World Bank Funded RRP II, Phase XI, Punjab The World Bank Funded Rural Road Project-II PMGSY, Phase XI Name of District: Block: Name of Road: Package No: Link Route No.: Estimated Cost: ESMF (Environmental & Social Management Framework) Submitted by: 1 World Bank Funded RRP II, Phase XI, Punjab Contents 1. Certificate ............................................................................................. 5 2. Project Background ................................................................................ 6 3. Environment & Social Audit Checklist ........................................................ 9 4. Transect Walk .................................................................................... 14 5. Public Consultation ............................................................................... 15 6. Common Property Resources ................................................................. 18 7. Utility ................................................................................................ 19 8. Environmental Section .......................................................................... 20 9. Social Section ...................................................................................... 31 10. Institutational Setup ........................................................................... 36 11.Organization Chart .............................................................................. 38 12. Budget for ESMF ................................................................................ 39 12. Annexures ......................................................................................... 40 2 World Bank Funded RRP II, Phase XI, Punjab Abbreviations AIDS Acquired Immune Deficiency Syndrome CPR Common Property Resources CE Chief Engineer CL Centerline DoRD Department of Rural Development DRDA District Rural Development Agency DPR Detail Project Report ECoP Environmental Code of Practice ESMF Environmental & Social Management Framework GP Gram Panchayat HIV Human immunodeficiency virus IRC Indian Road Congress LHS Left Hand Side MoEF Ministry of Environment and Forest MoRD Ministry of Rural Development MOU Memorandum of Understanding NOC No Objection Certificate NRRDA National Rural Road Development Agency PAF Project Affected Families PAP Project affected People PESA Act Panchayat Extension to Scheduled Areas Act PIU Project Implementation Unit PMB Punjab Mandi Board PMC Project Management Consultant PMGSY Pradhan Manatri Gram Sadak Yojana PPCB Punjab Pollution Control Board PRI Panchayate Raj Institute PWD Public Works Department RHS Right Hand side RoW Right of Way SC Schedule Caste SRRDA State Rural Road Development Agency SPCB State Pollution Control Board ST Schedule Tribe 3 World Bank Funded RRP II, Phase XI, Punjab Certification It is to certify that during the preparation of Environment and Social Framework Report for the road contract Attsh Road to Walipur, Jandoke to Takthu Chak ,package number PB01-58 under the World Bank funded PMGSY, the components of Environment Code of Practice (ECoP) and Social Management Framework (SMF) tabulated below have been considered and verified (on sample basis). Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Description Compliance Yes No NA Project planning and design Consultation for environment & social aspects Alternate material for construction Borrow areas Environment and Social impact assessment Topsoil salvage, storage and replacement Quarry management Water for construction Slope stability and erosion control Bio-engineering Waste management Water bodies Drainage Cultural properties Natural habitat Bio-diversity Signature: Signature: Nodal Officer(Social),SRRDA Nodal Officer(Environment),SRRDA Punjab Roads & Bridges Dev. Board Punjab Roads & Bridges Dev. Board Date: Date: 4 World Bank Funded RRP II, Phase XI, Punjab 1. Certificate regarding Application of Environment and Social Management Framework to the Detailed Project Report This is to certify that relevant provisions of the Environmental and Social Management Framework (ESMF) have been applied during the preparation process of the Detailed Project Report for the road from……………….,package number ………….., ………..Blocks of District ……… , Punjab State. The required information has been verified in the field and provided in the formats attached with this ESMF report for the said road. Certified by Name and Signature of the Executive Engineer: ________________________________ Name of the Division: ____________________________________________________ Name of the Department : Punjab Mandi Board Date : _________________________________________________________________ Place : ________________________________________________________________ Verified by ______________________________________________________________________ (Name, Designation and Signature of the concerned Division’s field official) Date : _________________________________________________________________ Place : ________________________________________________________________ 5 World Bank Funded RRP II, Phase XI, Punjab 2. Project Background 2.1 Part A: General Information 1. District Background : 2. Location of the Road : 2.2 Part B: Overview Name of the District Name of the Block Road Category Total Propose d length (in kms) Village Name and Chainage From To Details about Beneficiary Villages Names of the Village Chainage (km) Total Population (No’s) TOTAL 6 World Bank Funded RRP II, Phase XI, Punjab 2.3. Project Location Map 7 World Bank Funded RRP II, Phase XI, Punjab 3. Environment and Social Audit Checklist Response Sl. No. Aspects / Items A. Transact Walk 1 Has transact walk been conducted for finalizing the alignment? B. Public Consultation 2 Have consultation/s been conducted with community before alignment finalization? 3 Have suggestions been provided on the proposed alignment? 4 Have suggestions received from community been incorporated into design? 5 Only few suggestions are incorporated 6 Are reasons for not incorporating suggestions been communicated to the community? C. Indicate Yes No NA number Attachments (Provide page reference/s) Identification of Project Affected Persons 7 Have type and extent of losses due to project been identified? 8 Have PAPs been identified? 9 Is consent of land owners there for voluntary land uptake? - Have vulnerable PAPs identified? Provide break-up. BPL 10 Marginal land owner (less than 3-1/8 acres and losing 10% of residual land) WHH SC/ST Handicapped 11 Are grievances reported? - 12 Type of concerns or grievances - 13 Residual grievances, if any - D. Environmental Clearances 8 World Bank Funded RRP II, Phase XI, Punjab Response Sl. No. Aspects / Items Indicate Yes No NA number Attachments (Provide page reference/s) Are regulatory clearances required as per law of GoI/GoB? 14 SPCB Forest Department MoEF Any Other E. Surveys Conducted Have detailed surveys been conducted? 15 16 Hydrological Studies Topographical Studies Was peg marking carried out to delineate the proposed alignment? - F. Loss of common property resources 17 Have CPR/s likely to be affected been identified? 18 Have provisions been made to community losing common property or assets, if any? 19 Have provisions for relocation of cultural properties been made? G. Water Bodies 20 Does the alignment cut across or passing adjacent to water body? 21 Has the total area of ponds/water bodies likely to be affected been calculated? 22 Are provisions made for rehabilitation of the water body, if affected? 23 Was the issue discussed with the community? 24 Has the community provided its consent? H. Natural Habitats/ Protected Areas 25 Has inventory of ecological features been prepared during the transact walk? 26 Does the sub-project alignment cross/traverse through any protected area such as a National Park/Sanctuary/Wildlife 9 World Bank Funded RRP II, Phase XI, Punjab Response Sl. No. Aspects / Items Indicate Yes No NA number Attachments (Provide page reference/s) Reserve? 27 Does any natural habitat exist within 1 km (nearest aerial distance should be taken into account) of the project corridor? I. Forest, Tree Cutting and Plantation 28 Is diversion of any forest land required for the project ? 29 Are trees being cut by the project ? If yes, also indicate the number of trees that would be cut ? 30 Has land been identified for compensatory plantation? 31 Is roadside plantation being taken up as part of the sub-project ? If yes, indicate the number of trees proposed for plantation. 32 Are arrangements for supply of saplings from forest department and maintenance by PRI being made? J. Soil Erosion/Slope Protection 33 Are erosion control measures included in the DPR? 34 Are species of vegetation to be grown over the slopes determined? If yes, specify the names 35 Has special provisions such as chutes been made to protect high banks? K. Drainage 36 Does hydrological studies indicate afflux greater than 450mm due to construction of cross drainage structures? 37 Are culverts at such locations designed to handle the afflux and to ensure that upstream areas do not get flooded and scouring is not caused on downstream areas? 38 Have outfalls been identified for discharge? 39 Are provisions for channel drains in case of 10 World Bank Funded RRP II, Phase XI, Punjab Sl. No. Response Aspects / Items Indicate Yes No NA number Attachments (Provide page reference/s) high embankments ( > 1.5m) been made in the DPR? 40 Has provision been made for construction of siphons for irrigation channels and PAPs informed about it? L. Road Safety Related 41 42 Is junction design is in conformance to applicable IRC code? Are enhancements provided in the design mention details against each given below Cattle crossings at their normal crossing routes for safety of cattle and road user Cross roads for access to & from agriculture lands to avoid damage to embankment and roadside drain Bus-stops and/or bus bays 43 Has planning been made for required traffic diversions/management? M. Debris Disposal 44 Has site for disposal of construction debris been identified? 45 Has provision been made to ensure that the debris does not spill over into the water bodies and there is no leaching from toxic waste? 46 As and where needed, has the lead distance been specified in the BoQ? 47 Have material sources been identified? 48 Are possibilities of use of existing water sources identified in consultation with the villagers, PRI or Govt. Departments? 11 World Bank Funded RRP II, Phase XI, Punjab Response Sl. No. 49 Aspects / Items Indicate Yes No NA number Attachments (Provide page reference/s) Have provision made for TopSoil conservation? O. R&R actions 50 Have PAPs been identified? 51 Have provisions for losses been made? 52 Have provisions of alternate land site been made for the identified entitled/vulnerable PAPs losing land and structure? 53 Are provisions made for inclusion of PAPs losing land/shelter/livelihood under any ongoing Rural Development scheme? P. Induced Development 54 Have provisions been made for avoiding encroachments onto the RoW? Q. Pollution Prevention measures 55 Are provisions made for administering pollution control measures at construction sites as per ECoP 56 Are provisions made for safe disposal of wastes from construction sites 57 Are provisions made for worker's health & hygiene at construction camps 58 Are provisions made for traffic diversions during construction 59 Are traffic diversions/closure to traffic been intimated to the public 60 Are provisions made for signage, demarcating cones and tapes during construction on tracks being utilized by traffic at present 61 Are provisions made for supply of Personal Protective Equipment to the workers 62 Are provisions made for construction of parapet walls on hill roads for safety of road user. 12 World Bank Funded RRP II, Phase XI, Punjab 4. Transact Walk Summary Chainage Existing Land Width Additional Land Width Required Type of loss Village Remark 1. Total No. of People present for the Transect Walk: Male : Female: SC: Total : 13 World Bank Funded RRP II, Phase XI, Punjab 5. Public Consultation Details S. No. Date of Consultation Settlement Name/ Location of the Meeting Total Duration of the Meeting Venue of the Meeting Name of the Facilitator (who conducted the meeting) Method/Type of Materials Used for Dissemination of Information about the Meeting Remarks 14 World Bank Funded RRP II, Phase XI, Punjab 5.1. Public Consultation Record Block: Villages: Road Name : Date: Venue: Time: Duration: 1. Project Description 2. Issues raised by the community and responses provided 3. Key Agreements and Conclusion 5.2 Attendance Sheet Name of the Village: Road Name: Date of Meeting : S. No. Name of the Person Village of Residence Signature 1. 2. 3. 4. 5. 6. 7. 15 World Bank Funded RRP II, Phase XI, Punjab 16 World Bank Funded RRP II, Phase XI, Punjab 6. Affected Common Property Resources (CPRs) S. No. Type of Affected CPR Chainage Side of the Road Settlement/ Village Name Distance from the existing Centre Line Extent of Impact (Partial/Full) Remarks 1 2 3 4 5 17 World Bank Funded RRP II, Phase XI, Punjab 7. Utility Shifting Details S. No. Type of Affected Utility 1 Electrical Poles/Lines/ Transformers 2 Water Supply Lines 3 Irrigation (Ducts; Channels) 4 Telephone 5 Any Other Chainage/s Side of the Road Settlement/ Village Name Number and/or Length Affected Distance from the existing Centre Line Remarks . 18 World Bank Funded RRP II, Phase XI, Punjab 8. Environmental Section 8.1. Basic Environmental Datasheet S.No. Aspect 1. District/s 2. Block/s 3. Rainfall (in cm) – annual average 4. Rainfall (in cm) – peak intensity 5. Temperature (Max.) 6. Temperature (Minimum) 7. Soil Type 8. Wind Direction (pre-dominant) 9. Wind Velocity 10. Pre-dominant Land-use 11. Water table Details 19 World Bank Funded RRP II, Phase XI, Punjab 8.2 Environment Screening Checklist Part A: General Information 1. Location of the sub-project Name of the State District Block Village/s 2. Implementing Agency Details (sub-project level) Name of the Department/Agency Name of the designated contact person Designation Contact Number E-mail Id -- 3. Details about the Environment Screening Exercise Date Name of the Person Contact Number E-mail Id Part B : Environment Screening Question Yes No Details 1. Is the sub-project located in whole or part within a radius of 1 km from any of the following environmentally sensitive areas? a. Biosphere Reserve b. National Park c. Wildlife/Bird Sanctuary d. Game Reserve 20 World Bank Funded RRP II, Phase XI, Punjab Question e. Tiger Reserve/Elephant Reserve f. Wetland g. Natural Lake h. Swamps/Mudflats i. World Heritage Sites j. Archaeological monuments/sites (under ASI’s central/state list) k. Reservoirs/Dams Yes No Details 2. Is the sub-project located in whole or part within a radius of 500 mts. from the following features? a. Reserved/Protected Forest b. Migratory Route of Wild Animals/Birds c. Area with threatened/rare/ endangered fauna (outside protected areas) d. Area with threatened/rare/ endangered flora (outside protected areas) e. Habitat of migratory birds (outside protected areas) f. Historic Places (not listed under ASI – central or state list) g. Regionally Important Religious Places h. Public Water Supply Areas from Rivers/Surface Water Bodies/ Ground Water Sources 21 World Bank Funded RRP II, Phase XI, Punjab Part C : Result/Outcome of Environmental Screening Exercise 1. EIA Required 2. Regulatory Clearance Required 22 World Bank Funded RRP II, Phase XI, Punjab 8.3. Certificate regarding Regulatory Clearance Requirement Identification Office of the Executive Engineer, _ Punjab Mandi Board Tarn Taran,Punjab. This is to confirm that the ___________________________________ proposed (Name of road connecting Village/Road) to ___________________________________ (Name of Village/Road) located in ___________________ block/s and _____________________ district/s being proposed under the RRP-II Pradhan Mantri Gram Sadak Yojna, Phase XI, Punjab does not require environmental clearance/ forestry clearance/tree cutting permission from the Forest and/or Environment Department of Govt. of India or Govt. of Punjab. -------------------------------------------------------------------------------------(Er. ) (Stamp) Place : ___________________ Date : ___________________ 23 World Bank Funded RRP II, Phase XI, Punjab 8.4. Tree Cutting Requirement S. No. Species (Name) Chainage Side of the Road Girth Size Distance from the existing Centre Line Ownership Remarks 1 2 3 4 5 24 World Bank Funded RRP II, Phase XI, Punjab 8.5. Strip Plan showing Drainage Arrangements 25 World Bank Funded RRP II, Phase XI, Punjab 8.6. Debris Related Information 1. Total Quantum of Debris likely to be generated = Break-up by type of debris Concrete = 0.00 cu. mt. Bitumen/Scarified Bitumen = 2. Spoils/earth/other debris = 3. Total Quantum of Debris that is being proposed for re-use = 4. Total Quantum of Debris would require disposal = 5. Area/s for disposal Location 1: = Location 2: = 26 World Bank Funded RRP II, Phase XI, Punjab 8.7. Materials Requirement – Summary Chart S. No. Type of Material 1 Stone/Aggregate 2 Sand 3 Earth 4 GSB 5 Water 6 Bitumen 7 Cement Quantity Required 27 World Bank Funded RRP II, Phase XI, Punjab 8.9 Lead Table: S.No. Material 1. Stone/Agreegate 2. Bituminous 3. Cement 4. Hume Pipes 5. Gravel 6. Any other Source LEAD (Km) - - 28 World Bank Funded RRP II, Phase XI, Punjab 8.10 Lead Chart – Borrow Areas 29 World Bank Funded RRP II, Phase XI, Punjab Social Section 9.1 Social Screening Checklist Part A: General Information 1. Location of the sub-project Name of the State District Block Village 2. Implementing Agency Details (sub-project level) Name of the Department/Agency Name of the designated contact person Designation Contact Number E-mail Id - 3. Details about the Social Screening Exercise Date Name of the Person Contact Number E-mail Id 30 World Bank Funded RRP II, Phase XI, Punjab Part B: Land and Social Information 1. Does the sub-project activity require acquisition of private land? Yes Private Land (sq mts/hac.) Give the following details: Govt. Land (sq mts/hac.) Forest Land (sq mts/hac.) 2. Does the proposed sub-project activity result in demolition/removal of existing structures? Yes If so, give the following details: Number of public structures/buildings Number of common property resources (such as religious/cultural/ drinking water/wells/etc) Number of private structures (located on private or public land) 3. Does the proposed Project activity result in loss of crops/trees? Yes 4. Does the proposed Project activity result in loss of direct livelihood/ employment? Yes 5. Does the proposed activity result in loss of community forest/water bodies/pastures on which near-by residents/local population is dependent for domestic or other needs? Yes If yes, give the details of the extent of area to be lost (in acres/hac.). 6. Does the proposed Project activity affect schedule tribe communities? Yes 31 World Bank Funded RRP II, Phase XI, Punjab Part C : Result/Outcome of Social Screening Exercise S.No. Output Outcome 1. Answer to all questions is ‘No’ and only forest land is being acquired. No SIA/RAP required 2. Answer to any question is ‘Yes’ and the sub-project does not affect more than 200 people (i.e. either complete or partial loss of assets and/or livelihood) Abbreviated RAP is required 3. Answer to any question is ‘Yes’ and the sub-project affects more than 200 people (i.e. either complete or partial loss of assets and/or livelihood) SIA/RAP Required 32 World Bank Funded RRP II, Phase XI, Punjab 9.2 Land Requirement/Acquisition Details S. No. Name of the Land Owner Village District Khasra/Survey No. Total Land to be Acquired/ Donated (Acres/sq. mts.) Type of Land 1 2 3 4 5 6 7 33 World Bank Funded RRP II, Phase XI, Punjab 9.3 List of Affected Persons S.No. Name of the Affected Person Title/ Non-title Holder (TH/NTL)) Type of Loss (Agriculture/Residence/ Commercial) Extent of Loss (Sq. Mts. / Hac.) Social Category Type of Vulnerability Eligible Entitlements 1 2 3 4 5 34 World Bank Funded RRP II, Phase XI, Punjab 10. INSTITUTIONAL SETUP 1. Pradhan Mantri Gram Sadak Yozana (PMGSY) is a central program implemented by Ministry of Rural Development (MoRD) in all states and Union Territories involving agencies and departments from centre, state to local level. The key involving institutions are: (1) National Rural Development Agency (NRRDA) at central level (2) State Rural Road Development Agency (SRRDA) at state level (3) Project Implementation Units at District level (PWD/PMB) (4) Village Panchayat at local level. 2. The NRRDA is the implementing agency at central level and the SRRDA the executing agency at the state level, while the Project Implementation Unit (PIU), at the district levels, will execute the project at the local level. All these institutions are responsible for implementing the provisions of the SMF, VF, ECoPs and EMF along with the other project components, under the overall coordination and oversight of the NRRDA. NRRDA have a nodal Social and Environment Officer to oversee and ensure the implementation of the social and environmental safeguards. 3. To facilitate implementation of the safeguards (ESMF) at state level, SRRDA will have a dedicated nodal officer (Social and Environment Specialist). SRRDA can recruit these officers either on deputation from other departments or from the market as need be. The key tasks of the specialist include, assisting and advising the Project Director at SRRDA level and implementing the SMF/VF/ECoPs. 4. The Project Management Consultants (PMC) in each state will include the required number of Social Development Executives depending upon the quantum of sub projects to be implemented. These will assist the SRRDA and the Social and Environmental Specialist in planning, design, construction and monitoring of the rural road works and confirm that actions taken at each stage of the sub project cycle are in compliance with agreed procedures and standards. In case of Punjab, it was agreed with the World Bank and NRRDA that PMC will not be required in the project as the task of PMC is being carried out by the appointed Nodal Officers Social & Environment and inhouse capacity. 5. The PIU, through the designated SDE/JE on social and environmental safeguards, will implement all the SMF/VF tasks at the field level with the assistance and participation of the District Administration/PRIs/Sarpanches and other Panchayat / ward members. The PIU will coordinate implementation of project components with the different agencies, such as the PRIs, DRDA, Revenue Department etc, including resettlement issues. 35 World Bank Funded RRP II, Phase XI, Punjab 6. The civil works will be initiated only after the required RoW or land which is free from any encroachments and the PIU has the physical possession of the land. Before the start of civil works the compensation will be disbursed to land owners in state where land will be acquired through purchase or compensated acquisition. 7. Likewise the MoUs/Affidavits/Gift Deeds should be in place in the DPRs in states where land is arranged through donation. 8. During implementation, consultations with the communities shall be undertaken by the PIU to provide information on the progress of the project work. 36 World Bank Funded RRP II, Phase XI, Punjab 11. MoRD PMGSY Safeguard (Social/Environment) Implementation Organizational Chart NRRDA (National Rural Road Development Authority) Nodal Social & Environmental Officer SRRDA (State rural Road Development Authority) Nodal Officer (Social) Nodal Officer (Environmental) CE, PWD / CE, PMB Central Level State Level Support Unit to SRRDA PIU (PWD/PMB) PWD/PMB (Project Implementation Unit) i. Dedicated SDE/AE/JE for Social & Environment GRAM PANCHAYAT/COMMUNITY/PAPs District Level GP/Communiy Level 37 World Bank Funded RRP II, Phase XI, Punjab 12. BUDGET FOR ESMF The cost for implementation of ESMF includes expenditure incurred during implementation of all seven tasks mentioned under the implementation schedule. Sl No Activities 1 Forest Clearance 2 Environmental Mitigation Measures 3 Land Acquisition 4 Entitlement 5 Enhancement of CPRs 6 Road Safety Cost Remark/Attachement Total 38 World Bank Funded RRP II, Phase XI, Punjab ANNEXURES 39