Name Date of Birth : : Rolando G. Panaligan July 12, 1966 Position : 1) Sr. Construction Engineer (Piping and Pre-com) 2) Piping & Test Package Coordinator Contact Address : Lot 19, Block 12 Michigan St. Puerto Real Subd. Alangilan Batangas City, Philippines Email Address : rgpanaligan13@yahoo.com Contact Number : +966-551-932-510 (KSA) +63-43-723-9049 (PH) +63-9473977737 (PH) Education : BS Mechanical Engineering (1987~1991) Technical Drafting (1985~1987) Batangas State of University (BSU) formerly PBMIT Batangas City, Philippines SUMMARY OF WORK EXPERIENCE: With twenty two (22) years hands on experience in constructions of large/small bore UG (RTR, GRE/P and metallic piping fabrication/installation, mechanical & system completion (testing, flushing, reinstatement and pre-commissioning) and other related field in plant constructions. I joined & worked mainly in oil & gas and petrochemical projects on the side of Project Management Team/Contractor (PMT/C) and Sub Contractors, from grass roots up to mechanical completion of the projects, whose my primary task is to manage, prepare, control, supervise, inspect and acceptance of all piping activities in a proper implementation,application and compliance of the client / company, project procedures and standards; contracts & agreements, administration/management standard operating procedures, HSSE, PTWS, rules and policy QA/QC (ITP), method of statements and documentation, project study, cost & job estimating, planning & scheduling, engineering review of U/G & A/G piping drawings & doc’s, MTO of piping materials, fittings & in-line items, preparation of spooling & weld mapping from AFC piping isometric drawings and doc’s., total break down the inch dia of large and small bore piping, shop & field welds. Controlling of specific worksite, schedule and supervise day to day workshop & field activities to ensure proper utilization of manpower, equipments and materials that work is carried out to high technical, quality and safety standard and procedures of the company and assuring the daily target inch dia (shop/field). Manage, supervise and control the budget man hour for equipments & man power, minimized re-works and lost time manhours.Controlling of all incoming & outgoing piping drawings and documents. Retrieved project schedules as per project and client requirements and priorities. In addition to my qualification in System Completion Activities such as; testing, flushing and re-instatement. I am managing to prepare, review, supervise, inspect and acceptance of Test Package up to physical testing of pipe line from engineering & drafting job of test block diagram from Master P&ID and Isometric drawings with referred to the AFC & latest revision of line list & material specification, attachments of documentations & formats, punch list review and rectification, joint inspection & coordination with clients and sub-contractors for final acceptance of testing, flushing and reinstatement. Managed, supervise and co-ordinates to clients certified piping & welding inspectors for the acceptance of color coding system of gaskets and test blinds/plates. Acceptance of temporary spools, test manifold, hydro test pump, calibration of pressure gauges, set pressure of PRV, bolt torque procedures, NDE, UT,PT, PMI clearance and other valid certificates & stickers. Control & verified (RFI) prior for testing, flushing, reinstatement, bolt torque and other internal/external piping activities assuring all “A” punch items are killed/cleared and hand signature & initials of all involve personnel are available prior for test and for the final closed out of “B” & “C” items. Manage and co-ordinates to Pre-Com Group, hand over of all tested Test Pack through transmittals and e-mails. Closed coordinates to construction piping group regarding the outstanding “A” punch items and “B” prior for pre-commissioning and “C’’ prior for start–up. Manage, control and supervise the flow & filling of all Test Pack (“System Wise”). Simultaneously I am doing field and engineering supervision corresponding to my area of discipline from controlling and managing of piping engineering/drafting job, spooling, weld mapping marked-up, test package assembling including test block diagram on the master P&ID file, field modifications, engineering design revision, as-built drawings, documentations, progress updating and monitoring. Select key subordinates and organize them to achieve the objectives of the project/plan and to work as a team. Formulating construction strategies, interpreting of technical specification, piping plan, isometric, and pipe support drawings. Have the ability to negotiate with clients, suppliers and subcontractors. Coaching and pushing sub-contractors and subordinates for early completion of the projects controlling of specific project worksite. Prepared daily, weekly and monthly piping schedules and update as per actual accomplishment on the shop/field welding daily reports (DWR). Empowered to stop any unsafe construction activities if not following safety procedures. Attending/conducting clients and sub-contractors, Piping-QA/QC and with the other disciplines of co-ordination, important and internal meeting. Enforcing security and safety procedure of the company and worked independently as a Team Leader. Willing to relocate with other projects and to accept other related duties which it will be assigned by my immediate boss and manager. Specific duties and responsibilities: Responsible for total project: Responsible for the higher management for job execution, cost, planning and scheduling, dealing with clients and sub-contractors and handling the total piping indirect & direct manpower in a view to execute the project successfully and ensure that project is completed safely to the required schedules, engineering design & specification, budget and quality. Develop and implement project control system. Planned and study total scope of the project for u/g & a/g process & utility piping as per plot plan. Prepared total take-off dia-inch for shop/field joints, threaded/bolted joints, total quantity of spools, quantities of sheets of isometric drawings, pipe supports, total number of test packages and MTO for pipe / fittings and in-line items. Prepared piping organization chart, piping work flow and Test Package Cycle during testing. Supervise/organize and coordinates construction activities during fabrication and installation of piping spools such as; manpower & equipment mobilization, material requisition as per priority and availability of isometric drawings, tools requisition as per manpower requirements. Organize and supervised piping materials and piping spools lay-down area, separate SS & CS pipe & fittings, separate spools area wise and ensured project color coding is applied on all piping materials including gaskets. Prepared 3-days, 3-weeks and 3-months work schedule as per project requirements and or manpower, materials and equipments availability. Allocation of manpower, equipments and identifications of materials requirements versus priority schedules and clients requirements. Checked and supervised daily activities for Work Permit ensured all activities are written with full description in order to easy understand by the Issuer. Ensured all manpower and equipment are complied with the clients SAFETY requirements, such as PPE, ID’s, stickers vehicle access, expiry of the Welding Machine Calibration and other important documents are in placed in the projects. Controlled and supervise the flow of piping fabrication & installation, ensured materials and spools management system are properly implemented, to avoid double fabrication & material shortage. Ensured all additional joints and Field Change Request (FCR) are coordinated with clients and engineering head prior for fabrication/installation. Assist Cost Control for invoices of all FCR with supporting drawings and doc’s. Applied final procedures of the projects (engineering & QA/QC std. & procedures) Supervise/organize and coordinates engineering activities of piping engineering drawings & documents, draft and sketch shop/field revision drawings. Prepared final draft of revise isometric Resume: R.Panaligan Page 2 of 7 drawings, ensured it’s complied with latest revision of AFC piping drawings & documents such as; piping plan or GA, P&ID, structural & pipe supports drawings with referred on the latest and approved AFC piping material class or specifications, line list and other approved related standard and approved engineering procedures by clients. Supervise/organize and coordinates with the engineering and material coordinator/controller regarding the availability of approved isometric drawing versus the availability of fabrication and installation piping materials/fittings and in-line items, ensured its complied with approved material color coding and approved and signed by client and contractors QA/QC material inspector prior for material withdrawal for piping fabrication and installation. Coordinates and controlled the releasing of pipe spools from fab-shop, ensured it’s inspected/signed by QA/QC Piping & Welding Inspector and ensured it’s encoded on the system and properly delivered to area construction site with proper documentation of NDE/RT clearance. Supervise/organize and coordinates test package assembling and documentations, prepared master P&ID, showing all test limits of test pack, provide unique numbering of all test packages as per “system wise”. Ensured all test limits are accordance with the latest and approved line list documents, material specification break and flange ratings. Ensured all attached isometrics, P&ID’s, pipe supports drawings and related attached documents are latest revision and complied with the approved hydro test method of statements. Ensured all line numbers are encoded on the system and assigned test pack number on each line numbers prior for preparation and submission of test package on the system. Supervise/organize and coordinates a group of piping in shop fabrication, piping and welding supervisors/foreman, material/spool & equipment controller, time keeper, safety officers and all craft workers specially qualified welders with WPS ID issued by clients CWI. Ensured they are qualified and capable with their respective assignment. Monitored daily fit-up and welding progress ensured meeting target daily/weekly and monthly schedules. Ensured current revision drawings and documents are utilized for installation and complied on project clients engineering specifications and QA/QC welding and fit-up fabrication procedures and standards. Supervise/organize and coordinates with the higher management the availability, required and additional manpower’s/materials, equipments & tools during pick period of fabrication / erection and testing. Ensured all fabricated spools are properly delivered on the specific lay-down area, and or in the nearest place to be erected on the working area. Ensured all piping materials/fittings and spools out going are controlled and recorded by spool controller. Maintain close contact to all section heads and managers during construction, testing, precommissioning/commissioning and start-up phases of the project/plant to ensure an adequate flow of materials information to the sub-contractors to meet the established schedules, cost, safety, and quality productivity objectives. Take leading rule in providing a safe work place for all by assuring that contractors adhere to the onsite requirements of the construction, health, safety, security and environmental plans. Ensure that the contractors initiate any changes required to correct deficiencies identified through inspection audits in accordance with Project Engineering Procedures and Specifications. Develop and implement project control system, safety and quality for construction and testing procedures of U/G & A/G piping. Keep daily diary that includes items of importance which may become relevant in settling any contractual disputes that arise during the course of construction, testing, pre-commissioning and turn over. Direct the activities of designated subordinates staffs and members. Ensure that the staffs members are maintain good working relationship with other members of the team, with the clients as well as with the sub-contractors management staffs and construction team. Resume: R.Panaligan Page 3 of 7 Identified the pipe line by system wise, test description (hydro, pneumatic, service, visual, leak test or gravity test) and identified the lowest , medium and highest pressure for the fabrication of test manifolds, temporary spools, gaskets and color coding test blind/plates and gaskets. Coordinates NDE clearance at least one day prior for testing. Coordinates with the HSE regarding work permits, barricades and sign in traffic areas, proper sign boards, and isolation of system, isolated from equipments and or other system which plan shall be identified on the Test Packs and assigned personnel at all test limits during testing of big/long piping system as well pneumatic testing and ensured Test Package Flow Chart are sign-off of all involve personnel prior for test. Coordinates and supervised daily work shop activities for the fabrication of test manifolds, test blinds/plates, flanges, orifice plates, temporary spools and braces, ensured it is accordance and complied with project specification and standards providing approved color coding of the same. Actively promote the continual practice by the Sub Contractors of maintaining high quality workmanship and their own internal pre-inspection to minimize delays due to punch list items and repairs. Assist QA/QC and pre-commissioning group and sub contractors in identifying any special requirements to be included during the preparation of test package. Verify the Sub contractors is maintaining adequate quantities piping construction and testing materials, testing pumps, hoses, calibrated gauges, recorders and spares. Interface with shop and field piping engineers, ensure total integration of planned work scopes. Assist in ensuring safe delivery of all construction target inline with the clients and contractors. Provide and advice on project construction, installation and completion techniques, source and implement innovative equipments and methods to enhance man hour minimization. Participate as required, in the development and issue of weekly and monthly construction reports. Closed co-ordinates to Planning, Engineering, Material / Ware-House, Civil, Structural and Equipment departments for the next priority schedules releasing/issuance of piping isometric drawings, expected arrival (ETA) and installation schedules of all piping items, equipments and structures prior for piping fabrication and installation of pipe spools. Reporting to Construction / Piping Manager and conducting and attending daily and weekly important, progress and coordination meeting. Enforce safety and security procedures of the company. EMPLOYEMENT HISTORY: Company Position : : Date Project Client : : : YASREF/AL-BARRAK Piping & Pre-Commissioning Supervisor Project Management Team (PMT) October 26, 2013 to present Yanbu Export Refinery Project (EPC-2) Yanbu Aramco Sinopec Refining Company (YASREF) Ltd. Company Position Date Project Client : : : : : Kharafi National UEA Construction Superintendent (Hydrotest & Per-Commissioning) July 22, 2011 to July 30, 2013 Habshan 5 GASCO IGD Project, Abu Dabi, UEA GASCO / Tecnimont & JGC Company Position Date Project Client : : : : : ILYANG ENC Philippines Construction Supervisor (Piping) May 28, 2011 to July 20, 2011 JG Summit Naphtha Cracker Project Bo. Simlong Batangas City Philippines JGS Petrochemical Company & Daelim Philippines Resume: R.Panaligan Page 4 of 7 Company Position : : Sungchang / GS Engineering & Construction Co. Ltd. Construction Supervisor (Piping)Date : Dec. 6, 2009 to Project Client : : Manifa Gas Facility (MGF) at Kursaniya Gas Plant (KGP) Saudi Aramco Company Position Date Project Client : : : : : Snamprogetti Company of Saipem Construction Coordinator (Piping & Testing) September 6, 2008 to June 30, 2009 KWIF & KUC Project, Khurais KSA Saudi Aramco Company Position Date Project Client : : : : : JK (JGC & KBR) Construction Engineer (Piping) January 13, 2007 to July 23, 2008 Pearl GTL Qatar Shell Project, Ras Lafan Qatar Shell Company Position Date Project Client : : : : : Samsung Engineering Co. Ltd. Construction Supervisor (Piping) August 20, 2005 to November 28, 2007 APPC, IBN-ZHAR PP-3 & OCT Project, Jubail KSA ABB Lummus BV & IBN Zhar European Petrochemical Company Company Position Date Project Client : : : : : Nasser Al Hajri Corporation (NSH) Construction Superintendent (Piping & Hydrotest) April 8, 2003 to May 25, 2005 SABIC Acitic Acid Project (SAAP), Yanbu KSA SABIC/IBN Rushd & Technip Cooplexip, Italy Project Client : : GACIC BDO FACILITY, Jubail KSA SIPCHEM / AKER KVEANER GULF Project Client : : Wire Mill Rod Project, Jubail KSA HADEED / Danieli Engineering, Italy Company Position Date Project Client : : : : : Al-Yusr Townsend & Buttom Co. Ltd. (AYTB) Construction Engineer (Piping) December 23, 1998 to December 9, 2002 Berri-Gas Expansion Project, Jubail KSA Flour / AMEC (Saudi Aramco) Project Client : : Kemya Olifins Plant (KOP), SABIC Jubail KSA Exxon Mobile, ABB Lummus Aliriza & Parsons Arabia Ltd. Project Client : : Yanpet Expansion Project (SABIC) Saudi Toyo Engineering (SATEC) Project Client : : NGL Feed Stock Product Pipeline, Yanbu KSA Flour Arabia Ltd. (Saudi Aramco) Company Position Date Project Client : : : : : Samsung Engineering & Construction Co. Piping Supervisor June 30, 1997 to August 20, 1998 Olifins Project, Taiwan ROC Formosa Plastic Corp. Company Position : : Poong Lim Industrial Co. Ltd. Piping Supervisor March 10, 2010 Resume: R.Panaligan Page 5 of 7 Date Project Client : : : January. 20, 1996 to March 30, 1997 EIS Expansion Project, State of Kuwait FLUOR ARABIA LTD. Company Position Date Project Client : : : : : PRODETECH FT Philippines Shutdown & T/A Coordinator / Draftsman Jan 28, 1992 to December 15, 1995 Maintenance / Shutdown Project Client CALTEX Philippines Inc. Batangas Safety Training & Seminars Attended Company Location Date Topic : : : : YASREF YANBU KSA November 4, 2013 General Safety Orientation Company Location Date Topic : : : : GASCO IGD Habshan 5 Project Habshan 5 Abudabi January 16, 2009 to January 19, 2012 Incident & Injury Free (IIF) H2S Awareness Training Hydrotest & Pre-Commissioning PTW Training Company Location Date Topic : : : : Aramco MGF Project Khursaniyah Gas Plant, (KGP) Saudi Arabia December 8, 2009 to December 15, 2009 Safety Orientation Training & Seminars 1) 2) 3) 4) 5) Safety for Management and Supervisory Accident Reporting and Investigation Scaffolding Safety Working at Heights Defensive Driving Company Location Date Topic : : : : Aramco KUC / WIF Project Khurais Saudi Arabia Sept 8, 2008 to Sept 9, 2008 Safety Orientation Training & Seminars (General) Company Location Date Topic : : : : JK & Qatar Shell RLIC @ Qatar Shell Pearl GTL Project February 2, 2008 to March 28, 2008 I) Supervisors Skills & Incident and Injury Free Training (IIF) Eleven (11) Life Critical Activities IA) Road Transportation IB) Personal Protection (PPE) IC) Lifting ID) Fall Protection IE) Scaffolding IF) Excavation IG) Electrical Safety IH) Confined Space II) Working in Poor Lighting IJ) Falling Objects IK) Health and Welfare Resume: R.Panaligan Page 6 of 7 Company Location Date Topic Resume: R.Panaligan Page 7 of 7 : : : : SARPLAST GRP and RTR PIPING (underground) RLIC @ Qatar Shell Pearl GTL Project February 23 & 25 2008 Supervisors GRP and RTR Underground Piping Lamination, Bell & Spigot and Adhesive Joints Assembly and Installation.