total investment is about 22.28 million yuan, including stocks, bonds, 22.28 million yuan. Construction Unit:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Fax :******* Project Name: phosphate rock flotation agents and fertilizer production process agent project -update Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: the record Construction period: June 2012 In June -2013 Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for reference only Project: Project is located in Sanhe City, Taiwan, should the city, phosphate rock flotation agents and fertilizer production process agent projects, construction of new properties, with an annual 2 million tons of phosphate rock flotation agents and 1,500 tons of fertilizer production process additives. Content of phosphate rock flotation construction 20,000 tons / year, silicone emulsion defoamer 500 tons / year, flocculants -settling agents and filter aids 500 tons / year, 500 tons of phosphoric acid evaporation of additives / year. Civil works and equipment. The total investment is about 35.29 million yuan, stocks, bonds, 35.29 million yuan. Construction Unit:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Fax :******* Project Name: Project cefixime active ester Progress stage: the record Construction period: May 2011 -2012 in May Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, leaching equipment, evaporators, compression machine, granulating machine, dryer, grinder, centrifugal pumps, magnetic pumps, pipeline pumps, centrifugal fan, steam vacuum pumps, multistage pumps, liquid pumps, etc. -for reference only Project: Project is located in the town of Pro Yuanan Xian Ju Ming Fung Road 145, Chu Yang Technology Co., Ltd. Hubei cefixime active ester project, building new properties, with a total construction area of 40,000 square meters, the annual activity of cefixime 500 tons of fat and building a cephalosporin cefixime activity of lipid production line plant, equipment and other facilities The total investment is about 29.6 million yuan, of which 29.6 million yuan of funds owned enterprises. Construction unit:******* Postal Address:******* Tel :******* Stages of progress: environmental impact assessment Construction period: 2011 -2012 Major equipment: reactors, compressors, cracking furnace, dryer, granulator, extruder, water treatment equipment -for reference Project: Project is located in Wanrong County Village King Village West 160m at the project with methanol as the main raw material, methanol and air, water vapor by mixing, mixed gas through the heat, filter into the oxidizer, the catalyst of methanol dehydrogenation of aldehydes. Formaldehyde gas and water vapor by cooling and condensation absorbed by the absorber, made of 37% concentration of formaldehyde solution products. Annual output of 4 million tons of 37% formaldehyde solution. The total investment is about 8.9 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Fax :******* Design:******* Postal address:******* Post Code:******* Contact:******* Tel :******* Fax :******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org