Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) General Application Information See the following “Form B – Instructions” link for detailed information on completing this application form: http://www.hydroone.com/Generators/Pages/Distributed%20Generation.aspx Applicants This Application Form is for FIT, Net Metering, Load Displacement or Energy Storage Generators with a project size over 10 kilowatts (kW) and who are applying for a Connection Impact Assessment (“CIA”) to Hydro One Networks Inc., including: New Generators applying for Connection Impact Assessment (“CIA”) New Generators applying for revision(s) to their original CIA Existing Generators to verify information related to current connection to the Hydro One system. It is part of the overall Distribution Connection Agreement. Technical Requirements For technical requirements of Hydro One’s FIT projects, refer to the “Distributed Generation Technical Interconnection Requirements Interconnections at Voltages 50kV and Below”, available at: http://www.hydroone.com/Generators/Pages/TechnicalRequirements.aspx. Application Submission Instructions Please return the completed form, fees and other required documents by mail to: Hydro One Networks Inc. Attn: Dx Generation Connections Generation Connection Application 185 Clegg Road Markham, Ontario L6G 1B7 Important Notes Applicants are cautioned NOT to incur major expenses until Hydro One approves to connect the proposed generation facility. All technical submissions (Form B, Single Line Diagram, etc.) must be signed and sealed by a licensed Ontario Professional Engineer (P.Eng.). All fields below are mandatory, except where noted. Incomplete applications will be returned by Hydro One. If your project is between 1 and 10 kW in size (such as a microFIT project), please fill out Hydro One’s “MicroGeneration Connection Application (Form C)” available at: http://www.hydroone.com/Generators/Pages/Distributed%20Generation.aspx If you are applying for connection of a Load Displacement or Energy Storage facility, the assessment performed by Hydro One is a Detailed Technical Connection Assessment (“DTCA”). For such facilities, the term Connection Impact Assessment (“CIA”) as it appears throughout this Form B shall be interpreted to mean Detailed Technical Connection Assessment (“DTCA”). Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 1 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Section A – Administrative Information ENGINEERING STAMP: New CIA Application CIA Revision/Rework Reconnection of an Existing Generator Application Type: (choose one) Date: (mm / dd / yyyy) Program Type: (choose one) FIT Net Metering Load Displacement/Co-Gen Existing generator on the property?: Energy Storage Yes No OPA Contract # for existing generator(s): If “Yes” to above, check the generation type and provide the OPA Contract or Hydro One Project ID number for each: Biomass Solar (PV) Gas Turbine Wind Diesel Engine Water Other (please specify) If this is a CIA revision application, list the fields that have changed from your previous CIA below: (Example: “Original CIA Project ID#, OPA Contract Number and Type of Connection”) 1. (a) Original Connection Impact Assessment (CIA) Project ID # (if applicable): (XX,XXX) (b) Project Name: 2. OPA Feed-In-Tariff (FIT) Contract Number: (F-XXXXXX-XXX-XXX-XX) OPA Reference Number: (FIT-FXXXXXX) 3. Ontario Corporate Number OR Business Identification Number: 4. Proposed In-service Date: (mm/dd/yyyy) Section B – Project Information 5. Type of Connection (choose one): 6. Project Size (total requested DG output capacity (maximum DG power output): The project size must be in agreement with your OPA contract Equipment Capacity: (Total Nameplate capacity (equipment rating as per manufacturer’s stamp). See section 2.1.2 of Hydro One’s Technical Interconnection Requirements) Project Location 7. 8. Single phase Three phase kW kW Address: City/Town/Township: Postal Code: Lot Number(s): 9. Concession Number(s): Project Contact Information Single Point of Contact for the project: (choose one) Owner Information (same as Generator) Owner Consultant Consultant Information Contact Person: Company Name & Physical Mailing Address: (incl. Postal Code). No P.O. BOXES or Rural Routes will be accepted) Work Tel. Number: Cell: Fax: E-mail Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 2 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) a. 10. Customer Status (a) Is there an existing Hydro One customer account at the project location?: If you choose “No”, skip to 10(e) Yes No If “Yes” to 10(a), what is the Hydro One 12-digit account number of the property: (b) Customer name registered on existing account: (d) If you are an HST registrant, provide your HST number: 11. Yes (c) Is the owner an HST registrant? - No RT (e) Barcode of nearest Hydro pole serving project location: (Only provide this if you did NOT answer 10(b) above): Fuel / Renewable Energy Type Biomass Solar (PV) Gas Turbine Wind Diesel Engine Water Other (please specify): For water projects only: Please answer (a) and (b): (a) Is water your primary energy source?: Yes No (b) Is your generation facility located on provincial Crown or federally-regulated lands?: Yes No Section C – Project Connection Information See “Form B – Instructions” for definitions of “Point of Connection (POC)” and “Point of Common Coupling (PCC).” 12. Generation Facility and New Line Map On a cut-out from the Hydro One DOM (Distribution Operating Map) provide the location of the generation facility with proposed line routings for connection to Hydro One’s distribution system. It should identify the POC, the PCC and the location of new lines between the generation facility and the POC (i.e. on private property or public road right-of-ways). Drawing / Sketch Number: 13. Revision Number: Connection to Hydro One Distribution System: (a) Proposed or existing connection voltage to Hydro One’s distribution system: If this is a CIA revision application, list the kV as stated in your original CIA study agreement kV (b) Station Name: (c) Feeder: (d) GPS coordinates: (GPS Format: Latitude, Longitude - Degree Decimal e.g. 49.392, -75.570) POC GPS Coordinates: PCC GPS Coordinates: Generation Facility GPS Coordinates: (e) Please select ONE applicable connection figure from Appendix A: A1 A2 (f) Length of line from the POC to the PCC: (g) Length of line from PCC to the Generation Facility. Important: The line must NOT be shared with any other DG (refer to Appendix A): A3 km km Conductor Type/Size: / Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 3 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Three-phase generators: 3-phase short circuit (h) Fault contribution from the Generator’s Facilities, with the fault location at the PCC: Single-phase generators: 1-phase short circuit IMPORTANT NOTES: If this project requires line expansion work between the POC and PCC, Hydro One will provide a cost estimate to construct any line located on public road right-of-way. The cost estimate will include a breakdown of Uncontestable work (i.e. overbuild to existing line) that can only be performed by Hydro One, as well as Contestable work (i.e. new construction/green-field) that can be performed by the Generator, their contractor or Hydro One. (Both Uncontestable work and Contestable work requires the design to Hydro One specifications). Hydro One will become the owner of the line expansion. For Generator-owned line, the Generator may choose to apply for installation of the line on existing Hydro One-owned poles. This is known as an application for Joint Use (JU) of poles. If the application is accepted, Hydro One will provide the Generator with information on initial connection costs, annual pole-space rental and emergency service (ES) fees, and required JU & ES Agreements. 14. Single Line Diagram (“SLD”) Provide an SLD of the Generator’s facilities including the PCC, transformer and connecting station, feeder and supply voltage. Along with the SLD, provide the following information: SLD Drawing Number: Revision Number: Section D – Generation Characteristics 15. Generation Characteristics (a) Existing Generation: Are there any existing generators at the PCC?: Yes No (b) Characteristics of Proposed Generation: Note for facilities with multiple generators: Provide the manufacturer’s technical data (electrical) for the generator or inverter. If your generators have different characteristics, please provide the characteristics for each generator on an additional sheet(s). Number of Generating Units: Manufacturer: Type or Model Number: Rated Capacity of each unit: kW kVA Generator Output Voltage: kV Generator Type: Rotating Static (PV, fuel cell, battery) Generator Phasing: Single phase Single phase connecting to three phase system Power Conversion Technologies: Synchronous Induction Three phase Full inverter interfaced Other (Please Specify) (If the machine type is “Other”, please provide values equivalent to a Synchronous or Induction type Generator) Limits of range of reactive power at the machine output: Limits of range of reactive power i. Lagging (over-excited): kVAR ii. Leading (under-excited): kVAR iii. Lagging (over-excited): kVAR Power Factor: Power Factor: Power Factor: Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 4 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) at the PCC: iv. Leading (under-excited): Maximum Starting inrush current: (multiple of full load current) pu Generator Winding Connection: Solid Neutral grounding method of star connected generator: Power Factor: kVAR Delta Star Ungrounded Impedance: R: ohms X: ohms a) Nominal machine voltage: kV (LL) b) Unsaturated reactances on: kVA base kV base Direct axis subtransient reactance, Xd’’: pu Direct axis transient reactance, Xd’: pu Direct axis synchronous reactance, Xd: pu Subtransient time, Td”: ms Transient time, Td’: ms Zero sequence reactance, X0: pu For Synchronous Units: a) Nominal machine voltage: For Induction Units: kV b) Unsaturated reactances on: kVA base Direct axis subtransient reactance, Xd’’ 16. kV base pu Interface Step-Up Transformer Characteristics Customer (a) Transformer Ownership: / Hydro One If transformer is Hydro One owned, provide the Hydro One Account No. OR complete (b) to (h) below: (b) Transformer Rating: kVA (c) Nominal voltage of high voltage winding: kV (d) Nominal voltage of low voltage winding: kV (e) Transformer Type: Single phase kVA base (f) Impedances on: R: (g) (h) Three phase kV base pu X: High voltage winding connection: Delta Star Grounding method of star connected high voltage winding neutral: Solid Ungrounded Low voltage winding connection: Delta Star Solid Ungrounded Grounding method of star connected low voltage winding neural: Impedance: R: Impedance: R: pu ohms X: ohms ohms X: ohms Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 5 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) IMPORTANT NOTES: At the Generator’s expense, and, if requested, Hydro One may provide transformation up to a maximum of 500 KVA three-phase, as described in the Hydro One Conditions of Service (Section 3.5, item C.4). The term ‘High Voltage’ refers to the connection voltage to Hydro One’s distribution system and ‘Low Voltage’ refers to the generation or any other intermediate voltage. Providing a picture of transformer equipment along with this application may help expedite your application quicker. 17. Intermediate Transformer Characteristics (if applicable) (a) Transformer Rating: kVA (b) Nominal voltage of high voltage winding: kV (c) Nominal voltage of low voltage winding: kV (d) Transformer Type: Single phase Three phase kVA base (e) Impedances on: R: High voltage winding connection: (f) Grounding method of star connected high voltage winding neutral: (g) kV base pu Delta Star Solid Ungrounded Impedance: R: Low voltage winding connection: Delta Star Grounding method of star connected low voltage winding neural: Solid Ungrounded Impedance: R: X: pu ohms X: ohms ohms X: ohms IMPORTANT NOTE: The term ‘High Voltage’ refers to the intermediate voltage that is input to the interface step-up transformer and the ‘Low Voltage’ refers to the generation voltage. 18. High-Voltage Grounding Transformer Characteristics (if applicable) Type: Zig-zag Star-delta Zig-zag Grounding Transformer zero sequence impedance (Z0): R: ohms X: ohms Star-delta Grounding Transformer zero sequence impedance (Z0): R: ohms X: ohms 19. Load information (a) Maximum load of DG facility: kVA (b) Maximum load current (referred to the nominal voltage at the connection point to Hydro One system): (c) Maximum inrush current to loads (referred to the nominal voltage at the connection point to Hydro One system): kW A A Important: For load displacement generation facilities, please attach a schedule of the forecasted maximum generation output (as a function of loading of the facility). At a minimum, include the forecasted generation output information (i.e. Watts and Vars) during the minimum and maximum load of the load facility to which the load displacement generator is connecting. (See Appendix B for template) Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 6 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) 20. Energy Storage Facility Control Strategy: (choose one of the following if applicable) (See Appendix C for templates) Peak Shaving (Note: Facility will act as a generator during the daytime and a load at nighttime. Please submit a detailed schedule of operating times, Var and Watt schedules, etc.) Dynamic VAR Support (Note: Please submit a detailed description of control strategy, Var and Watt schedules, etc.) Frequency Support (Note: Please submit a detailed description of the frequency support control strategy, such as cut-in/cut-off frequency, Var and Watt schedules, etc.) Other (Note: Please attach a detailed description of the proposed control mode.) NOTE: Hydro One reserves the right to modify the control strategy as part of its Detailed Technical Connection Assessment. Attached Documents Item No. Description Document No. No. of Pages Document No. No. of Pages 1 2 3 4 Attached Drawings Item No. Description 1 2 3 4 Section E – Checklist Please ensure the following items are completed prior to submission. The application will be returned if Hydro One determines it is incomplete. Please also see the “Common Errors Customer Checklist” for detailed checklist. Completed Form B stamped by a Professional Engineer Payment in full by cheque including applicable taxes. Cheque should be made payable to “Hydro One Networks Inc.”). See section E1 Signed Study Agreement (original signature is required) Single Line Diagram (SLD) of the Generator’s facilities, must be stamped by a Professional Engineer DOM (Distribution Operating Map) Load Displacement Generation Facility’s Load and Generation schedules - Section 19(d) (if applicable) Energy Storage Facility operating strategy description and parameters - Section 20 (if applicable) Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 7 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Section E1 – CIA Application Fee Checklist Please ensure the following items are completed prior to submission. The application will be returned if Hydro One determines it is incomplete. Check all that apply: Applicable CIA Fee See the Connection Impact Assessment Fee Schedule on our website for costs. (http://www.hydroone.com/Generators/Pages/ConnectionImpactAssessment.aspx). Please enter the amount from the fee schedule. $ _______________ +HST Transmission Customer Impact Assessment (TxCIA) Fee (If Applicable) A TxCIA is also required if the total nameplate generation of the project is 10MW or greater. $15,000.00 +HST IESO System Impact Assessment (SIA) Fee (If Applicable) A SIA Deposit is required if the total nameplate generation of the project is 10MW or greater. The total cost of the SIA will be Trued Up/Down upon the receipt of the SIA from the IESO. See the IESO’s SIA application for costs. $ ________________ (http://www.ieso.ca/Documents/forms/IMO_FORM_1536-SIAA-Generation.doc) Note: when there is an upstream LDC, an additional $10,000 +HST will be required for costs associated with this LDC’s CIA Section F – Notes Important By submitting a Form B, the Proponent authorizes the collection by Hydro One Networks Inc. (“Hydro One”), of any agreements and any information pertaining to agreements made between the Proponent and the Ontario Power Authority from the Ontario Power Authority, the information set out in the Form B and otherwise collected in accordance with the terms hereof, the terms of Hydro One’s Conditions of Service, Hydro One’s Privacy Policy and the requirements of the Distribution System Code and the use of such information for the purposes of the connection of the generation facility to Hydro One’s distribution system. Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 8 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Appendix A: Illustrations of Point of Common Coupling (PCC) and Point of Connection (POC) Figure A-1: Hydro One Owns Entire Tap Line Hydro One Station Existing Hydro One Feeder Point of Connection New Hydro One Owned Line Point of Common Coupling (PCC) Generation Facility Figure A-2: Generator Owns Entire Tap Line Hydro One Station Existing Hydro One Feeder Point of Connection Point of Common Coupling (PCC) New NewGenerator Generator Owned Tap Owned Line cannot be shared Line which with any other DG Generation Facility Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 9 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Figure A-3: Hydro One Owns a Portion and Generator Owns a Portion of Tap Line Hydro One Station Existing Hydro One Feeder Point of Connection New Hydro One Owned Line Point of Common Coupling (PCC) New Generator Owned Tap Generator New Line cannot be shared Owned Line which with any other DG Generation Facility Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 10 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Appendix B: Minimum Generation Output Information required for Load Displacement Generation Facilities Figure B-1: Example Schedule with Minimum Information required for Load Displacement Projects Appendix C: Minimum Control Strategy Information required for Energy Storage Facilities Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 11 of 12 Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Figure C-1: Peak Shaving Figure C-2: Dynamic VAR Support Figure C-3: Frequency Support Figure C-4: Other Hydro One Connection Impact Assessment Application (Form B) | Version 6.0 | July 30, 2015 | Distributed Generation | Pg 12 of 12