fax message - Chinabidding.org

advertisement
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Municipal real estate construction
(20110829-20110902)
Project Name: Fujian Ningde Jiaocheng middle of the road construction project .................16
Project Name: Aerospace Information Co., Ltd. Zhuozhou industrial base two construction
projects ..........................................................................................................................17
Project Name: 2011 Wuyuan County Bayannaoer major projects of rural land remediation
........................................................................................ Error! Bookmark not defined.
Project Name: Zhangzhou, Fujian Zhangpu County MCH relocation project . Error! Bookmark
not defined.
Project Name: Wuhan, Central China Trade Co., Ltd. Baosteel Phase III expansion project
processing center ............................................................................................................20
Project Name: Red River State Psychiatric Hospital Building Project ...................................21
Project Name: Guangxi Liuzhou domain Purple White Lotus International Trade City
construction projects .......................................................................................................22
Project Name: Wuhan color toner production base construction project ..... Error! Bookmark
not defined.
Project Name: Hubei Enshi beautiful spring hotel construction project ................................24
Project Name: The Fourth Hospital of Changsha surgery building project ... Error! Bookmark
not defined.
Project name: Changsha, Hunan chalice Memphis Hotel Project .........................................26
Project Name: Fuzhou Minhou county police criminal investigation research business space
project ...........................................................................................................................27
Project name: Changsha, Hunan chalice Griffith residential area two projects .....................28
Project Name: Fuzhou Jingxi town small town planning exhibition hall project ....................28
Project name: Changde City, Taoyuan County People's Hospital expansion project ..............30
Project name: Changde City, Hunan bus company bus terminus project .............................31
Project Name: Enshi Icheon primary employment and social security services center project
......................................................................................................................................32
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Wuhan financial background services center Phase II ... Error! Bookmark not
defined.
Project Name: Wuhan City Court Phase III Fortress ..........................................................33
Project Name: Dongguan City Chang Ping-powered electricity production company building
the project schedule ........................................................................................................34
Project name: production center of Yinchuan, Ningxia Mobile Phase ..................................35
Project Name: Shaanxi Railway Vocational and Technical College campus a new project
........................................................................................ Error! Bookmark not defined.
Project Name: Singapore • Nanjing technology island promoter region of the North Ecoinfrastructure projects .....................................................................................................37
Project Name: Industry and Trade Co., Ltd. Shaanxi Baoji, Shaanxi API production project .38
Project Name: Gongyi City, and Garden District star Rhythm Project ..................................39
Project Name: Qingdao Yellow Sea Rubber Group semi-steel radial tire project ...................40
Project Name: Police Court, District of Xiaogan Lake Project Error! Bookmark not defined.
Project Name: Singapore • Nanjing technology island promoter region of the North Ecoinfrastructure projects .....................................................................................................42
Project Name: China-chemical Co., Ltd. Nanxiong City plant and other projects ..................43
Project Name: Times Square West project ........................................................................44
Project Name: Stone Town harbor land residential area north of North New Project ............44
Project Name: Inner Mongolia Grain Wholesale Market Expansion II project .......................45
Project Name: Hainan Hai salt works ramshackle shantytowns ...........................................46
Project Name: Education Park Shen-Fu new town project ..................................................47
Project Name: Yangzhong moderate Run Project Central International Plaza, a ..................48
Project Name: Indus Residence Project in Jiangsu Huai .....................................................48
Project Name: Tianjin Binhai flourishing international automotive theme gegu Business Park
Project Area A ................................................................... Error! Bookmark not defined.
Project Name: Hunan History Museum Project .................... Error! Bookmark not defined.
Project Name: Cangzhou Bohai School District first new campus project .............................51
Project Name: Wuhan, Hainan Blue Ocean overhead industrial park project .......................52
Project Name: Nanning Media Star City construction projects ............................................53
Project Name: Nanning Media Star City construction projects ............................................54
Project Name: Wuzhou City Chau District People's Hospital outpatient hospital complex
building construction projects ..........................................................................................54
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hepu County Residence School teaching building construction projects .. Error!
Bookmark not defined.
Project Name: Taizhou Gudea Furniture Co., Ltd. # 2 plant construction project .................57
Project Name: Nanning State Torch Program Software Industrial Base biotechnology center
construction project ........................................................................................................57
Project Name: Commercial, residential building construction ..............................................58
Project Name: Hubei Vocational College of Biotechnology: student apartments, student food,
conference center project ................................................................................................59
Project Name: Wuhan Science and Technology Museum new building construction projects 60
Project Name: Wuhan East Lake District National Innovation Model Convention and Exhibition
Center ............................................................................................................................60
Project Name: Yichang Changyang fruits and vegetables, medicinal herbs, deep-processing
projects ..........................................................................................................................61
Project Name: Ningxia Yinchuan City Center project in Women and Children ................ Error!
Bookmark not defined.
Project Name: Xi'an city reconstruction project to the village altar ......................................63
Project Name: Yue Zhai resettlement area construction projects ........................................64
Project Name: First High School Project Zhumadian Suiping ..............................................65
Project Name: Henan integrated transport hub in the East Plaza Square subway ................65
Project Name: Henan Xinyang Xiangshan International Triumph resort hotel project ...........66
Project Name: Qingdao Industrial Co., Ltd. Guang Nan test floor, plant project ...................67
Project Name: Lawrence Hospital, New Medical Building Project ........................................68
Project Name: cup River County Cultural Plaza.................... Error! Bookmark not defined.
Project Name: Dongfang City, Hainan Province Public Security Bureau and the Building of
affordable housing projects .............................................................................................69
Project Name: Sanya Resort Residence project ................... Error! Bookmark not defined.
Project Name: Changchun Shi Wang-County Building, 2 to 20, 1, 2 Building underground
garage project .................................................................. Error! Bookmark not defined.
Project Name: Liaoning Jinzhou City Golden Age Project ...................................................73
Project Name: Liaoyang branch of China Telecom Group, the production machine building
projects ..........................................................................................................................73
Project Name: Liaoning Panjin Liaohe Oilfield first high school building construction projects
......................................................................................................................................74
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Liaoning Dalian Hengli Group headquarters in East Port Project ............. Error!
Bookmark not defined.
Project Name: Yancheng City fire and rescue emergency center project ..... Error! Bookmark
not defined.
Project Name: Yancheng Wu You Pearl River school construction projects .. Error! Bookmark
not defined.
Project Name: Suzhou Pingjiang floor in school art and physical education building new
projects ..........................................................................................................................79
Project Name: Chongqing City real estate building projects ...............................................80
Project Name: Bazhong District Central Hospital, medical clinic construction of the second ..81
Project Name: Fuzhou Lu and Liu Zhuanghe along the land bridge project dilapidated change
......................................................................................................................................81
Project Name: Tianjin, a blue-collar apartment project ......................................................82
Project Name: Shanghai Zhangjiang Central District B-1-12 R & D building block projects
........................................................................................ Error! Bookmark not defined.
Project Name: Shanghai International Trade Center Hardware Electrical Hardware City,
supporting three projects ................................................................................................84
Project Name: Shanghai eastern suburb of commercial office center project .......................86
Project Name: Shanghai Pujiang Town, 122-4, block commercial office projects ........... Error!
Bookmark not defined.
Project Name: Foshan City Nanhai industry think tank, a project ........................................87
Project name: Town, Foshan City, Lion Red Sand living zone project ..................................88
Project name: Building, Shenzhen, information transmission cable project ..........................89
Project Name: Foshan, China Everbright Bank branch office projects... Error! Bookmark not
defined.
Project Name: Bank of China Building construction project files, Shunde Branch .................91
Project Name: Guangdong Medical College Hospital Clinic Building Expansion Project .... Error!
Bookmark not defined.
Project Name: Dongguan (Huizhou) Industrial Transfer Park Project a standardized plant ...93
Project Name: Guangning one hundred surplus garden (villa) Phase II ...............................94
Project Name: Baoding Road West Station transportation hub project car passenger ..........96
Project Name: Zhejiang Taizhou Dongtai New Century Commercial Group, an integrated
development project ......................................................... Error! Bookmark not defined.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Quzhou City, new construction Kaihua County Hospital Error! Bookmark not
defined.
Project Name: Agricultural biotechnology in the High Park Group kinds of experimental
building projects .............................................................................................................99
Project Name: Hubei Cancer Hospital New Outpatient Building Project ............................. 100
Project Name: Wenzhou Kean University construction projects ........................................ 101
Project Name: Ninghai County of Ningbo City, school project ........................................... 102
Project Name: Zhejiang Zhoushan Island District, build bamboo building project .......... Error!
Bookmark not defined.
Project Name: Nanjing Subway Line subway control center complete building renovation
project ......................................................................................................................... 105
Project Name: Zhejiang Wenling City Second People's Hospital expansion project ............. 106
Project Name: University Library expansion project ............. Error! Bookmark not defined.
Project Name: Ningbo Yinzhou District, militia training base construction.... Error! Bookmark
not defined.
Project Name: Guangdong Foshan Nanhai Gas Development Company Limited in the water
company's warehouse and R & D room project ............................................................... 109
Project Name: Fujian Wing vocational secondary school second phase of new campus .. Error!
Bookmark not defined.
Project Name: Beijing South-color school buildings project .............................................. 111
Project Name: Beijing Fengtai District, integrated services space program ........................ 112
Project Name: Beijing Building Materials City, dilapidated building the second phase ......... 113
Project Name: Customs business and technology Yunfu City building project .................... 114
Project Name: Liaoning Tieling Mountain Park community projects throughout Yan....... Error!
Bookmark not defined.
Project Name: People's Hospital of Shantou City, Nanao County expansion project ........... 116
Project Name: Henan Zhengzhou Air Port Health Park District No. 8 - 20 Building construction
project ......................................................................................................................... 117
Project Name: Industrial Research Institute of Tianjin University, Coastal Engineering
Laboratory of the fuel center ......................................................................................... 118
Project Name: New Lujiang County radio and television broadcasting center project ......... 119
Project Name: Shaoxing City Furniture City Management Service Center, District Disabled
Integrated Services Centre project ................................................................................. 120
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Xi'an University of commercial and academic exchanges Weiyang Campus
Center Project ............................................................................................................... 121
Project Name: Shao big line II block real estate development projects Error! Bookmark not
defined.
Project Name: Battery Materials Engineering Laboratory United States where ................... 123
Project Name: Wenzhou District, the southern suburbs of the street gathering point
benevolent transformation of rural housing project (Phase I) project ............................... 123
Project Name: Jiaxing Pinghu Economic Development Zone (Chung Tai-street) resettlement
housing project south garden ........................................................................................ 124
Project Name: Chongqing Kai County Yunfeng low-rent housing housing construction ....... 125
Project Name: Old City, Henan Province, Yiyang County Yellow Machine Factory bankruptcy
liquidation group shantytowns civil engineering construction projects ............................... 126
Project Name: Second School Qinyuan County New Project ............................................. 127
Project Name: New Project Jinnan District mentally retarded Error! Bookmark not defined.
Project Name: Baoshan District decoration integrated development project ...................... 129
Project Name: Hohhot Mercure Project Sunshine ................ Error! Bookmark not defined.
Project Name: Henan information management school teaching laboratory building and
auxiliary building project ................................................................................................ 131
Project Name: Golden Bridge Middle School construction project in Hohhot, Inner Mongolia
.................................................................................................................................... 132
Project Name: Heilongjiang CIQ integrated laboratory building construction projects ........ 132
Project Name: Tempo Liangmao Ltd 50,000 t storage facility construction project............. 134
Project Name: Shandong Jining Jinxiang County Hospital District People's Hospital new
construction projects ......................................................... Error! Bookmark not defined.
Project Name: Anhui Gujing Distillery Co., Ltd. Furui Industrial Park Project Error! Bookmark
not defined.
Project Name: Langfang Branch through the Garden District 6 #, 8 # -13 # floor and
underground garage project .......................................................................................... 136
Project Name: Wen County School Safety Engineering 2011 ............................................ 138
Project Name: Zhengzhou City, the school expansion project tax ..................................... 139
Project Name: Hunan Ningxiang Jinzhou District resettlement area construction projects .. 140
Project Name: Langfang Development Zone, the first primary school dormitory, classroom
building project ............................................................................................................. 141
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Nantong Tongzhou District Nanyuan orchard land resettlement project ...... 142
Project Name: Hangzhou Xiaoshan Cultural and Creative Industry Center (tentative name)
Project ......................................................................................................................... 143
Project Name: Pingyao County, south of the town of Fort Ancient Pottery village south of
New Commission (village housing area) 7 # residential building projects .......................... 144
Project Name: River Xining family planning services are county building project ................ 145
Project Name: Taiyuan, central heating (thermal Burghardt) a project (update) ............ Error!
Bookmark not defined.
Project Name: Hubei Provincial People's Hospital of cardiovascular Building Project .......... 147
Project Name: Siping Municipal Public Security Bureau Branch of business technology space
projects Tiedong ........................................................................................................... 147
Project Name: Nantong Qidong City, new construction Port Office ................................... 148
Project Name: Yancheng city's creative center project ......... Error! Bookmark not defined.
Project Name: Beijing International Yanxi will have (the core of the island) project ........... 150
Project Name: TISCO plant heating pipe heating station project ...................................... 151
Project Name: a power plant in Taiyuan heating pipe heating station project ................ Error!
Bookmark not defined.
Project Name: Henan Tanghe Yu Jianong-ecological park construction projects ............ Error!
Bookmark not defined.
Project Name: Changchun Auspicious Industrial Park building renovation and new
construction .................................................................................................................. 153
Project Name: Shenyang Sujiatun courts Building Project .... Error! Bookmark not defined.
Project Name: Xin Yue Panjin City Residential Project ...................................................... 155
Project Name: Dalian Quality and Technical Supervision and Inspection Center Project ..... 156
Project Name: Dalian Ling inlets Seven Sages Road east of the original carton factory land
reform projects ............................................................................................................. 157
Project Name: County central heating a large Phase III ....... Error! Bookmark not defined.
Project Name: Hebei Langfang Guan Patio Project .......................................................... 158
Project Name: Development Zone, Kunshan, Suzhou Street, a project.............................. 159
Project Name: Beijing International Plaza Nordisk ........................................................... 160
Project Name: Chongqing Huxi motor plant construction project ...................................... 161
Project Name: Beijing's Tongzhou District Luhe Hospital Outpatient Building Construction . 162
Project Name: Katie Triumph Dayi County, Chengdu City Construction Projects ................ 164
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: China Operations Center, the Cyberport project Hercynian ........................ 164
Project Name: Hunan Xiangtan County West Lake Project ............................................... 165
Project Name: Sichuan Pi fraternity vocational school expansion project ........................... 166
Project Name: car sales center upgrade project .................. Error! Bookmark not defined.
Project Name: Nantong Tongzhou District Jinxia Dong District Court placed the project price
of commercial housing land ........................................................................................... 168
Project Name: Sanming City Meliet District Integrated Services Centre project with disabilities
.................................................................................................................................... 169
Project Name: Tianjin, China Aviation Oil southern base storage depot project a .............. 170
Project Name: Zhejiang Huangyan District Maternity and Child Care Project ..................... 171
Project Name: Zhaoyang Industrial Zone Zhaotong 100,000 square meters standard factory
buildings and facilities construction projects........................ Error! Bookmark not defined.
Project Name: Hangzhou Xiaoshan District Hospital Orthopedics Ward Building Expansion
Project ......................................................................................................................... 173
Project Name: Tianjin Jing Hua spring community projects .............................................. 174
Project Name: Tianjin port economic zone grain logistics integrated services building
construction projects ..................................................................................................... 176
Project Name: Dongli District, Tianjin Armed Police College's new campus project ............ 176
Project Name: Civil Affairs Bureau Pi Pi funeral service station renovation project to move 177
Project Name: Shanghai Qingpu Huaxin Town, Fuchu, integrated development of land west
road ................................................................................. Error! Bookmark not defined.
Project Name: Community Chuansha town south of the land supporting junior C01-19 project
.................................................................................................................................... 180
Project Name: Jiangxi Vocational College of Applied Technology 1 # -10 # faculty transitional
housing project ............................................................................................................. 181
Project Name: Shanghai Fengxian District, a large residential community base 29A-01A block
south bridge construction projects ................................................................................. 182
Project Name: Shanghai three forest base A4-6 block New Project ................................... 183
Project Name: Shanghai Xu Bank town of AZ-004 and AZ-005 Block Project Oasis Hong Yun
Court................................................................................ Error! Bookmark not defined.
Project Name: Jilin Forestry 2011 shantytowns ............................................................... 185
Project Name: Sheet Co., Ltd. Taicang Sea smoke tobacco raw materials and finished
products warehouse project ........................................................................................... 186
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Nagqu Nagqu County People's Court trial of the construction business
premises ...................................................................................................................... 187
Project Name: Tianjin coatings R & D and Engineering Center program ............................ 188
Project Name: Digital Technology Park project in Wuhan ................................................. 189
Project Name: Health Plaza East • South Lake real estate construction projects are ...... Error!
Bookmark not defined.
Project Name: People's Hospital Emergency Department Medical Technology Building Project
.................................................................................................................................... 191
Project Name: Chengdu, Meishan warehouse center disaster preparedness and response,
emergency rescue aid the Red Cross center in Sichuan Meishan base project ................... 192
Project Name: Yutang, five-star Marriott hotel and conference resort complex project....... 193
Project Name: Fujian Tiancheng Riverside Project ........................................................... 194
Project Name: Fuzhou Kui Qi residential construction projects ......................................... 195
Project Name: Jilin eighteenth schools (high, junior high school buildings, student housing,
comprehensive building) reinforcement works .................... Error! Bookmark not defined.
Project name: Bay Village, Sanya City, Begonia style town project ................................... 197
Project Name: Fujian Quanzhou work boat show coated base project .............................. 198
Project Name: Changchun FAW General Hospital, New Medical Building Project EPC Contract
.................................................................................................................................... 198
Project Name: Zhejiang Ningbo Baoqing Temple # -2 1 block north of resettlement housing
project ......................................................................................................................... 199
Project name: Bohai Huadian City, One house 15 #, 19 #, 7 # residential building projects
.................................................................................................................................... 201
Project Name: Chongqing Street 34 Sand senior housing (A, B, C Building) project ........... 202
Project Name: Chongqing City Commercial Building Project longevity District One ............. 203
Project Name: Chongqing (Yubei) Taiwan Industrial Park Service Center Projects ............. 203
Project Name: Tianjin sky Road 15 Extension Project ...................................................... 204
Project Name: Jilin Women's Residence Hall 1, 2, reinforcement works canteen ................ 205
Project Name: Tianjin Jian put the Great Northern Town Ninghe grain storage and processing
projects ........................................................................................................................ 206
Project Name: Shanxi Datong Coal Industry Co., Queshan high caijiayao company mines coal
preparation plant project ................................................... Error! Bookmark not defined.
Project Name: Tianjin Eco-city 9A, 9B land residential construction projects ..................... 208
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: BYD Auto Co., Shaoguan City, the new industrial development projects ..... 209
Project Name: China Electronics Technology Group Corporation Seventh Research Complex
project ......................................................................................................................... 210
Project Name: Guangdong bit industrial vehicles (Foshan) Co., Ltd. New Project .............. 211
Project Name: Shanghai Jiading Ju Park District in control, Laboratory Centre Extension
Project ......................................................................................................................... 212
Project Name: Zhongshan City, Postal Information Complex project .... Error! Bookmark not
defined.
Project Name: College Ordos project environment .......................................................... 214
Project Name: Foshan Nanhai District, Guangdong Development Financial Center ............. 215
Project name: Changsha High-tech Zone Nanling Technology Park Project ....................... 216
Project Name: Beijing Railway Industrial Park Project Noble Center .................................. 217
Project Name: Beijing to open the Optical Valley home by industrial plants and facilities
projects ............................................................................ Error! Bookmark not defined.
Project Name: Beijing XII underground space and ancillary space project ......................... 220
Project Name: Wuhan modern ecological fisheries research and development base project
........................................................................................ Error! Bookmark not defined.
Project Name: Green Yangliuqing quiet road drainage works to extend the line ................ 222
Project Name: Stone Forest Lucheng Square (ternary transformation Palace Area) project
........................................................................................ Error! Bookmark not defined.
Project name: International Hotel Co., Ltd. Zhengzhou Zhongyuan fishing Baishun Paradise
Valley (a) construction project ....................................................................................... 224
Project Name: Hubei Enshi City reception base project .................................................... 225
Project Name: HG Science Park R & D and innovation base office building construction
project ............................................................................. Error! Bookmark not defined.
Project Name: Korla, China Yu Times Square Project ....................................................... 226
Project Name: Ankang City Yellow ditch two limit commercial construction projects .......... 227
Project Name: Chengdu ring pipe industry production and R & D base in the Northwest II
project ............................................................................. Error! Bookmark not defined.
Project Name: Spring Pro Qujiang Village, five residential placement slope Code Project ... 229
Project Name: Xi'an Chang'an Chang'an Hospital Health Authority relocation and relocation
projects ............................................................................ Error! Bookmark not defined.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Xi'an Chanba ecological zones of public rental and affordable housing projects
........................................................................................ Error! Bookmark not defined.
Project Name: Xi'an International Port District dream commune project ........................... 231
Project Name: SHANDONG BOSHAN School Project ......................................................... 232
Project Name: Qingdao Jiaozhou city hospital new construction projects .......................... 233
Project Name: Sunshine House Ordos Project ..................... Error! Bookmark not defined.
Project Name: Inner Mongolia, Baotou City, off Court Project ............. Error! Bookmark not
defined.
Project Name: Harbin City, turn garment expansion project . Error! Bookmark not defined.
Project Name: Harbin Qunli school construction project latitude and longitude .............. Error!
Bookmark not defined.
Project Name: Harbin Qunli the promoter region of 085 construction projects, land .......... 238
Project Name: Prime Harbin Terrace Project ................................................................... 239
Project Name: Panshi North Metro District Education Center Project ................................. 240
Project Name: Baoding fire emergency rescue command center project ........................... 241
Project Name: Dry ice expanded tobacco production plant construction project ............ Error!
Bookmark not defined.
Project Name: Wuxi red beans home XDG-2011-48 residential plot .................................. 244
Project Name: Ego Square residential development ......................................................... 245
Project Name: Nantong New High School Construction Project ........................................ 245
Project Name: Nantong Rudong Hospital relocation project . Error! Bookmark not defined.
Project Name: Chengdu, the provincial emergency rescue training base construction projects
specifically .................................................................................................................... 247
Project Name: Fujian, a data center disaster recovery projects ........... Error! Bookmark not
defined.
Project Name: Xiamen low carbon food packaging production base project Error! Bookmark
not defined.
Project Name: Shanghai Hua Lin Industrial Gases Co., Ltd. Expansion Project .................. 250
Project Name: Shanghai Shun Wah Toys Co., Ltd. new plant and villa projects ................. 252
Project Name: Jinqiao Export Processing Zone, Pudong New Area 16 neighborhood block
commercial development ................................................... Error! Bookmark not defined.
Project Name: China National Aero-Technology Research Institute Comprehensive Test and
Measurement Center research space construction projects .............................................. 254
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: China Artex Building Products Import & Export company of construction
projects ............................................................................ Error! Bookmark not defined.
Project Name: Shenzhen International Energy Building Project ........................................ 256
Project Name: Central Building Project ............................... Error! Bookmark not defined.
Project Name: Chong Hong Huiyuan projects .................................................................. 258
Project Name: Daya Bay, Huizhou City, Guangdong Province Economic and Technological
Development Zone, south of the stove village relocation project Residential Area ............. 259
Project Name: Tianjin Ninghe product quality inspection center project ............................ 261
Project Name: Yuanping Xue isolated towns and villages west of basic farmland consolidation
project ......................................................................................................................... 262
Project Name: Qinghai Salt Lake Industry Group Co., Ltd. magnesium integration project
office building quality inspection center of the main building and civil engineering project
scheduling .................................................................................................................... 263
Project Name: Jilin Longtan Siniora Street Manchu new primary school buildings the town
center project ............................................................................................................... 264
Project Name: Jilin Longtan River teaching building a new secret project peak secondary . 265
Project Name: Reconstruction Hui County human resources market and social protection
counties as units of service centers and office building projects ....................................... 266
Project Name: Cape Town Pingliang mysterious star 10 #, 15 #, 16 #, 21 #, 22 # residential
building projects ........................................................................................................... 268
Project Name: Guizhou Radio and TV University campus three new projects Jinyang ........ 269
Project Name: Energy saving heating system transformation projects .............................. 270
Project Name: Guiyang City Longdongbao administrative office building of the airport
expansion project.......................................................................................................... 271
Project Name: capacity of 7000 m3 chemical products warehouse project ........................ 272
Project Name: New City Sports Center on behalf of County Engineering ........................... 272
Project Name: Jilin Yinglong Buddha Mountain Cultural Park Project................................. 273
Project Name: No. 64 Alexander Road, Jinan City residential development projects ........... 274
Project Name: Power Supply Company Jinzhong new employee training center project ..... 275
Project Name: Yue Lan Mountain residential community construction project sites ............ 276
Project Name: Zhuhai Campus Culture Park Middle School District Project ........................ 277
Project Name: Tangshan City School Police Road affordable housing project .................... 278
Project Name: Wen'an often works long Yiyuan 2 #, 5 #, 6 #, 7 # Building Project .......... 279
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Wan Yee Tai Town home county home-hole 3 # -10 # Residential Building
Project ......................................................................................................................... 280
Project Name: Suzhou City, the construction of Radio and Television Entertainment Suzhou
International City project ............................................................................................... 281
Project Name: District Court two Zhangbei macros Top Bright Commercial Building Project
.................................................................................................................................... 282
Project Name: Jiangsu Chengde Run Properties Limited to the Soviet Union No. 2010-B-52
block commercial complex project .................................................................................. 283
Project Name: Real Estate Development Co., Suzhou River, Su Xu to No. 2009-B-48 land
projects ........................................................................................................................ 284
Project Name: Town beach Yongnian County Joint School Pro ALFA project ..................... 285
Project Name: Yongnian County, South West towns and villages along the inter-school
projects Daci................................................................................................................. 286
Project Name: Sichuan Chengdu Eastern maintenance base construction also .................. 287
Project Name: Jizhou low-rent housing project off Jiayuan .............................................. 288
Project Name: Hebei provincial second phase of apartments for the elderly ...................... 289
Project Name: detachment of Fuzhou Jinshan border project office and residential areas .. 290
Project Name: Weng'an County fitness center project ......... Error! Bookmark not defined.
Project Name: Tianjin Economic and Technological Development Zone, part of the mainland
capital expansion automotive construction plant on behalf of the ........ Error! Bookmark not
defined.
Project Name: Shanghai International Automobile City, Hong Kong Science and Technology R
& D projects ................................................................................................................. 293
Project Name: Taicang City, Jiangsu Province, early childhood education center Shaxi Shaxi
nursery space engineering ................................................. Error! Bookmark not defined.
Project Name: Shijiazhuang, Hebei, Shijiazhuang City, Town, Pingshan Pingshan Xibaipo level
secondary school construction project ............................................................................ 295
Project Name: Extension Project of Fujian Provincial Library Error! Bookmark not defined.
Project Name: Chengdu Wuhou Industrial Park Kindergarten Project................................ 297
Project Name: Zhongxiang City Public Security Bureau projects the business technology
space ........................................................................................................................... 298
Project Name: Wuhan Jiangxia Hidden Dragon School of Engineering .............................. 299
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Sanmenxia industry cluster BT standard industrial plant construction projects
.................................................................................................................................... 300
Project Name: Star City Jinnan District River drainage works infrastructure supporting
projects ........................................................................................................................ 301
Project Name: Hefei New Century Center project ............................................................ 302
Project Name: Changzhi Vocational and Technical College new campus construction projects
.................................................................................................................................... 302
Project Name: Changzhi Medical School new campus construction projects ...................... 304
Project Name: Focus Southern prison police staff housing relocation project ..................... 305
Project Name: Chemical Technology Co., Ltd. Jiangsu Yi Geluo New Project ..................... 306
Project Name: Suzhou Wujiang Green Center and Lakeside Park Project .......................... 307
Project Name: Nantong Tong Hai Qu County Center Hospital Project ............................... 307
Project Name: Chongqing Beibei District People's Court to move the court building
construction project expansion........................................... Error! Bookmark not defined.
Project Name: Ningbo Happy home two downtown projects Error! Bookmark not defined.
Project Name: Taizhou Sports School training base construction projects ... Error! Bookmark
not defined.
Project Name: Tianjin Eco-city blue-collar apartment block No. 99, a construction project . 311
Project Name: Tianjin Industrial Real Estate New construction projects ............................ 312
Project name: Bell and Drum Tower Beijing Museum project Error! Bookmark not defined.
Project Name: Cultural Palace of Nationalities renovation project ........ Error! Bookmark not
defined.
Project Name: Beijing Hong Bohao days Technology Co., Ltd. Digital Printing base
construction projects ..................................................................................................... 314
Project Name: Beijing Chaoyang District, CBD core area Z3 block construction project .. Error!
Bookmark not defined.
Project Name: Guangzhou University of apartment construction projects in town Ring
teachers ........................................................................... Error! Bookmark not defined.
Project Name: Lan Shan a product in the food garden project ............ Error! Bookmark not
defined.
Project Name: Shenzhen Investment Real Estate Co., Ltd. Shenzhen Sea World residential
development ................................................................................................................. 319
Project Name: Foshan Yuan Chong Hong Construction Project Meeting ............................ 320
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Shenzhen Heng Run Park construction project is still ................................. 320
Project Name: Changchun International Forte net monthly 4.1, 4.2 projects ..................... 321
Project Name: Langfang Vocational and Technical College three Yanjing teach 职工宿舍楼
Project # 9 ................................................................................................................... 322
Project Name: Silver Dragon Properties Ltd. Suzhou Su to 2010-B-43 construction project plot
.................................................................................................................................... 323
Project Name: Real Estate Development Co., Ltd. Suzhou Su dragon to 2010-B-46
construction project plot ................................................................................................ 324
Project Name: Hebei Huarui International Garden District 3-5 #, 7-9 # Building, Commercial
Building Project ............................................................................................................. 325
Project Name: Yongnian County, a small town eight Longma Wang Joint School Project ... 326
Project Name: Fairmont Hotel Co., Ltd. Suzhou New Project ............................................ 327
Project Name: Yongnian County River River Village at Fort Union Township School Project 328
Project Name: Suzhou Co., Ltd. Xin Yun real estate project ............................................. 329
Project Name: Rural Ambrose Liu Yongnian County Solid Joint School Project ................... 330
Project Name: Hillside Place convenient delivery of professional health services ................ 331
Project Name: Commercial office space project ................... Error! Bookmark not defined.
Project Name: Wuhan Economic and Technological Development Zone, the military
community a Huangling Hill Street, 28, 29 Building project .............................................. 333
Project Name: Jiangsu Suzhou Dulwich International School Project................................. 334
Project Name: Wuhu International Culture Square Hualun a pile foundation engineering
projects ........................................................................................................................ 335
Project Name: Hubei Science and Technology Parks Corporation Gold Hill rental (office
building and basement) Engineering .............................................................................. 336
Project Name: Hubei Chibi Hospital hospital building project ............................................ 337
Project Name: Hebei economic zone around Beijing Planning Exhibition Hall Project Green 338
Project Name: Chenxi County Daqian Jinsiou mountain area 2 - 3 phase .......................... 338
Project Name: Wuhan Xiao farmers squeezed Fangcun also built Village (Phase I) ............ 340
Project Name: Shanghai Tang Lane five neighbors A block matching real estate projects .. 340
Project Name: Shanghai financial information service industry base two 1 block project Error!
Bookmark not defined.
Project Name: Shanxi Changzhi City County Public Security Bureau, the business space
project ............................................................................. Error! Bookmark not defined.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Inner Mongolia Autonomous Region Committee of democratic institutions
office building project ........................................................ Error! Bookmark not defined.
Project Name: East County precious little home town of Siping Building construction
(including forestry affordable housing) civil construction projects ........ Error! Bookmark not
defined.
Project Name: Badong County Detention Center, Badong County Public Security Bureau
detention center construction project ................................. Error! Bookmark not defined.
Project Name: Shenzhen Royal Lake peak home construction general contracting projects 347
Project Name: Shantou CITIC Pu River Beach Resort holiday apartment project dragon .... 348
Project name: Jinan City, the body of China Railway Construction International Fair Area City
construction projects ..................................................................................................... 348
Project Name: Second Hospital of Henan Province, Luoyang City, Ward Building Integrated
Project ......................................................................................................................... 349
Project Name: Guangzhou Pearl City sporadic projects .................................................... 352
Project Name: Guangdong Shenzhen Huamei heavy industrial plant engineering plant ...... 353
Project Name: West Street, Chongqing, Chongqing Nanchuan Nanchuan District Adult
Education Training Center Project Area .......................................................................... 354
Project Name: Shishi City, administrative services Yongning town center project .............. 355
Project Name: Shanghai Waigaoqiao Town E08-05 block new nursery projects ................. 356
Project Name: Quanzhou Xing North Peak District project Xiamei ..................................... 357
Project Name: Second Experimental Kindergarten project Lienchiang ............................... 358
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Fujian Ningde Jiaocheng middle of the road construction project
Stages of progress: survey design
Construction period: 2012 April - June 2013
Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, pavers, protection
board, explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, police equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, security facilities, drilling rigs, cranes, tower cranes, bridge machines, hammers,
generators, excavators, road rollers, dump truck, motor graders, pull up equipment, template, pipe fittings,
fasteners (for reference)
Project:
Middle of the road project is located in Fujian Province to Ningchuan Jiaocheng South Road between the
land area of 42,839 square meters (equivalent to 64.26 acres), the actual land area of 25,130 square meters
(equivalent to 37.69 acres); proposed Fujian middle of the road about 490 meters, planning road red line
width 36 m; the road on both sides of A, B, C, D, E, F six plots, the proposed total construction area of
166,562 square meters [including: ground floor area of 127,233 square meters (including residential
construction area 95752 square meters of commercial building area of 24,502 square meters, office
building area of 5525 square meters, construction area of public service facilities 836 m2), ground floor
area of 39,329 square meters (including the basement floor area of 24,392 square meters, business area of
12,695 square meters of which , parking space of 11,697 square meters and equipment; ground floor area of
14,937 square meters for parking and equipment room)], building the basement area of 8968 square meters;
green area of 64,921 square meters .
The total investment of 685 million yuan, funding.
Construction units:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Aerospace Information Co., Ltd. Zhuozhou industrial base two construction projects
Stages of progress: survey design
Construction period: 2011 - 2013
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located south of East Zhuozhou Fan Yang, Yun Wo Street, east, west Zhuozhou Xiangyu
refueling center and Beijing-Zhuhai expressway roads, South and China National Seed Group Corporation
and the development of potato cultivation Frozen Food Co., Ltd. Baoding Quartet Zhuozhou food plants
with access. Two construction area of about 10,000 square meters.
The total investment 300 million yuan, self-financing.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Design:*******
Postal Address:*******
Progress stage: Planning and Design
Construction period: 2011 - 2012
Main equipment: excavators, transport, crane, mill, roller, hoist, pumps, valves, turbine, glass pipe,
automation control systems, pipes, manholes, sludge thickener, suction machine, mixed mixers,
submersible pumps, cranes, test equipment, instruments, analytical instruments. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Wuyuan County Bayannaoer public in the town, set the sea town, wins Fengzhen,
project planning and design in 2011 about 10 acres.
The total investment is not detailed, financial funds.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Fax:*******
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Zhangzhou, Fujian Zhangpu Sui Road, Chang'an Town, east of a large pavilion, with
a total construction area of 22,000 square meters, including: outpatient emergency room floor, medical
technology building, ward buildings, office buildings.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment 60.75 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Design:*******
Postal address:*******
Postal Code:*******
Contact System People: who Guoliang
Tel:*******
Fax:*******
Project Name: Wuhan, Central China Trade Co., Ltd. Baosteel Phase III expansion project processing
center
Progress stage: engineering design
Construction period: 2011 November - August 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Wuhan Economic and Technological Development Zone No. 1888 Plum Road,
construction of a single high plant with a total floor area of approximately 17,920 square meters.
The total investment of 30 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Red River State Psychiatric Hospital Building Project
Progress stage: construction preparation
Construction period: 2011 September - January 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Hani and Yi Autonomous Prefecture, Yunnan Red River Road Jianshui Chak No. 28,
on a 10-storey complex building for indoor decoration, with a total floor area of approximately 13,000
square meters, including: outpatient and emergency and inpatient departments.
The total investment 11 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction units:*******
Postal Address:*******
Tel:*******
Construction unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Code:*******
Contact System By: Jia Buddhist temple
Tel:*******
Project Name: Guangxi Liuzhou domain Purple White Lotus International Trade City construction projects
Progress stage: engineering design
Construction period: 2011-10 - October 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Liuzhou, Guangxi Liu Shi Road 56 (White Lotus airport port forward 100 meters), a
residential development with a total floor area of approximately 100,000 square meters, including: 19 to
15-storey 12-storey residential buildings, shops, set a single underground parking.
The total investment 100 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: engineering design
Construction period: 2011 November - December 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Hanyang District, Wuhan Golden Port Industrial Park, a comprehensive
development, with a total area of approximately 25,800 square meters, total construction area of
approximately 35,000 square meters, including: a nine-storey office building, three single higher plants.
The total investment of 80 million.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Hubei Enshi beautiful spring hotel construction project
Progress stage: engineering design
Construction period: 2012 February - May 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Enshi Tujia and Miao Autonomous Prefecture high Xianfeng Town, Leshan Village,
Yuying Road dam, construction of a 17-storey four-star hotel with single-layer high in the basement, with a
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
total area of approximately 13,000 square meters, total floor area of approximately 20,000 square meters,
about 201 rooms, providing about 132 parking spaces.
The total investment of 80 million.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Design:*******
Postal Code:*******
Contact:*******
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Lushan Road, Changsha, Hunan Yuelu District 70, the construction of a surgery
building, total floor area of approximately 11,943 square meters.
The total investment of 20 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction unit:*******
Postal address:*******
Postal Code:*******
Contact System : Xu Xiang
Tel:*******
Fax:*******
Construction Unit:*******
Postal Code:*******
Contact System People: not disclosed
Tel:*******
Project name: Changsha, Hunan chalice Memphis Hotel Project
Progress stage: engineering design
Construction period: 2011 - 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Golden Eagle project is located in Changsha city of film culture, to build a business hotel, with a total
construction area of about 145,000 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment 580 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Fuzhou Minhou county police criminal investigation research business space project
Progress stage: Design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Fuzhou, Fujian, Xu Minhou Jingxi Town Village 128, the construction of an eightstory complex building, covers an area of 16,600 square meters, including: police stations, offices, a singlelayer high in the basement, equipped with air defense equipment and parking.
The total investment 41.5 million yuan.
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Fax:*******
Project name: Changsha, Hunan chalice Griffith residential area two projects
Progress stage: engineering design
Construction period: 2011 - 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Changsha, Hunan, Kaifu District, integrated farm Hongxi breakout, the construction
of several small high-rise and high-rise residential buildings, covering a total area of 200,000 square meters,
total construction area of approximately 250,000 square meters.
The total investment 500 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Fuzhou Jingxi town small town planning exhibition hall project
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Fuzhou, Fujian Minhou Jingxi north of New Road, Gan Hong Luxi side, the
construction of a planned three-storey exhibition hall, with a single high basement, with a total construction
area of 13,998 square meters.
The total investment of 40 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction units:*******
Postal address:*******
Postal Code:*******
Contact System : Lin Qing Teng
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project name: Changde City, Taoyuan County People's Hospital expansion project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Taoyuan County, Changde, Hunan Zhangjiang Road, construction of a 16-storey,
single-patient building of high ground, with 700-800 beds, with a total construction area of 25,000 square
meters.
The total investment of 40 million.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project name: Changde City, Hunan bus company bus terminus project
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located south of Hunan Changde Shi-Chang Railway, the railway station north of a large
market, with a total construction area of about 21,360 square meters, including: bus schedule building,
maintenance shop, cafeteria, parking floor.
The total investment of 40 million.
Construction Unit:*******
Postal Code:*******
Contact System People: Yujuan
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Enshi Icheon primary employment and social security services center project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Enshi Tujia and Miao Autonomous Prefecture in Icheon City, Park Road 13,
construction of a six-storey office building of the employment service center, with a total floor area of
approximately 9,000 square meters.
The total investment of 12 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Code:*******
Contact:*******
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011-10 - October 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Wuhan East Lake New Technology Development Zone, Guan Shan 1st Road,
construction of three 11-storey office building with a total floor area of approximately 60,000 square
meters.
The total investment of 90 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Tel:*******
Project Name: Wuhan City Court Phase III Fortress
Progress stage: verification of project approval
Construction period: 2012 January - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located east of Avenue Wuhan Jiangxia Jiangxia, Nakasu Avenue north, with the basement
area of approximately 165,303 square meters, total construction area of approximately 277,894 square
meters, including: residential buildings, commercial buildings.
The total investment 300 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Project Name: Dongguan City Chang Ping-powered electricity production company building the project
schedule
Progress stage: construction started in
Construction period: 2011 September - September 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Changping Town, Dongguan City, Guangdong Road, the construction of a main
building 16-storey, three-storey building, deputy production scheduling floor area of approximately 9573
square meters, total construction area of approximately 22,000 square meters, with a single basement.
The total investment of 45 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Project name: production center of Yinchuan, Ningxia Mobile Phase
Progress stage: construction preparation
Construction period: 2011 September - December 2011
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
The project is located in Yinchuan Xixia days Wencui Street East intersection with the southwest corner,
with a total construction area of 16,500 square meters, including: a single-storey warehouse with high,
room four-storey building, a three equipment storey building, with single-layer basement.
The total investment of 20 million.
Construction:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 September - October 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Weinan Hi-tech Development Zone, Zhang Dong Village, covering about 286,810
square meters, total construction area of approximately 96,260 square meters, including: a six-storey
training building, a six-storey school building , four six-storey student dormitory, a three-storey student
canteen.
The total investment of 100 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design unit: Guangzhou City Han Jing architectural engineering design firm
Postal Address:*******
Postal Address:*******
Postal Address:*******
Postal Address:*******
Postal Address:*******
Tel:*******
Project Name: Singapore • Nanjing technology island promoter region of the North Eco-infrastructure
projects
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in the Chau Thai Jiangxinzhou Yongding village and village, south of latitude seven
river tunnel passing through the green belt, east Jiajiang Dyke, south of Yongding village planning of roads,
river west river bank, the implementation of an area of about 2100 acres. The main construction content of
the project road works, pipe network engineering, bridge engineering, environment and sanitation, and
other landscaping projects.
The total investment of 2.3 billion.
Construction units:*******
Postal Code:*******
Contact System By: Tian
Tel:*******
Design unit: State Power Environmental Protection Research Institute (EIA agencies)
Postal Address:*******
Tel:*******
Project Name: Industry and Trade Co., Ltd. Shaanxi Baoji, Shaanxi API production project
Progress stage: construction preparation
Construction period: 2011 - 2012
Main equipment: extraction equipment, water treatment equipment, automation equipment, reactors,
leaching equipment, evaporators, tablet presses, granulators, dryers, shredders, ozone generator. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Baoji, Shaanxi warburg Fengxiang Jia Dong Township, an area of 50,200 square
meters, including: factories, warehouses.
The total investment 15 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Gongyi City, and Garden District star Rhythm Project
Progress stage: engineering design
Construction period: 2011 November - February 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Gongyi City, Henan Province, Zhengzhou Wai Man Road East, new north road, the
construction of 11 residential buildings with a total construction area of about 22 million square meters.
The total investment 600 million yuan.
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Qingdao Yellow Sea Rubber Group semi-steel radial tire project
Progress stage: construction preparation
Construction period: 2011 September - April 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project area is located in Shandong Chengyang Jihongtan street, with a total construction area of 60,188
square meters, including: single-to two-storey high workshop, ancillary buildings, research and
development center.
The total investment of 80 million.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Designer:*******
Postal Code:*******
Contact:*******
Progress stage: construction preparation
Construction period: 2011 September - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located on Lake Area Xiaogan Huangpi Road north to the construction of seven 12-storey 20storey residential building, with single-layer high in the basement, with a total floor area of approximately
74,000 square meters.
The total investment of 80 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction units:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Singapore • Nanjing technology island promoter region of the North Eco-infrastructure
projects
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. (Reference)
Project:
Project is located in the Chau Thai Jiangxinzhou Yongding village and village, north to Chau Thai
Village planning for roads, east Jiajiang Dyke, south to latitude seven river tunnel passing through the
green belt north, west river river bank, the implementation of an area of about 1605 acres ( within the 150
mu less land has been expropriated). Construction, including road works, municipal pipe network
engineering, bridge engineering, river training works, landscaping projects in five parts.
The total investment of 1.6 billion.
Construction units:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact System By: Tian
Tel:*******
Design unit: State Power Environmental Protection Research Institute (EIA agencies)
Postal Address:*******
Tel:*******
Project Name: China-chemical Co., Ltd. Nanxiong City plant and other projects
Progress stage: the record
Construction period: 2011-09 January --2013-09 months
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Project is located in Nanxiong City Industrial Transfer Park, the construction scale 6426.00 square
meters, the main building there are workshops, warehouses, office buildings, janitors, cafeteria, covers an
area of 6776.0 square meters, annual output of 4,000 tons of organic silicon coupling agent
The total investment 6.3436 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Times Square West project
Progress stage: under construction
Construction period: August 2011 to March 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Western section of the Huaihe River Road project is located in the south zone, north western part of
genistein Road, dragon mountain (Planning) on both sides, the total area of about 52,000 square meters,
together 78 acres, total construction area of 249,000 square meters, including: ground construction area of
234,000 square meters, ground floor area of 15,000 square meters; area of 213,380 square meters of
residential buildings, commercial building area 18720 square meters, residential area of 1900 square meters
of public buildings complete. The proposed high-level 16, a total of 2307, for 7945 persons. A total of 1430
sets the following 90 square meters, construction area of 128,028 square meters, about 60% of the housing
387 to protect a building area of 21338 square meters, about 10%, more than 90 square meters apartment
490 sets of building area of 64014 square meters, about 30%, green rate of 33.3%, the volume rate of 4.5.
District, the major equipment including fire, civil defense, security and other intelligent devices.
The total investment 515.24 million yuan.
Construction unit:*******
Contact:*******
Tel:*******
Project Name: Stone Town harbor land residential area north of North New Project
Progress stage: the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 - 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Road project is located north of Stone Town harbor, the total construction area of 6074 square meters.
One ground floor area of 5251 square meters, including 3632 square meters of residential, commercial
space 1395 square meters, houses 31 square meters of property management, property management space
51 square meters, power distribution room 60 square meters, mechanical garage (converted) 82 square
meters; ground floor area of 823 square meters, including the storage room, bike library, the function space,
etc.; and above-ground parking spaces, roads, landscaping and other facilities. The project of a new
500KVA transformer.
The total investment 57.5 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Inner Mongolia Grain Wholesale Market Expansion II project
Progress stage: verification of project approval
Construction period: 2012 April - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Baotou, Inner Mongolia No. 15 East River Road neighborhood of industrial area,
Industrial Road, east of a comprehensive development, with a total construction area of 160,000 square
meters, including: warehousing centers, car parks, office buildings.
The total investment 150 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Hainan Hai salt works ramshackle shantytowns
Progress stage: verification of project approval
Construction period: 2012 March - March 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located west of Hainan Ledong Li autonomy northwest side of town yellow stream,
construction of 20 six-to 11-storey residential building, covers an area of 43,548 square meters, total
construction area of 55,470 square meters, including: 13 six high residential buildings, seven 11-storey
residential building, the project floor area ratio of 1.27.
The total investment of 80 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Education Park Shen-Fu new town project
Progress stage: engineering design
Construction period: 2011 November - September 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shenyang, Liaoning Jia Wang North Street Village, a development of education,
with a total construction area of 31,700 square meters, including: teaching buildings, office buildings,
dormitories.
The total investment of 30 million.
Construction:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Designer:*******
Postal Code:*******
Contact System By: Dan
Tel:*******
Project Name: Yangzhong moderate Run Project Central International Plaza, a
Progress stage: verification of project approval
Construction period: 2012 August - February 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Zhenjiang City, Zhenjiang, Jiangsu Road, River Island, the construction of a ninestorey commercial building, with two-storey underground garage, covering about 12,606 square meters,
total construction area of 100,000 square meters.
The total investment of 120 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Indus Residence Project in Jiangsu Huai
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: Design
Construction period: 2012 July - October 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Huaian gold project is located north of Gao Road, Sanyo Bay Road, west side, 18-story building 21 to
33-storey residential building, with single underground garage, with a total construction area of about
280,000 square meters.
The total investment of 300 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Stages of progress: preliminary design
Construction period: 2011 November - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Tianjin Jinnan District gegu town, the construction of a two to three-storey
integrated development, with a total construction area of 38,583 square meters, including: the exhibition
floor, retail floor, repair floor.
The total investment of 90 million.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Design by: Friends of Architectural Design Co., Ltd. Tianjin
Postal Address:*******
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the town of Changsha High-tech Zone Lei Feng Lei Feng Memorial Hall, the
construction of a museum, with a total floor area of approximately 15,000 square meters.
The total investment of 25 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Cangzhou Bohai School District first new campus project
Progress stage: verification of project approval
Construction period: 2012 March - March 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
McNair project is located in Cangzhou, Hebei Industrial Park, with a total construction area of 44,000
square meters, including: school buildings, restaurants, laboratory building, student dormitory, office
building.
The total investment of 70 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Project Name: Wuhan, Hainan Blue Ocean overhead industrial park project
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Huangpi invading Hainan Blue Ocean Industrial Development Zone, Wuhan,
invading the new industrial park project, with a total area of about 190.21ha. Project is divided into Free
Trade Zone, the general processing and logistics area, integrated service area of three parts, the total project
size of 1.8495 million square meters.
The total investment 5,077,533,600 yuan.
Construction Unit:*******
Postal Code:*******
Contact System : Li Jun
Tel:*******
Designer:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Nanning Media Star City construction projects
Progress stage: construction design
Construction period: 2011 November - May 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Nanning, Guangxi plans to extend the line in the Hengyang Road, near the car
Bamboo Avenue, a comprehensive development, covers an area of 104,113 square meters, total
construction area of 510,048 square meters, including: A plot: two 32-story high four-storey commercial
and residential and residential buildings, B block: three 25-storey commercial and residential, two 32storey commercial and residential, four 32-storey residential building and a 11-storey residential building,
C block: a 50-storey apartment.
The total investment of 14 million.
Construction Unit:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Nanning Media Star City construction projects
Progress stage: construction design
Construction period: 2011 November - May 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. o
Project Name: Wuzhou City Chau District People's Hospital outpatient hospital complex building
construction projects
Progress stage: engineering design
Construction period: 2012 March - March 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Wuzhou, Guangxi, Cheung Chau District, Long Road, Wuzhou middle of the
southeast of the central grain depots land, construction of a 11-storey outpatient hospital complex building,
covers an area of 917 square meters, total construction area of 11,000 square meters, include: outpatient
and inpatient departments, providing about 200 beds, has a single basement.
The total investment 15 million yuan.
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal address:*******
Postal Code:*******
Contact System People: Zhongwei Shen
Tel:*******
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 September - June 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Residence project located in the town of Beihai, Guangxi 016 forward, the construction of several blocks
of five to six-storey teaching building, with a total floor area of approximately 1,2000 square meters.
The total investment 63 million yuan.
Construction unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Design unit: construction and installation of Guangxi Lian Kay Engineering Corporation
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Taizhou Gudea Furniture Co., Ltd. # 2 plant construction project
Progress stage: under construction
Construction period: 2011-8 to 2012-8
Major equipment: sawing machine; curtain machine; drilling machine (for reference)Project:
Project is located in Yuhuan County, Taizhou City, Zhejiang Province town industrial industrial parks
clear, the purchase of sawing machine 10; curtain machine 3 sets; drilling machine 2 and other equipment.
Construction area of 9990 square meters plant, an annual furniture 3000.
The total investment of 13 million yuan, including fixed assets investment: 13 million yuan (700 civil;
equipment 600;).
Construction Unit:*******
Postal Code: 317606
Contact:*******
Tel:*******
Project Name: Nanning State Torch Program Software Industrial Base biotechnology center construction
project
Progress stage: construction design
Construction period: 2011 November - November 2014
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Nanning High-tech District 7 Road to the north, a comprehensive development,
covers an area of 273,750 square meters, total construction area of 900,690 square meters, including:
biological engineering technology center building, incubation building, development of software industry
base office building.
The total investment is 10 million.
Owner:*******
Postal Address:*******
Tel:*******
Project Name: Commercial, residential building construction
Progress stage: the record
Construction period: 2011-10 to 2012-10
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Project is located in Zhuji City, Town, River Yangcun Anwar, the new land for the project, with the
(sign) an area of 6588.3 square meters, construction land area of 6588.3 square meters, total construction
area of 17,050 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment 72 million yuan, of which Fixed asset investment: 67 million yuan (civil
engineering 2000; equipment 200; installation of 300; other costs of construction 4000; reserve fund of
200), construction period interest 300 million, initial working capital of 2 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Hubei Vocational College of Biotechnology: student apartments, student food, conference
center project
Progress stage: construction preparation
Construction period: 2011 September - August 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Hubei Wuhan Hong mountainous wild Chih Lion Street, Lake 1, a comprehensive
development, with a total area of approximately 13,600 square meters, total construction area of
approximately 34,100 square meters, including: a layer of 11 to 12 storey student dormitory, a four-storey
dining hall and conference center.
The total investment of 50 million yuan.
Construction:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Wuhan Science and Technology Museum new building construction projects
Stages of progress: preliminary design
Construction period: 2012 May - August 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Wuhan East Lake High-tech Zone Optical Valley Technology City along the
roadside, the future construction of a Science and Technology Museum, with a total area of approximately
100,000 square meters, total construction area of approximately 50,000 square meters.
The total investment of 100 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Wuhan East Lake District National Innovation Model Convention and Exhibition Center
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Stages of progress: preliminary design
Construction period: 2012 July - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Wuhan East Lake New Technology Development Zone, high-tech center of modern
service road north of the construction of a convention center, with a total area of approximately 240,000
square meters, total construction area of approximately 200,000 square meters, including: exhibition center,
office, conference room.
The total investment of 400 million yuan.
Construction unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Yichang Changyang fruits and vegetables, medicinal herbs, deep-processing projects
Progress stage: Design
Construction period: 2011 November - October 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Main equipment: extraction equipment, water treatment equipment, automation equipment, reactors,
leaching equipment, evaporators, tablet presses, granulators, dryers, shredders, ozone generator. (Reference)
Project:
Project is located in Yichang, Hubei Changyang Lang Town, an industrial development, with a total area
of approximately 100,000 square meters, including: factories, warehouses, cold storage, office.
The total investment of 50 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Stages of progress: preliminary design
Construction period: 2012 March - March 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Silver Chuanning An Avenue project is located east of Ningxia, construction of a complex, including
activity centers, training centers and libraries with a total construction area of 18,000 square meters.
The total investment of 50 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Xi'an city reconstruction project to the village altar
Progress stage: construction design
Construction period: 2012 March - October 2015
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Xi'an Beilin altar Village, South Second Ring Road overpass and the Tai-around, an
integrated development with a total floor area of approximately 300,000 square meters, including: shops,
shopping malls.
The total investment 600 million yuan.
Construction Unit:*******
Postal Code:*******
Contact System By: Dong Yaping
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Yue Zhai resettlement area construction projects
Progress stage: engineering design
Construction period: 2011 November - November 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Xi'an Qu Jiang New District, South Lake Development Zone, a residential
development, an area of 50,320 square meters, total construction area of 213,149 square meters, including:
eight 26-storey residential building, a three-storey kindergarten, a 3-storey commercial clubs.
The total investment of 1.5 billion.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: First High School Project Zhumadian Suiping
Progress stage: engineering design
Construction period: 2012 January - November 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project on children in the Zhumadian South Bay Bridge, the new State Road 107 east, a development of
education, with a total area of 200,000 square meters, total construction area of 95,000 square meters,
including: teaching building, office building, laboratory building, library building, dormitory, playground,
cafeteria.
The total investment 120 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Henan integrated transport hub in the East Plaza Square subway
Stages of progress: preliminary design
Construction period: 2011 December - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located south of Zhengzhou, Zhengzhou, Henan transit hub station, west of Zhengzhou East
Railway Station, north of highway hub terminal, a comprehensive development, with a total area of 51,953
square meters, total construction area of 69,000 square meters, including: Station Square, transport facilities,
underground business, garage, ancillary equipment space.
The total investment 700 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Henan Xinyang Xiangshan International Triumph resort hotel project
Progress stage: construction started in
Construction period: 2011 August - August 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Xiangshan County, Xinyang, Henan new Lake Management District, a
comprehensive development, with a total construction area of 45,000 square meters, including: a 21-storey
five-star hotel with single basement, 60 single-to two- high house, car park.
The total investment 200 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction unit:*******
Postal Address:*******
Tel:*******
Project Name: Qingdao Industrial Co., Ltd. Guang Nan test floor, plant project
Progress stage: construction preparation
Construction period: 2011 October - November 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located south of Huaihe East Road, Qingdao, Shandong Province, east of the former Bay on
the 7th line, a comprehensive development, with a total construction area of 9,275 square meters, including:
workshops, testing floor.
The total investment 10 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Lawrence Hospital, New Medical Building Project
Progress stage: engineering design
Construction period: 2012 February - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Zunyi, Guizhou Province, No. 98 Phoenix Road, construction of a 19-storey
residential building with about 1500 beds, with a total floor area of approximately 120,000 square meters.
The total investment 200 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Contact:*******
Progress stage: engineering design
Construction period: 2011 November - November 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Yuxi city cup Fengxiang County Road North River, administrative center of Hing
Wah Street, both sides of the construction of a three and a half high conjoined complex building, covering
about 33,300 square meters, total construction area of approximately 45,000 square meters, including: the
first layer of shops, about 150 stalls, the second layer to the third floor of residential buildings, has a single
underground car park, the project floor area ratio of 1.3.
The total investment of 100 million yuan.
Construction Unit:*******
Postal Code:*******
Contact System People: your Thursday
Tel:*******
Designer:*******
Postal address:*******
Postal Code:*******
Contact:*******
Electricity Tel:*******
Project Name: Dongfang City, Hainan Province Public Security Bureau and the Building of affordable
housing projects
Progress stage: construction started in
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 August - October 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Dongfang City, Hainan town, eight North Eastern Avenue, with a total construction
area of 66,532 square meters, including: a 11-storey business and technology building, a three-story
building window, a single-storey canteen, a few blocks 16-storey residential buildings around.
The total investment of 80 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal address:*******
Postal Code:*******
Contact System By: Peng Xumao (architect)
Tel:*******
Design:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the town of Sanya Bay, Sanya, Hainan, the construction of an approximately 12storey residential building, total construction area of approximately 20,000 square meters.
The total investment of 25 million.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact System By: Yu Tao
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 September - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Changchun city wide Qingfeng Road, south of road east of the nine, a two-to 30storey integrated development, partial basement with single-layer high, including the underground garage,
with a total construction area of 193,604 square meters including: residential buildings, commercial podium.
The total investment 200 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact System By: Dong Jihong
Tel:*******
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal address:*******
Postal Code:*******
Contact System People: Dingxi ago
Tel:*******
Project Name: Liaoning Jinzhou City Golden Age Project
Progress stage: construction preparation
Construction period: 2011 September - April 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Jinzhou, Liaoning Tiger Town Heishan big black large road east, the construction of
30 apartment buildings with a total construction area of 200,000 square meters.
The total investment 250 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Liaoyang branch of China Telecom Group, the production machine building projects
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 September - May 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
River project is located in the east coast of Prince Edward Liaoyang, Liaoning, east green belt, west of
Park Road, north China Street, construction of a four-storey office building with a total construction area of
7,614 square meters.
The total investment of 18 million.
Construction:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Tel:*******
Project Name: Liaoning Panjin Liaohe Oilfield first high school building construction projects
Progress stage: construction preparation
Construction period: 2011 September - September 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Panjin, Liaoning dual Rd near the construction of a seven-storey teaching building,
with a total area of 2,792 square meters, total construction area of 14,998 square meters.
The total investment 15 million yuan.
Construction units:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Stages of progress: preliminary design
Construction period: 2012 March - March 2014
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in the mountains of East Port, Dalian, Liaoning, Dalian Bay to the north, a 53-layer to
68-storey integrated development, with three-to four-storey podium, with three levels of basement, with a
total area of approximately 42,846 square meters, total construction area of approximately 552,801 square
meters, including: apartment buildings, commercial buildings, office buildings.
The total investment of 3.0 billion.
Construction Unit:*******
Postal Code:*******
Contact System By: Qiang Cheng
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction preparation
Construction period: 2011 October - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Mountain Road, East Development Zone, Yancheng, Jiangsu Province, the Minjiang
River Road North, a comprehensive development, with a total construction area of 13,300 square meters,
including: a comprehensive five-storey buildings, with dormitories, a two-storey training center with
swimming pool.
The total investment of 30 million.
Construction unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Code:*******
Contact System : Wei Yong (architect)
Tel:*******
Designer:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact System : Huang County (Drainage Engineer)
Tel:*******
Designer:*******
Postal Code:*******
Contact System By: Dong Zhirong (Structural Engineer)
Electricity
If 0515-88189328, 88189019
Designer:*******
Postal Code:*******
Contact:*******
Progress stage: engineering design
Construction period: 2012 April - October 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the town of Yancheng Wu You, the construction of several school buildings,
covering about 66,600 square meters, total construction area of approximately 30,000 square meters.
The total investment of 40 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Suzhou Pingjiang floor in school art and physical education building new projects
Stages of progress: preliminary design
Construction period: 2012 April - August 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Samsung project is located in Suzhou, Jiangsu Road, the new one art and physical education building
and a building with a total construction area of 9,500 square meters.
The total investment of 20 million.
Construction Unit:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Chongqing City real estate building projects
Progress stage: construction preparation
Construction period: 2011-10 - October 2013
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Project is located in Chongqing, the new St. Paul Street, Yubei Longxi new irrigation Road, construction
of a 24-storey office building, with a three-storey basement, with 1000 parking spaces, with a total
construction area of 110,000 square meters.
The total investment 150 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Bazhong District Central Hospital, medical clinic construction of the second
Progress stage: construction preparation
Construction period: 2011 September - February 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Technology Park Economic Development Zone Administrative Committee
Sichuanbazhong Nanba seven road south, out-patient medical technology to build a 25-storey building and
a hospital building, providing about 1,000 beds, has a basement, with a total construction area of 107,072
square meters.
The total investment of 200 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Fuzhou Lu and Liu Zhuanghe along the land bridge project dilapidated change
Stages of progress: preliminary design
Construction period: 2012 March - March 2014
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located east of Second Ring Road of Fuzhou, Fujian, Yangqiao Road north of Gijón Road,
south block, land Zhuanghe west, a residential development, an area of 33,623 square meters, total
construction area of 99,000 square meters, including: high-rise office, high-rise residential buildings.
The total investment 257,400,000 yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Tianjin, a blue-collar apartment project
Progress stage: engineering design
Construction period: 2011 November - November 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Tanggu District, Tianjin Coastal Science Park, the construction of several apartment
buildings, total construction area of 65,500 square meters.
The total investment of 80 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Stages of progress: preliminary design
Construction period: 2012 March - February 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shanghai Zhangjiang Hi-Tech Park in Pudong New Area District B-1-12 block,
construction of a research building, with underground parking garage, with a total construction area of
20,192 square meters.
The total investment of 70 million.
Construction:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Shanghai International Trade Center Hardware Electrical Hardware City, supporting three
projects
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction preparation
Construction period: 2011 September - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Baoan Road, Jiading District, Shanghai, No. 4229, built a few blocks of four high
street shops, with high single underground parking garage, with a total construction area of about 100,000
square meters.
The total investment 104 million yuan.
Construction:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Code:*******
Contact System People: Baiyun (architect)
Tel:*******
Design:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Project Name: Shanghai eastern suburb of commercial office center project
Progress stage: Design
Construction period: 2012 June - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shanghai Pudong Jinqiao Road, east, south to Long Dong Avenue, west Zizhu Road,
north to Yin Liu Road, construction of 85 buildings 15 meters high limit commercial and office building
with underground parking garage, with a total area of of 112,479 square meters, total construction area of
214,612 square meters.
The total investment 600 million yuan.
Construction:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Progress stage: engineering design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2012 April - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Planning project is located east road Minhang District, Shanghai, Pu Xiao west road, south to Hua Jiang
Road, north to River Road, Beech, a comprehensive development, with underground parking, with a total
construction area of 65,137 square meters, including: office building, commercial building, dining center.
The total investment 130 million yuan.
Construction:*******
Postal Address:*******
Tel:*******
Project Name: Foshan City Nanhai industry think tank, a project
Stages of progress: preliminary design
Construction period: 2012 March - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in the town of Nanhai District, Foshan, Guangdong, a comprehensive development
area of approximately 106,851 square meters, total construction area of approximately 110,000 square
meters, including: innovation area, office area, business district, R & D centers, warehouses, parking field.
The total investment of 250 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project name: Town, Foshan City, Lion Red Sand living zone project
Stages of progress: preliminary design
Construction period: 2012 March - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in the town of Nanhai District, Foshan, Guangdong Songgang, a residential
development with a total floor area of approximately 320,000 square meters, including: residential
buildings, shops, parking.
The total investment 400 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project name: Building, Shenzhen, information transmission cable project
Progress stage: construction design
Construction period: 2012 July - December 2014
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Project is located in Binhai Road, Nanshan District, Shenzhen, Guangdong, south, Ring Road, west side,
construction of a comprehensive 23-storey building, total construction area of 38,600 square meters,
including: operating room, office, TV room, with a three- levels of basement parking.
The total investment of 100 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Code:*******
Contact:*******
Progress stage: construction preparation
Construction period: 2011 September - January 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Nanhai District, Foshan, Guangdong Road, Jinyuan Street, west of Guicheng 80
blocks D-05d block, construction of a 11-storey office building, with a two-tier basement area of
approximately 5,275 square meters, total construction area of 24,480 square meters.
The total investment 78 million yuan.
Construction:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Bank of China Building construction project files, Shunde Branch
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Foshan, Guangdong Daliang bang west residential area, construction of a sevenstorey building of files, covers an area of 2,120 square meters, total construction area of 9,913 square
meters.
The total investment of 14 million.
Owner:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction preparation
Construction period: 2011 September - April 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the South Renmin Road, Zhanjiang Xiashan No. 57, the construction of an eightstory outpatient building, total construction area of 8,407 square meters, including: the infusion center, CT
Room, MR room, B-room, endoscopy center, test , ophthalmology, dentistry rooms, rehabilitation centers,
echocardiography room, dermatology, consultation show the classroom.
The total investment of 12 million yuan.
Construction:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Dongguan (Huizhou) Industrial Transfer Park Project a standardized plant
Progress stage: construction started in
Construction period: 2011 September - December 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Dongguan, Guangdong Longmen County, Huizhou (Huizhou) Industrial Transfer
Park, the construction of five four-to six-storey complex building, covering about 48,440 square meters,
total construction area of approximately 54,208 square meters, including: four four-storey factory buildings,
a six-storey staff quarters, canteen.
The total investment of 50 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Guangning one hundred surplus garden (villa) Phase II
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the town of Zhaoqing Guangning South Street, North Avenue, one hundred one
hundred Ying Ying Garden, the construction of 87 three-storey villa, with a total floor area of
approximately 35,000 square meters.
The total investment of 50 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Postal Address:*******
Tel:*******
Construction:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Construction:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Baoding Road West Station transportation hub project car passenger
Progress stage: construction preparation
Construction period: 2011-10 - October 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Baoding seven all the way north, the south side of Fuxing Road planning, a
comprehensive two-to five-storey development, with a total construction area of 19,763 square meters,
including: waiting building, team building, and passengers apartment, repair shop , the station hall, waiting
building and team building with a corridor connecting the middle.
The total investment 22 million yuan.
Construction Unit:*******
Postal Code:*******
Contact System By: Wei Ming Chao
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: Design
Construction period: 2012 February - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Center Avenue project is located in Taizhou, Zhejiang, a comprehensive development, with a total
construction area of approximately 250,000 square meters, including: six 16-story residential building, six
28-story residential buildings, four to five-story commercial building, single underground garage.
The total investment 300 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: Design
Construction period: 2012 August - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Quzhou Kaihua County, west of Phoenix Road, with a total construction area of
about 52,300 square meters, including: outpatient and emergency building, medical building, hospital
building, floor, infection, administration and logistics space, rehabilitation centers.
The total investment 150 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Design:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Design:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Agricultural biotechnology in the High Park Group kinds of experimental building projects
Stages of progress: environmental impact assessment
Construction period: 2011 - 201 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Kowloon East Lake New Technology Development Zone, agricultural bio-industry
base of high biological garden, God all the way south of the pier, Long Road, west of the mountain streams,
high farm road east of New Road to the north. Average annual construction scale cultivation of new
varieties of 20 crops, for farmers $ 3.8 billion. The main construction content of research and development
laboratory building renovation 36500m2, purchase a total of 754 sets of experimental apparatus.
The total investment 432,816,200 yuan, of which construction investment 188,154,900 yuan,
119,990,000 yuan investment in equipment.
Owner:*******
Postal Code:*******
Contact:*******
Tel:*******
Design Unit: Department of Environmental Protection, Nanjing Institute of Environmental Science (EIA
agencies)
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Hubei Cancer Hospital New Outpatient Building Project
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Hongshan District of Wuhan City, 116 South Zhuodao Quan, a new outpatient
hospital in the complex building. The building proposed total construction area of 28,000 square meters, to
be set six wards of internal medicine ward, 300 new beds, the hospital beds after completion of the project
to 1042 (can be amplified to 1688). The building has a comprehensive outpatient clinic, medical ward,
catering, office and other administrative functions.
The total investment is unknown.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Wenzhou Kean University construction projects
Progress stage: feasibility study stage
Construction period: 2012 June - October 2014
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located east of Lai Tong Road, Wenzhou, Zhejiang, south of Laguna Park Road, west of the
new State Road 104, north of the mountain, covering about 706,620 square meters, total construction area
of 305,300 square meters, including: Academic Building , library, laboratory internship sites, wind and rain
the playground, school administration buildings, the Department of administrative buildings, halls, student
hostels, student canteens, dormitories for single faculty, faculty housing (apartment), faculty canteen,
welfare, outdoor sports, outdoor swimming pool.
The total investment 540 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Ninghai County of Ningbo City, school project
Progress stage: engineering design
Construction period: 2012 - 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Ningbo, Zhejiang Xinghai east, to build a primary school, with 48 classes, covering
an area of 33,509 square meters, total construction area of 20,671 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment of 25 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 September - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Zhoushan Island New Daishan bamboo, the construction of four storey office
building 6-15, with high single underground car park, covers an area of 20,000 square meters, total
construction area of approximately 39,000 square meters.
The total investment of 80 million.
Construction units:*******
Postal address:*******
Postal Code:*******
Contact System : Huang Yao Juan
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Design:*******
Postal Address:*******
Tel:*******
Project Name: Nanjing Subway Line subway control center complete building renovation project
Progress stage: construction preparation
Construction period: end of September 2011 - December 2011
Major equipment: steel, building materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, control pieces of pipe, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Item No. 228 Zhongshan Road, Nanjing is located in the building area of 2813.9 square meters, a total of
29 floors, underground part 3 floors above ground and 26 floors, the floor area of 1048.49 square meters.
The total building height of less than 100 meters. Metro Building control center on the first floor which
support the transformation (about 356 square meters).
The supporting projects for the control center on the first floor part of the interior decoration, installation
works. Specifically: 1) interior decoration; 2) building intelligent; 3) water supply and drainage and fire,
electrical; 4) wall reconstruction (about 100 square meters); 5) removal of interior decoration and the
original Sinotrans; 6) Conference Room ventilation and air conditioning; 7) electrical engineering
conference room; 8) conference room sound system.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is not detailed.
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Zhejiang Wenling City Second People's Hospital expansion project
Progress stage: Design
Construction period: 2012 - 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Xinhe Town, Wenling City, Taizhou, Zhejiang, north of the public road, with 400
beds, covers an area of approximately 34,589 square meters, total construction area of 36,511 square meters,
including: the cancer ward, science and technology building, emergency building, life auxiliary space.
The total investment of 75 million.
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Xicheng District, Beijing No. 1 Muxidi South, construction of a four-storey library
with a total construction area of 4345 square meters. Building height of 25m.
The total investment of 12 million yuan.
Construction:*******
Postal address:*******
Postal Code:*******
Contact System People: Tension
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Designer:*******
Postal address:*******
Contact:*******
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Yinzhou District, Town King Yin Lu Village, an area of about 7241 square meters
building, structure, layers: frame 3, 5 layers.
The total investment 28.64 million yuan, sources of funding for the funding.
Construction unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Guangdong Foshan Nanhai Gas Development Company Limited in the water company's
warehouse and R & D room project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Foshan Nanhai Lishui Heshun Avenue, construction of a six-storey main building
and annex building R & D room two-storey warehouse, with a total floor area of approximately 5244
square meters.
The total investment of 12 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax:*******
Construction Unit:*******
Postal Code:*******
Contact System People: He Huali
Tel:*******
Fax:*******
Design:*******
Postal Code:*******
Contact:*******
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Fujian Sanming Yong Ji Village on the street Yanxi exposed pits, construction of
integrated building a few blocks, with a total floor area of approximately 30,000 square meters, including:
teaching building, dormitory, dining hall.
The total investment of 28 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction units:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Beijing South-color school buildings project
Progress stage: construction preparation
Construction period: 2011 September - March 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shunyi District, Beijing Cai Town, South Village color, with a total construction
area of 22,306 square meters, including: five-story classroom building, laboratory building, building height
of 24 meters.
The total investment of 50 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Project Name: Beijing Fengtai District, integrated services space program
Progress stage: construction preparation
Construction period: 2011 September - April 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Beijing Fengtai District South Garden Road No. 5, with a total floor area of
approximately 8630 square meters, including: a comprehensive two-storey office building, a two-storey
youth activities center with a single basement.
The total investment 17 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Designer:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Beijing Building Materials City, dilapidated building the second phase
Progress stage: verification of project approval
Construction period: 2012 January - October 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Haidian District, Beijing Xisanqi building east, planning to build three-way east,
south planning Silicon Valley pioneer North, west planning a small mouth of the East Village, West, North
to planning Xisanqi Road, a residential development, located underground parking garage and equipment
room, an area of approximately 83,810 square meters, total construction area of approximately 196,762
square meters.
The total investment 230 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Customs business and technology Yunfu City building project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Yunfu House Road junction with Fu Lu Road, southwest corner, the construction of
a complex building, covers an area of 14,224 square meters, total construction area of approximately
12,400 square meters, including: office, business premises, warehouses.
The total investment 15 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Economic Development Project in Liaoning Tieling the west side of the rubber plantation, transportation
Driving south into the land, the construction of several blocks of six-storey residential building, total
construction area of 90000 square meters.
The total investment of 50 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: People's Hospital of Shantou City, Nanao County expansion project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Nanao County, Guangdong Shantou Long after Zhaizhen Australian Avenue
(formerly Canton New Road), construction of two integrated two-to six-storey building, total construction
area of 7386 square meters, including: a six-storey hospital building , with 100 beds, a comprehensive twostorey building, with equipment rooms, morgue, oxygen center.
The total investment of 14 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Design by: Shantou City Chenghai District, Architectural Design
Postal Address:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Henan Zhengzhou Air Port Health Park District No. 8 - 20 Building construction project
Progress stage: under construction
Construction period: August 2011-August 2012
Major equipment: fire, air defense, intelligence equipment, complete (for reference)Project:
Project is located in Zhengzhou Zheng Air Port Road East Hong Kong six north, the new project area of
145.28 acres of land for construction levy (about 96852.61 square meters), with a total construction area of
198,215.37 square meters: one on the ground floor area of 180,921.69 square meters, ground floor area of
17,293.68 square meters. 8, 11, 14, 17 Building construction area of 22769.56 square meters, respectively,
which were commercial area of 2741.8 square meters; 9, 19 Building construction area of 11789.8 square
meters, respectively; 10, 18 Building construction area of 7144.68 square meters, respectively; 12, 13
Building construction area of 13660.91 square meters, respectively, which were commercial area of
2143.48 square meters; 15, 16 Building construction area of 5781.6 square meters, respectively, which
were 935.6 square meters commercial space; 20 Building construction area of 19711.71 square meters;
Square basement construction an area of 3999.88 square meters; Commercial Street building area of
5186.68 square meters; support services building area of 1277.29; distribution area of 207.59 square meters
housing construction. Volume rate of 2.05, an area of 33898.4 square meters green, greening rate of 35%;
3054 dwellings, all of the dormitories, are 90 square meters or less. The main equipment including fire, air
defense, full of intelligent devices.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment 618,727,400 yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Industrial Research Institute of Tianjin University, Coastal Engineering Laboratory of the
fuel center
Progress stage: construction preparation
Construction period: 2011 September - May 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the east Bohai Sea, Tianjin Harbor Industrial District 12 Road, south to the Jialing
River Road, west of Bohai Ten Road, Ring Road, north to the Jinsha River, with a total construction area of
8512 square meters, single, steel, eight of which the largest single area of 1165 square meters, the
maximum height of 18.6 m, no underground works.
The total investment 44.37 million yuan.
Construction Unit:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Design Unit: Tianjin University Institute of Architectural Design
Postal Address:*******
Tel:*******
Fax:*******
Project Name: New Lujiang County radio and television broadcasting center project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
New project in the east, New Lujiang County radio and television broadcasting center project. Ten-story
plus the negative layer, with a total area of 12,000 square meters, the frame structure.
The total investment of 30 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Shaoxing City Furniture City Management Service Center, District Disabled Integrated
Services Centre project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shaoxing city, layers 12 layers; number one buildings; construction area of 13519.45
square meters.
The total investment 56.5 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Xi'an University of commercial and academic exchanges Weiyang Campus Center Project
Progress stage: Design
Construction period: 2012 April - August 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Jinhua Road, Xi'an, Shaanxi, a comprehensive development, with a total floor area
of approximately 80,000 square meters, including: the number of blocks of three-storey commercial
building, four-star hotel offering 200 and 300 rooms, Commercial Street, Commercial Street, 700 meters
long.
The total investment 150 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Contact:*******
Progress stage: the record
Construction period: 2011-12 to 2014-12
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Shao Li River in the east to the railway project, the planning of roads south, west, north to the river
bridge the status quo, introduce a large line 二号 block real estate development projects with a total land
area of 37,607 square meters, total construction area of 118,017 square meters, of which ground floor area
of 24,000 square meters.
The total investment 822.87 million yuan, including fixed assets investment: 771 million yuan (Civil
33500; installation of 4000; construction of other costs 38000; reserve fund 1600), construction period
interest 51.87 million yuan.
Construction Unit:*******
Postal Code:*******
Contact System People: Makati peak
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Battery Materials Engineering Laboratory United States where
Progress stage: the record
Construction period: October 2011 to December 2012
Major equipment: battery anode material testing instruments; battery separator material experiments,
testing equipment (for reference)Project:
Project is located in the city's hospital, 168 North Second Ring Road, a new research building, building
area of 3,000 square meters; purchase laboratory equipment, testing equipment platform, a total of 24
pieces (sets), including: battery anode materials testing instruments 4 (sets); battery separator material
experiments, testing instruments 20 (sets).
The total investment 26.6 million yuan, of which: self 24.6 million yuan, the other capital of 2 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Wenzhou District, the southern suburbs of the street gathering point benevolent
transformation of rural housing project (Phase I) project
Progress stage: construction preparation
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Wenzhou area suburbs street.
The total investment 121,661,200 yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Jiaxing Pinghu Economic Development Zone (Chung Tai-street) resettlement housing
project south garden
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Yongxing Road project is located north west of the emerging Rd.
The total investment 445 million yuan.
Construction units:*******
Postal Address:*******
Tel:*******
Project Name: Chongqing Kai County Yunfeng low-rent housing housing construction
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Yunfeng Street project is located in Chongqing Kai County (western part of the hillside, Nanshan Road),
a building area of 16,484.53 square meters tenders, two tenders construction area of 25259.01 square
meters, a total of 7 layers, the structure of brick and concrete structure.
The total investment of 470 million yuan.
Construction:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact System : Mr. Hu
Tel:*******
Fax:*******
Project Name: Old City, Henan Province, Yiyang County Yellow Machine Factory bankruptcy liquidation
group shantytowns civil engineering construction projects
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Yiyang County western part of the old city north and south sides of Red Road, east
to West Street neighborhood, west of the Yellow River plant production area, south to West Village, North
County Mill appropriate family member courtyard, the first tenders : 1 # floor area of 7380.93 square
meters, 6-layer, two-story frame structure following the second floor above the condensate for the brick
structure; 6 # floor area of 5224.3 square meters, 6 layers, all brick condensate structure; second Lot: 2 #
floor area of 5904.68 square meters, 11 floors, all of the frame structure; third tenders: 3 # F 4765.9 square
meters, 5 # F 3466.73 square meters, 7 # F 3958.64 square meters, 8 # 2680.16 square meters, the four
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
buildings are six-layer, two-story frame structure following the second floor above the condensate for the
brick structure.
The total investment 46 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Second School Qinyuan County New Project
Progress stage: construction design
Construction period: 2011 October - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shanxi Changzhi Qinyuan County Guo Guo Road, Village Road, northeast corner of
town, a development of education, with a total floor area of approximately 16,522 square meters, including:
teaching buildings, office buildings, libraries, laboratory buildings, student apartment buildings, teachers,
apartment buildings, canteens.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment of 25 million.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the town of Red Road, Jinnan District xianshuigu south (Jinnan district hospital
mentally retarded), total construction area of 5966.9 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment 28.18 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Baoshan District decoration integrated development project
Progress stage: construction design
Construction period: 2011 October - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project in Inner Mongolia Chifeng Yuanbaoshan area, a comprehensive development, with a total area of
about 1,734,200 square meters, including: commercial complex building, high-end residential buildings,
villas, hotels, facilities.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment of 13 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Code:*******
Contact:*******
Progress stage: engineering design
Construction period: 2012 January - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Hohhot Saihan District Bayantala Road, west of the construction of a residential
development with a total construction area of 256,300 square meters, including: the number of blocks 21storey residential buildings, facilities, parking.
The total investment of 250 million yuan.
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Project Name: Henan information management school teaching laboratory building and auxiliary building
project
Progress stage: construction design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Zhengzhou City, Zhongmu future industrial park vocational Park Road East, Long
Yang Xi Luxi, Hope Road south, north road of peace and prosperity, building area 8500 square meters.
The total investment 18.8 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Featuring: Southern Building Design Co., Ltd. Zhengzhou
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Golden Bridge Middle School construction project in Hohhot, Inner Mongolia
Stages of progress: preliminary design
Construction period: 2012 January - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Jinqiao Economic Development Zone, Hohhot, Inner Mongolia, Riverside Road
between 11 Road and Century, an educational development, with a total construction area of 67,572 square
meters, including: library, administration building, two laboratory building, integrated building, dormitory,
canteen, rain playground, bleachers, guard room.
The total investment of 100 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Heilongjiang CIQ integrated laboratory building construction projects
Progress stage: construction preparation
Construction period: 2011 September - September 2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Technological innovation projects in the city of Harbin, Heilongjiang Innovation Park Road 21 south of
the starting area planning, planning road 10 west, a comprehensive development, with a total construction
area of about 50,000 square meters, including: a comprehensive 23-storey laboratory building, with a single
basement, a 10-storey annexe, with a single basement, a four-storey podium, with a single basement.
The total investment 200 million yuan.
Construction unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Design unit: Harbin Institute of Technology Institute of Architectural Design
Postal Address:*******
Postal Address:*******
Tel:*******
Design unit: Harbin Institute of Technology Institute of Architectural Design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Postal Address:*******
Tel:*******
Project Name: Tempo Liangmao Ltd 50,000 t storage facility construction project
Progress stage: construction preparation
Construction period: 2011 September - September 2012
Major equipment: electronic measuring, circulation fumigation system, grain suction machine, a storage
unit, bulk grain unlucky car, green, fire and other facilities. (Reference)
Project:
Project is located in Jilin Siping Yitong Manchu Autonomous County Itami Town Village, a single highintegrated development, with a total construction area of 12,120 square meters, including: two flat
warehouse, offices, laboratories, inspection jin room.
The total investment of 20 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Progress stage: engineering design
Construction period: 2011 - 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Shandong Jining Jinxiang, set bed 1600, covers an area of 133,400 square meters,
total construction area of 150,000 square meters.
The total investment 200 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Anhui Gujing sheet set near 2000 meters south of the village administration.
The total investment 1.9 billion.
Construction Unit:*******
Postal Code:*******
Contact System : Yu Yongbo
Tel:*******
Design Unit: Hefei Design Institute of Coal Industry
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Langfang Branch through the Garden District 6 #, 8 # -13 # floor and underground garage
project
Progress stage: construction started in
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 - 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located south of the light minthi Road, Xin language Xingyuan district east wall, 6 # F 24 layer
12065.03 square meters, 8 # 18-storey 5735.42 square meters, 18 floors 5735.42 9 # Building, 10 #
Building 18-storey 9474.06 ㎡ , 11 # Building 18-storey 9474.06 square meters, 12 # Building 18-storey
23786.97 square meters, 13 # F, 6-layer 1075.98 ㎡, Total: 67346.94 square meters; the basement area of
4474.04 square meters; underground garage area of 18,073.76 square meters. Main elements: civil, fire,
water, windows and doors, rough decoration.
The total investment 275.85 million yuan.
Construction units:*******
Contact:*******
Tel:*******
Fax:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Wen County School Safety Engineering 2011
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Wen County project is located within a Lot: clouds 3131.36 ㎡ town middle school, high school clouds
Town Building 762 square meters, clouds Town Middle School Reading Room 810 square meters. Two
tenders: Lin Zhao School student accommodation building 1384.56 m, restaurant 700 m forest called
school. Three tenders: Cold School North Building 1981 square meters. Four tenders: Takenori Town
Primary School Building 1380 square meters.
The total investment 10 million yuan.
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Zhengzhou City, the school expansion project tax
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Zhengzhou City Jindailunan, Gang Road North, Village Road, is still something,
with a total land area of 67,540 square meters (about 101.3 acres), of which urban road area of 17,540
square meters (about 26.3 acres), construction land area of 50,000 square meters ( combined 75 acres), with
a total construction area of 53,810 square meters.
The total investment of 129.3 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Hunan Ningxiang Jinzhou District resettlement area construction projects
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the territory of Hunan Ningxiang Jinzhou District, the proposed construction of
resettlement housing 11, with a total construction area of 50285 square meters; first tenders (Xing
resettlement area with 8 #, 9 #, 10 # Building): floor area of about 14,464 square meters, eight buildings
covering about 5152 # m, 9 # Building construction area of about 4147 square meters, 10 buildings
covering about 5165 # m; the second section (Ziyun resettlement areas A, B Building): floor area of about
13,056 square meters, of which A building is an area of about 6956 square meters, B Building construction
area of about 6100 square meters; third tenders (national resettlement area F3 Building): floor area of
approximately 4960 square meters; fourth tenders (Longqiao resettlement area 10 #, 11 # Building) :
construction area is about 7045 square meters; fifth tenders (Longqiao resettlement area 12 #, 13 #, 14 #
Building): floor area of about 10,760 square meters, of which 12 # Building construction area of about
6885 square meters, 13 #, 14 # buildings area of about 3875 square meters.
The total investment is not detailed.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Langfang Development Zone, the first primary school dormitory, classroom building project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Langfang Economic and Technological Development Zone, construction, fire, water,
windows, thick decoration, frame structure, with a total construction area of 15401.42 square meters.
The total investment 29.15 million yuan.
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Nantong Tongzhou District Nanyuan orchard land resettlement project
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Nantong, Jiangsu Tongzhou Development Zone, Xuanwu Lake Road, south of the
Yangtze River Road, west side, Tong Lu highway north, with a total land area of 61,289 square meters,
total construction area of 136,339 square meters. A total of nine residential high-rise residential planning (1
+5 +1 form), high-rise 9 (1 + 10 + 1 form), total construction area of 116,654 square meters floor area ratio,
basement 2200 square meters, underground garage, 3884 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Hangzhou Xiaoshan Cultural and Creative Industry Center (tentative name) Project
Progress stage: the record
Construction period: 2012-8 to 2014-6
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Project is located in the north dry streets, 14.84 acres of land for the project, with a total construction
area of 101,772 square meters, including: commercial, office (cultural and creative) space 84,127 square
meters, the property management space 260 m2, ground floor area of 17,385 square meters.
The total investment 900 million yuan, of which Fixed asset investment: 900 million yuan (civil 50000;
construction of other costs 40000;).
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Code:*******
Contact Person: Wang Rong its
Tel:*******
Project Name: Pingyao County, south of the town of Fort Ancient Pottery village south of New
Commission (village housing area) 7 # residential building projects
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Tuen Pingyao South Outer Ring Road West, South Fen, brick, six-floor, basement,
height 18.3 meters; project size: 9599.65 m2.
The total investment 10 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Project Name: River Xining family planning services are county building project
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Projects are located in Xining River Road Bridge east of Dengfeng County, building area of 12,052
square meters, a total of nine, 31.5 meters high.
The total investment of 20 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Construction period: 2011 - 2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: pipes, valves, automation control systems, instrumentation, boilers, instrumentation,
coolers, chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels (for reference)
Project:
Project area is located within the Shanxi Jinzhong Yuci Sleeve Town, the total heating load 622Mw,
heating area of 10.6 million m2. Heating range is east of Riverside Road, South Street south of the inner
ring, Sports Road and west of Central Street, north of South Africa, with three hot water pipe network
system.
The total investment 1,013,630,000 yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Design:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hubei Provincial People's Hospital of cardiovascular Building Project
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Zhang Wuchang District, Wuhan City Road and Fuxing Road Interchange, the total
land area of 5732.9 m2, total construction area of 47725.5m2, including ground floor area of 5600 m2,
designed beds 600.
The total investment of 500 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Design:*******
Tel:*******
Project Name: Siping Municipal Public Security Bureau Branch of business technology space projects
Tiedong
Stages of progress: preliminary design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 November - November 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Siping Tiedong Cultural Square northwest side of the South and by Street and south
Wei Road Interchange, the construction of a 11-storey office building, with a single high basement, with a
total construction area of 7,729 square meters.
The total investment 10 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact System : Yu Founder
Tel:*******
Project Name: Nantong Qidong City, new construction Port Office
Progress stage: construction preparation
Construction period: 2011 November - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Nantong, Jiangsu Qidong City in the construction of several office buildings with a
total construction area of 46,170 square meters, including: border check points Mudanjiang Road building,
construction area of about 9,451 square meters, Yin Yang duty Squadron Building, construction area of
about 3,500 square meters, Mudanjiang Road, Maritime Building, construction area of about 8,000 square
meters, the people of West Customs reform and ancillary buildings, construction area of about 8,000 square
meters, Folk Village Road Exit Inspection and Quarantine subsidiary of peace building with a construction
area of 6,568 square meters .
The total investment of 60 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Stages of progress: preliminary design
Construction period: 2012 May - April 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Yancheng, Jiangsu, Henan small new, Circle East, a comprehensive development
area of approximately 226,400 square meters, including: office buildings, apartment personnel, scientific
research centers.
The total investment of 400 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Project Name: Beijing International Yanxi will have (the core of the island) project
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Project is located in Huairou District of Beijing Yanqi West peninsula. The total planned area of 651,800
m2, construction area of 636,400 m2; construction area of 160852.25 m2 (which contains underground area:
53859.2 m2). The main construction contents include conference center, boutique hotel, vip clubs and other
ancillary services required space, equipment and security space, sports and leisure and entertainment
facilities and parking facilities. After the operation of the project surrounded by water, north, east, south of
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
the original Yanxi water, the west side of the new excavation of river-oriented projects, the ancient capital
of the river west of Dream Park.
The total investment 3,136,460,000 yuan, of which 29.53 million investment in environmental protection.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Code:*******
Contact System People: He Rong Hui
Tel:*******
Project Name: TISCO plant heating pipe heating station project
Advanced stage: being approved
Construction period: 2011 - 2012
Major equipment: pipes, valves, automation control systems, instrumentation, boilers, instrumentation,
coolers, chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels, heatconducting oil furnace, steel-plastic composite pipe. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
TISCO power plant project is located in Taiyuan, new heating area 4.7 million square meters, including
subnet main project, branch lines; thermal stations and extension.
The total investment of 247 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Advanced stage: being approved
Construction period: 2011 - 2012
Major equipment: pipes, valves, automation control systems, instrumentation, boilers, instrumentation,
coolers, chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels, heatconducting oil furnace, steel-plastic composite pipe. (Reference)
Project:
A power plant project is located in Taiyuan, new heating area of 6.3 million square meters, contains the
subnet master project, branch lines; thermal stations and extension.
The total investment of 477 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Progress stage: the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: October 2011 to October 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Project is located in the river Tunzhen Tanghe County, the project covers an area of 10,000 acres,
divided into high-yield food production and efficient agricultural demonstration zone central demonstration
area. The project includes grain cultivation, livestock farming, organic vegetable cultivation, leisure and
tourism, and pollution control.
The total investment 1,000,000,000 yuan.
Construction Unit:*******
Postal Code:*******
Contact System People: good Cattle
Tel:*******
Project Name: Changchun Auspicious Industrial Park building renovation and new construction
Stages of progress: preliminary design
Construction period: 2011 November - November 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Road project is located in Chengdu, Changchun, Jilin, north east of the inner ring road, an industrial
development, with a total area of 199,191 square meters, total construction area of 292,257 square meters,
including: workshop, office, staff quarters, ancillary buildings.
The total investment 300 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Contact:*******
Progress stage: construction preparation
Construction period: 2011 September - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shenyang Sujiatun District White Pine Road 66, construction of a complex building
with a total construction area of 19,800 square meters, including: the Hall of Justice, Office.
The total investment of 25 million.
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal address:*******
Postal Code:*******
Contact System By: Hao Guoqiang
Tel:*******
Design units: the construction of good faith (Shenyang) Engineering Co., Ltd.
Postal Address:*******
Tel:*******
Project Name: Xin Yue Panjin City Residential Project
Progress stage: engineering design
Construction period: 2012 January - March 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Panjin Xinglongtai District, Hing Oil Street to the south west of Shuangxing Road,
west side near Paradise Road, near the south side of Park Street, north side of the strip adjacent to the park,
a residential development with underground parking garage and the basement and air defense, to provide
612 parking spaces, covering about 38,490 square meters, total construction area of approximately 135,130
square meters, including: residential buildings, commercial buildings.
The total investment of 1.5 billion.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Dalian Quality and Technical Supervision and Inspection Center Project
Progress stage: engineering design
Construction period: 2011-10 - October 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project area is located in Dalian, Liaoning Lushunkou Shuishiying street thirty-eight Village, the
construction of an eight-story office building, with a single layer of basement, total floor area of
approximately 10,215 square meters.
The total investment of 40 million.
Construction unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Dalian Ling inlets Seven Sages Road east of the original carton factory land reform projects
Progress stage: construction design
Construction period: 2011 September - September 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located south of Dalian Port Arthur Road, Seven Sages Road east, a comprehensive
development, with a total area of approximately 20,000 square meters, total construction area of
approximately 119,000 square meters, including: the number of layers 32 to 44 storey buildings residential
buildings, commercial buildings with local, with three in the basement, a four-storey clubhouse, with a
single layer of the basement.
The total investment 200 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Design unit: Dalian Institute of Architectural Design Co., Ltd.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Progress stage: engineering design
Construction period: 2011 10 1 May - 10 November 2011
Major equipment: pipes, valves, automation control systems, instrumentation, boilers, instrumentation,
coolers, chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels, heatconducting oil furnace, steel-plastic composite pipe. (Reference)
Project:
Daning County project is located in the ancient town, South Bay, the new boiler room 468 square meters,
the new 20T boiler, the laying of pipe network 600m, two new heat exchange station.
The total investment of 80 million yuan.
Construction units:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Hebei Langfang Guan Patio Project
Progress stage: engineering design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2012 January - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Langfang, Hebei Guan, a residential development area of approximately 22,969
square meters, total construction area of approximately 61,080 square meters, including: six residential
buildings, public housing construction.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Development Zone, Kunshan, Suzhou Street, a project
Progress stage: engineering design
Construction period: 2011 December - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Kunshan Economic and Technological Development Zone, Suzhou, Jiangsu Road,
south of progress, the summer driving east of the river, a comprehensive development, covers an area of
119,978 square meters, total construction area of 417,136 square meters.
The total investment of 1.5 billion.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Beijing International Plaza Nordisk
Stages of progress: environmental impact assessment
Construction period: 2011 - 2013
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Project is located in Fengtai District, Hua Xiang Courtyard Village 1516-16, 1516-18 land, commercial
and financial sites. Land east of the International Automobile Exhibition Center Road, south side of the
road for five laps, the International Automotive Expo Center west of West, north to south road at the
village stems. The total area of 54475.476m2, of which construction area is 27616.966m2, collected land
26858.51m2, including: land area roads collected 13644.001m2, levied by the green area of 13214.509m2,
the ground floor area 152019.4m2, In addition, according to the The project design information as well as
ground floor area of 70521m2, total construction area of the ground and underground 222540.40m2. The
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
project water supply, water, sewage, water, gas, electricity and other facilities for access by the municipal
status quo solution.
The total investment 2,193,400,000 yuan, of which 22 million yuan investment in environmental
protection.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Chongqing Huxi motor plant construction project
Progress stage: construction preparation
Construction period: 2011 September - May 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Bishan County of Chongqing Industrial Park, Hexi Area, an industrial development,
with a total construction area of 29,000 square meters, including: a three-story research building, a singlestorey townhouses with high plant, plant up to 18 meters.
The total investment of 35 million yuan.
Construction:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction unit:*******
Postal Code:*******
Contact System People: Yucheng Li
Tel:*******
Project Name: Beijing's Tongzhou District Luhe Hospital Outpatient Building Construction
Progress stage: the construction preparation (EIA at the same time)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 October - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Tongzhou District, Beijing, No. 82 Xinhua Road, demolition of existing buildings,
in-situ regional comprehensive building a new clinic, on the ground 10 floors, 3 basements, the design
capacity of 7,000 people admissions / d, 198 new beds . After the completion of new buildings existing
outpatient building, medical building and other buildings will be demolished, outpatient reception daily
accommodation capacity than the original 5500 people, to increase 1500 times / d.
The total investment 586,526,000 yuan, of which 730,000 yuan investment in environmental protection.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design unit: Environmental Protection Technology Co., Ltd. Beijing Shenzhou Rui Lin (EIA agencies)
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Katie Triumph Dayi County, Chengdu City Construction Projects
Progress stage: engineering design
Construction period: 2012 January - February 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Dayi County, Chengdu, Sichuan, Inner Mongolia Jin of the original town Road, a
residential development area of approximately 26,761 square meters, total construction area of
approximately 131,770 square meters, including: residential buildings, commercial buildings.
The total investment is not detailed.
Construction units:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: China Operations Center, the Cyberport project Hercynian
Progress stage: construction started in
Construction period: 2011 July - July 2014
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Jimei District, Xiamen, Fujian, a comprehensive development, with a total
construction area of 470,000 square meters, including: financial disaster recovery center, computer center,
software development, laboratory, office building.
The total investment is 10 million.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Hunan Xiangtan County West Lake Project
Stages of progress: preliminary design
Construction period: 2011 December - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Sand Ridge project is located west of Xiangtan, Hunan, north long urban fisheries, west of Xiangtan City
Computer School, east of State Road 107, a comprehensive development, with a total area of 70,545 square
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
meters, total construction area of 183,788 square meters, including residential, commercial, kindergarten,
parking lot.
The total investment of 300 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Sichuan Pi fraternity vocational school expansion project
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Sichuan Province Pi Andhra town, expanding the total construction area of 18,820
square meters campus, including: the classroom 6960 square meters, 600 square meters office teacher,
student housing 9760 m, 1500 m canteen; new school construction area of 14,540 square meters total,
including: Stadium 1500 m, 1660 m library and lecture hall, science building 11380 square meters real one.
Plastic playground 9382 square meters.
The total investment 105.62 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction units:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Progress stage: the record
Construction period: September 2011-May 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Project is located in Zhengzhou City, Huiji Kaiyuan Road, Garden Road intersection with Henan Auto
Trade Center 2, the project upgraded an area of 3496 square meters, the transformation reads: 1200 square
meters showroom sales, auto repair center 1396 m, supermarket 400 m Aftermarket customer lounge 140 m,
120 m repair reception room, 240 square meters and maintenance of general office, office equipment
purchase and installation. After completion of the project put into operation, is expected to add annual sales
income of 80.4 million yuan, profits of 1.496 million yuan, the market prospect is broad.
The total investment of 30 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction units:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Nantong Tongzhou District Jinxia Dong District Court placed the project price of
commercial housing land
Progress stage: engineering design
Construction period: 2011 - 201 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Tongzhou Development Zone, Nantong, Jiangsu, Henan Road, south of the salt, the
Lancang River Road, west side, north side of the Galaxy Road, east of the Xiangjiang River Road, with a
total land area of 114,890 square meters, total construction area of 206,992 square meters. The basement of
3003 square meters, underground garage 11,189 square meters.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Design unit: four Nantong Construction Group Architectural Design Co., Ltd.
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Sanming City Meliet District Integrated Services Centre project with disabilities
Progress stage: engineering design
Construction period: 2011 November - November 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project area is located in Fujian Sanming Ming Mei column greenstone Village, a comprehensive
development, with a total construction area of 22,690 square meters, including: rehabilitation centers,
nursing homes care of persons with disabilities, people with disabilities work center.
The total investment of 30 million.
Construction Unit:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Project Name: Tianjin, China Aviation Oil southern base storage depot project a
Progress stage: construction preparation
Construction period: 2011 - 2013
Major equipment: target flowmeters, valves, pump, valve, pipe network, traffic transmission, pump, pump
in addition to coke, oil coke pump, mass flow meter, level indicator, fire facilities, stackers, cranes, tractor
tire hanging, container, crane, pressure vessel, spherical tank, remote control and data acquisition systems,
oil and gas recovery. (Reference)
Project:
Project is located in Tianjin Port of Tianjin Tanggu port area south of the southern border, with a total
construction area of 5080 square meters.
The total investment 788.66 million yuan.
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Designer:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Zhejiang Huangyan District Maternity and Child Care Project
Progress stage: engineering design
Construction period: 2012 March - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Huangyan District, Taizhou, Zhejiang, two ring road south, the north side of the
trunk, a medical development, covering about 8,250 square meters, total construction area of approximately
36,383 square meters, including: A & F, Ward Building, assisted with room.
The total investment of 70 million.
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Zhaoyang Industrial Park project is located in mechanical and electrical industrial base.
The total investment 150 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Hangzhou Xiaoshan District Hospital Orthopedics Ward Building Expansion Project
Stages of progress: preliminary design
Construction period: 2012 January - February 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Xiaoshan District, Hangzhou, Zhejiang Jinxiu 79 Dai village, construction of a ward
building, with 400 beds, with a total floor area of approximately 28,000 square meters.
The total investment 65 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal address:*******
Postal Code:*******
Contact Person: Xie for production (architect)
Tel:*******
Project Name: Tianjin Jing Hua spring community projects
Progress stage: engineering design
Construction period: 2011-10 - July 2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the Yu Wei Road Tianjin Jinghai County, south, west spring Xi Road, a residential
development, with underground garage and basement area of approximately 71,667 square meters, total
construction area of 155,650 square meters, including: the number of blocks of three to 28-storey
residential building, including: villas, houses, public buildings floor, supporting the construction of
supporting public facilities.
The total investment 120 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Design Unit: Tianjin Huaxia Construction Design Co., Ltd. (Head Office)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Project Name: Tianjin port economic zone grain logistics integrated services building construction projects
Stages of progress: preliminary design
Construction period: 2011 December - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Tanggu District, Tianjin Port Economic Zone, the construction of a complex
building with a total construction area of 9,000 square meters. Pit depth: 3 m, maximum span: 7.5 meters.
The total investment of 50 million yuan.
Construction Unit:*******
Postal Code:*******
Contact System By: Chun Kou
Tel:*******
Project Name: Dongli District, Tianjin Armed Police College's new campus project
Progress stage: engineering design
Construction period: 2012 January - July 2014
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Dongli District, Tianjin Dongli Lake Avenue, west side, a development of education,
with a total floor area of approximately 204,568 square meters.
The total investment of 400 million yuan.
Construction units:*******
Postal address:*******
Postal Code:*******
Contact System People: Indian Spring Summer
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Civil Affairs Bureau Pi Pi funeral service station renovation project to move
Progress stage: engineering design
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Pi Pi barrel projects in the Sichuan town, funeral services, complex construction, the unnatural deaths
and track the storage buildings, storing the ashes of the building, bid farewell to the remains of temporary
storage room, parking lot, with a total construction area of about 1.35 million square meters.
The total investment is not detailed.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Design units: Sichuan Ya Feng Co., Ltd. construction survey and design
Postal address:*******
Postal Code:*******
Contact:*******
Progress stage: engineering design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 November - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Qingpu District, Shanghai New Fuchu Road east, west new Phoenix Road, south
China in agriculture, a comprehensive development, with a total area of 227,849 square meters, total
construction area of approximately 300,000 square meters, including: the number of blocks of 11 floors up
to 18-storey residential buildings, commercial buildings, single-high underground parking garage.
The total investment 500 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Community Chuansha town south of the land supporting junior C01-19 project
Progress stage: construction preparation
Construction period: 2011 October - November 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shanghai Pudong Chuansha new community C01-19 south of town land, the
construction of a five-storey teaching building and a comprehensive two-storey building, total construction
area of 18,136 square meters.
The total investment 54 million yuan.
Construction:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Construction:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Jiangxi Vocational College of Applied Technology 1 # -10 # faculty transitional housing
project
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Zone gold project is located in Ganzhou campus, a faculty Lot # 1 # -5 transitional housing: construction
area of about 20,000 square meters; two tenders 6 # -10 # faculty Transitional Housing: building area of
about 22,000 m2.
The total investment of 40 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Shanghai Fengxian District, a large residential community base 29A-01A block south bridge
construction projects
Progress stage: engineering design
Construction period: 2012 February - October 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Fengxian District, Shanghai Light Gongming S. Highway east to plan, six-way
exchange program south, west planning Golden Road, North Rd to the planning Department, and the
construction of several multi-storey high-rise residential buildings, covers an area of 63,510 square meters,
The total construction area of 127,000 square meters.
The total investment 280 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Shanghai three forest base A4-6 block New Project
Progress stage: Design
Construction period: 2012 March - February 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shanghai Pudong New Area, east A4-7 block, all the way south to plan X, A4-5
blocks west, north to Lu Road, construction of a five-storey secondary school with 48 classes, with a total
construction area of 28,584 square meters.
The total investment of 80 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Stages of progress: preliminary design
Construction period: 2012 January - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shanghai's Jiading District of Shanghai Xu Bank town, east Kai Sau Road, south to
the tree Pingtung Road, west of Kai Yuen Road, north to the new way, a residential development, with two
single-layer high-underground parking garage, providing about 3,645 parking spaces, covering about
88,688 square meters, total construction area of approximately 203,206 square meters, including: 18 to 18storey 14-storey residential building, community support services-storey buildings.
The total investment of 250 million yuan.
Construction:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Project Name: Jilin Forestry 2011 shantytowns
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Forestry Project is located in Riverside, Lushuihe Forestry, Songjianghe Forestry, baishishan Forestry,
Sanchazi Forestry, Stephen Yang Forestry, Forestry Redstone, Dunhua Forestry, Forestry large stones,
eight sub-forestry Bureau, Daxing ditch Forestry, Wangqing Forestry, White River Forest, Forest on the
camp by the Bureau, total construction area of 598,750 square meters.
The total investment is not detailed, investment funding sources for the central, provincial facilities,
businesses and workers self-financing.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax:*******
Design Unit: Jilin Institute of Forestry Survey and Design
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Sheet Co., Ltd. Taicang Sea smoke tobacco raw materials and finished products warehouse
project
Stages of progress: preliminary design
Construction period: 2012 April - August 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Suzhou, Jiangsu Taicang Port Development Zone East Road No. 19, the
construction of two single-layer high warehouse with a total construction area of about 49,100 square
meters.
The total investment 120 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Postal Address:*******
Tel:*******
Project Name: Nagqu Nagqu County People's Court trial of the construction business premises
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Nagqu Nagqu County, construction area of 6987.62 square meters, floor area of
1446.15 square meters, the frame structure.
The total investment 10 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Design:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Tianjin coatings R & D and Engineering Center program
Progress stage: engineering design
Construction period: 2011 December - May 2013
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Tanggu District, Tianjin Economic and Technological Development Zone West, with a
total floor area of approximately 42,000 square meters, including: a single-high plant, a single high
warehouse, a five-story research building, a few blocks two-storey public buildings.
The total investment of 80 million.
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Digital Technology Park project in Wuhan
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located east of East Lake Development Zone Optical Valley Road, south of the loop. Project
covers an area of 63414.8 square meters, construction area of 125,731.54 square meters, main construction
contents include: 16-storey headquarters office building 1; 12-story office building three; 4 quarters a
supporting layer; 4 layers of 23 R & D workshop Building (IT software development).
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is unknown.
Construction units:*******
Postal Address:*******
Tel:*******
Design unit: Wuhan Academy of Environmental Sciences (EIA agencies)
Postal Address:*******
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Zigong City, east of Bauhinia Street, South Lake Eastern resettlement housing to the
south west of the highway within the appropriate land, the planned total land area 47080.63m2, total
building area of 153577m2 (including the ground floor space included in the volume rate of about
103577m2, underground construction area of 50000m2), the total volume was 2.2, basal area of 9410m2,
building density of 20%, 42% green space project.
The total investment 450 million yuan.
Construction units:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Design unit: State Environmental Protection Administration, Nanjing Institute of Environmental Sciences
(EIA agencies)
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: People's Hospital Emergency Department Medical Technology Building Project
Stages of progress: preliminary design
Construction period: 2012 August - September 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Ziyang City, Jianyang Hospital Road, emergency medical technicians to build a
clinic building, total construction area of 58,000 square meters.
The total investment 232 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Chengdu, Meishan warehouse center disaster preparedness and response, emergency rescue
aid the Red Cross center in Sichuan Meishan base project
Progress stage: engineering design
Construction period: 2011 November - November 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Chengdu, Sichuan Meishan City Economic Development Zone, New District, a
comprehensive development, with a total construction area of 25,580 square meters, including: warehouse /
office building, medical building.
The total investment of 100 million yuan.
Construction units:*******
Postal address:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Yutang, five-star Marriott hotel and conference resort complex project
Progress stage: engineering design
Construction period: 2011 November - November 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Chengdu, Sichuan town of Dujiangyan City, Yutang three villages, a comprehensive
development, with a total area of 204,144 square meters, total construction area of 129,105 square meters.
The total investment of 300 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact System By: Dong Yibo
Tel:*******
Construction units:*******
Postal Code:*******
Contact System : Lin Cong
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Designer:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Fujian Tiancheng Riverside Project
Progress stage: engineering design
Construction period: 2011 September - November 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Riverside County, Sanming, Fujian Road, west of the music, House Road east of the
north side of Ring Road, a residential development, an area of 43,386 square meters, total construction area
of 125,308 square meters, including: ten 11-storey residential buildings, conference centers, shops along
the street, community service space, property management space.
The total investment is not detailed.
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Project Name: Fuzhou Kui Qi residential construction projects
Stages of progress: preliminary design
Construction period: 2012 March - October 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project area is located in Fuzhou, Fujian Kui Qi Village, a residential development, an area of 58,204
square meters, total construction area of 153,016 square meters, including: residential building, the
basement.
The total investment 310 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction started in
Construction period: 2011 August - November 2011
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Road project workers and peasants in the Economic Development Zone No. 75, with a total construction
area: 16158 ㎡.
The total investment is not detailed.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact System By: Qi Qingjun
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project name: Bay Village, Sanya City, Begonia style town project
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Sanya City, Hainan, the land area of 4,369,001 square meters, total construction area
of 272,800 square meters, total units 2270 units, layers 3-5 layers.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Design:*******
Postal Address:*******
Tel:*******
Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Fujian Quanzhou work boat show coated base project
Progress stage: engineering design
Construction period: 2011 December - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Quanzhou, Fujian Province west of a major thoroughfare along the coast, a
comprehensive development, covers an area of 19,980 square meters, construction area of work boats base
of 35,000 square meters, including: office buildings, training exercises building, apartment building.
The total investment 110 million yuan.
Owner:*******
Postal Address:*******
Tel:*******
Project Name: Changchun FAW General Hospital, New Medical Building Project EPC Contract
Progress stage: construction started in
Construction period: 2011 - 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Jincheng Street project is located south east of the East Jin Road, Zhenxing Road, west, east, north street,
medical building construction area of 132,100 square meters total.
The total investment 1,223,173,300 yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Zhejiang Ningbo Baoqing Temple # -2 1 block north of resettlement housing project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Yunfei Road project is located south, west Baoqing Road, east, north of the river farm Zhang, Ⅰ tenders:
The total construction area of 132,694.91 square meters (of which 31,804 square meters underground), Ⅱ
tenders: The total construction area of 83121.3 square meters (including underground 14652.76 square
meters).
The total investment 569,600,000 yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax:*******
Project name: Bohai Huadian City, One house 15 #, 19 #, 7 # residential building projects
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Huadian City project is located south of Bohai Street, Jincheng Road, west side, a Lot: Huadian City,
One house Bohai 15 #, 19 #, residential buildings, floor area: 5239.56 square meters, two tenders: Huadian
City Bohai Sea One house, No. 7 # residential building, building area: 11290.36 square meters.
The total investment 32.34 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Chongqing Street 34 Sand senior housing (A, B, C Building) project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shapingba original drug depot factory with a total construction area of about
122,433.54 square meters, including those with A, B, C and podium towers, underground garage, frame
structure, -3F/35F.
The total investment 151.77 million yuan, sources of funding for the state-owned investment.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction unit:*******
Postal Code:*******
Contact System : Li Ying-wen
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Chongqing City Commercial Building Project longevity District One
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Peach Park Changshou District, total construction area of 15987.37 square meters,
including building area of 2219.79 square meters basement. Floor area of 13,767.58 square meters thirteen
buildings, building height 52.2m.
The total investment 23.1 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction:*******
Contact System By: Zhi-Liang Huang
Tel:*******
Project Name: Chongqing (Yubei) Taiwan Industrial Park Service Center Projects
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Yuzhong District, Taiwan Industrial Park Service Center and other supporting
facilities.
The total investment 300 million.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Tianjin sky Road 15 Extension Project
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Nankai District, Tianjin Water Park Road and the sky Dao Jiaokou, building area:
4664.05 square meters, including the total ground floor area: 2983.28 square meters, the total ground floor
area: 1680.77 square meters the highest number of layers: three layers.
The total investment 36.52 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Design Unit: Tianjin Institute of Geology Engineering Lecha
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Jilin Women's Residence Hall 1, 2, reinforcement works canteen
Progress stage: construction started in
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Ji Feng Road project is located in Jilin City, with a total construction area of 14,338 square meters. No. 1,
5096 m2 of which apartment, 2 apartments 6800 square meters, canteen 2442 m2.
The total investment 39.51 million yuan, sources of funding for the funding.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Tianjin Jian put the Great Northern Town Ninghe grain storage and processing projects
Progress stage: engineering design
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: electronic measuring, circulation fumigation system, grain suction machine, a storage
unit, bulk grain unlucky cars, grain inspection system, information network management systems, firefighting facilities. (Reference)
Project:
Great Northern Stream project is located in Tianjin put Ninghe town industrial park, the construction
scale of about 61,357 square meters.
The total investment of 320 billion yuan.
Construction Unit:*******
Postal Code:*******
Contact System By: Hao Shi Road
Tel:*******
Featuring: National Food Reserve Wuhan Research Institute
Postal Address:*******
Stages of progress: preliminary design
Construction period: 2011 - 2012
Main equipment: coal machine, cited coal, lifting equipment, axial mine fan, belt conveyors, drilling
equipment, coal machine, screening equipment, crushing equipment, cranes, coal centrifuges, conveyor
belts, jig, pressure filter, flotation beds, filter press, cage, water pumps, fans, automatic control systems,
explosion-proof electrical, elevator, conveyor, ball mill, vibrating screen, crusher, conveyor, water
treatment equipment, heavy medium cyclone, sieve dehydration, coal centrifugal dewatering machine,
flotation machine. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Datong City, Shanxi Zuoyun, scale: 210 tons / year.
The total investment of 90 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Tianjin Eco-city 9A, 9B land residential construction projects
Progress stage: construction preparation
Construction period: 2011 September - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Tianjin eco-city of Hangu District in the new 9A, 9B land, construction of 18 to 23storey 15-storey residential building, with a single high basement, with a total construction area of 200,000
square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment of 300 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Design Unit: Tianjin Institute of Architectural Design - Marina Branch
Postal Address:*******
Postal Address:*******
Postal Address:*******
Postal Address:*******
Postal Address:*******
Tel:*******
Project Name: BYD Auto Co., Shaoguan City, the new industrial development projects
Progress stage: engineering design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 November - May 2013
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Dongguan, Shaoguan, Guangdong (Shaoguan) Industrial Transfer Park Zhenjiang
Area, an industrial development area of 440,000 square meters, including: factories, warehouses.
The total investment 230 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: China Electronics Technology Group Corporation Seventh Research Complex project
Progress stage: verification of project approval
Construction period: 2012 March - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Haizhu District, Guangzhou Road 381, the comprehensive construction of a 10storey building, total construction area of 70,000 square meters, including: the first layer to the sixth floor
of Products Center, seventh floor to the tenth floor for the office.
The total investment 100 million yuan.
Construction:*******
Postal Address:*******
Tel:*******
Construction:*******
Postal Address:*******
Tel:*******
Project Name: Guangdong bit industrial vehicles (Foshan) Co., Ltd. New Project
Progress stage: construction preparation
Construction period: 2011 September - January 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Foshan Nanhai National Demonstration Eco-Industrial Park Industrial Estate Casa
foreign Avenue 9, an industrial development area of 4,805 square meters, construction area of 3,276 square
meters, including: factories, warehouses.
The total investment 24 million yuan.
Construction unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Shanghai Jiading Ju Park District in control, Laboratory Centre Extension Project
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Jiading Ju Park, New Yongxin Road, No. 380, the general public buildings, single
building area of 17,605.9 square meters; underground of underground space for a total construction area of
1499.7 square meters.
The total investment 98.83 million yuan.
Construction:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 September - January 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Guangdong, Shandong area Boailunan side of a 12-storey office building curtain
wall engineering, with a two-storey building of vice, with a total construction area of 14,000 square meters.
The total investment of 12 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design Unit: Zhongshan Xinda Curtain Wall Decoration Engineering Co., Ltd. Kay
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Construction unit:*******
Postal Address:*******
Tel:*******
Project Name: College Ordos project environment
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
High-tech Zone project is located Kangbashi Weisan northbound, one street south latitude, east Sport
Line East, the Road 12 West, with a total land area of 742,282 square meters, the net land area of 585,808
square meters.
The total investment is not detailed.
Owner:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact System People: iron posts
Tel:*******
Design:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Foshan Nanhai District, Guangdong Development Financial Center
Progress stage: construction preparation
Construction period: 2011 September - September 2015
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Nanhai District, Foshan, Guangdong Guicheng 86 blocks, a comprehensive
development area of approximately 105,646 square meters, total construction area of about 340,000 square
meters.
The total investment 700 million yuan.
Construction:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project name: Changsha High-tech Zone Nanling Technology Park Project
Progress stage: engineering design
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
High-tech Zone project is located in Changsha, Hunan Lugu Industry Park, with a total construction area
of about 33,370 square meters, including: R & D center, testing center.
The total investment of 80 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Beijing Railway Industrial Park Project Noble Center
Progress stage: construction started in
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Fengtai District of Beijing Science Park East 1516-10 block, construction of a 11story and three 21-storey commercial office building, three-storey underground garage with a total area of
approximately 42,611 square meters, total construction area approximately 237,620 square meters. Limited
to 80 meters high.
The total investment of 500 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Contact:*******
Tel:*******
Designer:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Progress stage: construction preparation
Construction period: 2011 September - December 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Tongzhou District of Beijing Drainage G130 sub-plots with a total construction area
of 203,956 square meters, including: factories, office buildings.
The total investment 250 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Beijing XII underground space and ancillary space project
Progress stage: construction preparation
Construction period: 2011-10 - August 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in southwestern Fengtai District, Beijing, No. 93 Fourth Ring Road, construction of a
two-story underground space, with a total floor area of approximately 18,027 square meters, including:
basketball, badminton, table tennis hall.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment 97.2 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in scenic North Wuhan Jiangxia Liangzihu Tsui area, the planned land area of 1216 mu,
of which 225 acres of land for construction, land transfer of 991 acres (does not change the nature of land
use, including: agricultural land, 920.54 acres, 70.46 acres of wasteland beach ). Total floor area (on the
construction site) 113773m2. Main construction contents include: research office, international academic
exchange center, logistics service area, experimental breeding areas, while the construction of water supply
and drainage, power supply, lighting, natural gas, air, fire and environmental protection and other ancillary
works.
The total investment is unknown.
Construction units:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Design unit: Wuhan Academy of Environmental Sciences (EIA agencies)
Postal address:*******
Postal Code:*******
Contact System People: who Lihong
Tel:*******
Project Name: Green Yangliuqing quiet road drainage works to extend the line
Progress stage: has the record
Construction period: November 2011 - 2012
Major equipment: grill, pumps, pipes, valves, automation control systems, submersible pumps, cranes,
lightning protection grounding, flow meters, transmitters, ozone generator, anti-fishing type grate discharge
machine. (Reference)
Project:
Project is located in Xiqing District Yangliuqing town, north Ze Yang Road, south to the old Jin Jing
Road, total length of 4200 meters. For the sewer and storm sewer projects, sewer length of 4.2 km,
maximum diameter sewer 1200mm, maximum diameter water pipe 2200mm.
The total investment 68.58 million yuan, about 55 million yuan investment in drainage.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Stone Forest project is located southeast of the old city, the block east Ashima Road, south of the river
close to Pakistan, South Gate Street, west, north water Shihfang project (Stone Forest County, one of
transformation of the old deer Fu), the northeast grain Council Area Project (Shilin County of deer Fu
redevelopment project). The total land of approximately 99,959.99 square meters (about 149.87 acres). One
area of 88,021.67 square meters of net land (131.97 acres), collected by an area of 11,938.32 square meters
of urban roads.
The total investment 1.1 billion yuan.
Owner:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Project name: International Hotel Co., Ltd. Zhengzhou Zhongyuan fishing Baishun Paradise Valley (a)
construction project
Progress stage: the record
Construction period: October 2011 to December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Project is located in low-lying communities Erqi District Houzhai Xiang Tung, project an area of about
70 acres, the main construction contents are: the new visitor reception center 10,000 square meters,
renovation of existing tourist service space 15,000 square meters, regional road hardening and green
vegetation, as well as restaurants, fishing, hot springs, harvesting, health and other leisure travel services,
tourist facilities.
The total investment 350 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hubei Enshi City reception base project
Progress stage: construction design
Construction period: 2012 March - May 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Enshi Tujia and Miao Autonomous Prefecture Qifeng Road Ash weir, a
comprehensive development, with a total floor area of approximately 26,000 square meters, including: an
eight-story houses, about offers 100 rooms, a two-storey conference room.
The total investment of 50 million yuan.
Construction units:*******
Postal Code:*******
Contact:*******
Tel:*******
Design units: architectural design company in Enshi Guangsha
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 September - October 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Wuhan Huazhong University of Science and Technology Miaoshan Community
Park, construction of a 10-storey office building, with single-layer high in the basement, with a total floor
area of approximately 30,461 square meters.
The total investment of 70 million.
Construction unit:*******
Postal Address:*******
Tel:*******
Design by: Huazhong University of Science and Technology Institute of Architecture and Urban Planning
and Design - Hanyang Branch
Postal Address:*******
Postal Address:*******
Tel:*******
Project Name: Korla, China Yu Times Square Project
Stages of progress: preliminary design
Construction period: 2012 January - February 2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project Bayingolin Mongol Autonomous Prefecture in Xinjiang Korla City, Grand Cross of the
commercial center, a comprehensive development, with underground parking, supermarkets and equipment,
buildings, covering about 9,959 square meters, total construction area of approximately 132,150 square
meters, including: apartment buildings, five-storey commercial podium, hotel, business apartment, refuge
floors.
The total investment 200 million yuan.
Construction unit:*******
Contact:*******
Tel:*******
Project Name: Ankang City Yellow ditch two limit commercial construction projects
Progress stage: Design
Construction period: 2012 April - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the town of Shaanxi Ankang Hanbin Jianmin Huang Village, Yellow Road north of
the ditch, the construction of several apartment buildings, covers an area of approximately 75,333 square
meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment 200 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: verification of project approval
Construction period: 2012 12 Month - October 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Weinan, Shaanxi Economic Development Zone, the construction of several
buildings plant, with production lines, covering an area of about 667,00 square meters.
The total investment 139 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Spring Pro Qujiang Village, five residential placement slope Code Project
Stages of progress: preliminary design
Construction period: 2012 June - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Xi'an Qu Jiang New District, two areas, the construction of several apartment
buildings with a total floor area of approximately 400,000 square meters.
The total investment 700 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design Unit: Xi'an Institute of Architectural Design
Postal Address:*******
Progress stage: Design
Construction period: 2012 June - February 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Xi'an Chang'an Avenue, east of Meridian, Wei Guo Road, south of the construction
of a hospital and health supervision of the office business space, with a total floor area of approximately
96,990 square meters, including: outpatient building, hospital building, epidemiology unit Floor, Health
Authority office business space.
The total investment 140 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Design:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Stages of progress: preliminary design
Construction period: 2012 May - September 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Xi'an, north basaltic East, West, according to Zhao Wai Road, the construction of
several apartment buildings, covers an area of approximately 27,412 square meters.
The total investment of 60 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Xi'an International Port District dream commune project
Progress stage: engineering design
Construction period: 2011 December - December 2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Xi'an International Port District, Port Road East, Pan Qian Road, south west of Port
Road, a residential development, an area of 28,280 square meters, total construction area of 130,000 square
meters, including: apartment buildings, office buildings, kindergartens, commercial buildings, underground
garage.
The total investment 120 million yuan.
Construction Unit:*******
Postal Code:*******
Contact System By: Hoi An
Tel:*******
Project Name: SHANDONG BOSHAN School Project
Progress stage: engineering design
Construction period: 2011 November - January 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Long Hill Road project is located in Zibo, Shandong, south east west transit road, a comprehensive
development, with a total construction area of 5,500 square meters, including sports, logistics buildings,
playground.
The total investment of 12 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Qingdao Jiaozhou city hospital new construction projects
Progress stage: engineering design
Construction period: 2011 November - April 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Jiaozhou, Qingdao, Shandong Province, Quanzhou City Road and the new
intersection of Beijing Road, a medical development, with a total area of approximately 73,370 square
meters, total construction area of approximately 114,000 square meters.
The total investment 200 million yuan.
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Design unit: Shandong Institute of Architectural Design
Postal Address:*******
Progress stage: construction started in
Construction period: 2011 August - August 2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
What project is located in Inner Mongolia Erdos Kamba New construction of an office building with a
total floor area of approximately 60,000 square meters.
The total investment of 80 million.
Owner:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Code:*******
Contact System : Wang Yafei (architect)
Tel:*******
Designer:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Postal Address:*******
Postal Address:*******
Progress stage: Design
Construction period: 2011 12 Month - April 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project in Inner Mongolia Baotou Rare Earth High-tech Zone, North Riverside Avenue, off New,
Wilhelm Road East, Chunhua Road, South, West Wenchang Road, construction of several apartment
buildings with a total floor area of approximately 220,000 square meters.
The total investment 200 million yuan.
Construction unit:*******
Contact:*******
Tel:*******
Designer:*******
Contact:*******
Progress stage: construction design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 12 Month - October 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Nangang District, Harbin, Heilongjiang Xuefu 51, the construction of a six-storey
commercial building with a total floor area of approximately 55,673 square meters.
The total investment of 70 million.
Construction unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Code:*******
Contact:*******
Progress stage: engineering design
Construction period: 2011 November - May 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Harbin Qunli the construction of a teaching building, total construction area of 9,689
square meters.
The total investment 15 million yuan.
Construction unit:*******
Postal address:*******
Postal Code:*******
Contact System People: song Huaining
Tel:*******
Design unit: Harbin Institute of Technology Institute of Architectural Design
Postal Address:*******
Tel:*******
Project Name: Harbin Qunli the promoter region of 085 construction projects, land
Stages of progress: preliminary design
Construction period: 2012 January - December 2015
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Harbin Daoli District, north of Anyang Road, south of Ming Avenue East, west
Third Ring Road, east of Long Road as, a residential development, with high single underground car park
with 3,300 parking spaces, accounting for land area of about 176,224 square meters, total construction area
of approximately 497,300 square meters.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Prime Harbin Terrace Project
Progress stage: engineering design
Construction period: 2012 January - December 2015
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Harbin, North Pine, planning 144 Road, west of the Third Ring Road north of Road
143 east of planning, planning 159 south road, a residential development, has a basement, offers 1,913
parking spaces, covering an area of about of 202,869 square meters, total construction area of
approximately 537,789 square meters.
The total investment is not detailed.
Construction unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Panshi North Metro District Education Center Project
Progress stage: construction preparation
Construction period: 2011 September - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Main Street revitalization project is located east of Jilin Panshi, South Road, north of aluminum pan, a
two-to four-storey development of education, with a total construction area of 26,522 square meters,
including: school buildings, kindergartens, sports centers.
The total investment of 50 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Baoding fire emergency rescue command center project
Progress stage: construction preparation
Construction period: 2011 September - October 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Baoding Lucky North Second Ring Road and the southeast intersection of North
Main Street 300 meters, the construction of a nine-storey office building, with a single high basement, with
a total construction area of 15,712 square meters.
The total investment of 30 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Progress stage: construction preparation
Construction period: 2011 September - November 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
A product of the project is located in Jiangsu Huai Mei Road 32, construction of a two-storey factory
building with a total floor area of approximately 11,000 square meters.
The total investment 27 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Design by: Wuzhou Engineering Design and Research Institute
Postal address:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Postal address:*******
Postal Code:*******
Contact:*******
Postal address:*******
Postal Code:*******
Contact:*******
Postal address:*******
Postal Code:*******
Contact System : Xu Jin (Structural Engineer)
Tel:*******
Fax:*******
Design by: Wuzhou Engineering Design and Research Institute
Postal address:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal address:*******
Postal Code:*******
Contact System By: Xing Chen (weak Engineer)
Tel:*******
Fax:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Wuxi red beans home XDG-2011-48 residential plot
Stages of progress: preliminary design
Construction period: 2012 June - July 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in East Town, Xishan District, Wuxi, Jiangsu Province Xiangshan Road South, Health
Road East, a residential development, covering about 57,050 square meters, including: residential buildings,
commercial buildings, underground garage.
The total investment 110 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Ego Square residential development
Progress stage: engineering design
Construction period: 2012 May - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in north Jiangsu Zhenjiang Huangshan Road, Huangshan West Road, a residential
development, an area of 6104 square meters, total construction area of 103,000 square meters.
The total investment 200 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Nantong New High School Construction Project
Progress stage: engineering design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2012 April - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located north of Nantong University, Nantong, Jiangsu, south of Century Boulevard, a
development of education, with a total floor area of approximately 75,000 square meters.
The total investment 100 million yuan.
Construction units:*******
Postal Address:*******
Tel:*******
Fax:*******
Design Unit: Planning and Design Institute of Posts and Telecommunications, Jiangsu Province, limited
liability company
Postal Address:*******
Progress stage: engineering design
Construction period: 2012 June - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Nantong, Jiangsu, such as the East Road, south of the Yellow River, north of
Huaihai Road, Taishan Road, west side, construction of a hospital, with a total floor area of approximately
99,800 square meters, including: hospital buildings, outpatient and emergency medical technology building,
comprehensive building and auxiliary space.
The total investment 180 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Design:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Chengdu, the provincial emergency rescue training base construction projects specifically
Stages of progress: preliminary design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 November - November 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Chengdu, Sichuan China county road next to the public shangxingzhen animal
husbandry, construction of five two-to six-storey building, total construction area of 18,350 square meters,
including: office buildings, exhibition halls, teaching laboratory building, canteen.
The total investment of 80 million.
Construction units:*******
Postal Address:*******
Tel:*******
Construction units:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Stages of progress: preliminary design
Construction period: 2011-10 - October 2015
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Project is located in Quanzhou, Fujian Anxi Longmen County, South Wing Park Zone, a comprehensive
development, covers an area of 888,657 square meters, total construction area of 800,000 square meters.
The total investment 1.2 billion yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Progress stage: engineering design
Construction period: 2011 November - November 2013
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Xiamen Tongan Industrial Park, an industrial development, with a total construction
area of 125,000 square meters to 150,000 square meters, including: factories, warehouses.
The total investment 300 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Shanghai Hua Lin Industrial Gases Co., Ltd. Expansion Project
Progress stage: construction design
Construction period: 2011-10 - April 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Jinshan District, Shanghai Chemical Industry Park Lot F3, the construction of a
single-storey high factory covers an area of 2,175 square meters, total construction area of 560 square
meters.
The total investment 270 million yuan.
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Postal Code:*******
Contact System People: License (architect)
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Shanghai Shun Wah Toys Co., Ltd. new plant and villa projects
Progress stage: construction design
Construction period: 2011 December - December 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Minhang District, Shanghai Ji Zhai Road No. 1058, the construction of three fivestorey factory building and two two-storey villa, with a total construction area of 24,668 square meters.
The total investment 64 million yuan.
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: engineering design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2012 March - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shanghai Pudong New Area [original Nanhui District] Jinqiao Export Processing
Zone 16 residents, a seven-storey complex, with two-storey underground parking garage, an area of 46,538
square meters, total construction area of approximately 210,000 square meters.
The total investment 320 million yuan.
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Tel:*******
Project Name: China National Aero-Technology Research Institute Comprehensive Test and Measurement
Center research space construction projects
Progress stage: construction preparation
Construction period: 2011 September - December 2015
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Yanqi project is located in Beijing Economic Development Zone, Huairou District, an industrial
development, with a total construction area of 104,170 square meters.
The total investment 450 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Postal Address:*******
Tel:*******
Fax:*******
Design:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Code:*******
Contact:*******
Stages of progress: preliminary design
Construction period: 2012 July - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in North Tucheng Road, Chaoyang District, Beijing, construction of a 12-storey office
building with a total floor area of approximately 40,000 square meters.
The total investment 200 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Postal Address:*******
Tel:*******
Project Name: Shenzhen International Energy Building Project
Progress stage: construction design
Construction period: 2012 March - March 2014
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Project is located in the central area of Shenzhen in the east axis, Jin Tian Road, Binhai Avenue and
northeast of the junction of the construction of a 47-storey main building and an approximately 23-storey
ancillary office building, with a four-storey basement , covers an area of about 6,427 square meters, total
construction area of approximately 120,000 square meters.
The total investment 300 million yuan.
Construction:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Project is located in Nanhai District, South Street Road Guicheng 18. Project east, south of Guangdong
Pearl River Switch Factory; west of South Road, across South Road as a single shop; north of Hoi Fai Road,
across Fai Road for the clothing factory, a residential, Guicheng traffic police squadron. The total
investment of about 180 million yuan, from a commercial office component, the planned total land area of
4021.3 square meters, total construction area of 28923.54 square meters, 20% green space, ground floor,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
underground garage, basement , 1 layer 3 layers of business, four layers of equipment conversion layer, 5
layers to 19 layers for the office. Supporting motor vehicle parking spaces 140. Supporting public facilities,
including commercial (including catering), underground garage, power distribution room, backup generator
room, pump house, cooling tower.
The total investment 180 million yuan.
Construction Unit:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Chong Hong Huiyuan projects
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Nanhai District, Foshan City, Guicheng street 58 blocks east of South Avenue, sixway north of the sea. The site is divided into A, B two districts in the middle separated by the South China
Sea area rural credit cooperatives. A distance of 10m east of the project area to the East China Sea Garden,
B District, east distance of 15m for the Royal Garden, A area 120m away from the water to hit Hong Yun
still have (under construction); B for the sea area south of the six-way, away from 15m to Lianhua Tower
(under construction), 40m away from the police station for the Guicheng, 110m away from China Mobile;
B area southwest of the South China Sea Road, 110m away from the garden for the North and the base; the
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
South China Sea west road, 60m away from property trading center for the South China Sea area, Lake
Village, South Mountain clinic, Industrial Village; A sea area north of seven road, 20m away from the sea
for the greenery in the garden (under construction). The total investment of about 651.975 million yuan,
from the A area of a 5-storey commercial center and B of 6 (12 small buildings) 26-31 storey high-rise
residential component, the planned total land area of 55,052.8 square meters, total construction area of
260,777 square meters, the total planned area of 16,516 square meters green land, green space was 30.00%,
planned residential households 1345, the number of 4,300 is expected to live. 1536 motor vehicle parking
facilities, including motor vehicle parking spaces 1243 residential, commercial motor vehicle parking
spaces 293. Supporting public facilities, including commercial (including catering), property management,
underground garage, garbage collection points, public toilets, power distribution room, backup generator
room, pump room, multi-line air conditioning.
The total investment 651,975,000 yuan.
Construction units:*******
Contact System By: Wen Yucheng
Tel:*******
Designer:*******
Postal Code:*******
Contact System : Chen Yuan
Tel:*******
Fax:*******
Project Name: Daya Bay, Huizhou City, Guangdong Province Economic and Technological Development
Zone, south of the stove village relocation project Residential Area
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Huizhou, Guangdong Daya Bay Economic and Technological Development Zone
West, covering about 146,430 square meters, total construction area of approximately 441,000 square
meters, including: residential buildings, shops, parking.
The total investment 600 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction units:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Tianjin Ninghe product quality inspection center project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Ninghe located in Tianjin Economic Development Zone project, the construction of three single-storey
office building to 12, with a single high basement, with a total construction area of 10,655 square meters.
The total investment of 30 million.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Fax:*******
Design Unit: Stone Architectural Design Co., Ltd. Tianjin is
Postal Address:*******
Postal Address:*******
Postal Address:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Yuanping Xue isolated towns and villages west of basic farmland consolidation project
Progress stage: pre-feasibility study prepared
Construction period: 2011 - 2013
Main equipment: excavators, bulldozers, cranes, etc. (reference)
Project:
Project is located in Yuanping City West towns and villages, the construction scale of 2056 ha.
The total investment is not detailed, the provincial investment.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Qinghai Salt Lake Industry Group Co., Ltd. magnesium integration project office building
quality inspection center of the main building and civil engineering project scheduling
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Golmud City, Qinghai Salt Lake, office building type of structure: reinforced
concrete frame shear wall structure, the height of fifth floor, height 63.6 meters, construction area:
21147.28 square meters; dispatch inspection center structure type: steel concrete frame structure, fourstorey, height 23.9 meters, building area: 8200 square meters.
The total investment is not detailed.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Jilin Longtan Siniora Street Manchu new primary school buildings the town center project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Jilin City Longtan Siniora Street Culture Street Manchu town, with a total
construction area of 11050.5 square meters, of which: teaching building construction area of 5524.9 square
meters ①, 5 floors, height 19.8 m, the frame structure; teaching building floor area of 5203.6 square meters
② , 5 floors, height 19.8 m, the frame structure; guard ③ construction area of 35 square meters, 1st floor,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
height of 4 meters, brick-concrete structure; ④ pump house building area of 287 square meters, 1st floor,
height of 9 meters, brick mixed structure.
The total investment is not detailed.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Jilin Longtan River teaching building a new secret project peak secondary
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Jilin City Longtan River close-town Yucai Road No. 18, with a total building area of
9172.2 square meters. Of which: teaching building construction area of 3700.6 square meters ①, 2-5
ground level, height 20.5 m, the frame structure; teaching building construction area of 5385.6 square
meters ②, 2-4 ground level, height 15.8 m, the frame structure; guard ③ construction area 38 m2, 1st floor,
height of 4 meters, brick-concrete structure; pump ④ construction area of 480,000 square meters, 1st floor,
height of 3 meters, brick structure.
The total investment is not detailed.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Design Unit: Jilin City Park Institute Co., Ltd.
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Reconstruction Hui County human resources market and social protection counties as units
of service centers and office building projects
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Hui County Street north, with a total construction area: 23,043.8 square meters,
basement, ground and 20 floors frame shear wall structure.
The total investment of 50 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Pass Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Cape Town Pingliang mysterious star 10 #, 15 #, 16 #, 21 #, 22 # residential building
projects
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located south of Willow Lake Road, Crane Road, east of the mysterious, fire brigade north,
with a total construction area of 15551.05 square meters. Divided into five tenders: first residential building
in Lot # 10, Lot 15 # residential second and third tenders residential building # 16, Lot 21 # residential
building fourth, fifth Lot 22 # residential buildings.
The total investment 49.48 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact System By: Kim Chun-yuan
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Guizhou Radio and TV University campus three new projects Jinyang
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Jinyang New Area project is located in Guiyang, Guizhou Province, with a total construction area of
50,546 square meters, of which 27,846 square meters dormitory, canteen facilities and living space 6,700
square meters, the library 13,000 square meters, hall 3000 square meters.
The total investment of 30 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Project Name: Energy saving heating system transformation projects
Progress stage: the record
Construction period: 2011-8 to 2012-8
Major equipment: Film Dust devices, to water distribution installations, chimneys, etc. (for
reference)Project:
Project is located in Wenzhou City of Zhejiang village of Huangshi Pukou plant, heating system, energysaving technological transformation projects, the construction of a boiler room, an area of about 400 square
meters, construction area of about 200 square meters, equipped with two coal-fired boiler steam , were 6
tons and 4 tons of peripherals supporting devices, including water film dust removal device for water
distribution installations, chimneys, etc., in addition to the implementation of several transformation-related
equipment and facilities.
The total investment is unknown.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Guiyang City Longdongbao administrative office building of the airport expansion project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Guiyang, Guizhou Longdongbao International Airport, construction area of about
1.8 million square meters.
The total investment of 90 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction units:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: capacity of 7000 m3 chemical products warehouse project
Progress stage: the record
Construction period: 2011-8 to 2013-8
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Project is located in Quzhou City Kecheng Garden Township village idle wish barren streets, the project
is not a new levy of industrial land, 14.4 acres of land leased enterprises.
The total investment 500 million.
Construction Unit:*******
Postal Code:*******
Contact System By: Qiang Weihong Yan
Tel:*******
Project Name: New City Sports Center on behalf of County Engineering
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in a new city on behalf of the county, total project area of 15 hectares, construction
area of 7323.16 square meters, the stadium area of 14,052 square meters.
The total investment 120 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Jilin Yinglong Buddha Mountain Cultural Park Project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project area is located in White Township Fengman bergamot Yoshimura Hill, ① Museum: Frame
structure, steel roof, a total layer, 2482m2, ② Hall (1): frame structure, steel roof, a total of three, 3428m2,
③ Hall (2): frame structure, steel roof, a total of four , 4364m2, ④ services space: frame structure A total
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
of three, 2641m2, ⑤ landscape bell tower (1): framework Total floor, 53.03m2, ⑥ landscape bell tower
(2): frame structure Total floor, 53.03m2, ⑦ landscape porch: frame structure, steel roof, total floor,
1162m2, ⑧ Building: frame structure A total of four, 3914m2, ⑨ toilet: frame structure, 220 m2.
The total investment 15.99 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact System By: Peng Bo
Tel:*******
Project Name: No. 64 Alexander Road, Jinan City residential development projects
Progress stage: construction design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Jinan City, No. 64 Alexander Road, construction area of the ground floor area:
201.46 million square meters, ground floor area: 09,860 square meters.
The total investment is not detailed.
Construction unit:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Power Supply Company Jinzhong new employee training center project
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Jinzhong power project is located in the North Branch field training base, building area of 17,900 square
meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment 29.53 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Yue Lan Mountain residential community construction project sites
Progress stage: the record
Construction period: 2011-8 to 2013-12
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Seven projects are located in Xinchang Village and Temple streets Hou Village, Yue Lan mountain
mansion estate construction commercial and residential projects with a total land area of 33,442 square
meters, total construction area of 61,867 square meters (not including the basement, carport area of 22,976
square meters) , where commercial buildings 5,000 square meters, 56,867 square meters of residential
space
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment 350 million yuan, of which Investment in fixed assets: 32,000 million
(construction 30000; equipment 300; install 500; other costs of construction 1200;), construction period
interest $ 10 million initial working capital of 20 million.
Construction unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Zhuhai Campus Culture Park Middle School District Project
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Guangdong, Zhuhai District, north of Garden Village, a total of approximately
14,369 square meters floor area (including elevated floor area of 2341 square meters), in which ordinary
classroom building area of about 3350 square meters, specialized area of about 3127 square meters building
classrooms, public classroom building area of about 4131 square meters, office building area of about 1316
square meters of living space service area of about 2083 square meters building, other building area of
approximately 361 square meters.
The total investment 54.85 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction units:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction units:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Tangshan City School Police Road affordable housing project
Progress stage: construction preparation
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Road project is located in Hebei Province auspicious east sides of the road planning, road planning
recruits north, with a total construction area of approximately 42 million square meters of residential floor
area of about 28 million square meters, all of the low-cost housing (50 square meters below), housing
prices (90 sq m), 3300 total units, public buildings and commercial building area of 50,000 square meters,
the underground area of about 90,000 square meters, with parking and storage-based.
The total investment is not detailed.
Construction unit:*******
Postal Address:*******
Tel:*******
Design by: Beijing Orient Huatai architectural engineering Co., Ltd.
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Wen'an often works long Yiyuan 2 #, 5 #, 6 #, 7 # Building Project
Progress stage: construction started in
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
ANALYSIS projects are located in a building area of 19,180 square meters.
The total investment 17 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction units:*******
Postal Address:*******
Tel:*******
Project Name: Wan Yee Tai Town home county home-hole 3 # -10 # Residential Building Project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Wan Town Democratic Strand county home-hole, Dongsheng Road East, building
area of 67896.9 square meters.
The total investment 14.62 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Suzhou City, the construction of Radio and Television Entertainment Suzhou International
City project
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Project is located in Jinshan Road, Suzhou, Mudu Town West, Zhang Jin Bang Hebei. Project covers an
area of 138,028.4 square meters, total construction area of 320,000 square meters designed, namely,
capacity building area of 220,845 square meters.
The total investment 1.5 billion yuan.
Construction:*******
Postal Address:*******
Tel:*******
Design unit: Development and Investment in Environmental Protection Technology Co., Ltd. Sheng (EIA
agencies)
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: District Court two Zhangbei macros Top Bright Commercial Building Project
Progress stage: construction started in
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Zhangbei, construction area of 22341.6 square meters.
The total investment 23.73 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction units:*******
Postal Address:*******
Tel:*******
Project Name: Jiangsu Chengde Run Properties Limited to the Soviet Union No. 2010-B-52 block
commercial complex project
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Project is located in the town of Sioux Road North Mudu Wuzhong District, Shen Lane Road West. The
total area of 55697.2m2, total construction area of 167325m2. Building type for commercial complexes.
The total investment 980 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Design by: Suzhou Institute of Environmental Science (EIA agencies)
Postal Address:*******
Tel:*******
Project Name: Real Estate Development Co., Suzhou River, Su Xu to No. 2009-B-48 land projects
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Suzhou City xukou Town Xin Luxi side, Xujiang north. Project covers an area of
114,508.8 square meters, total construction area of 181,660 square meters designed, namely, capacity
building area of 129,534 square meters.
The total investment 1.1 billion yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design unit: Development and Investment in Environmental Protection Technology Co., Ltd. Sheng (EIA
agencies)
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Town beach Yongnian County Joint School Pro ALFA project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Pro ALFA project is located in Yongnian County Town beach village, the new restaurant project, a layer,
the frame structure, construction area of 321 square meters; new dormitory construction, a layer of brickconcrete structure, construction area of 261 square meters; New sports hall project, a layer, the frame
structure, construction area of 563 square meters; new toilet, guard, gates, fences and playground campus
sclerosis and other ancillary works.
The total investment 2.19 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Yongnian County, South West towns and villages along the inter-school projects Daci
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Yongnian County, towns and villages along the south along the South Village, the
new restaurant project, a layer, the frame structure, construction area of 321 square meters; new dormitory
construction, a layer of brick-concrete structure, construction area of 261 square meters; New sports hall
project, a layer, the frame structure, construction area of 562 square meters; new toilet, guard, gates, fences
and playground campus sclerosis and other ancillary works.
The total investment 2.28 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Sichuan Chengdu Eastern maintenance base construction also
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Sichuan, Chengdu International Airport, the airline built hangar floor, special garage,
cafeteria, duty floor, maintenance ramp and ancillary facilities, with a total construction area of 35,183
square meters.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Jizhou low-rent housing project off Jiayuan
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
New West Project is located south of Hebei, Friendship Avenue, west side, with a total area of 25,000
square meters, a total of 420 sets.
The total investment of 35 million, sources of funding for government investment.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Hebei provincial second phase of apartments for the elderly
Progress stage: construction preparation
Construction period: 2011 - 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shijiazhuang, Hebei Street, North Second Ring Road intersection with the northwest
corner of Thailand, the construction of a 21-storey apartments for the elderly, with a two-storey basement,
with a total construction area of 32,180 square meters, including: elderly living room , kitchen, restaurant,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
function rooms, gym, nursing stations, treatment rooms, staff quarters, underground garage, the engine
room.
The total investment 100 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: detachment of Fuzhou Jinshan border project office and residential areas
Progress stage: engineering design
Construction period: 2011 November - November 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Jinshan Cangshan build a new middle road, with a total construction area of about
42,000 square meters.
The total investment 72 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Weng'an county center next to the old South, with a total construction area of
15788.5 square meters, including stadium construction area of 10343.5 square meters, construction area of
5455 square meters stadium.
The total investment 77,646,600 yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction units:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in the Eastern zone, building area of 2,800 square meters.
The total investment of 25 million, funding sources for the funding.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Fax:*******
Project Name: Shanghai International Automobile City, Hong Kong Science and Technology R & D
projects
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Yokogawa project is located in Anting Town to Hong Kong, south to Ann Rainbow Road, west An
Extension Road, north to road safety research, construction area of 202,609.15 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment of 1.5 billion.
Construction:*******
Postal Code:*******
Contact System : Chen roots
Tel:*******
Fax:*******
Design:*******
Postal Code:*******
Contact:*******
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Taicang City, Jiangsu Shaxi, construction area of 6765 square meters.
The total investment 10 million yuan.
Construction unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Design unit: good architectural design Taicang Branch Company
Postal Address:*******
Tel:*******
Project Name: Shijiazhuang, Hebei, Shijiazhuang City, Town, Pingshan Pingshan Xibaipo level secondary
school construction project
Progress stage: engineering design
Construction period: 2011 - 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shijiazhuang, Hebei Pingshan Town flat, with a total area of about 200,100 square
meters, total construction area of 120,935 square meters, including: teaching building, dormitory, office,
library, cafeteria.
The total investment 150 million yuan.
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Design Unit: Hebei Institute of Architectural Design Co., Ltd.
Postal Address:*******
Progress stage: verification of project approval
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Fuzhou, Fujian 227 Lake Road, the construction of several buildings the library,
with a total construction area of 10,000 square meters, including: Book Centre, reading room, stacks,
offices.
The total investment 31 million yuan.
Construction units:*******
Postal Address:*******
Tel:*******
Fax:*******
Design units: Fujian Institute of Architectural Design
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Fax:*******
Project Name: Chengdu Wuhou Industrial Park Kindergarten Project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Chengdu, Sichuan Wuhou Wu Xing Industrial Park all the way, covering about 6.6
acres, building area of about 4,600 square meters (3 floors for kindergarten, library basement for cars, a
total of 12 classes, frame structure, story the ground is: 3.6m, ground to 3.8m, building height of 12.75m,
the highest point height 17.75m. basement part of the basic use of reinforced concrete column under the
independent Canadian-based water-resistant floor, on the ground part of the basic use of reinforced
concrete columns using an independent basis under the ).
The total investment of 16 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction units:*******
Contact System People: Wencheng You
Electricity Tel:*******
Project Name: Zhongxiang City Public Security Bureau projects the business technology space
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Shicheng Avenue project is located south of the construction area of 20675.83 square meters.
The total investment 29.88 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Wuhan Jiangxia Hidden Dragon School of Engineering
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Long Island project office is located in Jiangxia Li Tibetan Village, Building floor area: 5235 square
meters, the ground floors: 4, primary school buildings, lecture hall floor area: 5352.07 square meters, the
ground floors: 4, canteens, dormitories floor area: 5346.65 square meters, the ground floors: 5, middle
school, administration building floor area: 4023.69 square meters, the ground floors: 3, rain playground
construction area: 1234.75 square meters, the floor layers: 1, kindergarten building area : 3206.46 square
meters, the ground floors: 3, total construction area: 24398.62 square meters.
The total investment 45.05 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Construction units:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Sanmenxia industry cluster BT standard industrial plant construction projects
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Henan, with a total floor area of approximately 26,500 square meters, a Lot: 2
73mx25m four standardized plant and supporting facilities; two tenders: 2 61mx24m four standard
industrial plant and facilities.
The total investment 34.5 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Star City Jinnan District River drainage works infrastructure supporting projects
Advanced stage: being approved
Construction period: November 2011 - 2012
Major equipment: grill, pumps, pipes, valves, automation control systems, submersible pumps, cranes,
lightning protection grounding, flow meters, transmitters, ozone generator, anti-fishing type grate discharge
machine. (Reference)
Project:
Double town project is located in Jinnan District (Hong Nihe east, south to Tianjin Road, west of the
Outer Ring Road, north to Hai) The main construction content and scale: Star City for the Riverside
residential area five storm sewer system, paved roads, water pipes length of 4,500 meters, total length of
4500 meters of sewage pipes. One: Planning Road: water pipe diameter 1200mm-1350mm, length 750
meters, sewer diameter 400mm-500mm, 750 meters long; planning of two: water pipe diameter 600mm1350mm, length 1250 m, diameter sewers 300mm, length 1250 m; planning of three: water pipe diameter
600mm-1100mm, length 1,100 meters, sewage pipe diameter 300mm-400mm, length 1100 m; planning of
four: water pipe diameter 600mm-1200mm, length 800 meters, sewage pipe diameter 300mm, length 800
meters; planning of five: water pipe diameter 1200mm-1350mm, length 600 meters, sewer diameter
300mm, length 600 meters.
The total investment 64,735,800 yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact System By: Wei Zhi Chao
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Hefei New Century Center project
Progress stage: engineering design
Construction period: 2011 December - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in downtown Hefei Economic and Technological Development Zone, Lianhua Road
intersection with the northeast, a comprehensive development, covers an area of 30,762 square meters, total
construction area of 220,000 square meters, including: office buildings, shops.
The total investment of 250 million yuan.
Construction Unit:*******
Postal Code:*******
Contact System People: as manager
Tel:*******
Project Name: Changzhi Vocational and Technical College new campus construction projects
Stages of progress: preliminary design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2012 March - December 2015
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in north Shanxi Changzhi long suburban lines, a two-to six-storey development of
education, partial basement with a single layer, with a total floor area of approximately 210,000 square
meters, including: teaching buildings, student dormitories, cafeteria, administrative offices floor, sports
games, life ancillary buildings, libraries, halls.
The total investment 300 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Changzhi Medical School new campus construction projects
Stages of progress: preliminary design
Construction period: 2012 March - December 2015
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in north Shanxi Changzhi long suburban lines, a two-to six-storey development of
education, partial basement with a single layer, with a total floor area of approximately 120,000 square
meters, including: teaching buildings, student dormitories, cafeteria, administrative offices floor, sports
games, life ancillary buildings.
The total investment 200 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal address:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Focus Southern prison police staff housing relocation project
Progress stage: engineering design
Construction period: 2012 January - November 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Jiaozuo, Henan Central Prison, south side, north side of Black River, Mengzhou
Road east, west road of democracy, 11-story building 29 to 26-storey residential building, with a single
layer of basement, with a total construction area of 428,360 square meters, including: residential buildings,
shops.
The total investment 856 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction unit:*******
Postal Address:*******
Tel:*******
Project Name: Chemical Technology Co., Ltd. Jiangsu Yi Geluo New Project
Progress stage: engineering design
Construction period: 2011 November - November 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Salt Chemical Industrial Park, Jiangsu Huai Ze Area, an industrial development,
including: factories, warehouses.
The total investment of 80 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax:*******
Project Name: Suzhou Wujiang Green Center and Lakeside Park Project
Stages of progress: preliminary design
Construction period: 2012 January - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Wujiang City, Jiangsu Province, Suzhou Lakeside Park, a comprehensive
development area of approximately 466,900 square meters, including: residential buildings, office
buildings.
The total investment 500 million yuan.
Construction:*******
Postal Code:*******
Contact System People: not disclosed
Tel:*******
Fax:*******
Project Name: Nantong Tong Hai Qu County Center Hospital Project
Progress stage: construction design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2012 March - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
County project is located in Nantong, Jiangsu Hai Qu Qu Town water, a medical development, with a
total floor area of approximately 10,900 square meters, including: a three-story outpatient building, a fourstorey ward floor.
The total investment of 20 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design unit: Survey Design Co., Ltd. Nantong
Postal Address:*******
Postal Address:*******
Postal Address:*******
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011-10 - October 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Beibei District, Chongqing, partition A91-1/17 A standard plot, the construction of a
seven-storey office building, with a two-storey basement, with a total construction area of 17,543 square
meters.
The total investment of 35 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Progress stage: construction design
Construction period: 2011 12 Month - October 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Ningbo city center, the construction of 10-20 six-to 11-storey residential building,
total construction area of 125,637 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment 250 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Stages of progress: preliminary design
Construction period: 2012 March - May 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Taizhou, Zhejiang Taizhou Economic Development Zone, west of Avenue, a
comprehensive development area of approximately 26,132 square meters, total construction area of
approximately 17,104 square meters.
The total investment of 25 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Code:*******
Contact System : Wang Yong
Tel:*******
Project Name: Tianjin Eco-city blue-collar apartment block No. 99, a construction project
Progress stage: verification of project approval
Construction period: 2012 April - October 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Tanggu District, Tianjin Eco-City 99 01-03-04 land plot, building a few blocks of
blue and white apartment building with a total construction area of 157,470 square meters.
The total investment 300 million yuan.
Construction Unit:*******
Postal Code:*******
Contact System People: management Qing Friends
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Tianjin Industrial Real Estate New construction projects
Progress stage: engineering design
Construction period: 2011 November - December 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Tianjin Jinnan District gegu town, the construction of 21 two to three-storey R & D
plant, with a total construction area of 10,396 square meters.
The total investment of 50 million yuan.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: Design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011-10 - April 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Dongcheng District, Beijing Bell and Drum Tower area, the construction of a threestory museum, with a three-storey basement, total floor area of approximately 14,970 square meters.
The total investment 199 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Postal Address:*******
Stages of progress: preliminary design
Construction period: 2011-10 - October 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Xicheng District, Beijing, No. 49 Fu Xing Men Nei Street, on a 13-storey complex
building for indoor and outdoor decoration and renovation, with a two-story basement, with a total floor
area of approximately 30,003 square meters.
The total investment 173 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Contact System By: Dan
Tel:*******
Project Name: Beijing Hong Bohao days Technology Co., Ltd. Digital Printing base construction projects
Progress stage: engineering design
Construction period: 2011 September - September 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Daxing District of Beijing Economic and Technological Development Zone in the
southern district, a two-to seven-storey integrated development, with a single layer of basement, with a
total area of approximately 30,015 square meters, total construction area of approximately 47,360 square
meters, include: workshops, office buildings, R & D building, laboratory building.
The total investment 100 million yuan.
Construction Unit:*******
Postal Code:*******
Contact System People: Ye Changsong
Tel:*******
Design:*******
Postal Address:*******
Progress stage: Design
Construction period: 2012 March - December 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Guanghua Road, Chaoyang District, Beijing CBD core area Z3 land, construction of
a complex building with a total area of approximately 10,490 square meters, total construction area of
approximately 169,800 square meters, including: commercial, office, underground garage.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is 10 million.
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Progress stage: construction design
Construction period: 2011 December - June 2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Panyu District, Guangzhou, Guangdong Xiaoguwei University City district, the
construction of several blocks of about 18-storey residential building, covers an area of 22,378 square
meters, total construction area of 62,658 square meters.
The total investment 200 million yuan.
Construction unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Design unit: Guangzhou Panyu City Architectural Design Institute Co., Ltd.
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 September - May 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Shenzhen, Guangdong Greeting pit-like streets of Portland Road and Dan King
Azusa Avenue interchange, a residential development area of approximately 53,113 square meters, total
construction area of approximately 163,220 square meters.
The total investment 400 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Tel:*******
Project Name: Shenzhen Investment Real Estate Co., Ltd. Shenzhen Sea World residential development
Progress stage: engineering design
Construction period: 2012 March - March 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shekou, Nanshan District, Shenzhen, Guangdong, Sea World Area, a residential
development with a total floor area of approximately 160,000 square meters.
The total investment 220 million yuan.
Construction:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Fax:*******
Project Name: Foshan Yuan Chong Hong Construction Project Meeting
Progress stage: engineering design
Construction period: 2011 December - December 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Nanhai District, Foshan, Guangdong Guicheng street 58 blocks east of South
Avenue, six-way north of the sea, a residential development, an area of 55,053 square meters, total
construction area of 260,777 square meters.
The total investment 300 million yuan.
Construction units:*******
Postal Code:*******
Contact System By: Wen Yucheng
Tel:*******
Fax:*******
Project Name: Shenzhen Heng Run Park construction project is still
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction design
Construction period: 2012 February - February 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Bao'an District, Shenzhen, Guangdong, the central area (Bin Long Road, Baoan
Road Interchange in the southeast, a residential development area of approximately 38,174 square meters,
total construction area of 146,100 square meters, including: residential buildings, shops , parking.
The total investment 350 million yuan.
Construction:*******
Postal Address:*******
Tel:*******
Project Name: Changchun International Forte net monthly 4.1, 4.2 projects
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Net project is located in Changchun City on Development, learned Road, south of Atlas Street, east of
the tree, with a total construction area of 269,189.5 square meters.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax:*******
Construction Unit:*******
Postal Code:*******
Contact System : Xu Feng
Tel:*******
Project Name: Langfang Vocational and Technical College three Yanjing teach 职工宿舍楼 Project # 9
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Qi Li Xijing Town project is located north of Ha Road, east of Three Rivers Vocational Education
Center, building area of 6851.76 square meters as shown in the drawings, covers an area of 1450.1 square
meters, ground five, building height of 16.75 m, the frame structure, raft foundation .
The total investment 15,019,700 yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Silver Dragon Properties Ltd. Suzhou Su to 2010-B-43 construction project plot
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Suzhou City Economic Development Zone, Wu Guo Lane street looking west, Guo
Xindong Road, south side. Project covers an area of 120,107.5 square meters, total design capacity of
216,193.5 square meters building area, floor area ratio of 1.8.
Total investment $ 298 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design unit: Development and Investment in Environmental Protection Technology Co., Ltd. Sheng (EIA
agencies)
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Real Estate Development Co., Ltd. Suzhou Su dragon to 2010-B-46 construction project plot
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Suzhou City Economic Development Zone, Kuo Lane Street, Lake Road West,
accessible way east. Project covers an area of 112,310 square meters, total construction area of 168,456
square meters capacity, the volume was 1.5.
Total investment $ 220 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design unit: Development and Investment in Environmental Protection Technology Co., Ltd. Sheng (EIA
agencies)
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Hebei Huarui International Garden District 3-5 #, 7-9 # Building, Commercial Building
Project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in the town of Chu Yuxian songjiazhuang Village West, the scale of 47,210.34 square
meters, of which 3-5 #, 7-9 # F 44688.84 m2, brick, six-floor, basement, commercial buildings 2521.5
square m, the frame structure, the ground floors.
The total investment is not detailed.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Yongnian County, a small town eight Longma Wang Joint School Project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Rabbit Project is located in Yongnian County, Township, Village West, Cao eight Wang, the new
dormitory building a two-story, brick-concrete structure, construction area of 488 square meters; new
restaurant, one floor, the frame structure, construction area of 321 square meters; new sports hall project, a
layer, the frame structure, construction area of 640 square meters; new toilet, guard, gates, fences and
playground campus sclerosis and other ancillary works.
The total investment 2.61 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Fairmont Hotel Co., Ltd. Suzhou New Project
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Project is located in Suzhou Wuzhong Feng Jin Road No. 36, project leasing Soochow Industry and
Trade Co., Ltd. Suzhou Industrial Park area in the Wu-chun Feng Road 36, the buildings have been built
interior operations. The project covers an area of 988.2m2, total construction area of approximately
5000m2, 8 buildings, 1-2 for the catering, hotel accommodation 3-7 layer, 8 layers for the office. The
project has 60 rooms (120 beds), dining area of 1000 m2, including the kitchen area of 500m2.
The total investment 55 million yuan, of which environmental protection investment of $ 600,000.
Construction Unit:*******
Postal Address:*******
Tel:*******
Design:*******
Contact:*******
Tel:*******
Project Name: Yongnian County River River Village at Fort Union Township School Project
Progress stage: construction started in
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project River Township is located in River Village, Yongnian County, New restaurant construction, a
layer of brick-concrete structure, construction area of 308 square meters; New sports hall project, a layer,
the frame structure, construction area of 640 square meters; toilet, guard, gates, fences, school and
playground sclerosis and other ancillary works.
The total investment 2.15 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Suzhou Co., Ltd. Xin Yun real estate project
Stages of progress: environmental impact assessment
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Dongshan District, Suzhou City Road, east of the landscape, with a total investment
900 million yuan, covers an area of 117388.4 m2, construction area of 175066m2, building into a
residential and business-oriented high-standard residential and commercial projects.
The total investment 900 million yuan.
Construction:*******
Postal Code:*******
Contact System People: money manager
Tel:*******
Designer:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Rural Ambrose Liu Yongnian County Solid Joint School Project
Progress stage: construction started in
Construction period: 2011 - 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Yongnian County Solid Ambrose Lau village west village, new toilets, guards, gates,
fences and playground campus sclerosis and other ancillary works.
Total investment 940,000 yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Project Name: Hillside Place convenient delivery of professional health services
Progress stage: under construction
Construction period: 2011-01 January --2013-12 months
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Huadu District, Xinhua Industrial Zone, Road No. 20, Daphne, dietary Square
convenience of professional health services delivery , The size of 2500.00 square meters building, the
main buildings are food processing workshop, information center room, a dormitory building
The total investment of 20 million.
Construction unit:*******
Postal Code:*******
Contact:*******
Progress stage: the record
Construction period: 2011-12 to 2013-12
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting (for reference)Project:
Project is located in the town of Ge Xiang Cun former warehouse, commercial office space project
proposed commercial office space, with a total construction area of 99,990 square meters, of which the
ground floor area of 71,990 square meters, ground floor area of 28,000 square meters, the project land area
of 20683 square meters (31.02 acres), land transfer contract number 3301102010A21090. Specific issues
by planning the implementation of approved comments.
The total investment 360 million yuan, including fixed assets investment: 343 million yuan (Civil 21400;
equipment 3000; installation of 4000; construction of other costs 4900; reserve fund 1000), construction
period interest on 17 million yuan.
Construction unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Project Name: Wuhan Economic and Technological Development Zone, the military community a
Huangling Hill Street, 28, 29 Building project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Wuhan Economic and Technological Development Zone, a new group village.
The total investment 31.28 million yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Construction:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Jiangsu Suzhou Dulwich International School Project
Progress stage: construction preparation
Construction period: 2011 September - September 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Suzhou, Jiangsu Su Sheng South Road, Xinghua Street East, with a total
construction area of about 2.6 million square meters, the largest single area of 23,000 square meters, sixstory frame structure on the ground locally, school buildings with indoor swimming pool and gymnasium.
The largest single-span nine meters.
The total investment of 100 million.
Construction:*******
Postal Address:*******
Electricity Tel:*******
Fax:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Wuhu International Culture Square Hualun a pile foundation engineering projects
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Wuhu City, Anhui Province Yijiang District Limin West Road and Zhongshan Road
intersection, a construction area of about 150,000 square meters, frame shear wall structure, containing 2 to
4 # 8 # 6 high-rise residential and basement.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hubei Science and Technology Parks Corporation Gold Hill rental (office building and
basement) Engineering
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Gold Hill project is located in Industrial Area, on the ground about 10797.24 square meters, about
5238.86 square meters underground, the structure type as a framework, a total of 15 layers.
The total investment of 20 million.
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Construction:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Hubei Chibi Hospital hospital building project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Chibi Hospital project is located in the hospital.
The total investment 113.97 million yuan, sources of funding for investment and self-government.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Hebei economic zone around Beijing Planning Exhibition Hall Project Green
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the town of movie Zhuozhou City Pier Road South, with a total construction area of
33,000 square meters, covers an area of about 110 acres.
The total investment is not detailed.
Owner:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Chenxi County Daqian Jinsiou mountain area 2 - 3 phase
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chenxi County Pioneer Road project is located, a bid of (two): A total of 10, mixed 14-layer frame, area
47157 square meters; two tenders (three): 1, frame-wall layer 21, an area of 35,000 square meters.
The total investment of 57.5 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax:*******
Project Name: Wuhan Xiao farmers squeezed Fangcun also built Village (Phase I)
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Wuhan Development Zone, Xiao Jiangxia Miaoshan virgin Fangcun.
The total investment 30.01 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project Name: Shanghai Tang Lane five neighbors A block matching real estate projects
Progress stage: verification of project approval
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shanghai Pudong New District Industrial Park East Cambridge in key areas,
building civil construction: residential area, factory living area, with a total construction area of 93,992
square meters; underground of underground space for a total construction area of 13,792 square meters.
The total investment 360 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Progress stage: engineering design
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Pudong New Area, Tang Zhenhong two villages 11 / 1 hill (ie, bank card industry
park two 1 - 2, 1 - 3, 1 - 4 blocks), east to Fanchang Road, south of Union Road, Tang Gu Road, west ,
north to King Nga Road, area: 39,301 square meters (58.95 acres), can be built on the ground floor area of
approximately 5.9 million square meters.
The total investment 600 million yuan.
Construction:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Progress stage: construction design
Construction period: 2011 - 2013
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference)
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Shanxi Changzhi Changzhi County Lidu Dong Street north, Changling Road, west
side, construction of a 10-storey office building, with a single layer of basement, total floor area of
approximately 11,925 square meters.
The total investment 29 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Progress stage: construction design
Construction period: 2011 October - December 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Hohhot, Inner Mongolia Genghis Khan Avenue, south of New City, Overseas
Chinese Village, west of the original building materials warehouse to the north east of the New World
home, the construction of an office building with underground garage single high, with a total floor area of
approximately 20,000 square meters .
The total investment of 100 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal address:*******
Postal Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Designer:*******
Postal address:*******
Postal Code:*******
Contact:*******
Progress stage: construction preparation
Construction period: 2011 August - November 2011
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the East County town of Siping Siping Village, two small groups, building area:
10,775 square meters, Layers: 6 layers, structure type: the underlying framework of the brick; forestry
affordable housing, building area: 5005 square meters, number of storeys: 5-layer structure Type: brickconcrete structure.
The total investment is not detailed.
Construction unit:*******
Postal Address:*******
Tel:*******
Design Unit: Liaoning Institute of Architectural Design Co., Ltd. North
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting, barricades machine. (Reference)
Project:
Shennongxi residential project is located in Badong County, with a total construction area of 11757.72
square meters.
The total investment 29.84 million yuan, sources of funding arrangements for the central and provincial
financial burden.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Shenzhen Royal Lake peak home construction general contracting projects
Progress stage: construction started in
Construction period: 2011 - 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Luohu District, Shenzhen Yanhe Interchange Road and patriotism, the tender area of
64865.3 square meters.
The total investment 437.25 million yuan.
Construction:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Shantou CITIC Pu River Beach Resort holiday apartment project dragon
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shantou CITIC dragon Pu River Beach Resort, a construction of 66 holiday
apartments and a clubhouse, each with 2 to 3 layers, with a total construction area of 39318.36 square
meters.
The total investment 99.99 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Project name: Jinan City, the body of China Railway Construction International Fair Area City construction
projects
Progress stage: engineering design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 - 2012
Major equipment: ventilation systems, fire equipment, instrumentation, lightning protection and grounding,
glass doors and windows, waterproof anti-corrosion, paint, wall tile, light fixtures, low voltage electrical
appliances, power distribution, wire and cable, weak systems, water supply equipment, pipe parts, valve
components, outdoor drainage, hardware, plumbing, recreational facilities, landscaping, access control
systems. (Reference)
Project:
Fair Project Area is located in the body of the heart, the liberation of the north East, west of the body of
West, about 40 million square meters, which block A building area of about 170,000 square meters of land
area of about 230,000 construction B square meters.
The total investment 2.2 billion.
Construction Unit:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Second Hospital of Henan Province, Luoyang City, Ward Building Integrated Project
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference)
Project:
Project is located in Luoyang, Henan Province, Nanchang Changjiang Road junction 3, the total
construction area of 33,507 square meters, including a fine 20 storey building decorated rooms, with singlelayer high in the basement, providing approximately 700 beds.
The total investment of 45 million.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction Unit:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Fax:*******
Designer:*******
Postal Address:*******
Tel:*******
Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Guangzhou Pearl City sporadic projects
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Guangzhou City, the core business district of Pearl River New City B1-8 block, the
project is located in Pearl City, Pearl River New City, Guangzhou City, the core business district, the
project is positioned as an international landmark Grade A office space. The main building includes the
main building 71-story office and conference center 3-layer skirt, with a total construction area of 210,000
square meters, the main building of 309.6 meters.
The total investment 9,302,970.96 yuan.
Construction unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax:*******
Project Name: Guangdong Shenzhen Huamei heavy industrial plant engineering plant
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic
products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low voltage power distribution equipment, steel structures.
(Reference)
Project:
Project is located in Bao'an District, Shenzhen, Guangdong Huamei Industrial Park, Song Gang, an area
of 13,596 square meters.
The total investment 10.92 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction unit:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Code:*******
Contact:*******
Tel:*******
Project Name: West Street, Chongqing, Chongqing Nanchuan Nanchuan District Adult Education Training
Center Project Area
Progress stage: construction preparation
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Xicheng District, Chongqing Nanchuan streets, construction of a training building,
total construction area of 12,000 square meters.
The total investment 15 million yuan.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Design:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Project Name: Shishi City, administrative services Yongning town center project
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Shishi City, Fujian Yongning town, building area of 15,892.48 square meters, tenstory frame structure.
The total investment of 25 million, funding sources for the funding.
Construction Unit:*******
Postal Address:*******
Tel:*******
Construction Unit:*******
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Shanghai Waigaoqiao Town E08-05 block new nursery projects
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in the east and south west of the community planning supporting schools to supporting
commercial land north latitude nine road construction area 5526.83m2.
The total investment 21.82 million yuan.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel:*******
Fax:*******
Construction:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Fax:*******
Project Name: Quanzhou Xing North Peak District project Xiamei
Progress stage: verification of project approval
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located in Quanzhou, Fujian Feng Xia U.S. North Area, with a total of about 307.6 acres of
land.
The total investment of 800 million, sources of funds for government investment and financing.
Construction Unit:*******
Postal Address:*******
Tel:*******
Fax:*******
Construction units:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Fax:*******
Project Name: Second Experimental Kindergarten project Lienchiang
Progress stage: construction started in
Construction period: 2011 - 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. (Reference)
Project:
Project is located east of Fujian Lianjiang Aojiang Road, Hsin Tung Yang Foods plant north of total
construction land area of 1580 square meters, total construction area of 4907.6 square meters.
The total investment of 12 million, sources of funding for domestic government funds.
Construction Unit:*******
Postal address:*******
Postal Code:*******
Contact System : Cheng teacher, Luo
Tel:*******
Construction Unit:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
Download