The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Municipal real estate construction (20110829-20110902) Project Name: Fujian Ningde Jiaocheng middle of the road construction project .................16 Project Name: Aerospace Information Co., Ltd. Zhuozhou industrial base two construction projects ..........................................................................................................................17 Project Name: 2011 Wuyuan County Bayannaoer major projects of rural land remediation ........................................................................................ Error! Bookmark not defined. Project Name: Zhangzhou, Fujian Zhangpu County MCH relocation project . Error! Bookmark not defined. Project Name: Wuhan, Central China Trade Co., Ltd. Baosteel Phase III expansion project processing center ............................................................................................................20 Project Name: Red River State Psychiatric Hospital Building Project ...................................21 Project Name: Guangxi Liuzhou domain Purple White Lotus International Trade City construction projects .......................................................................................................22 Project Name: Wuhan color toner production base construction project ..... Error! Bookmark not defined. Project Name: Hubei Enshi beautiful spring hotel construction project ................................24 Project Name: The Fourth Hospital of Changsha surgery building project ... Error! Bookmark not defined. Project name: Changsha, Hunan chalice Memphis Hotel Project .........................................26 Project Name: Fuzhou Minhou county police criminal investigation research business space project ...........................................................................................................................27 Project name: Changsha, Hunan chalice Griffith residential area two projects .....................28 Project Name: Fuzhou Jingxi town small town planning exhibition hall project ....................28 Project name: Changde City, Taoyuan County People's Hospital expansion project ..............30 Project name: Changde City, Hunan bus company bus terminus project .............................31 Project Name: Enshi Icheon primary employment and social security services center project ......................................................................................................................................32 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Wuhan financial background services center Phase II ... Error! Bookmark not defined. Project Name: Wuhan City Court Phase III Fortress ..........................................................33 Project Name: Dongguan City Chang Ping-powered electricity production company building the project schedule ........................................................................................................34 Project name: production center of Yinchuan, Ningxia Mobile Phase ..................................35 Project Name: Shaanxi Railway Vocational and Technical College campus a new project ........................................................................................ Error! Bookmark not defined. Project Name: Singapore • Nanjing technology island promoter region of the North Ecoinfrastructure projects .....................................................................................................37 Project Name: Industry and Trade Co., Ltd. Shaanxi Baoji, Shaanxi API production project .38 Project Name: Gongyi City, and Garden District star Rhythm Project ..................................39 Project Name: Qingdao Yellow Sea Rubber Group semi-steel radial tire project ...................40 Project Name: Police Court, District of Xiaogan Lake Project Error! Bookmark not defined. Project Name: Singapore • Nanjing technology island promoter region of the North Ecoinfrastructure projects .....................................................................................................42 Project Name: China-chemical Co., Ltd. Nanxiong City plant and other projects ..................43 Project Name: Times Square West project ........................................................................44 Project Name: Stone Town harbor land residential area north of North New Project ............44 Project Name: Inner Mongolia Grain Wholesale Market Expansion II project .......................45 Project Name: Hainan Hai salt works ramshackle shantytowns ...........................................46 Project Name: Education Park Shen-Fu new town project ..................................................47 Project Name: Yangzhong moderate Run Project Central International Plaza, a ..................48 Project Name: Indus Residence Project in Jiangsu Huai .....................................................48 Project Name: Tianjin Binhai flourishing international automotive theme gegu Business Park Project Area A ................................................................... Error! Bookmark not defined. Project Name: Hunan History Museum Project .................... Error! Bookmark not defined. Project Name: Cangzhou Bohai School District first new campus project .............................51 Project Name: Wuhan, Hainan Blue Ocean overhead industrial park project .......................52 Project Name: Nanning Media Star City construction projects ............................................53 Project Name: Nanning Media Star City construction projects ............................................54 Project Name: Wuzhou City Chau District People's Hospital outpatient hospital complex building construction projects ..........................................................................................54 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Hepu County Residence School teaching building construction projects .. Error! Bookmark not defined. Project Name: Taizhou Gudea Furniture Co., Ltd. # 2 plant construction project .................57 Project Name: Nanning State Torch Program Software Industrial Base biotechnology center construction project ........................................................................................................57 Project Name: Commercial, residential building construction ..............................................58 Project Name: Hubei Vocational College of Biotechnology: student apartments, student food, conference center project ................................................................................................59 Project Name: Wuhan Science and Technology Museum new building construction projects 60 Project Name: Wuhan East Lake District National Innovation Model Convention and Exhibition Center ............................................................................................................................60 Project Name: Yichang Changyang fruits and vegetables, medicinal herbs, deep-processing projects ..........................................................................................................................61 Project Name: Ningxia Yinchuan City Center project in Women and Children ................ Error! Bookmark not defined. Project Name: Xi'an city reconstruction project to the village altar ......................................63 Project Name: Yue Zhai resettlement area construction projects ........................................64 Project Name: First High School Project Zhumadian Suiping ..............................................65 Project Name: Henan integrated transport hub in the East Plaza Square subway ................65 Project Name: Henan Xinyang Xiangshan International Triumph resort hotel project ...........66 Project Name: Qingdao Industrial Co., Ltd. Guang Nan test floor, plant project ...................67 Project Name: Lawrence Hospital, New Medical Building Project ........................................68 Project Name: cup River County Cultural Plaza.................... Error! Bookmark not defined. Project Name: Dongfang City, Hainan Province Public Security Bureau and the Building of affordable housing projects .............................................................................................69 Project Name: Sanya Resort Residence project ................... Error! Bookmark not defined. Project Name: Changchun Shi Wang-County Building, 2 to 20, 1, 2 Building underground garage project .................................................................. Error! Bookmark not defined. Project Name: Liaoning Jinzhou City Golden Age Project ...................................................73 Project Name: Liaoyang branch of China Telecom Group, the production machine building projects ..........................................................................................................................73 Project Name: Liaoning Panjin Liaohe Oilfield first high school building construction projects ......................................................................................................................................74 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Liaoning Dalian Hengli Group headquarters in East Port Project ............. Error! Bookmark not defined. Project Name: Yancheng City fire and rescue emergency center project ..... Error! Bookmark not defined. Project Name: Yancheng Wu You Pearl River school construction projects .. Error! Bookmark not defined. Project Name: Suzhou Pingjiang floor in school art and physical education building new projects ..........................................................................................................................79 Project Name: Chongqing City real estate building projects ...............................................80 Project Name: Bazhong District Central Hospital, medical clinic construction of the second ..81 Project Name: Fuzhou Lu and Liu Zhuanghe along the land bridge project dilapidated change ......................................................................................................................................81 Project Name: Tianjin, a blue-collar apartment project ......................................................82 Project Name: Shanghai Zhangjiang Central District B-1-12 R & D building block projects ........................................................................................ Error! Bookmark not defined. Project Name: Shanghai International Trade Center Hardware Electrical Hardware City, supporting three projects ................................................................................................84 Project Name: Shanghai eastern suburb of commercial office center project .......................86 Project Name: Shanghai Pujiang Town, 122-4, block commercial office projects ........... Error! Bookmark not defined. Project Name: Foshan City Nanhai industry think tank, a project ........................................87 Project name: Town, Foshan City, Lion Red Sand living zone project ..................................88 Project name: Building, Shenzhen, information transmission cable project ..........................89 Project Name: Foshan, China Everbright Bank branch office projects... Error! Bookmark not defined. Project Name: Bank of China Building construction project files, Shunde Branch .................91 Project Name: Guangdong Medical College Hospital Clinic Building Expansion Project .... Error! Bookmark not defined. Project Name: Dongguan (Huizhou) Industrial Transfer Park Project a standardized plant ...93 Project Name: Guangning one hundred surplus garden (villa) Phase II ...............................94 Project Name: Baoding Road West Station transportation hub project car passenger ..........96 Project Name: Zhejiang Taizhou Dongtai New Century Commercial Group, an integrated development project ......................................................... Error! Bookmark not defined. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Quzhou City, new construction Kaihua County Hospital Error! Bookmark not defined. Project Name: Agricultural biotechnology in the High Park Group kinds of experimental building projects .............................................................................................................99 Project Name: Hubei Cancer Hospital New Outpatient Building Project ............................. 100 Project Name: Wenzhou Kean University construction projects ........................................ 101 Project Name: Ninghai County of Ningbo City, school project ........................................... 102 Project Name: Zhejiang Zhoushan Island District, build bamboo building project .......... Error! Bookmark not defined. Project Name: Nanjing Subway Line subway control center complete building renovation project ......................................................................................................................... 105 Project Name: Zhejiang Wenling City Second People's Hospital expansion project ............. 106 Project Name: University Library expansion project ............. Error! Bookmark not defined. Project Name: Ningbo Yinzhou District, militia training base construction.... Error! Bookmark not defined. Project Name: Guangdong Foshan Nanhai Gas Development Company Limited in the water company's warehouse and R & D room project ............................................................... 109 Project Name: Fujian Wing vocational secondary school second phase of new campus .. Error! Bookmark not defined. Project Name: Beijing South-color school buildings project .............................................. 111 Project Name: Beijing Fengtai District, integrated services space program ........................ 112 Project Name: Beijing Building Materials City, dilapidated building the second phase ......... 113 Project Name: Customs business and technology Yunfu City building project .................... 114 Project Name: Liaoning Tieling Mountain Park community projects throughout Yan....... Error! Bookmark not defined. Project Name: People's Hospital of Shantou City, Nanao County expansion project ........... 116 Project Name: Henan Zhengzhou Air Port Health Park District No. 8 - 20 Building construction project ......................................................................................................................... 117 Project Name: Industrial Research Institute of Tianjin University, Coastal Engineering Laboratory of the fuel center ......................................................................................... 118 Project Name: New Lujiang County radio and television broadcasting center project ......... 119 Project Name: Shaoxing City Furniture City Management Service Center, District Disabled Integrated Services Centre project ................................................................................. 120 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Xi'an University of commercial and academic exchanges Weiyang Campus Center Project ............................................................................................................... 121 Project Name: Shao big line II block real estate development projects Error! Bookmark not defined. Project Name: Battery Materials Engineering Laboratory United States where ................... 123 Project Name: Wenzhou District, the southern suburbs of the street gathering point benevolent transformation of rural housing project (Phase I) project ............................... 123 Project Name: Jiaxing Pinghu Economic Development Zone (Chung Tai-street) resettlement housing project south garden ........................................................................................ 124 Project Name: Chongqing Kai County Yunfeng low-rent housing housing construction ....... 125 Project Name: Old City, Henan Province, Yiyang County Yellow Machine Factory bankruptcy liquidation group shantytowns civil engineering construction projects ............................... 126 Project Name: Second School Qinyuan County New Project ............................................. 127 Project Name: New Project Jinnan District mentally retarded Error! Bookmark not defined. Project Name: Baoshan District decoration integrated development project ...................... 129 Project Name: Hohhot Mercure Project Sunshine ................ Error! Bookmark not defined. Project Name: Henan information management school teaching laboratory building and auxiliary building project ................................................................................................ 131 Project Name: Golden Bridge Middle School construction project in Hohhot, Inner Mongolia .................................................................................................................................... 132 Project Name: Heilongjiang CIQ integrated laboratory building construction projects ........ 132 Project Name: Tempo Liangmao Ltd 50,000 t storage facility construction project............. 134 Project Name: Shandong Jining Jinxiang County Hospital District People's Hospital new construction projects ......................................................... Error! Bookmark not defined. Project Name: Anhui Gujing Distillery Co., Ltd. Furui Industrial Park Project Error! Bookmark not defined. Project Name: Langfang Branch through the Garden District 6 #, 8 # -13 # floor and underground garage project .......................................................................................... 136 Project Name: Wen County School Safety Engineering 2011 ............................................ 138 Project Name: Zhengzhou City, the school expansion project tax ..................................... 139 Project Name: Hunan Ningxiang Jinzhou District resettlement area construction projects .. 140 Project Name: Langfang Development Zone, the first primary school dormitory, classroom building project ............................................................................................................. 141 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Nantong Tongzhou District Nanyuan orchard land resettlement project ...... 142 Project Name: Hangzhou Xiaoshan Cultural and Creative Industry Center (tentative name) Project ......................................................................................................................... 143 Project Name: Pingyao County, south of the town of Fort Ancient Pottery village south of New Commission (village housing area) 7 # residential building projects .......................... 144 Project Name: River Xining family planning services are county building project ................ 145 Project Name: Taiyuan, central heating (thermal Burghardt) a project (update) ............ Error! Bookmark not defined. Project Name: Hubei Provincial People's Hospital of cardiovascular Building Project .......... 147 Project Name: Siping Municipal Public Security Bureau Branch of business technology space projects Tiedong ........................................................................................................... 147 Project Name: Nantong Qidong City, new construction Port Office ................................... 148 Project Name: Yancheng city's creative center project ......... Error! Bookmark not defined. Project Name: Beijing International Yanxi will have (the core of the island) project ........... 150 Project Name: TISCO plant heating pipe heating station project ...................................... 151 Project Name: a power plant in Taiyuan heating pipe heating station project ................ Error! Bookmark not defined. Project Name: Henan Tanghe Yu Jianong-ecological park construction projects ............ Error! Bookmark not defined. Project Name: Changchun Auspicious Industrial Park building renovation and new construction .................................................................................................................. 153 Project Name: Shenyang Sujiatun courts Building Project .... Error! Bookmark not defined. Project Name: Xin Yue Panjin City Residential Project ...................................................... 155 Project Name: Dalian Quality and Technical Supervision and Inspection Center Project ..... 156 Project Name: Dalian Ling inlets Seven Sages Road east of the original carton factory land reform projects ............................................................................................................. 157 Project Name: County central heating a large Phase III ....... Error! Bookmark not defined. Project Name: Hebei Langfang Guan Patio Project .......................................................... 158 Project Name: Development Zone, Kunshan, Suzhou Street, a project.............................. 159 Project Name: Beijing International Plaza Nordisk ........................................................... 160 Project Name: Chongqing Huxi motor plant construction project ...................................... 161 Project Name: Beijing's Tongzhou District Luhe Hospital Outpatient Building Construction . 162 Project Name: Katie Triumph Dayi County, Chengdu City Construction Projects ................ 164 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: China Operations Center, the Cyberport project Hercynian ........................ 164 Project Name: Hunan Xiangtan County West Lake Project ............................................... 165 Project Name: Sichuan Pi fraternity vocational school expansion project ........................... 166 Project Name: car sales center upgrade project .................. Error! Bookmark not defined. Project Name: Nantong Tongzhou District Jinxia Dong District Court placed the project price of commercial housing land ........................................................................................... 168 Project Name: Sanming City Meliet District Integrated Services Centre project with disabilities .................................................................................................................................... 169 Project Name: Tianjin, China Aviation Oil southern base storage depot project a .............. 170 Project Name: Zhejiang Huangyan District Maternity and Child Care Project ..................... 171 Project Name: Zhaoyang Industrial Zone Zhaotong 100,000 square meters standard factory buildings and facilities construction projects........................ Error! Bookmark not defined. Project Name: Hangzhou Xiaoshan District Hospital Orthopedics Ward Building Expansion Project ......................................................................................................................... 173 Project Name: Tianjin Jing Hua spring community projects .............................................. 174 Project Name: Tianjin port economic zone grain logistics integrated services building construction projects ..................................................................................................... 176 Project Name: Dongli District, Tianjin Armed Police College's new campus project ............ 176 Project Name: Civil Affairs Bureau Pi Pi funeral service station renovation project to move 177 Project Name: Shanghai Qingpu Huaxin Town, Fuchu, integrated development of land west road ................................................................................. Error! Bookmark not defined. Project Name: Community Chuansha town south of the land supporting junior C01-19 project .................................................................................................................................... 180 Project Name: Jiangxi Vocational College of Applied Technology 1 # -10 # faculty transitional housing project ............................................................................................................. 181 Project Name: Shanghai Fengxian District, a large residential community base 29A-01A block south bridge construction projects ................................................................................. 182 Project Name: Shanghai three forest base A4-6 block New Project ................................... 183 Project Name: Shanghai Xu Bank town of AZ-004 and AZ-005 Block Project Oasis Hong Yun Court................................................................................ Error! Bookmark not defined. Project Name: Jilin Forestry 2011 shantytowns ............................................................... 185 Project Name: Sheet Co., Ltd. Taicang Sea smoke tobacco raw materials and finished products warehouse project ........................................................................................... 186 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Nagqu Nagqu County People's Court trial of the construction business premises ...................................................................................................................... 187 Project Name: Tianjin coatings R & D and Engineering Center program ............................ 188 Project Name: Digital Technology Park project in Wuhan ................................................. 189 Project Name: Health Plaza East • South Lake real estate construction projects are ...... Error! Bookmark not defined. Project Name: People's Hospital Emergency Department Medical Technology Building Project .................................................................................................................................... 191 Project Name: Chengdu, Meishan warehouse center disaster preparedness and response, emergency rescue aid the Red Cross center in Sichuan Meishan base project ................... 192 Project Name: Yutang, five-star Marriott hotel and conference resort complex project....... 193 Project Name: Fujian Tiancheng Riverside Project ........................................................... 194 Project Name: Fuzhou Kui Qi residential construction projects ......................................... 195 Project Name: Jilin eighteenth schools (high, junior high school buildings, student housing, comprehensive building) reinforcement works .................... Error! Bookmark not defined. Project name: Bay Village, Sanya City, Begonia style town project ................................... 197 Project Name: Fujian Quanzhou work boat show coated base project .............................. 198 Project Name: Changchun FAW General Hospital, New Medical Building Project EPC Contract .................................................................................................................................... 198 Project Name: Zhejiang Ningbo Baoqing Temple # -2 1 block north of resettlement housing project ......................................................................................................................... 199 Project name: Bohai Huadian City, One house 15 #, 19 #, 7 # residential building projects .................................................................................................................................... 201 Project Name: Chongqing Street 34 Sand senior housing (A, B, C Building) project ........... 202 Project Name: Chongqing City Commercial Building Project longevity District One ............. 203 Project Name: Chongqing (Yubei) Taiwan Industrial Park Service Center Projects ............. 203 Project Name: Tianjin sky Road 15 Extension Project ...................................................... 204 Project Name: Jilin Women's Residence Hall 1, 2, reinforcement works canteen ................ 205 Project Name: Tianjin Jian put the Great Northern Town Ninghe grain storage and processing projects ........................................................................................................................ 206 Project Name: Shanxi Datong Coal Industry Co., Queshan high caijiayao company mines coal preparation plant project ................................................... Error! Bookmark not defined. Project Name: Tianjin Eco-city 9A, 9B land residential construction projects ..................... 208 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: BYD Auto Co., Shaoguan City, the new industrial development projects ..... 209 Project Name: China Electronics Technology Group Corporation Seventh Research Complex project ......................................................................................................................... 210 Project Name: Guangdong bit industrial vehicles (Foshan) Co., Ltd. New Project .............. 211 Project Name: Shanghai Jiading Ju Park District in control, Laboratory Centre Extension Project ......................................................................................................................... 212 Project Name: Zhongshan City, Postal Information Complex project .... Error! Bookmark not defined. Project Name: College Ordos project environment .......................................................... 214 Project Name: Foshan Nanhai District, Guangdong Development Financial Center ............. 215 Project name: Changsha High-tech Zone Nanling Technology Park Project ....................... 216 Project Name: Beijing Railway Industrial Park Project Noble Center .................................. 217 Project Name: Beijing to open the Optical Valley home by industrial plants and facilities projects ............................................................................ Error! Bookmark not defined. Project Name: Beijing XII underground space and ancillary space project ......................... 220 Project Name: Wuhan modern ecological fisheries research and development base project ........................................................................................ Error! Bookmark not defined. Project Name: Green Yangliuqing quiet road drainage works to extend the line ................ 222 Project Name: Stone Forest Lucheng Square (ternary transformation Palace Area) project ........................................................................................ Error! Bookmark not defined. Project name: International Hotel Co., Ltd. Zhengzhou Zhongyuan fishing Baishun Paradise Valley (a) construction project ....................................................................................... 224 Project Name: Hubei Enshi City reception base project .................................................... 225 Project Name: HG Science Park R & D and innovation base office building construction project ............................................................................. Error! Bookmark not defined. Project Name: Korla, China Yu Times Square Project ....................................................... 226 Project Name: Ankang City Yellow ditch two limit commercial construction projects .......... 227 Project Name: Chengdu ring pipe industry production and R & D base in the Northwest II project ............................................................................. Error! Bookmark not defined. Project Name: Spring Pro Qujiang Village, five residential placement slope Code Project ... 229 Project Name: Xi'an Chang'an Chang'an Hospital Health Authority relocation and relocation projects ............................................................................ Error! Bookmark not defined. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Xi'an Chanba ecological zones of public rental and affordable housing projects ........................................................................................ Error! Bookmark not defined. Project Name: Xi'an International Port District dream commune project ........................... 231 Project Name: SHANDONG BOSHAN School Project ......................................................... 232 Project Name: Qingdao Jiaozhou city hospital new construction projects .......................... 233 Project Name: Sunshine House Ordos Project ..................... Error! Bookmark not defined. Project Name: Inner Mongolia, Baotou City, off Court Project ............. Error! Bookmark not defined. Project Name: Harbin City, turn garment expansion project . Error! Bookmark not defined. Project Name: Harbin Qunli school construction project latitude and longitude .............. Error! Bookmark not defined. Project Name: Harbin Qunli the promoter region of 085 construction projects, land .......... 238 Project Name: Prime Harbin Terrace Project ................................................................... 239 Project Name: Panshi North Metro District Education Center Project ................................. 240 Project Name: Baoding fire emergency rescue command center project ........................... 241 Project Name: Dry ice expanded tobacco production plant construction project ............ Error! Bookmark not defined. Project Name: Wuxi red beans home XDG-2011-48 residential plot .................................. 244 Project Name: Ego Square residential development ......................................................... 245 Project Name: Nantong New High School Construction Project ........................................ 245 Project Name: Nantong Rudong Hospital relocation project . Error! Bookmark not defined. Project Name: Chengdu, the provincial emergency rescue training base construction projects specifically .................................................................................................................... 247 Project Name: Fujian, a data center disaster recovery projects ........... Error! Bookmark not defined. Project Name: Xiamen low carbon food packaging production base project Error! Bookmark not defined. Project Name: Shanghai Hua Lin Industrial Gases Co., Ltd. Expansion Project .................. 250 Project Name: Shanghai Shun Wah Toys Co., Ltd. new plant and villa projects ................. 252 Project Name: Jinqiao Export Processing Zone, Pudong New Area 16 neighborhood block commercial development ................................................... Error! Bookmark not defined. Project Name: China National Aero-Technology Research Institute Comprehensive Test and Measurement Center research space construction projects .............................................. 254 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: China Artex Building Products Import & Export company of construction projects ............................................................................ Error! Bookmark not defined. Project Name: Shenzhen International Energy Building Project ........................................ 256 Project Name: Central Building Project ............................... Error! Bookmark not defined. Project Name: Chong Hong Huiyuan projects .................................................................. 258 Project Name: Daya Bay, Huizhou City, Guangdong Province Economic and Technological Development Zone, south of the stove village relocation project Residential Area ............. 259 Project Name: Tianjin Ninghe product quality inspection center project ............................ 261 Project Name: Yuanping Xue isolated towns and villages west of basic farmland consolidation project ......................................................................................................................... 262 Project Name: Qinghai Salt Lake Industry Group Co., Ltd. magnesium integration project office building quality inspection center of the main building and civil engineering project scheduling .................................................................................................................... 263 Project Name: Jilin Longtan Siniora Street Manchu new primary school buildings the town center project ............................................................................................................... 264 Project Name: Jilin Longtan River teaching building a new secret project peak secondary . 265 Project Name: Reconstruction Hui County human resources market and social protection counties as units of service centers and office building projects ....................................... 266 Project Name: Cape Town Pingliang mysterious star 10 #, 15 #, 16 #, 21 #, 22 # residential building projects ........................................................................................................... 268 Project Name: Guizhou Radio and TV University campus three new projects Jinyang ........ 269 Project Name: Energy saving heating system transformation projects .............................. 270 Project Name: Guiyang City Longdongbao administrative office building of the airport expansion project.......................................................................................................... 271 Project Name: capacity of 7000 m3 chemical products warehouse project ........................ 272 Project Name: New City Sports Center on behalf of County Engineering ........................... 272 Project Name: Jilin Yinglong Buddha Mountain Cultural Park Project................................. 273 Project Name: No. 64 Alexander Road, Jinan City residential development projects ........... 274 Project Name: Power Supply Company Jinzhong new employee training center project ..... 275 Project Name: Yue Lan Mountain residential community construction project sites ............ 276 Project Name: Zhuhai Campus Culture Park Middle School District Project ........................ 277 Project Name: Tangshan City School Police Road affordable housing project .................... 278 Project Name: Wen'an often works long Yiyuan 2 #, 5 #, 6 #, 7 # Building Project .......... 279 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Wan Yee Tai Town home county home-hole 3 # -10 # Residential Building Project ......................................................................................................................... 280 Project Name: Suzhou City, the construction of Radio and Television Entertainment Suzhou International City project ............................................................................................... 281 Project Name: District Court two Zhangbei macros Top Bright Commercial Building Project .................................................................................................................................... 282 Project Name: Jiangsu Chengde Run Properties Limited to the Soviet Union No. 2010-B-52 block commercial complex project .................................................................................. 283 Project Name: Real Estate Development Co., Suzhou River, Su Xu to No. 2009-B-48 land projects ........................................................................................................................ 284 Project Name: Town beach Yongnian County Joint School Pro ALFA project ..................... 285 Project Name: Yongnian County, South West towns and villages along the inter-school projects Daci................................................................................................................. 286 Project Name: Sichuan Chengdu Eastern maintenance base construction also .................. 287 Project Name: Jizhou low-rent housing project off Jiayuan .............................................. 288 Project Name: Hebei provincial second phase of apartments for the elderly ...................... 289 Project Name: detachment of Fuzhou Jinshan border project office and residential areas .. 290 Project Name: Weng'an County fitness center project ......... Error! Bookmark not defined. Project Name: Tianjin Economic and Technological Development Zone, part of the mainland capital expansion automotive construction plant on behalf of the ........ Error! Bookmark not defined. Project Name: Shanghai International Automobile City, Hong Kong Science and Technology R & D projects ................................................................................................................. 293 Project Name: Taicang City, Jiangsu Province, early childhood education center Shaxi Shaxi nursery space engineering ................................................. Error! Bookmark not defined. Project Name: Shijiazhuang, Hebei, Shijiazhuang City, Town, Pingshan Pingshan Xibaipo level secondary school construction project ............................................................................ 295 Project Name: Extension Project of Fujian Provincial Library Error! Bookmark not defined. Project Name: Chengdu Wuhou Industrial Park Kindergarten Project................................ 297 Project Name: Zhongxiang City Public Security Bureau projects the business technology space ........................................................................................................................... 298 Project Name: Wuhan Jiangxia Hidden Dragon School of Engineering .............................. 299 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Sanmenxia industry cluster BT standard industrial plant construction projects .................................................................................................................................... 300 Project Name: Star City Jinnan District River drainage works infrastructure supporting projects ........................................................................................................................ 301 Project Name: Hefei New Century Center project ............................................................ 302 Project Name: Changzhi Vocational and Technical College new campus construction projects .................................................................................................................................... 302 Project Name: Changzhi Medical School new campus construction projects ...................... 304 Project Name: Focus Southern prison police staff housing relocation project ..................... 305 Project Name: Chemical Technology Co., Ltd. Jiangsu Yi Geluo New Project ..................... 306 Project Name: Suzhou Wujiang Green Center and Lakeside Park Project .......................... 307 Project Name: Nantong Tong Hai Qu County Center Hospital Project ............................... 307 Project Name: Chongqing Beibei District People's Court to move the court building construction project expansion........................................... Error! Bookmark not defined. Project Name: Ningbo Happy home two downtown projects Error! Bookmark not defined. Project Name: Taizhou Sports School training base construction projects ... Error! Bookmark not defined. Project Name: Tianjin Eco-city blue-collar apartment block No. 99, a construction project . 311 Project Name: Tianjin Industrial Real Estate New construction projects ............................ 312 Project name: Bell and Drum Tower Beijing Museum project Error! Bookmark not defined. Project Name: Cultural Palace of Nationalities renovation project ........ Error! Bookmark not defined. Project Name: Beijing Hong Bohao days Technology Co., Ltd. Digital Printing base construction projects ..................................................................................................... 314 Project Name: Beijing Chaoyang District, CBD core area Z3 block construction project .. Error! Bookmark not defined. Project Name: Guangzhou University of apartment construction projects in town Ring teachers ........................................................................... Error! Bookmark not defined. Project Name: Lan Shan a product in the food garden project ............ Error! Bookmark not defined. Project Name: Shenzhen Investment Real Estate Co., Ltd. Shenzhen Sea World residential development ................................................................................................................. 319 Project Name: Foshan Yuan Chong Hong Construction Project Meeting ............................ 320 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Shenzhen Heng Run Park construction project is still ................................. 320 Project Name: Changchun International Forte net monthly 4.1, 4.2 projects ..................... 321 Project Name: Langfang Vocational and Technical College three Yanjing teach 职工宿舍楼 Project # 9 ................................................................................................................... 322 Project Name: Silver Dragon Properties Ltd. Suzhou Su to 2010-B-43 construction project plot .................................................................................................................................... 323 Project Name: Real Estate Development Co., Ltd. Suzhou Su dragon to 2010-B-46 construction project plot ................................................................................................ 324 Project Name: Hebei Huarui International Garden District 3-5 #, 7-9 # Building, Commercial Building Project ............................................................................................................. 325 Project Name: Yongnian County, a small town eight Longma Wang Joint School Project ... 326 Project Name: Fairmont Hotel Co., Ltd. Suzhou New Project ............................................ 327 Project Name: Yongnian County River River Village at Fort Union Township School Project 328 Project Name: Suzhou Co., Ltd. Xin Yun real estate project ............................................. 329 Project Name: Rural Ambrose Liu Yongnian County Solid Joint School Project ................... 330 Project Name: Hillside Place convenient delivery of professional health services ................ 331 Project Name: Commercial office space project ................... Error! Bookmark not defined. Project Name: Wuhan Economic and Technological Development Zone, the military community a Huangling Hill Street, 28, 29 Building project .............................................. 333 Project Name: Jiangsu Suzhou Dulwich International School Project................................. 334 Project Name: Wuhu International Culture Square Hualun a pile foundation engineering projects ........................................................................................................................ 335 Project Name: Hubei Science and Technology Parks Corporation Gold Hill rental (office building and basement) Engineering .............................................................................. 336 Project Name: Hubei Chibi Hospital hospital building project ............................................ 337 Project Name: Hebei economic zone around Beijing Planning Exhibition Hall Project Green 338 Project Name: Chenxi County Daqian Jinsiou mountain area 2 - 3 phase .......................... 338 Project Name: Wuhan Xiao farmers squeezed Fangcun also built Village (Phase I) ............ 340 Project Name: Shanghai Tang Lane five neighbors A block matching real estate projects .. 340 Project Name: Shanghai financial information service industry base two 1 block project Error! Bookmark not defined. Project Name: Shanxi Changzhi City County Public Security Bureau, the business space project ............................................................................. Error! Bookmark not defined. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Inner Mongolia Autonomous Region Committee of democratic institutions office building project ........................................................ Error! Bookmark not defined. Project Name: East County precious little home town of Siping Building construction (including forestry affordable housing) civil construction projects ........ Error! Bookmark not defined. Project Name: Badong County Detention Center, Badong County Public Security Bureau detention center construction project ................................. Error! Bookmark not defined. Project Name: Shenzhen Royal Lake peak home construction general contracting projects 347 Project Name: Shantou CITIC Pu River Beach Resort holiday apartment project dragon .... 348 Project name: Jinan City, the body of China Railway Construction International Fair Area City construction projects ..................................................................................................... 348 Project Name: Second Hospital of Henan Province, Luoyang City, Ward Building Integrated Project ......................................................................................................................... 349 Project Name: Guangzhou Pearl City sporadic projects .................................................... 352 Project Name: Guangdong Shenzhen Huamei heavy industrial plant engineering plant ...... 353 Project Name: West Street, Chongqing, Chongqing Nanchuan Nanchuan District Adult Education Training Center Project Area .......................................................................... 354 Project Name: Shishi City, administrative services Yongning town center project .............. 355 Project Name: Shanghai Waigaoqiao Town E08-05 block new nursery projects ................. 356 Project Name: Quanzhou Xing North Peak District project Xiamei ..................................... 357 Project Name: Second Experimental Kindergarten project Lienchiang ............................... 358 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Fujian Ningde Jiaocheng middle of the road construction project Stages of progress: survey design Construction period: 2012 April - June 2013 Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, pavers, protection board, explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, police equipment, bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities, lighting, drainage facilities, security facilities, drilling rigs, cranes, tower cranes, bridge machines, hammers, generators, excavators, road rollers, dump truck, motor graders, pull up equipment, template, pipe fittings, fasteners (for reference) Project: Middle of the road project is located in Fujian Province to Ningchuan Jiaocheng South Road between the land area of 42,839 square meters (equivalent to 64.26 acres), the actual land area of 25,130 square meters (equivalent to 37.69 acres); proposed Fujian middle of the road about 490 meters, planning road red line width 36 m; the road on both sides of A, B, C, D, E, F six plots, the proposed total construction area of 166,562 square meters [including: ground floor area of 127,233 square meters (including residential construction area 95752 square meters of commercial building area of 24,502 square meters, office building area of 5525 square meters, construction area of public service facilities 836 m2), ground floor area of 39,329 square meters (including the basement floor area of 24,392 square meters, business area of 12,695 square meters of which , parking space of 11,697 square meters and equipment; ground floor area of 14,937 square meters for parking and equipment room)], building the basement area of 8968 square meters; green area of 64,921 square meters . The total investment of 685 million yuan, funding. Construction units:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Design:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Fax:******* Project Name: Aerospace Information Co., Ltd. Zhuozhou industrial base two construction projects Stages of progress: survey design Construction period: 2011 - 2013 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located south of East Zhuozhou Fan Yang, Yun Wo Street, east, west Zhuozhou Xiangyu refueling center and Beijing-Zhuhai expressway roads, South and China National Seed Group Corporation and the development of potato cultivation Frozen Food Co., Ltd. Baoding Quartet Zhuozhou food plants with access. Two construction area of about 10,000 square meters. The total investment 300 million yuan, self-financing. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Design:******* Postal Address:******* Progress stage: Planning and Design Construction period: 2011 - 2012 Main equipment: excavators, transport, crane, mill, roller, hoist, pumps, valves, turbine, glass pipe, automation control systems, pipes, manholes, sludge thickener, suction machine, mixed mixers, submersible pumps, cranes, test equipment, instruments, analytical instruments. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Wuyuan County Bayannaoer public in the town, set the sea town, wins Fengzhen, project planning and design in 2011 about 10 acres. The total investment is not detailed, financial funds. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Fax:******* Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Zhangzhou, Fujian Zhangpu Sui Road, Chang'an Town, east of a large pavilion, with a total construction area of 22,000 square meters, including: outpatient emergency room floor, medical technology building, ward buildings, office buildings. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment 60.75 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Design:******* Postal address:******* Postal Code:******* Contact System People: who Guoliang Tel:******* Fax:******* Project Name: Wuhan, Central China Trade Co., Ltd. Baosteel Phase III expansion project processing center Progress stage: engineering design Construction period: 2011 November - August 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Wuhan Economic and Technological Development Zone No. 1888 Plum Road, construction of a single high plant with a total floor area of approximately 17,920 square meters. The total investment of 30 million. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Red River State Psychiatric Hospital Building Project Progress stage: construction preparation Construction period: 2011 September - January 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Hani and Yi Autonomous Prefecture, Yunnan Red River Road Jianshui Chak No. 28, on a 10-storey complex building for indoor decoration, with a total floor area of approximately 13,000 square meters, including: outpatient and emergency and inpatient departments. The total investment 11 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction units:******* Postal Address:******* Tel:******* Construction unit:******* Postal Address:******* Tel:******* Designer:******* Postal Code:******* Contact System By: Jia Buddhist temple Tel:******* Project Name: Guangxi Liuzhou domain Purple White Lotus International Trade City construction projects Progress stage: engineering design Construction period: 2011-10 - October 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Liuzhou, Guangxi Liu Shi Road 56 (White Lotus airport port forward 100 meters), a residential development with a total floor area of approximately 100,000 square meters, including: 19 to 15-storey 12-storey residential buildings, shops, set a single underground parking. The total investment 100 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Progress stage: engineering design Construction period: 2011 November - December 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Hanyang District, Wuhan Golden Port Industrial Park, a comprehensive development, with a total area of approximately 25,800 square meters, total construction area of approximately 35,000 square meters, including: a nine-storey office building, three single higher plants. The total investment of 80 million. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Hubei Enshi beautiful spring hotel construction project Progress stage: engineering design Construction period: 2012 February - May 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Enshi Tujia and Miao Autonomous Prefecture high Xianfeng Town, Leshan Village, Yuying Road dam, construction of a 17-storey four-star hotel with single-layer high in the basement, with a Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. total area of approximately 13,000 square meters, total floor area of approximately 20,000 square meters, about 201 rooms, providing about 132 parking spaces. The total investment of 80 million. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Design:******* Postal Code:******* Contact:******* Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Lushan Road, Changsha, Hunan Yuelu District 70, the construction of a surgery building, total floor area of approximately 11,943 square meters. The total investment of 20 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction unit:******* Postal address:******* Postal Code:******* Contact System : Xu Xiang Tel:******* Fax:******* Construction Unit:******* Postal Code:******* Contact System People: not disclosed Tel:******* Project name: Changsha, Hunan chalice Memphis Hotel Project Progress stage: engineering design Construction period: 2011 - 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Golden Eagle project is located in Changsha city of film culture, to build a business hotel, with a total construction area of about 145,000 square meters. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment 580 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Project Name: Fuzhou Minhou county police criminal investigation research business space project Progress stage: Design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Fuzhou, Fujian, Xu Minhou Jingxi Town Village 128, the construction of an eightstory complex building, covers an area of 16,600 square meters, including: police stations, offices, a singlelayer high in the basement, equipped with air defense equipment and parking. The total investment 41.5 million yuan. Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Fax:******* Project name: Changsha, Hunan chalice Griffith residential area two projects Progress stage: engineering design Construction period: 2011 - 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Changsha, Hunan, Kaifu District, integrated farm Hongxi breakout, the construction of several small high-rise and high-rise residential buildings, covering a total area of 200,000 square meters, total construction area of approximately 250,000 square meters. The total investment 500 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Project Name: Fuzhou Jingxi town small town planning exhibition hall project Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Fuzhou, Fujian Minhou Jingxi north of New Road, Gan Hong Luxi side, the construction of a planned three-storey exhibition hall, with a single high basement, with a total construction area of 13,998 square meters. The total investment of 40 million. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Construction units:******* Postal address:******* Postal Code:******* Contact System : Lin Qing Teng Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project name: Changde City, Taoyuan County People's Hospital expansion project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Taoyuan County, Changde, Hunan Zhangjiang Road, construction of a 16-storey, single-patient building of high ground, with 700-800 beds, with a total construction area of 25,000 square meters. The total investment of 40 million. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Construction Unit:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project name: Changde City, Hunan bus company bus terminus project Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located south of Hunan Changde Shi-Chang Railway, the railway station north of a large market, with a total construction area of about 21,360 square meters, including: bus schedule building, maintenance shop, cafeteria, parking floor. The total investment of 40 million. Construction Unit:******* Postal Code:******* Contact System People: Yujuan Tel:******* Fax:******* Designer:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Enshi Icheon primary employment and social security services center project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Enshi Tujia and Miao Autonomous Prefecture in Icheon City, Park Road 13, construction of a six-storey office building of the employment service center, with a total floor area of approximately 9,000 square meters. The total investment of 12 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Code:******* Contact:******* Progress stage: construction preparation Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011-10 - October 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Wuhan East Lake New Technology Development Zone, Guan Shan 1st Road, construction of three 11-storey office building with a total floor area of approximately 60,000 square meters. The total investment of 90 million. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Tel:******* Project Name: Wuhan City Court Phase III Fortress Progress stage: verification of project approval Construction period: 2012 January - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located east of Avenue Wuhan Jiangxia Jiangxia, Nakasu Avenue north, with the basement area of approximately 165,303 square meters, total construction area of approximately 277,894 square meters, including: residential buildings, commercial buildings. The total investment 300 million yuan. Construction unit:******* Postal Address:******* Tel:******* Project Name: Dongguan City Chang Ping-powered electricity production company building the project schedule Progress stage: construction started in Construction period: 2011 September - September 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Changping Town, Dongguan City, Guangdong Road, the construction of a main building 16-storey, three-storey building, deputy production scheduling floor area of approximately 9573 square meters, total construction area of approximately 22,000 square meters, with a single basement. The total investment of 45 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Project name: production center of Yinchuan, Ningxia Mobile Phase Progress stage: construction preparation Construction period: 2011 September - December 2011 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: The project is located in Yinchuan Xixia days Wencui Street East intersection with the southwest corner, with a total construction area of 16,500 square meters, including: a single-storey warehouse with high, room four-storey building, a three equipment storey building, with single-layer basement. The total investment of 20 million. Construction:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Address:******* Progress stage: construction preparation Construction period: 2011 September - October 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Weinan Hi-tech Development Zone, Zhang Dong Village, covering about 286,810 square meters, total construction area of approximately 96,260 square meters, including: a six-storey training building, a six-storey school building , four six-storey student dormitory, a three-storey student canteen. The total investment of 100 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Design unit: Guangzhou City Han Jing architectural engineering design firm Postal Address:******* Postal Address:******* Postal Address:******* Postal Address:******* Postal Address:******* Tel:******* Project Name: Singapore • Nanjing technology island promoter region of the North Eco-infrastructure projects Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in the Chau Thai Jiangxinzhou Yongding village and village, south of latitude seven river tunnel passing through the green belt, east Jiajiang Dyke, south of Yongding village planning of roads, river west river bank, the implementation of an area of about 2100 acres. The main construction content of the project road works, pipe network engineering, bridge engineering, environment and sanitation, and other landscaping projects. The total investment of 2.3 billion. Construction units:******* Postal Code:******* Contact System By: Tian Tel:******* Design unit: State Power Environmental Protection Research Institute (EIA agencies) Postal Address:******* Tel:******* Project Name: Industry and Trade Co., Ltd. Shaanxi Baoji, Shaanxi API production project Progress stage: construction preparation Construction period: 2011 - 2012 Main equipment: extraction equipment, water treatment equipment, automation equipment, reactors, leaching equipment, evaporators, tablet presses, granulators, dryers, shredders, ozone generator. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Baoji, Shaanxi warburg Fengxiang Jia Dong Township, an area of 50,200 square meters, including: factories, warehouses. The total investment 15 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Gongyi City, and Garden District star Rhythm Project Progress stage: engineering design Construction period: 2011 November - February 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Gongyi City, Henan Province, Zhengzhou Wai Man Road East, new north road, the construction of 11 residential buildings with a total construction area of about 22 million square meters. The total investment 600 million yuan. Construction Unit:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Qingdao Yellow Sea Rubber Group semi-steel radial tire project Progress stage: construction preparation Construction period: 2011 September - April 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project area is located in Shandong Chengyang Jihongtan street, with a total construction area of 60,188 square meters, including: single-to two-storey high workshop, ancillary buildings, research and development center. The total investment of 80 million. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Designer:******* Postal Code:******* Contact:******* Progress stage: construction preparation Construction period: 2011 September - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located on Lake Area Xiaogan Huangpi Road north to the construction of seven 12-storey 20storey residential building, with single-layer high in the basement, with a total floor area of approximately 74,000 square meters. The total investment of 80 million. Construction Unit:******* Postal Address:******* Tel:******* Construction units:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Singapore • Nanjing technology island promoter region of the North Eco-infrastructure projects Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders, green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine, TBM , rig, mud circulation reserve tank and so on. (Reference) Project: Project is located in the Chau Thai Jiangxinzhou Yongding village and village, north to Chau Thai Village planning for roads, east Jiajiang Dyke, south to latitude seven river tunnel passing through the green belt north, west river river bank, the implementation of an area of about 1605 acres ( within the 150 mu less land has been expropriated). Construction, including road works, municipal pipe network engineering, bridge engineering, river training works, landscaping projects in five parts. The total investment of 1.6 billion. Construction units:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact System By: Tian Tel:******* Design unit: State Power Environmental Protection Research Institute (EIA agencies) Postal Address:******* Tel:******* Project Name: China-chemical Co., Ltd. Nanxiong City plant and other projects Progress stage: the record Construction period: 2011-09 January --2013-09 months Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Project is located in Nanxiong City Industrial Transfer Park, the construction scale 6426.00 square meters, the main building there are workshops, warehouses, office buildings, janitors, cafeteria, covers an area of 6776.0 square meters, annual output of 4,000 tons of organic silicon coupling agent The total investment 6.3436 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Times Square West project Progress stage: under construction Construction period: August 2011 to March 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Western section of the Huaihe River Road project is located in the south zone, north western part of genistein Road, dragon mountain (Planning) on both sides, the total area of about 52,000 square meters, together 78 acres, total construction area of 249,000 square meters, including: ground construction area of 234,000 square meters, ground floor area of 15,000 square meters; area of 213,380 square meters of residential buildings, commercial building area 18720 square meters, residential area of 1900 square meters of public buildings complete. The proposed high-level 16, a total of 2307, for 7945 persons. A total of 1430 sets the following 90 square meters, construction area of 128,028 square meters, about 60% of the housing 387 to protect a building area of 21338 square meters, about 10%, more than 90 square meters apartment 490 sets of building area of 64014 square meters, about 30%, green rate of 33.3%, the volume rate of 4.5. District, the major equipment including fire, civil defense, security and other intelligent devices. The total investment 515.24 million yuan. Construction unit:******* Contact:******* Tel:******* Project Name: Stone Town harbor land residential area north of North New Project Progress stage: the record Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 - 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Road project is located north of Stone Town harbor, the total construction area of 6074 square meters. One ground floor area of 5251 square meters, including 3632 square meters of residential, commercial space 1395 square meters, houses 31 square meters of property management, property management space 51 square meters, power distribution room 60 square meters, mechanical garage (converted) 82 square meters; ground floor area of 823 square meters, including the storage room, bike library, the function space, etc.; and above-ground parking spaces, roads, landscaping and other facilities. The project of a new 500KVA transformer. The total investment 57.5 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Inner Mongolia Grain Wholesale Market Expansion II project Progress stage: verification of project approval Construction period: 2012 April - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Baotou, Inner Mongolia No. 15 East River Road neighborhood of industrial area, Industrial Road, east of a comprehensive development, with a total construction area of 160,000 square meters, including: warehousing centers, car parks, office buildings. The total investment 150 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Hainan Hai salt works ramshackle shantytowns Progress stage: verification of project approval Construction period: 2012 March - March 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located west of Hainan Ledong Li autonomy northwest side of town yellow stream, construction of 20 six-to 11-storey residential building, covers an area of 43,548 square meters, total construction area of 55,470 square meters, including: 13 six high residential buildings, seven 11-storey residential building, the project floor area ratio of 1.27. The total investment of 80 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Education Park Shen-Fu new town project Progress stage: engineering design Construction period: 2011 November - September 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shenyang, Liaoning Jia Wang North Street Village, a development of education, with a total construction area of 31,700 square meters, including: teaching buildings, office buildings, dormitories. The total investment of 30 million. Construction:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Designer:******* Postal Code:******* Contact System By: Dan Tel:******* Project Name: Yangzhong moderate Run Project Central International Plaza, a Progress stage: verification of project approval Construction period: 2012 August - February 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Zhenjiang City, Zhenjiang, Jiangsu Road, River Island, the construction of a ninestorey commercial building, with two-storey underground garage, covering about 12,606 square meters, total construction area of 100,000 square meters. The total investment of 120 million. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Indus Residence Project in Jiangsu Huai Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: Design Construction period: 2012 July - October 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Huaian gold project is located north of Gao Road, Sanyo Bay Road, west side, 18-story building 21 to 33-storey residential building, with single underground garage, with a total construction area of about 280,000 square meters. The total investment of 300 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Stages of progress: preliminary design Construction period: 2011 November - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Tianjin Jinnan District gegu town, the construction of a two to three-storey integrated development, with a total construction area of 38,583 square meters, including: the exhibition floor, retail floor, repair floor. The total investment of 90 million. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Design by: Friends of Architectural Design Co., Ltd. Tianjin Postal Address:******* Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the town of Changsha High-tech Zone Lei Feng Lei Feng Memorial Hall, the construction of a museum, with a total floor area of approximately 15,000 square meters. The total investment of 25 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Project Name: Cangzhou Bohai School District first new campus project Progress stage: verification of project approval Construction period: 2012 March - March 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: McNair project is located in Cangzhou, Hebei Industrial Park, with a total construction area of 44,000 square meters, including: school buildings, restaurants, laboratory building, student dormitory, office building. The total investment of 70 million. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Project Name: Wuhan, Hainan Blue Ocean overhead industrial park project Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Huangpi invading Hainan Blue Ocean Industrial Development Zone, Wuhan, invading the new industrial park project, with a total area of about 190.21ha. Project is divided into Free Trade Zone, the general processing and logistics area, integrated service area of three parts, the total project size of 1.8495 million square meters. The total investment 5,077,533,600 yuan. Construction Unit:******* Postal Code:******* Contact System : Li Jun Tel:******* Designer:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Project Name: Nanning Media Star City construction projects Progress stage: construction design Construction period: 2011 November - May 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Nanning, Guangxi plans to extend the line in the Hengyang Road, near the car Bamboo Avenue, a comprehensive development, covers an area of 104,113 square meters, total construction area of 510,048 square meters, including: A plot: two 32-story high four-storey commercial and residential and residential buildings, B block: three 25-storey commercial and residential, two 32storey commercial and residential, four 32-storey residential building and a 11-storey residential building, C block: a 50-storey apartment. The total investment of 14 million. Construction Unit:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Nanning Media Star City construction projects Progress stage: construction design Construction period: 2011 November - May 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. o Project Name: Wuzhou City Chau District People's Hospital outpatient hospital complex building construction projects Progress stage: engineering design Construction period: 2012 March - March 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Wuzhou, Guangxi, Cheung Chau District, Long Road, Wuzhou middle of the southeast of the central grain depots land, construction of a 11-storey outpatient hospital complex building, covers an area of 917 square meters, total construction area of 11,000 square meters, include: outpatient and inpatient departments, providing about 200 beds, has a single basement. The total investment 15 million yuan. Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal address:******* Postal Code:******* Contact System People: Zhongwei Shen Tel:******* Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Progress stage: construction preparation Construction period: 2011 September - June 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Residence project located in the town of Beihai, Guangxi 016 forward, the construction of several blocks of five to six-storey teaching building, with a total floor area of approximately 1,2000 square meters. The total investment 63 million yuan. Construction unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Design unit: construction and installation of Guangxi Lian Kay Engineering Corporation Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Taizhou Gudea Furniture Co., Ltd. # 2 plant construction project Progress stage: under construction Construction period: 2011-8 to 2012-8 Major equipment: sawing machine; curtain machine; drilling machine (for reference)Project: Project is located in Yuhuan County, Taizhou City, Zhejiang Province town industrial industrial parks clear, the purchase of sawing machine 10; curtain machine 3 sets; drilling machine 2 and other equipment. Construction area of 9990 square meters plant, an annual furniture 3000. The total investment of 13 million yuan, including fixed assets investment: 13 million yuan (700 civil; equipment 600;). Construction Unit:******* Postal Code: 317606 Contact:******* Tel:******* Project Name: Nanning State Torch Program Software Industrial Base biotechnology center construction project Progress stage: construction design Construction period: 2011 November - November 2014 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Nanning High-tech District 7 Road to the north, a comprehensive development, covers an area of 273,750 square meters, total construction area of 900,690 square meters, including: biological engineering technology center building, incubation building, development of software industry base office building. The total investment is 10 million. Owner:******* Postal Address:******* Tel:******* Project Name: Commercial, residential building construction Progress stage: the record Construction period: 2011-10 to 2012-10 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Project is located in Zhuji City, Town, River Yangcun Anwar, the new land for the project, with the (sign) an area of 6588.3 square meters, construction land area of 6588.3 square meters, total construction area of 17,050 square meters. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment 72 million yuan, of which Fixed asset investment: 67 million yuan (civil engineering 2000; equipment 200; installation of 300; other costs of construction 4000; reserve fund of 200), construction period interest 300 million, initial working capital of 2 million. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Hubei Vocational College of Biotechnology: student apartments, student food, conference center project Progress stage: construction preparation Construction period: 2011 September - August 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Hubei Wuhan Hong mountainous wild Chih Lion Street, Lake 1, a comprehensive development, with a total area of approximately 13,600 square meters, total construction area of approximately 34,100 square meters, including: a layer of 11 to 12 storey student dormitory, a four-storey dining hall and conference center. The total investment of 50 million yuan. Construction:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Wuhan Science and Technology Museum new building construction projects Stages of progress: preliminary design Construction period: 2012 May - August 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Wuhan East Lake High-tech Zone Optical Valley Technology City along the roadside, the future construction of a Science and Technology Museum, with a total area of approximately 100,000 square meters, total construction area of approximately 50,000 square meters. The total investment of 100 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Wuhan East Lake District National Innovation Model Convention and Exhibition Center Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Stages of progress: preliminary design Construction period: 2012 July - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Wuhan East Lake New Technology Development Zone, high-tech center of modern service road north of the construction of a convention center, with a total area of approximately 240,000 square meters, total construction area of approximately 200,000 square meters, including: exhibition center, office, conference room. The total investment of 400 million yuan. Construction unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Yichang Changyang fruits and vegetables, medicinal herbs, deep-processing projects Progress stage: Design Construction period: 2011 November - October 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Main equipment: extraction equipment, water treatment equipment, automation equipment, reactors, leaching equipment, evaporators, tablet presses, granulators, dryers, shredders, ozone generator. (Reference) Project: Project is located in Yichang, Hubei Changyang Lang Town, an industrial development, with a total area of approximately 100,000 square meters, including: factories, warehouses, cold storage, office. The total investment of 50 million yuan. Construction unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Stages of progress: preliminary design Construction period: 2012 March - March 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Silver Chuanning An Avenue project is located east of Ningxia, construction of a complex, including activity centers, training centers and libraries with a total construction area of 18,000 square meters. The total investment of 50 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Xi'an city reconstruction project to the village altar Progress stage: construction design Construction period: 2012 March - October 2015 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Xi'an Beilin altar Village, South Second Ring Road overpass and the Tai-around, an integrated development with a total floor area of approximately 300,000 square meters, including: shops, shopping malls. The total investment 600 million yuan. Construction Unit:******* Postal Code:******* Contact System By: Dong Yaping Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Yue Zhai resettlement area construction projects Progress stage: engineering design Construction period: 2011 November - November 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Xi'an Qu Jiang New District, South Lake Development Zone, a residential development, an area of 50,320 square meters, total construction area of 213,149 square meters, including: eight 26-storey residential building, a three-storey kindergarten, a 3-storey commercial clubs. The total investment of 1.5 billion. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: First High School Project Zhumadian Suiping Progress stage: engineering design Construction period: 2012 January - November 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project on children in the Zhumadian South Bay Bridge, the new State Road 107 east, a development of education, with a total area of 200,000 square meters, total construction area of 95,000 square meters, including: teaching building, office building, laboratory building, library building, dormitory, playground, cafeteria. The total investment 120 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Henan integrated transport hub in the East Plaza Square subway Stages of progress: preliminary design Construction period: 2011 December - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located south of Zhengzhou, Zhengzhou, Henan transit hub station, west of Zhengzhou East Railway Station, north of highway hub terminal, a comprehensive development, with a total area of 51,953 square meters, total construction area of 69,000 square meters, including: Station Square, transport facilities, underground business, garage, ancillary equipment space. The total investment 700 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Henan Xinyang Xiangshan International Triumph resort hotel project Progress stage: construction started in Construction period: 2011 August - August 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Xiangshan County, Xinyang, Henan new Lake Management District, a comprehensive development, with a total construction area of 45,000 square meters, including: a 21-storey five-star hotel with single basement, 60 single-to two- high house, car park. The total investment 200 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction unit:******* Postal Address:******* Tel:******* Project Name: Qingdao Industrial Co., Ltd. Guang Nan test floor, plant project Progress stage: construction preparation Construction period: 2011 October - November 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located south of Huaihe East Road, Qingdao, Shandong Province, east of the former Bay on the 7th line, a comprehensive development, with a total construction area of 9,275 square meters, including: workshops, testing floor. The total investment 10 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Lawrence Hospital, New Medical Building Project Progress stage: engineering design Construction period: 2012 February - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Zunyi, Guizhou Province, No. 98 Phoenix Road, construction of a 19-storey residential building with about 1500 beds, with a total floor area of approximately 120,000 square meters. The total investment 200 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Contact:******* Progress stage: engineering design Construction period: 2011 November - November 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Yuxi city cup Fengxiang County Road North River, administrative center of Hing Wah Street, both sides of the construction of a three and a half high conjoined complex building, covering about 33,300 square meters, total construction area of approximately 45,000 square meters, including: the first layer of shops, about 150 stalls, the second layer to the third floor of residential buildings, has a single underground car park, the project floor area ratio of 1.3. The total investment of 100 million yuan. Construction Unit:******* Postal Code:******* Contact System People: your Thursday Tel:******* Designer:******* Postal address:******* Postal Code:******* Contact:******* Electricity Tel:******* Project Name: Dongfang City, Hainan Province Public Security Bureau and the Building of affordable housing projects Progress stage: construction started in Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 August - October 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Dongfang City, Hainan town, eight North Eastern Avenue, with a total construction area of 66,532 square meters, including: a 11-storey business and technology building, a three-story building window, a single-storey canteen, a few blocks 16-storey residential buildings around. The total investment of 80 million. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal address:******* Postal Code:******* Contact System By: Peng Xumao (architect) Tel:******* Design:******* Postal address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the town of Sanya Bay, Sanya, Hainan, the construction of an approximately 12storey residential building, total construction area of approximately 20,000 square meters. The total investment of 25 million. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Contact System By: Yu Tao Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Designer:******* Postal Address:******* Progress stage: construction preparation Construction period: 2011 September - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Changchun city wide Qingfeng Road, south of road east of the nine, a two-to 30storey integrated development, partial basement with single-layer high, including the underground garage, with a total construction area of 193,604 square meters including: residential buildings, commercial podium. The total investment 200 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact System By: Dong Jihong Tel:******* Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal address:******* Postal Code:******* Contact System People: Dingxi ago Tel:******* Project Name: Liaoning Jinzhou City Golden Age Project Progress stage: construction preparation Construction period: 2011 September - April 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Jinzhou, Liaoning Tiger Town Heishan big black large road east, the construction of 30 apartment buildings with a total construction area of 200,000 square meters. The total investment 250 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Liaoyang branch of China Telecom Group, the production machine building projects Progress stage: construction preparation Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 September - May 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: River project is located in the east coast of Prince Edward Liaoyang, Liaoning, east green belt, west of Park Road, north China Street, construction of a four-storey office building with a total construction area of 7,614 square meters. The total investment of 18 million. Construction:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Tel:******* Project Name: Liaoning Panjin Liaohe Oilfield first high school building construction projects Progress stage: construction preparation Construction period: 2011 September - September 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Panjin, Liaoning dual Rd near the construction of a seven-storey teaching building, with a total area of 2,792 square meters, total construction area of 14,998 square meters. The total investment 15 million yuan. Construction units:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Stages of progress: preliminary design Construction period: 2012 March - March 2014 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in the mountains of East Port, Dalian, Liaoning, Dalian Bay to the north, a 53-layer to 68-storey integrated development, with three-to four-storey podium, with three levels of basement, with a total area of approximately 42,846 square meters, total construction area of approximately 552,801 square meters, including: apartment buildings, commercial buildings, office buildings. The total investment of 3.0 billion. Construction Unit:******* Postal Code:******* Contact System By: Qiang Cheng Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction preparation Construction period: 2011 October - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Mountain Road, East Development Zone, Yancheng, Jiangsu Province, the Minjiang River Road North, a comprehensive development, with a total construction area of 13,300 square meters, including: a comprehensive five-storey buildings, with dormitories, a two-storey training center with swimming pool. The total investment of 30 million. Construction unit:******* Postal Address:******* Tel:******* Designer:******* Postal Code:******* Contact System : Wei Yong (architect) Tel:******* Designer:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact System : Huang County (Drainage Engineer) Tel:******* Designer:******* Postal Code:******* Contact System By: Dong Zhirong (Structural Engineer) Electricity If 0515-88189328, 88189019 Designer:******* Postal Code:******* Contact:******* Progress stage: engineering design Construction period: 2012 April - October 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the town of Yancheng Wu You, the construction of several school buildings, covering about 66,600 square meters, total construction area of approximately 30,000 square meters. The total investment of 40 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Project Name: Suzhou Pingjiang floor in school art and physical education building new projects Stages of progress: preliminary design Construction period: 2012 April - August 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Samsung project is located in Suzhou, Jiangsu Road, the new one art and physical education building and a building with a total construction area of 9,500 square meters. The total investment of 20 million. Construction Unit:******* Postal address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Project Name: Chongqing City real estate building projects Progress stage: construction preparation Construction period: 2011-10 - October 2013 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Project is located in Chongqing, the new St. Paul Street, Yubei Longxi new irrigation Road, construction of a 24-storey office building, with a three-storey basement, with 1000 parking spaces, with a total construction area of 110,000 square meters. The total investment 150 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Bazhong District Central Hospital, medical clinic construction of the second Progress stage: construction preparation Construction period: 2011 September - February 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Technology Park Economic Development Zone Administrative Committee Sichuanbazhong Nanba seven road south, out-patient medical technology to build a 25-storey building and a hospital building, providing about 1,000 beds, has a basement, with a total construction area of 107,072 square meters. The total investment of 200 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Fuzhou Lu and Liu Zhuanghe along the land bridge project dilapidated change Stages of progress: preliminary design Construction period: 2012 March - March 2014 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located east of Second Ring Road of Fuzhou, Fujian, Yangqiao Road north of Gijón Road, south block, land Zhuanghe west, a residential development, an area of 33,623 square meters, total construction area of 99,000 square meters, including: high-rise office, high-rise residential buildings. The total investment 257,400,000 yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Tianjin, a blue-collar apartment project Progress stage: engineering design Construction period: 2011 November - November 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Tanggu District, Tianjin Coastal Science Park, the construction of several apartment buildings, total construction area of 65,500 square meters. The total investment of 80 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Stages of progress: preliminary design Construction period: 2012 March - February 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shanghai Zhangjiang Hi-Tech Park in Pudong New Area District B-1-12 block, construction of a research building, with underground parking garage, with a total construction area of 20,192 square meters. The total investment of 70 million. Construction:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Construction:******* Postal Code:******* Contact:******* Tel:******* Construction:******* Postal Code:******* Contact:******* Tel:******* Construction:******* Postal Code:******* Contact:******* Tel:******* Project Name: Shanghai International Trade Center Hardware Electrical Hardware City, supporting three projects Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction preparation Construction period: 2011 September - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Baoan Road, Jiading District, Shanghai, No. 4229, built a few blocks of four high street shops, with high single underground parking garage, with a total construction area of about 100,000 square meters. The total investment 104 million yuan. Construction:******* Postal Address:******* Tel:******* Design:******* Postal Code:******* Contact System People: Baiyun (architect) Tel:******* Design:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Project Name: Shanghai eastern suburb of commercial office center project Progress stage: Design Construction period: 2012 June - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shanghai Pudong Jinqiao Road, east, south to Long Dong Avenue, west Zizhu Road, north to Yin Liu Road, construction of 85 buildings 15 meters high limit commercial and office building with underground parking garage, with a total area of of 112,479 square meters, total construction area of 214,612 square meters. The total investment 600 million yuan. Construction:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Progress stage: engineering design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2012 April - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Planning project is located east road Minhang District, Shanghai, Pu Xiao west road, south to Hua Jiang Road, north to River Road, Beech, a comprehensive development, with underground parking, with a total construction area of 65,137 square meters, including: office building, commercial building, dining center. The total investment 130 million yuan. Construction:******* Postal Address:******* Tel:******* Project Name: Foshan City Nanhai industry think tank, a project Stages of progress: preliminary design Construction period: 2012 March - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in the town of Nanhai District, Foshan, Guangdong, a comprehensive development area of approximately 106,851 square meters, total construction area of approximately 110,000 square meters, including: innovation area, office area, business district, R & D centers, warehouses, parking field. The total investment of 250 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project name: Town, Foshan City, Lion Red Sand living zone project Stages of progress: preliminary design Construction period: 2012 March - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in the town of Nanhai District, Foshan, Guangdong Songgang, a residential development with a total floor area of approximately 320,000 square meters, including: residential buildings, shops, parking. The total investment 400 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project name: Building, Shenzhen, information transmission cable project Progress stage: construction design Construction period: 2012 July - December 2014 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Project is located in Binhai Road, Nanshan District, Shenzhen, Guangdong, south, Ring Road, west side, construction of a comprehensive 23-storey building, total construction area of 38,600 square meters, including: operating room, office, TV room, with a three- levels of basement parking. The total investment of 100 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction:******* Postal Address:******* Tel:******* Design:******* Postal Code:******* Contact:******* Progress stage: construction preparation Construction period: 2011 September - January 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Nanhai District, Foshan, Guangdong Road, Jinyuan Street, west of Guicheng 80 blocks D-05d block, construction of a 11-storey office building, with a two-tier basement area of approximately 5,275 square meters, total construction area of 24,480 square meters. The total investment 78 million yuan. Construction:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Designer:******* Postal Address:******* Tel:******* Project Name: Bank of China Building construction project files, Shunde Branch Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Foshan, Guangdong Daliang bang west residential area, construction of a sevenstorey building of files, covers an area of 2,120 square meters, total construction area of 9,913 square meters. The total investment of 14 million. Owner:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction preparation Construction period: 2011 September - April 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the South Renmin Road, Zhanjiang Xiashan No. 57, the construction of an eightstory outpatient building, total construction area of 8,407 square meters, including: the infusion center, CT Room, MR room, B-room, endoscopy center, test , ophthalmology, dentistry rooms, rehabilitation centers, echocardiography room, dermatology, consultation show the classroom. The total investment of 12 million yuan. Construction:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Design:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Dongguan (Huizhou) Industrial Transfer Park Project a standardized plant Progress stage: construction started in Construction period: 2011 September - December 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Dongguan, Guangdong Longmen County, Huizhou (Huizhou) Industrial Transfer Park, the construction of five four-to six-storey complex building, covering about 48,440 square meters, total construction area of approximately 54,208 square meters, including: four four-storey factory buildings, a six-storey staff quarters, canteen. The total investment of 50 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Project Name: Guangning one hundred surplus garden (villa) Phase II Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the town of Zhaoqing Guangning South Street, North Avenue, one hundred one hundred Ying Ying Garden, the construction of 87 three-storey villa, with a total floor area of approximately 35,000 square meters. The total investment of 50 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction:******* Postal Address:******* Tel:******* Construction:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Construction:******* Postal Address:******* Tel:******* Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Contact:******* Tel:******* Project Name: Baoding Road West Station transportation hub project car passenger Progress stage: construction preparation Construction period: 2011-10 - October 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Baoding seven all the way north, the south side of Fuxing Road planning, a comprehensive two-to five-storey development, with a total construction area of 19,763 square meters, including: waiting building, team building, and passengers apartment, repair shop , the station hall, waiting building and team building with a corridor connecting the middle. The total investment 22 million yuan. Construction Unit:******* Postal Code:******* Contact System By: Wei Ming Chao Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Designer:******* Postal Address:******* Progress stage: Design Construction period: 2012 February - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Center Avenue project is located in Taizhou, Zhejiang, a comprehensive development, with a total construction area of approximately 250,000 square meters, including: six 16-story residential building, six 28-story residential buildings, four to five-story commercial building, single underground garage. The total investment 300 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Design:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: Design Construction period: 2012 August - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Quzhou Kaihua County, west of Phoenix Road, with a total construction area of about 52,300 square meters, including: outpatient and emergency building, medical building, hospital building, floor, infection, administration and logistics space, rehabilitation centers. The total investment 150 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Design:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Design:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Agricultural biotechnology in the High Park Group kinds of experimental building projects Stages of progress: environmental impact assessment Construction period: 2011 - 201 years Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Kowloon East Lake New Technology Development Zone, agricultural bio-industry base of high biological garden, God all the way south of the pier, Long Road, west of the mountain streams, high farm road east of New Road to the north. Average annual construction scale cultivation of new varieties of 20 crops, for farmers $ 3.8 billion. The main construction content of research and development laboratory building renovation 36500m2, purchase a total of 754 sets of experimental apparatus. The total investment 432,816,200 yuan, of which construction investment 188,154,900 yuan, 119,990,000 yuan investment in equipment. Owner:******* Postal Code:******* Contact:******* Tel:******* Design Unit: Department of Environmental Protection, Nanjing Institute of Environmental Science (EIA agencies) Postal Address:******* Tel:******* Fax:******* Project Name: Hubei Cancer Hospital New Outpatient Building Project Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Hongshan District of Wuhan City, 116 South Zhuodao Quan, a new outpatient hospital in the complex building. The building proposed total construction area of 28,000 square meters, to be set six wards of internal medicine ward, 300 new beds, the hospital beds after completion of the project to 1042 (can be amplified to 1688). The building has a comprehensive outpatient clinic, medical ward, catering, office and other administrative functions. The total investment is unknown. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal Code:******* Contact:******* Tel:******* Project Name: Wenzhou Kean University construction projects Progress stage: feasibility study stage Construction period: 2012 June - October 2014 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located east of Lai Tong Road, Wenzhou, Zhejiang, south of Laguna Park Road, west of the new State Road 104, north of the mountain, covering about 706,620 square meters, total construction area of 305,300 square meters, including: Academic Building , library, laboratory internship sites, wind and rain the playground, school administration buildings, the Department of administrative buildings, halls, student hostels, student canteens, dormitories for single faculty, faculty housing (apartment), faculty canteen, welfare, outdoor sports, outdoor swimming pool. The total investment 540 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Ninghai County of Ningbo City, school project Progress stage: engineering design Construction period: 2012 - 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Ningbo, Zhejiang Xinghai east, to build a primary school, with 48 classes, covering an area of 33,509 square meters, total construction area of 20,671 square meters. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment of 25 million. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Progress stage: construction preparation Construction period: 2011 September - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Zhoushan Island New Daishan bamboo, the construction of four storey office building 6-15, with high single underground car park, covers an area of 20,000 square meters, total construction area of approximately 39,000 square meters. The total investment of 80 million. Construction units:******* Postal address:******* Postal Code:******* Contact System : Huang Yao Juan Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Design:******* Postal Address:******* Tel:******* Project Name: Nanjing Subway Line subway control center complete building renovation project Progress stage: construction preparation Construction period: end of September 2011 - December 2011 Major equipment: steel, building materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, control pieces of pipe, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Item No. 228 Zhongshan Road, Nanjing is located in the building area of 2813.9 square meters, a total of 29 floors, underground part 3 floors above ground and 26 floors, the floor area of 1048.49 square meters. The total building height of less than 100 meters. Metro Building control center on the first floor which support the transformation (about 356 square meters). The supporting projects for the control center on the first floor part of the interior decoration, installation works. Specifically: 1) interior decoration; 2) building intelligent; 3) water supply and drainage and fire, electrical; 4) wall reconstruction (about 100 square meters); 5) removal of interior decoration and the original Sinotrans; 6) Conference Room ventilation and air conditioning; 7) electrical engineering conference room; 8) conference room sound system. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment is not detailed. Construction:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Project Name: Zhejiang Wenling City Second People's Hospital expansion project Progress stage: Design Construction period: 2012 - 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Xinhe Town, Wenling City, Taizhou, Zhejiang, north of the public road, with 400 beds, covers an area of approximately 34,589 square meters, total construction area of 36,511 square meters, including: the cancer ward, science and technology building, emergency building, life auxiliary space. The total investment of 75 million. Construction Unit:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Xicheng District, Beijing No. 1 Muxidi South, construction of a four-storey library with a total construction area of 4345 square meters. Building height of 25m. The total investment of 12 million yuan. Construction:******* Postal address:******* Postal Code:******* Contact System People: Tension Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Designer:******* Postal address:******* Contact:******* Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Yinzhou District, Town King Yin Lu Village, an area of about 7241 square meters building, structure, layers: frame 3, 5 layers. The total investment 28.64 million yuan, sources of funding for the funding. Construction unit:******* Postal Code:******* Contact:******* Tel:******* Construction unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Project Name: Guangdong Foshan Nanhai Gas Development Company Limited in the water company's warehouse and R & D room project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Foshan Nanhai Lishui Heshun Avenue, construction of a six-storey main building and annex building R & D room two-storey warehouse, with a total floor area of approximately 5244 square meters. The total investment of 12 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Fax:******* Construction Unit:******* Postal Code:******* Contact System People: He Huali Tel:******* Fax:******* Design:******* Postal Code:******* Contact:******* Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Fujian Sanming Yong Ji Village on the street Yanxi exposed pits, construction of integrated building a few blocks, with a total floor area of approximately 30,000 square meters, including: teaching building, dormitory, dining hall. The total investment of 28 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction units:******* Postal Address:******* Tel:******* Fax:******* Project Name: Beijing South-color school buildings project Progress stage: construction preparation Construction period: 2011 September - March 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shunyi District, Beijing Cai Town, South Village color, with a total construction area of 22,306 square meters, including: five-story classroom building, laboratory building, building height of 24 meters. The total investment of 50 million yuan. Construction unit:******* Postal Address:******* Tel:******* Designer:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Project Name: Beijing Fengtai District, integrated services space program Progress stage: construction preparation Construction period: 2011 September - April 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Beijing Fengtai District South Garden Road No. 5, with a total floor area of approximately 8630 square meters, including: a comprehensive two-storey office building, a two-storey youth activities center with a single basement. The total investment 17 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Designer:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Beijing Building Materials City, dilapidated building the second phase Progress stage: verification of project approval Construction period: 2012 January - October 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Haidian District, Beijing Xisanqi building east, planning to build three-way east, south planning Silicon Valley pioneer North, west planning a small mouth of the East Village, West, North to planning Xisanqi Road, a residential development, located underground parking garage and equipment room, an area of approximately 83,810 square meters, total construction area of approximately 196,762 square meters. The total investment 230 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Customs business and technology Yunfu City building project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Yunfu House Road junction with Fu Lu Road, southwest corner, the construction of a complex building, covers an area of 14,224 square meters, total construction area of approximately 12,400 square meters, including: office, business premises, warehouses. The total investment 15 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Economic Development Project in Liaoning Tieling the west side of the rubber plantation, transportation Driving south into the land, the construction of several blocks of six-storey residential building, total construction area of 90000 square meters. The total investment of 50 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: People's Hospital of Shantou City, Nanao County expansion project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Nanao County, Guangdong Shantou Long after Zhaizhen Australian Avenue (formerly Canton New Road), construction of two integrated two-to six-storey building, total construction area of 7386 square meters, including: a six-storey hospital building , with 100 beds, a comprehensive twostorey building, with equipment rooms, morgue, oxygen center. The total investment of 14 million. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Design by: Shantou City Chenghai District, Architectural Design Postal Address:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Postal Address:******* Tel:******* Fax:******* Project Name: Henan Zhengzhou Air Port Health Park District No. 8 - 20 Building construction project Progress stage: under construction Construction period: August 2011-August 2012 Major equipment: fire, air defense, intelligence equipment, complete (for reference)Project: Project is located in Zhengzhou Zheng Air Port Road East Hong Kong six north, the new project area of 145.28 acres of land for construction levy (about 96852.61 square meters), with a total construction area of 198,215.37 square meters: one on the ground floor area of 180,921.69 square meters, ground floor area of 17,293.68 square meters. 8, 11, 14, 17 Building construction area of 22769.56 square meters, respectively, which were commercial area of 2741.8 square meters; 9, 19 Building construction area of 11789.8 square meters, respectively; 10, 18 Building construction area of 7144.68 square meters, respectively; 12, 13 Building construction area of 13660.91 square meters, respectively, which were commercial area of 2143.48 square meters; 15, 16 Building construction area of 5781.6 square meters, respectively, which were 935.6 square meters commercial space; 20 Building construction area of 19711.71 square meters; Square basement construction an area of 3999.88 square meters; Commercial Street building area of 5186.68 square meters; support services building area of 1277.29; distribution area of 207.59 square meters housing construction. Volume rate of 2.05, an area of 33898.4 square meters green, greening rate of 35%; 3054 dwellings, all of the dormitories, are 90 square meters or less. The main equipment including fire, air defense, full of intelligent devices. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment 618,727,400 yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Industrial Research Institute of Tianjin University, Coastal Engineering Laboratory of the fuel center Progress stage: construction preparation Construction period: 2011 September - May 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the east Bohai Sea, Tianjin Harbor Industrial District 12 Road, south to the Jialing River Road, west of Bohai Ten Road, Ring Road, north to the Jinsha River, with a total construction area of 8512 square meters, single, steel, eight of which the largest single area of 1165 square meters, the maximum height of 18.6 m, no underground works. The total investment 44.37 million yuan. Construction Unit:******* Postal address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Fax:******* Design Unit: Tianjin University Institute of Architectural Design Postal Address:******* Tel:******* Fax:******* Project Name: New Lujiang County radio and television broadcasting center project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: New project in the east, New Lujiang County radio and television broadcasting center project. Ten-story plus the negative layer, with a total area of 12,000 square meters, the frame structure. The total investment of 30 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Shaoxing City Furniture City Management Service Center, District Disabled Integrated Services Centre project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shaoxing city, layers 12 layers; number one buildings; construction area of 13519.45 square meters. The total investment 56.5 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Xi'an University of commercial and academic exchanges Weiyang Campus Center Project Progress stage: Design Construction period: 2012 April - August 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Jinhua Road, Xi'an, Shaanxi, a comprehensive development, with a total floor area of approximately 80,000 square meters, including: the number of blocks of three-storey commercial building, four-star hotel offering 200 and 300 rooms, Commercial Street, Commercial Street, 700 meters long. The total investment 150 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Contact:******* Progress stage: the record Construction period: 2011-12 to 2014-12 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Shao Li River in the east to the railway project, the planning of roads south, west, north to the river bridge the status quo, introduce a large line 二号 block real estate development projects with a total land area of 37,607 square meters, total construction area of 118,017 square meters, of which ground floor area of 24,000 square meters. The total investment 822.87 million yuan, including fixed assets investment: 771 million yuan (Civil 33500; installation of 4000; construction of other costs 38000; reserve fund 1600), construction period interest 51.87 million yuan. Construction Unit:******* Postal Code:******* Contact System People: Makati peak Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Battery Materials Engineering Laboratory United States where Progress stage: the record Construction period: October 2011 to December 2012 Major equipment: battery anode material testing instruments; battery separator material experiments, testing equipment (for reference)Project: Project is located in the city's hospital, 168 North Second Ring Road, a new research building, building area of 3,000 square meters; purchase laboratory equipment, testing equipment platform, a total of 24 pieces (sets), including: battery anode materials testing instruments 4 (sets); battery separator material experiments, testing instruments 20 (sets). The total investment 26.6 million yuan, of which: self 24.6 million yuan, the other capital of 2 million. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Wenzhou District, the southern suburbs of the street gathering point benevolent transformation of rural housing project (Phase I) project Progress stage: construction preparation Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Wenzhou area suburbs street. The total investment 121,661,200 yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Project Name: Jiaxing Pinghu Economic Development Zone (Chung Tai-street) resettlement housing project south garden Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Yongxing Road project is located north west of the emerging Rd. The total investment 445 million yuan. Construction units:******* Postal Address:******* Tel:******* Project Name: Chongqing Kai County Yunfeng low-rent housing housing construction Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Yunfeng Street project is located in Chongqing Kai County (western part of the hillside, Nanshan Road), a building area of 16,484.53 square meters tenders, two tenders construction area of 25259.01 square meters, a total of 7 layers, the structure of brick and concrete structure. The total investment of 470 million yuan. Construction:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Contact System : Mr. Hu Tel:******* Fax:******* Project Name: Old City, Henan Province, Yiyang County Yellow Machine Factory bankruptcy liquidation group shantytowns civil engineering construction projects Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Yiyang County western part of the old city north and south sides of Red Road, east to West Street neighborhood, west of the Yellow River plant production area, south to West Village, North County Mill appropriate family member courtyard, the first tenders : 1 # floor area of 7380.93 square meters, 6-layer, two-story frame structure following the second floor above the condensate for the brick structure; 6 # floor area of 5224.3 square meters, 6 layers, all brick condensate structure; second Lot: 2 # floor area of 5904.68 square meters, 11 floors, all of the frame structure; third tenders: 3 # F 4765.9 square meters, 5 # F 3466.73 square meters, 7 # F 3958.64 square meters, 8 # 2680.16 square meters, the four Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. buildings are six-layer, two-story frame structure following the second floor above the condensate for the brick structure. The total investment 46 million yuan. Construction unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Second School Qinyuan County New Project Progress stage: construction design Construction period: 2011 October - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shanxi Changzhi Qinyuan County Guo Guo Road, Village Road, northeast corner of town, a development of education, with a total floor area of approximately 16,522 square meters, including: teaching buildings, office buildings, libraries, laboratory buildings, student apartment buildings, teachers, apartment buildings, canteens. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment of 25 million. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the town of Red Road, Jinnan District xianshuigu south (Jinnan district hospital mentally retarded), total construction area of 5966.9 square meters. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment 28.18 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Fax:******* Project Name: Baoshan District decoration integrated development project Progress stage: construction design Construction period: 2011 October - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project in Inner Mongolia Chifeng Yuanbaoshan area, a comprehensive development, with a total area of about 1,734,200 square meters, including: commercial complex building, high-end residential buildings, villas, hotels, facilities. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment of 13 million. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal Code:******* Contact:******* Progress stage: engineering design Construction period: 2012 January - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Hohhot Saihan District Bayantala Road, west of the construction of a residential development with a total construction area of 256,300 square meters, including: the number of blocks 21storey residential buildings, facilities, parking. The total investment of 250 million yuan. Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Project Name: Henan information management school teaching laboratory building and auxiliary building project Progress stage: construction design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Zhengzhou City, Zhongmu future industrial park vocational Park Road East, Long Yang Xi Luxi, Hope Road south, north road of peace and prosperity, building area 8500 square meters. The total investment 18.8 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Featuring: Southern Building Design Co., Ltd. Zhengzhou Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Golden Bridge Middle School construction project in Hohhot, Inner Mongolia Stages of progress: preliminary design Construction period: 2012 January - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Jinqiao Economic Development Zone, Hohhot, Inner Mongolia, Riverside Road between 11 Road and Century, an educational development, with a total construction area of 67,572 square meters, including: library, administration building, two laboratory building, integrated building, dormitory, canteen, rain playground, bleachers, guard room. The total investment of 100 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Heilongjiang CIQ integrated laboratory building construction projects Progress stage: construction preparation Construction period: 2011 September - September 2013 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Technological innovation projects in the city of Harbin, Heilongjiang Innovation Park Road 21 south of the starting area planning, planning road 10 west, a comprehensive development, with a total construction area of about 50,000 square meters, including: a comprehensive 23-storey laboratory building, with a single basement, a 10-storey annexe, with a single basement, a four-storey podium, with a single basement. The total investment 200 million yuan. Construction unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Design unit: Harbin Institute of Technology Institute of Architectural Design Postal Address:******* Postal Address:******* Tel:******* Design unit: Harbin Institute of Technology Institute of Architectural Design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Postal Address:******* Tel:******* Project Name: Tempo Liangmao Ltd 50,000 t storage facility construction project Progress stage: construction preparation Construction period: 2011 September - September 2012 Major equipment: electronic measuring, circulation fumigation system, grain suction machine, a storage unit, bulk grain unlucky car, green, fire and other facilities. (Reference) Project: Project is located in Jilin Siping Yitong Manchu Autonomous County Itami Town Village, a single highintegrated development, with a total construction area of 12,120 square meters, including: two flat warehouse, offices, laboratories, inspection jin room. The total investment of 20 million. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Progress stage: engineering design Construction period: 2011 - 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Shandong Jining Jinxiang, set bed 1600, covers an area of 133,400 square meters, total construction area of 150,000 square meters. The total investment 200 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Progress stage: construction preparation Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Anhui Gujing sheet set near 2000 meters south of the village administration. The total investment 1.9 billion. Construction Unit:******* Postal Code:******* Contact System : Yu Yongbo Tel:******* Design Unit: Hefei Design Institute of Coal Industry Postal address:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Project Name: Langfang Branch through the Garden District 6 #, 8 # -13 # floor and underground garage project Progress stage: construction started in Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 - 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located south of the light minthi Road, Xin language Xingyuan district east wall, 6 # F 24 layer 12065.03 square meters, 8 # 18-storey 5735.42 square meters, 18 floors 5735.42 9 # Building, 10 # Building 18-storey 9474.06 ㎡ , 11 # Building 18-storey 9474.06 square meters, 12 # Building 18-storey 23786.97 square meters, 13 # F, 6-layer 1075.98 ㎡, Total: 67346.94 square meters; the basement area of 4474.04 square meters; underground garage area of 18,073.76 square meters. Main elements: civil, fire, water, windows and doors, rough decoration. The total investment 275.85 million yuan. Construction units:******* Contact:******* Tel:******* Fax:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Fax:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Wen County School Safety Engineering 2011 Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Wen County project is located within a Lot: clouds 3131.36 ㎡ town middle school, high school clouds Town Building 762 square meters, clouds Town Middle School Reading Room 810 square meters. Two tenders: Lin Zhao School student accommodation building 1384.56 m, restaurant 700 m forest called school. Three tenders: Cold School North Building 1981 square meters. Four tenders: Takenori Town Primary School Building 1380 square meters. The total investment 10 million yuan. Construction Unit:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Zhengzhou City, the school expansion project tax Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Zhengzhou City Jindailunan, Gang Road North, Village Road, is still something, with a total land area of 67,540 square meters (about 101.3 acres), of which urban road area of 17,540 square meters (about 26.3 acres), construction land area of 50,000 square meters ( combined 75 acres), with a total construction area of 53,810 square meters. The total investment of 129.3 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Fax:******* Designer:******* Postal Address:******* Tel:******* Project Name: Hunan Ningxiang Jinzhou District resettlement area construction projects Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the territory of Hunan Ningxiang Jinzhou District, the proposed construction of resettlement housing 11, with a total construction area of 50285 square meters; first tenders (Xing resettlement area with 8 #, 9 #, 10 # Building): floor area of about 14,464 square meters, eight buildings covering about 5152 # m, 9 # Building construction area of about 4147 square meters, 10 buildings covering about 5165 # m; the second section (Ziyun resettlement areas A, B Building): floor area of about 13,056 square meters, of which A building is an area of about 6956 square meters, B Building construction area of about 6100 square meters; third tenders (national resettlement area F3 Building): floor area of approximately 4960 square meters; fourth tenders (Longqiao resettlement area 10 #, 11 # Building) : construction area is about 7045 square meters; fifth tenders (Longqiao resettlement area 12 #, 13 #, 14 # Building): floor area of about 10,760 square meters, of which 12 # Building construction area of about 6885 square meters, 13 #, 14 # buildings area of about 3875 square meters. The total investment is not detailed. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Project Name: Langfang Development Zone, the first primary school dormitory, classroom building project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Langfang Economic and Technological Development Zone, construction, fire, water, windows, thick decoration, frame structure, with a total construction area of 15401.42 square meters. The total investment 29.15 million yuan. Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Project Name: Nantong Tongzhou District Nanyuan orchard land resettlement project Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Nantong, Jiangsu Tongzhou Development Zone, Xuanwu Lake Road, south of the Yangtze River Road, west side, Tong Lu highway north, with a total land area of 61,289 square meters, total construction area of 136,339 square meters. A total of nine residential high-rise residential planning (1 +5 +1 form), high-rise 9 (1 + 10 + 1 form), total construction area of 116,654 square meters floor area ratio, basement 2200 square meters, underground garage, 3884 square meters. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment is not detailed. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Hangzhou Xiaoshan Cultural and Creative Industry Center (tentative name) Project Progress stage: the record Construction period: 2012-8 to 2014-6 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Project is located in the north dry streets, 14.84 acres of land for the project, with a total construction area of 101,772 square meters, including: commercial, office (cultural and creative) space 84,127 square meters, the property management space 260 m2, ground floor area of 17,385 square meters. The total investment 900 million yuan, of which Fixed asset investment: 900 million yuan (civil 50000; construction of other costs 40000;). Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Code:******* Contact Person: Wang Rong its Tel:******* Project Name: Pingyao County, south of the town of Fort Ancient Pottery village south of New Commission (village housing area) 7 # residential building projects Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Tuen Pingyao South Outer Ring Road West, South Fen, brick, six-floor, basement, height 18.3 meters; project size: 9599.65 m2. The total investment 10 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Project Name: River Xining family planning services are county building project Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Projects are located in Xining River Road Bridge east of Dengfeng County, building area of 12,052 square meters, a total of nine, 31.5 meters high. The total investment of 20 million. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Construction period: 2011 - 2013 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: pipes, valves, automation control systems, instrumentation, boilers, instrumentation, coolers, chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels (for reference) Project: Project area is located within the Shanxi Jinzhong Yuci Sleeve Town, the total heating load 622Mw, heating area of 10.6 million m2. Heating range is east of Riverside Road, South Street south of the inner ring, Sports Road and west of Central Street, north of South Africa, with three hot water pipe network system. The total investment 1,013,630,000 yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Design:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Hubei Provincial People's Hospital of cardiovascular Building Project Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Zhang Wuchang District, Wuhan City Road and Fuxing Road Interchange, the total land area of 5732.9 m2, total construction area of 47725.5m2, including ground floor area of 5600 m2, designed beds 600. The total investment of 500 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Design:******* Tel:******* Project Name: Siping Municipal Public Security Bureau Branch of business technology space projects Tiedong Stages of progress: preliminary design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 November - November 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Siping Tiedong Cultural Square northwest side of the South and by Street and south Wei Road Interchange, the construction of a 11-storey office building, with a single high basement, with a total construction area of 7,729 square meters. The total investment 10 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact System : Yu Founder Tel:******* Project Name: Nantong Qidong City, new construction Port Office Progress stage: construction preparation Construction period: 2011 November - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Nantong, Jiangsu Qidong City in the construction of several office buildings with a total construction area of 46,170 square meters, including: border check points Mudanjiang Road building, construction area of about 9,451 square meters, Yin Yang duty Squadron Building, construction area of about 3,500 square meters, Mudanjiang Road, Maritime Building, construction area of about 8,000 square meters, the people of West Customs reform and ancillary buildings, construction area of about 8,000 square meters, Folk Village Road Exit Inspection and Quarantine subsidiary of peace building with a construction area of 6,568 square meters . The total investment of 60 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Stages of progress: preliminary design Construction period: 2012 May - April 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Yancheng, Jiangsu, Henan small new, Circle East, a comprehensive development area of approximately 226,400 square meters, including: office buildings, apartment personnel, scientific research centers. The total investment of 400 million yuan. Construction unit:******* Postal Address:******* Tel:******* Project Name: Beijing International Yanxi will have (the core of the island) project Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Project is located in Huairou District of Beijing Yanqi West peninsula. The total planned area of 651,800 m2, construction area of 636,400 m2; construction area of 160852.25 m2 (which contains underground area: 53859.2 m2). The main construction contents include conference center, boutique hotel, vip clubs and other ancillary services required space, equipment and security space, sports and leisure and entertainment facilities and parking facilities. After the operation of the project surrounded by water, north, east, south of Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. the original Yanxi water, the west side of the new excavation of river-oriented projects, the ancient capital of the river west of Dream Park. The total investment 3,136,460,000 yuan, of which 29.53 million investment in environmental protection. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Code:******* Contact System People: He Rong Hui Tel:******* Project Name: TISCO plant heating pipe heating station project Advanced stage: being approved Construction period: 2011 - 2012 Major equipment: pipes, valves, automation control systems, instrumentation, boilers, instrumentation, coolers, chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels, heatconducting oil furnace, steel-plastic composite pipe. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. TISCO power plant project is located in Taiyuan, new heating area 4.7 million square meters, including subnet main project, branch lines; thermal stations and extension. The total investment of 247 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Advanced stage: being approved Construction period: 2011 - 2012 Major equipment: pipes, valves, automation control systems, instrumentation, boilers, instrumentation, coolers, chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels, heatconducting oil furnace, steel-plastic composite pipe. (Reference) Project: A power plant project is located in Taiyuan, new heating area of 6.3 million square meters, contains the subnet master project, branch lines; thermal stations and extension. The total investment of 477 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Progress stage: the record Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: October 2011 to October 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Project is located in the river Tunzhen Tanghe County, the project covers an area of 10,000 acres, divided into high-yield food production and efficient agricultural demonstration zone central demonstration area. The project includes grain cultivation, livestock farming, organic vegetable cultivation, leisure and tourism, and pollution control. The total investment 1,000,000,000 yuan. Construction Unit:******* Postal Code:******* Contact System People: good Cattle Tel:******* Project Name: Changchun Auspicious Industrial Park building renovation and new construction Stages of progress: preliminary design Construction period: 2011 November - November 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Road project is located in Chengdu, Changchun, Jilin, north east of the inner ring road, an industrial development, with a total area of 199,191 square meters, total construction area of 292,257 square meters, including: workshop, office, staff quarters, ancillary buildings. The total investment 300 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Contact:******* Progress stage: construction preparation Construction period: 2011 September - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shenyang Sujiatun District White Pine Road 66, construction of a complex building with a total construction area of 19,800 square meters, including: the Hall of Justice, Office. The total investment of 25 million. Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal address:******* Postal Code:******* Contact System By: Hao Guoqiang Tel:******* Design units: the construction of good faith (Shenyang) Engineering Co., Ltd. Postal Address:******* Tel:******* Project Name: Xin Yue Panjin City Residential Project Progress stage: engineering design Construction period: 2012 January - March 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Panjin Xinglongtai District, Hing Oil Street to the south west of Shuangxing Road, west side near Paradise Road, near the south side of Park Street, north side of the strip adjacent to the park, a residential development with underground parking garage and the basement and air defense, to provide 612 parking spaces, covering about 38,490 square meters, total construction area of approximately 135,130 square meters, including: residential buildings, commercial buildings. The total investment of 1.5 billion. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Dalian Quality and Technical Supervision and Inspection Center Project Progress stage: engineering design Construction period: 2011-10 - October 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project area is located in Dalian, Liaoning Lushunkou Shuishiying street thirty-eight Village, the construction of an eight-story office building, with a single layer of basement, total floor area of approximately 10,215 square meters. The total investment of 40 million. Construction unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Dalian Ling inlets Seven Sages Road east of the original carton factory land reform projects Progress stage: construction design Construction period: 2011 September - September 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located south of Dalian Port Arthur Road, Seven Sages Road east, a comprehensive development, with a total area of approximately 20,000 square meters, total construction area of approximately 119,000 square meters, including: the number of layers 32 to 44 storey buildings residential buildings, commercial buildings with local, with three in the basement, a four-storey clubhouse, with a single layer of the basement. The total investment 200 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Design unit: Dalian Institute of Architectural Design Co., Ltd. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Progress stage: engineering design Construction period: 2011 10 1 May - 10 November 2011 Major equipment: pipes, valves, automation control systems, instrumentation, boilers, instrumentation, coolers, chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels, heatconducting oil furnace, steel-plastic composite pipe. (Reference) Project: Daning County project is located in the ancient town, South Bay, the new boiler room 468 square meters, the new 20T boiler, the laying of pipe network 600m, two new heat exchange station. The total investment of 80 million yuan. Construction units:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Hebei Langfang Guan Patio Project Progress stage: engineering design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2012 January - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Langfang, Hebei Guan, a residential development area of approximately 22,969 square meters, total construction area of approximately 61,080 square meters, including: six residential buildings, public housing construction. The total investment is not detailed. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Project Name: Development Zone, Kunshan, Suzhou Street, a project Progress stage: engineering design Construction period: 2011 December - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Kunshan Economic and Technological Development Zone, Suzhou, Jiangsu Road, south of progress, the summer driving east of the river, a comprehensive development, covers an area of 119,978 square meters, total construction area of 417,136 square meters. The total investment of 1.5 billion. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Beijing International Plaza Nordisk Stages of progress: environmental impact assessment Construction period: 2011 - 2013 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Project is located in Fengtai District, Hua Xiang Courtyard Village 1516-16, 1516-18 land, commercial and financial sites. Land east of the International Automobile Exhibition Center Road, south side of the road for five laps, the International Automotive Expo Center west of West, north to south road at the village stems. The total area of 54475.476m2, of which construction area is 27616.966m2, collected land 26858.51m2, including: land area roads collected 13644.001m2, levied by the green area of 13214.509m2, the ground floor area 152019.4m2, In addition, according to the The project design information as well as ground floor area of 70521m2, total construction area of the ground and underground 222540.40m2. The Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. project water supply, water, sewage, water, gas, electricity and other facilities for access by the municipal status quo solution. The total investment 2,193,400,000 yuan, of which 22 million yuan investment in environmental protection. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Code:******* Contact:******* Tel:******* Project Name: Chongqing Huxi motor plant construction project Progress stage: construction preparation Construction period: 2011 September - May 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Bishan County of Chongqing Industrial Park, Hexi Area, an industrial development, with a total construction area of 29,000 square meters, including: a three-story research building, a singlestorey townhouses with high plant, plant up to 18 meters. The total investment of 35 million yuan. Construction:******* Postal Address:******* Tel:******* Design:******* Postal Code:******* Contact:******* Tel:******* Construction unit:******* Postal Code:******* Contact System People: Yucheng Li Tel:******* Project Name: Beijing's Tongzhou District Luhe Hospital Outpatient Building Construction Progress stage: the construction preparation (EIA at the same time) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 October - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Tongzhou District, Beijing, No. 82 Xinhua Road, demolition of existing buildings, in-situ regional comprehensive building a new clinic, on the ground 10 floors, 3 basements, the design capacity of 7,000 people admissions / d, 198 new beds . After the completion of new buildings existing outpatient building, medical building and other buildings will be demolished, outpatient reception daily accommodation capacity than the original 5500 people, to increase 1500 times / d. The total investment 586,526,000 yuan, of which 730,000 yuan investment in environmental protection. Construction Unit:******* Postal Address:******* Tel:******* Design unit: Environmental Protection Technology Co., Ltd. Beijing Shenzhou Rui Lin (EIA agencies) Postal address:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Katie Triumph Dayi County, Chengdu City Construction Projects Progress stage: engineering design Construction period: 2012 January - February 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Dayi County, Chengdu, Sichuan, Inner Mongolia Jin of the original town Road, a residential development area of approximately 26,761 square meters, total construction area of approximately 131,770 square meters, including: residential buildings, commercial buildings. The total investment is not detailed. Construction units:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: China Operations Center, the Cyberport project Hercynian Progress stage: construction started in Construction period: 2011 July - July 2014 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Jimei District, Xiamen, Fujian, a comprehensive development, with a total construction area of 470,000 square meters, including: financial disaster recovery center, computer center, software development, laboratory, office building. The total investment is 10 million. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Hunan Xiangtan County West Lake Project Stages of progress: preliminary design Construction period: 2011 December - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Sand Ridge project is located west of Xiangtan, Hunan, north long urban fisheries, west of Xiangtan City Computer School, east of State Road 107, a comprehensive development, with a total area of 70,545 square Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. meters, total construction area of 183,788 square meters, including residential, commercial, kindergarten, parking lot. The total investment of 300 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Sichuan Pi fraternity vocational school expansion project Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Sichuan Province Pi Andhra town, expanding the total construction area of 18,820 square meters campus, including: the classroom 6960 square meters, 600 square meters office teacher, student housing 9760 m, 1500 m canteen; new school construction area of 14,540 square meters total, including: Stadium 1500 m, 1660 m library and lecture hall, science building 11380 square meters real one. Plastic playground 9382 square meters. The total investment 105.62 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction units:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Progress stage: the record Construction period: September 2011-May 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Project is located in Zhengzhou City, Huiji Kaiyuan Road, Garden Road intersection with Henan Auto Trade Center 2, the project upgraded an area of 3496 square meters, the transformation reads: 1200 square meters showroom sales, auto repair center 1396 m, supermarket 400 m Aftermarket customer lounge 140 m, 120 m repair reception room, 240 square meters and maintenance of general office, office equipment purchase and installation. After completion of the project put into operation, is expected to add annual sales income of 80.4 million yuan, profits of 1.496 million yuan, the market prospect is broad. The total investment of 30 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction units:******* Postal Code:******* Contact:******* Tel:******* Project Name: Nantong Tongzhou District Jinxia Dong District Court placed the project price of commercial housing land Progress stage: engineering design Construction period: 2011 - 201 years Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Tongzhou Development Zone, Nantong, Jiangsu, Henan Road, south of the salt, the Lancang River Road, west side, north side of the Galaxy Road, east of the Xiangjiang River Road, with a total land area of 114,890 square meters, total construction area of 206,992 square meters. The basement of 3003 square meters, underground garage 11,189 square meters. The total investment is not detailed. Construction Unit:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Design unit: four Nantong Construction Group Architectural Design Co., Ltd. Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Sanming City Meliet District Integrated Services Centre project with disabilities Progress stage: engineering design Construction period: 2011 November - November 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project area is located in Fujian Sanming Ming Mei column greenstone Village, a comprehensive development, with a total construction area of 22,690 square meters, including: rehabilitation centers, nursing homes care of persons with disabilities, people with disabilities work center. The total investment of 30 million. Construction Unit:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Project Name: Tianjin, China Aviation Oil southern base storage depot project a Progress stage: construction preparation Construction period: 2011 - 2013 Major equipment: target flowmeters, valves, pump, valve, pipe network, traffic transmission, pump, pump in addition to coke, oil coke pump, mass flow meter, level indicator, fire facilities, stackers, cranes, tractor tire hanging, container, crane, pressure vessel, spherical tank, remote control and data acquisition systems, oil and gas recovery. (Reference) Project: Project is located in Tianjin Port of Tianjin Tanggu port area south of the southern border, with a total construction area of 5080 square meters. The total investment 788.66 million yuan. Construction:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Designer:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Zhejiang Huangyan District Maternity and Child Care Project Progress stage: engineering design Construction period: 2012 March - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Huangyan District, Taizhou, Zhejiang, two ring road south, the north side of the trunk, a medical development, covering about 8,250 square meters, total construction area of approximately 36,383 square meters, including: A & F, Ward Building, assisted with room. The total investment of 70 million. Construction Unit:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Construction Unit:******* Postal Address:******* Contact:******* Tel:******* Construction Unit:******* Postal Address:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Zhaoyang Industrial Park project is located in mechanical and electrical industrial base. The total investment 150 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Hangzhou Xiaoshan District Hospital Orthopedics Ward Building Expansion Project Stages of progress: preliminary design Construction period: 2012 January - February 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Xiaoshan District, Hangzhou, Zhejiang Jinxiu 79 Dai village, construction of a ward building, with 400 beds, with a total floor area of approximately 28,000 square meters. The total investment 65 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal address:******* Postal Code:******* Contact Person: Xie for production (architect) Tel:******* Project Name: Tianjin Jing Hua spring community projects Progress stage: engineering design Construction period: 2011-10 - July 2013 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the Yu Wei Road Tianjin Jinghai County, south, west spring Xi Road, a residential development, with underground garage and basement area of approximately 71,667 square meters, total construction area of 155,650 square meters, including: the number of blocks of three to 28-storey residential building, including: villas, houses, public buildings floor, supporting the construction of supporting public facilities. The total investment 120 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Design Unit: Tianjin Huaxia Construction Design Co., Ltd. (Head Office) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Project Name: Tianjin port economic zone grain logistics integrated services building construction projects Stages of progress: preliminary design Construction period: 2011 December - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Tanggu District, Tianjin Port Economic Zone, the construction of a complex building with a total construction area of 9,000 square meters. Pit depth: 3 m, maximum span: 7.5 meters. The total investment of 50 million yuan. Construction Unit:******* Postal Code:******* Contact System By: Chun Kou Tel:******* Project Name: Dongli District, Tianjin Armed Police College's new campus project Progress stage: engineering design Construction period: 2012 January - July 2014 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Dongli District, Tianjin Dongli Lake Avenue, west side, a development of education, with a total floor area of approximately 204,568 square meters. The total investment of 400 million yuan. Construction units:******* Postal address:******* Postal Code:******* Contact System People: Indian Spring Summer Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Civil Affairs Bureau Pi Pi funeral service station renovation project to move Progress stage: engineering design Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Pi Pi barrel projects in the Sichuan town, funeral services, complex construction, the unnatural deaths and track the storage buildings, storing the ashes of the building, bid farewell to the remains of temporary storage room, parking lot, with a total construction area of about 1.35 million square meters. The total investment is not detailed. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Design units: Sichuan Ya Feng Co., Ltd. construction survey and design Postal address:******* Postal Code:******* Contact:******* Progress stage: engineering design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 November - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Qingpu District, Shanghai New Fuchu Road east, west new Phoenix Road, south China in agriculture, a comprehensive development, with a total area of 227,849 square meters, total construction area of approximately 300,000 square meters, including: the number of blocks of 11 floors up to 18-storey residential buildings, commercial buildings, single-high underground parking garage. The total investment 500 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Community Chuansha town south of the land supporting junior C01-19 project Progress stage: construction preparation Construction period: 2011 October - November 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shanghai Pudong Chuansha new community C01-19 south of town land, the construction of a five-storey teaching building and a comprehensive two-storey building, total construction area of 18,136 square meters. The total investment 54 million yuan. Construction:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Construction:******* Postal Address:******* Tel:******* Design:******* Postal Code:******* Contact:******* Tel:******* Project Name: Jiangxi Vocational College of Applied Technology 1 # -10 # faculty transitional housing project Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Zone gold project is located in Ganzhou campus, a faculty Lot # 1 # -5 transitional housing: construction area of about 20,000 square meters; two tenders 6 # -10 # faculty Transitional Housing: building area of about 22,000 m2. The total investment of 40 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Project Name: Shanghai Fengxian District, a large residential community base 29A-01A block south bridge construction projects Progress stage: engineering design Construction period: 2012 February - October 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Fengxian District, Shanghai Light Gongming S. Highway east to plan, six-way exchange program south, west planning Golden Road, North Rd to the planning Department, and the construction of several multi-storey high-rise residential buildings, covers an area of 63,510 square meters, The total construction area of 127,000 square meters. The total investment 280 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction:******* Postal Address:******* Tel:******* Designer:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Shanghai three forest base A4-6 block New Project Progress stage: Design Construction period: 2012 March - February 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shanghai Pudong New Area, east A4-7 block, all the way south to plan X, A4-5 blocks west, north to Lu Road, construction of a five-storey secondary school with 48 classes, with a total construction area of 28,584 square meters. The total investment of 80 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Stages of progress: preliminary design Construction period: 2012 January - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shanghai's Jiading District of Shanghai Xu Bank town, east Kai Sau Road, south to the tree Pingtung Road, west of Kai Yuen Road, north to the new way, a residential development, with two single-layer high-underground parking garage, providing about 3,645 parking spaces, covering about 88,688 square meters, total construction area of approximately 203,206 square meters, including: 18 to 18storey 14-storey residential building, community support services-storey buildings. The total investment of 250 million yuan. Construction:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Project Name: Jilin Forestry 2011 shantytowns Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Forestry Project is located in Riverside, Lushuihe Forestry, Songjianghe Forestry, baishishan Forestry, Sanchazi Forestry, Stephen Yang Forestry, Forestry Redstone, Dunhua Forestry, Forestry large stones, eight sub-forestry Bureau, Daxing ditch Forestry, Wangqing Forestry, White River Forest, Forest on the camp by the Bureau, total construction area of 598,750 square meters. The total investment is not detailed, investment funding sources for the central, provincial facilities, businesses and workers self-financing. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Fax:******* Design Unit: Jilin Institute of Forestry Survey and Design Postal Address:******* Tel:******* Fax:******* Project Name: Sheet Co., Ltd. Taicang Sea smoke tobacco raw materials and finished products warehouse project Stages of progress: preliminary design Construction period: 2012 April - August 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Suzhou, Jiangsu Taicang Port Development Zone East Road No. 19, the construction of two single-layer high warehouse with a total construction area of about 49,100 square meters. The total investment 120 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction:******* Postal Address:******* Tel:******* Project Name: Nagqu Nagqu County People's Court trial of the construction business premises Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Nagqu Nagqu County, construction area of 6987.62 square meters, floor area of 1446.15 square meters, the frame structure. The total investment 10 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Design:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Tianjin coatings R & D and Engineering Center program Progress stage: engineering design Construction period: 2011 December - May 2013 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Tanggu District, Tianjin Economic and Technological Development Zone West, with a total floor area of approximately 42,000 square meters, including: a single-high plant, a single high warehouse, a five-story research building, a few blocks two-storey public buildings. The total investment of 80 million. Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Digital Technology Park project in Wuhan Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located east of East Lake Development Zone Optical Valley Road, south of the loop. Project covers an area of 63414.8 square meters, construction area of 125,731.54 square meters, main construction contents include: 16-storey headquarters office building 1; 12-story office building three; 4 quarters a supporting layer; 4 layers of 23 R & D workshop Building (IT software development). Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment is unknown. Construction units:******* Postal Address:******* Tel:******* Design unit: Wuhan Academy of Environmental Sciences (EIA agencies) Postal Address:******* Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Zigong City, east of Bauhinia Street, South Lake Eastern resettlement housing to the south west of the highway within the appropriate land, the planned total land area 47080.63m2, total building area of 153577m2 (including the ground floor space included in the volume rate of about 103577m2, underground construction area of 50000m2), the total volume was 2.2, basal area of 9410m2, building density of 20%, 42% green space project. The total investment 450 million yuan. Construction units:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Design unit: State Environmental Protection Administration, Nanjing Institute of Environmental Sciences (EIA agencies) Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: People's Hospital Emergency Department Medical Technology Building Project Stages of progress: preliminary design Construction period: 2012 August - September 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Ziyang City, Jianyang Hospital Road, emergency medical technicians to build a clinic building, total construction area of 58,000 square meters. The total investment 232 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Chengdu, Meishan warehouse center disaster preparedness and response, emergency rescue aid the Red Cross center in Sichuan Meishan base project Progress stage: engineering design Construction period: 2011 November - November 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Chengdu, Sichuan Meishan City Economic Development Zone, New District, a comprehensive development, with a total construction area of 25,580 square meters, including: warehouse / office building, medical building. The total investment of 100 million yuan. Construction units:******* Postal address:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Yutang, five-star Marriott hotel and conference resort complex project Progress stage: engineering design Construction period: 2011 November - November 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Chengdu, Sichuan town of Dujiangyan City, Yutang three villages, a comprehensive development, with a total area of 204,144 square meters, total construction area of 129,105 square meters. The total investment of 300 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact System By: Dong Yibo Tel:******* Construction units:******* Postal Code:******* Contact System : Lin Cong Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Designer:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Fujian Tiancheng Riverside Project Progress stage: engineering design Construction period: 2011 September - November 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Riverside County, Sanming, Fujian Road, west of the music, House Road east of the north side of Ring Road, a residential development, an area of 43,386 square meters, total construction area of 125,308 square meters, including: ten 11-storey residential buildings, conference centers, shops along the street, community service space, property management space. The total investment is not detailed. Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Project Name: Fuzhou Kui Qi residential construction projects Stages of progress: preliminary design Construction period: 2012 March - October 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project area is located in Fuzhou, Fujian Kui Qi Village, a residential development, an area of 58,204 square meters, total construction area of 153,016 square meters, including: residential building, the basement. The total investment 310 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction started in Construction period: 2011 August - November 2011 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Road project workers and peasants in the Economic Development Zone No. 75, with a total construction area: 16158 ㎡. The total investment is not detailed. Construction Unit:******* Postal address:******* Postal Code:******* Contact System By: Qi Qingjun Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project name: Bay Village, Sanya City, Begonia style town project Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Sanya City, Hainan, the land area of 4,369,001 square meters, total construction area of 272,800 square meters, total units 2270 units, layers 3-5 layers. The total investment is not detailed. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Design:******* Postal Address:******* Tel:******* Fax:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Fujian Quanzhou work boat show coated base project Progress stage: engineering design Construction period: 2011 December - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Quanzhou, Fujian Province west of a major thoroughfare along the coast, a comprehensive development, covers an area of 19,980 square meters, construction area of work boats base of 35,000 square meters, including: office buildings, training exercises building, apartment building. The total investment 110 million yuan. Owner:******* Postal Address:******* Tel:******* Project Name: Changchun FAW General Hospital, New Medical Building Project EPC Contract Progress stage: construction started in Construction period: 2011 - 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Jincheng Street project is located south east of the East Jin Road, Zhenxing Road, west, east, north street, medical building construction area of 132,100 square meters total. The total investment 1,223,173,300 yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Zhejiang Ningbo Baoqing Temple # -2 1 block north of resettlement housing project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Yunfei Road project is located south, west Baoqing Road, east, north of the river farm Zhang, Ⅰ tenders: The total construction area of 132,694.91 square meters (of which 31,804 square meters underground), Ⅱ tenders: The total construction area of 83121.3 square meters (including underground 14652.76 square meters). The total investment 569,600,000 yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Tel:******* Fax:******* Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Fax:******* Project name: Bohai Huadian City, One house 15 #, 19 #, 7 # residential building projects Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Huadian City project is located south of Bohai Street, Jincheng Road, west side, a Lot: Huadian City, One house Bohai 15 #, 19 #, residential buildings, floor area: 5239.56 square meters, two tenders: Huadian City Bohai Sea One house, No. 7 # residential building, building area: 11290.36 square meters. The total investment 32.34 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Chongqing Street 34 Sand senior housing (A, B, C Building) project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shapingba original drug depot factory with a total construction area of about 122,433.54 square meters, including those with A, B, C and podium towers, underground garage, frame structure, -3F/35F. The total investment 151.77 million yuan, sources of funding for the state-owned investment. Construction Unit:******* Postal Address:******* Tel:******* Construction unit:******* Postal Code:******* Contact System : Li Ying-wen Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Chongqing City Commercial Building Project longevity District One Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Peach Park Changshou District, total construction area of 15987.37 square meters, including building area of 2219.79 square meters basement. Floor area of 13,767.58 square meters thirteen buildings, building height 52.2m. The total investment 23.1 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Construction:******* Contact System By: Zhi-Liang Huang Tel:******* Project Name: Chongqing (Yubei) Taiwan Industrial Park Service Center Projects Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Yuzhong District, Taiwan Industrial Park Service Center and other supporting facilities. The total investment 300 million. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Project Name: Tianjin sky Road 15 Extension Project Progress stage: construction preparation Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Nankai District, Tianjin Water Park Road and the sky Dao Jiaokou, building area: 4664.05 square meters, including the total ground floor area: 2983.28 square meters, the total ground floor area: 1680.77 square meters the highest number of layers: three layers. The total investment 36.52 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Design Unit: Tianjin Institute of Geology Engineering Lecha Postal Address:******* Tel:******* Fax:******* Project Name: Jilin Women's Residence Hall 1, 2, reinforcement works canteen Progress stage: construction started in Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Ji Feng Road project is located in Jilin City, with a total construction area of 14,338 square meters. No. 1, 5096 m2 of which apartment, 2 apartments 6800 square meters, canteen 2442 m2. The total investment 39.51 million yuan, sources of funding for the funding. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Tianjin Jian put the Great Northern Town Ninghe grain storage and processing projects Progress stage: engineering design Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: electronic measuring, circulation fumigation system, grain suction machine, a storage unit, bulk grain unlucky cars, grain inspection system, information network management systems, firefighting facilities. (Reference) Project: Great Northern Stream project is located in Tianjin put Ninghe town industrial park, the construction scale of about 61,357 square meters. The total investment of 320 billion yuan. Construction Unit:******* Postal Code:******* Contact System By: Hao Shi Road Tel:******* Featuring: National Food Reserve Wuhan Research Institute Postal Address:******* Stages of progress: preliminary design Construction period: 2011 - 2012 Main equipment: coal machine, cited coal, lifting equipment, axial mine fan, belt conveyors, drilling equipment, coal machine, screening equipment, crushing equipment, cranes, coal centrifuges, conveyor belts, jig, pressure filter, flotation beds, filter press, cage, water pumps, fans, automatic control systems, explosion-proof electrical, elevator, conveyor, ball mill, vibrating screen, crusher, conveyor, water treatment equipment, heavy medium cyclone, sieve dehydration, coal centrifugal dewatering machine, flotation machine. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Datong City, Shanxi Zuoyun, scale: 210 tons / year. The total investment of 90 million. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Tianjin Eco-city 9A, 9B land residential construction projects Progress stage: construction preparation Construction period: 2011 September - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Tianjin eco-city of Hangu District in the new 9A, 9B land, construction of 18 to 23storey 15-storey residential building, with a single high basement, with a total construction area of 200,000 square meters. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment of 300 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Design Unit: Tianjin Institute of Architectural Design - Marina Branch Postal Address:******* Postal Address:******* Postal Address:******* Postal Address:******* Postal Address:******* Tel:******* Project Name: BYD Auto Co., Shaoguan City, the new industrial development projects Progress stage: engineering design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 November - May 2013 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Dongguan, Shaoguan, Guangdong (Shaoguan) Industrial Transfer Park Zhenjiang Area, an industrial development area of 440,000 square meters, including: factories, warehouses. The total investment 230 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: China Electronics Technology Group Corporation Seventh Research Complex project Progress stage: verification of project approval Construction period: 2012 March - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Haizhu District, Guangzhou Road 381, the comprehensive construction of a 10storey building, total construction area of 70,000 square meters, including: the first layer to the sixth floor of Products Center, seventh floor to the tenth floor for the office. The total investment 100 million yuan. Construction:******* Postal Address:******* Tel:******* Construction:******* Postal Address:******* Tel:******* Project Name: Guangdong bit industrial vehicles (Foshan) Co., Ltd. New Project Progress stage: construction preparation Construction period: 2011 September - January 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Foshan Nanhai National Demonstration Eco-Industrial Park Industrial Estate Casa foreign Avenue 9, an industrial development area of 4,805 square meters, construction area of 3,276 square meters, including: factories, warehouses. The total investment 24 million yuan. Construction unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Shanghai Jiading Ju Park District in control, Laboratory Centre Extension Project Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Jiading Ju Park, New Yongxin Road, No. 380, the general public buildings, single building area of 17,605.9 square meters; underground of underground space for a total construction area of 1499.7 square meters. The total investment 98.83 million yuan. Construction:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Progress stage: construction preparation Construction period: 2011 September - January 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Guangdong, Shandong area Boailunan side of a 12-storey office building curtain wall engineering, with a two-storey building of vice, with a total construction area of 14,000 square meters. The total investment of 12 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Design Unit: Zhongshan Xinda Curtain Wall Decoration Engineering Co., Ltd. Kay Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Construction unit:******* Postal Address:******* Tel:******* Project Name: College Ordos project environment Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: High-tech Zone project is located Kangbashi Weisan northbound, one street south latitude, east Sport Line East, the Road 12 West, with a total land area of 742,282 square meters, the net land area of 585,808 square meters. The total investment is not detailed. Owner:******* Postal address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact System People: iron posts Tel:******* Design:******* Postal Address:******* Tel:******* Fax:******* Project Name: Foshan Nanhai District, Guangdong Development Financial Center Progress stage: construction preparation Construction period: 2011 September - September 2015 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Nanhai District, Foshan, Guangdong Guicheng 86 blocks, a comprehensive development area of approximately 105,646 square meters, total construction area of about 340,000 square meters. The total investment 700 million yuan. Construction:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Construction:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project name: Changsha High-tech Zone Nanling Technology Park Project Progress stage: engineering design Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: High-tech Zone project is located in Changsha, Hunan Lugu Industry Park, with a total construction area of about 33,370 square meters, including: R & D center, testing center. The total investment of 80 million. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Fax:******* Project Name: Beijing Railway Industrial Park Project Noble Center Progress stage: construction started in Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Fengtai District of Beijing Science Park East 1516-10 block, construction of a 11story and three 21-storey commercial office building, three-storey underground garage with a total area of approximately 42,611 square meters, total construction area approximately 237,620 square meters. Limited to 80 meters high. The total investment of 500 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Contact:******* Tel:******* Designer:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Progress stage: construction preparation Construction period: 2011 September - December 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Tongzhou District of Beijing Drainage G130 sub-plots with a total construction area of 203,956 square meters, including: factories, office buildings. The total investment 250 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Construction Unit:******* Postal Address:******* Tel:******* Project Name: Beijing XII underground space and ancillary space project Progress stage: construction preparation Construction period: 2011-10 - August 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in southwestern Fengtai District, Beijing, No. 93 Fourth Ring Road, construction of a two-story underground space, with a total floor area of approximately 18,027 square meters, including: basketball, badminton, table tennis hall. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment 97.2 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in scenic North Wuhan Jiangxia Liangzihu Tsui area, the planned land area of 1216 mu, of which 225 acres of land for construction, land transfer of 991 acres (does not change the nature of land use, including: agricultural land, 920.54 acres, 70.46 acres of wasteland beach ). Total floor area (on the construction site) 113773m2. Main construction contents include: research office, international academic exchange center, logistics service area, experimental breeding areas, while the construction of water supply and drainage, power supply, lighting, natural gas, air, fire and environmental protection and other ancillary works. The total investment is unknown. Construction units:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Design unit: Wuhan Academy of Environmental Sciences (EIA agencies) Postal address:******* Postal Code:******* Contact System People: who Lihong Tel:******* Project Name: Green Yangliuqing quiet road drainage works to extend the line Progress stage: has the record Construction period: November 2011 - 2012 Major equipment: grill, pumps, pipes, valves, automation control systems, submersible pumps, cranes, lightning protection grounding, flow meters, transmitters, ozone generator, anti-fishing type grate discharge machine. (Reference) Project: Project is located in Xiqing District Yangliuqing town, north Ze Yang Road, south to the old Jin Jing Road, total length of 4200 meters. For the sewer and storm sewer projects, sewer length of 4.2 km, maximum diameter sewer 1200mm, maximum diameter water pipe 2200mm. The total investment 68.58 million yuan, about 55 million yuan investment in drainage. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Stone Forest project is located southeast of the old city, the block east Ashima Road, south of the river close to Pakistan, South Gate Street, west, north water Shihfang project (Stone Forest County, one of transformation of the old deer Fu), the northeast grain Council Area Project (Shilin County of deer Fu redevelopment project). The total land of approximately 99,959.99 square meters (about 149.87 acres). One area of 88,021.67 square meters of net land (131.97 acres), collected by an area of 11,938.32 square meters of urban roads. The total investment 1.1 billion yuan. Owner:******* Postal Address:******* Tel:******* Designer:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Project name: International Hotel Co., Ltd. Zhengzhou Zhongyuan fishing Baishun Paradise Valley (a) construction project Progress stage: the record Construction period: October 2011 to December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Project is located in low-lying communities Erqi District Houzhai Xiang Tung, project an area of about 70 acres, the main construction contents are: the new visitor reception center 10,000 square meters, renovation of existing tourist service space 15,000 square meters, regional road hardening and green vegetation, as well as restaurants, fishing, hot springs, harvesting, health and other leisure travel services, tourist facilities. The total investment 350 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Hubei Enshi City reception base project Progress stage: construction design Construction period: 2012 March - May 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Enshi Tujia and Miao Autonomous Prefecture Qifeng Road Ash weir, a comprehensive development, with a total floor area of approximately 26,000 square meters, including: an eight-story houses, about offers 100 rooms, a two-storey conference room. The total investment of 50 million yuan. Construction units:******* Postal Code:******* Contact:******* Tel:******* Design units: architectural design company in Enshi Guangsha Postal Address:******* Progress stage: construction preparation Construction period: 2011 September - October 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Wuhan Huazhong University of Science and Technology Miaoshan Community Park, construction of a 10-storey office building, with single-layer high in the basement, with a total floor area of approximately 30,461 square meters. The total investment of 70 million. Construction unit:******* Postal Address:******* Tel:******* Design by: Huazhong University of Science and Technology Institute of Architecture and Urban Planning and Design - Hanyang Branch Postal Address:******* Postal Address:******* Tel:******* Project Name: Korla, China Yu Times Square Project Stages of progress: preliminary design Construction period: 2012 January - February 2013 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project Bayingolin Mongol Autonomous Prefecture in Xinjiang Korla City, Grand Cross of the commercial center, a comprehensive development, with underground parking, supermarkets and equipment, buildings, covering about 9,959 square meters, total construction area of approximately 132,150 square meters, including: apartment buildings, five-storey commercial podium, hotel, business apartment, refuge floors. The total investment 200 million yuan. Construction unit:******* Contact:******* Tel:******* Project Name: Ankang City Yellow ditch two limit commercial construction projects Progress stage: Design Construction period: 2012 April - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the town of Shaanxi Ankang Hanbin Jianmin Huang Village, Yellow Road north of the ditch, the construction of several apartment buildings, covers an area of approximately 75,333 square meters. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment 200 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Progress stage: verification of project approval Construction period: 2012 12 Month - October 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Weinan, Shaanxi Economic Development Zone, the construction of several buildings plant, with production lines, covering an area of about 667,00 square meters. The total investment 139 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Spring Pro Qujiang Village, five residential placement slope Code Project Stages of progress: preliminary design Construction period: 2012 June - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Xi'an Qu Jiang New District, two areas, the construction of several apartment buildings with a total floor area of approximately 400,000 square meters. The total investment 700 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Design Unit: Xi'an Institute of Architectural Design Postal Address:******* Progress stage: Design Construction period: 2012 June - February 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Xi'an Chang'an Avenue, east of Meridian, Wei Guo Road, south of the construction of a hospital and health supervision of the office business space, with a total floor area of approximately 96,990 square meters, including: outpatient building, hospital building, epidemiology unit Floor, Health Authority office business space. The total investment 140 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Design:******* Postal address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Stages of progress: preliminary design Construction period: 2012 May - September 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Xi'an, north basaltic East, West, according to Zhao Wai Road, the construction of several apartment buildings, covers an area of approximately 27,412 square meters. The total investment of 60 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Xi'an International Port District dream commune project Progress stage: engineering design Construction period: 2011 December - December 2013 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Xi'an International Port District, Port Road East, Pan Qian Road, south west of Port Road, a residential development, an area of 28,280 square meters, total construction area of 130,000 square meters, including: apartment buildings, office buildings, kindergartens, commercial buildings, underground garage. The total investment 120 million yuan. Construction Unit:******* Postal Code:******* Contact System By: Hoi An Tel:******* Project Name: SHANDONG BOSHAN School Project Progress stage: engineering design Construction period: 2011 November - January 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Long Hill Road project is located in Zibo, Shandong, south east west transit road, a comprehensive development, with a total construction area of 5,500 square meters, including sports, logistics buildings, playground. The total investment of 12 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Qingdao Jiaozhou city hospital new construction projects Progress stage: engineering design Construction period: 2011 November - April 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Jiaozhou, Qingdao, Shandong Province, Quanzhou City Road and the new intersection of Beijing Road, a medical development, with a total area of approximately 73,370 square meters, total construction area of approximately 114,000 square meters. The total investment 200 million yuan. Construction Unit:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Design unit: Shandong Institute of Architectural Design Postal Address:******* Progress stage: construction started in Construction period: 2011 August - August 2013 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: What project is located in Inner Mongolia Erdos Kamba New construction of an office building with a total floor area of approximately 60,000 square meters. The total investment of 80 million. Owner:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Code:******* Contact System : Wang Yafei (architect) Tel:******* Designer:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Postal Address:******* Postal Address:******* Progress stage: Design Construction period: 2011 12 Month - April 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project in Inner Mongolia Baotou Rare Earth High-tech Zone, North Riverside Avenue, off New, Wilhelm Road East, Chunhua Road, South, West Wenchang Road, construction of several apartment buildings with a total floor area of approximately 220,000 square meters. The total investment 200 million yuan. Construction unit:******* Contact:******* Tel:******* Designer:******* Contact:******* Progress stage: construction design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 12 Month - October 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Nangang District, Harbin, Heilongjiang Xuefu 51, the construction of a six-storey commercial building with a total floor area of approximately 55,673 square meters. The total investment of 70 million. Construction unit:******* Postal Address:******* Tel:******* Designer:******* Postal Code:******* Contact:******* Progress stage: engineering design Construction period: 2011 November - May 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Harbin Qunli the construction of a teaching building, total construction area of 9,689 square meters. The total investment 15 million yuan. Construction unit:******* Postal address:******* Postal Code:******* Contact System People: song Huaining Tel:******* Design unit: Harbin Institute of Technology Institute of Architectural Design Postal Address:******* Tel:******* Project Name: Harbin Qunli the promoter region of 085 construction projects, land Stages of progress: preliminary design Construction period: 2012 January - December 2015 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Harbin Daoli District, north of Anyang Road, south of Ming Avenue East, west Third Ring Road, east of Long Road as, a residential development, with high single underground car park with 3,300 parking spaces, accounting for land area of about 176,224 square meters, total construction area of approximately 497,300 square meters. The total investment is not detailed. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Prime Harbin Terrace Project Progress stage: engineering design Construction period: 2012 January - December 2015 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Harbin, North Pine, planning 144 Road, west of the Third Ring Road north of Road 143 east of planning, planning 159 south road, a residential development, has a basement, offers 1,913 parking spaces, covering an area of about of 202,869 square meters, total construction area of approximately 537,789 square meters. The total investment is not detailed. Construction unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Project Name: Panshi North Metro District Education Center Project Progress stage: construction preparation Construction period: 2011 September - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Main Street revitalization project is located east of Jilin Panshi, South Road, north of aluminum pan, a two-to four-storey development of education, with a total construction area of 26,522 square meters, including: school buildings, kindergartens, sports centers. The total investment of 50 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Project Name: Baoding fire emergency rescue command center project Progress stage: construction preparation Construction period: 2011 September - October 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Baoding Lucky North Second Ring Road and the southeast intersection of North Main Street 300 meters, the construction of a nine-storey office building, with a single high basement, with a total construction area of 15,712 square meters. The total investment of 30 million. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Progress stage: construction preparation Construction period: 2011 September - November 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: A product of the project is located in Jiangsu Huai Mei Road 32, construction of a two-storey factory building with a total floor area of approximately 11,000 square meters. The total investment 27 million yuan. Construction unit:******* Postal Address:******* Tel:******* Design by: Wuzhou Engineering Design and Research Institute Postal address:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Postal address:******* Postal Code:******* Contact:******* Postal address:******* Postal Code:******* Contact:******* Postal address:******* Postal Code:******* Contact System : Xu Jin (Structural Engineer) Tel:******* Fax:******* Design by: Wuzhou Engineering Design and Research Institute Postal address:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal address:******* Postal Code:******* Contact System By: Xing Chen (weak Engineer) Tel:******* Fax:******* Construction Unit:******* Postal Address:******* Tel:******* Project Name: Wuxi red beans home XDG-2011-48 residential plot Stages of progress: preliminary design Construction period: 2012 June - July 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in East Town, Xishan District, Wuxi, Jiangsu Province Xiangshan Road South, Health Road East, a residential development, covering about 57,050 square meters, including: residential buildings, commercial buildings, underground garage. The total investment 110 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Project Name: Ego Square residential development Progress stage: engineering design Construction period: 2012 May - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in north Jiangsu Zhenjiang Huangshan Road, Huangshan West Road, a residential development, an area of 6104 square meters, total construction area of 103,000 square meters. The total investment 200 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Project Name: Nantong New High School Construction Project Progress stage: engineering design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2012 April - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located north of Nantong University, Nantong, Jiangsu, south of Century Boulevard, a development of education, with a total floor area of approximately 75,000 square meters. The total investment 100 million yuan. Construction units:******* Postal Address:******* Tel:******* Fax:******* Design Unit: Planning and Design Institute of Posts and Telecommunications, Jiangsu Province, limited liability company Postal Address:******* Progress stage: engineering design Construction period: 2012 June - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Nantong, Jiangsu, such as the East Road, south of the Yellow River, north of Huaihai Road, Taishan Road, west side, construction of a hospital, with a total floor area of approximately 99,800 square meters, including: hospital buildings, outpatient and emergency medical technology building, comprehensive building and auxiliary space. The total investment 180 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Design:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Project Name: Chengdu, the provincial emergency rescue training base construction projects specifically Stages of progress: preliminary design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 November - November 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Chengdu, Sichuan China county road next to the public shangxingzhen animal husbandry, construction of five two-to six-storey building, total construction area of 18,350 square meters, including: office buildings, exhibition halls, teaching laboratory building, canteen. The total investment of 80 million. Construction units:******* Postal Address:******* Tel:******* Construction units:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Stages of progress: preliminary design Construction period: 2011-10 - October 2015 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Project is located in Quanzhou, Fujian Anxi Longmen County, South Wing Park Zone, a comprehensive development, covers an area of 888,657 square meters, total construction area of 800,000 square meters. The total investment 1.2 billion yuan. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Progress stage: engineering design Construction period: 2011 November - November 2013 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Xiamen Tongan Industrial Park, an industrial development, with a total construction area of 125,000 square meters to 150,000 square meters, including: factories, warehouses. The total investment 300 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Shanghai Hua Lin Industrial Gases Co., Ltd. Expansion Project Progress stage: construction design Construction period: 2011-10 - April 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Jinshan District, Shanghai Chemical Industry Park Lot F3, the construction of a single-storey high factory covers an area of 2,175 square meters, total construction area of 560 square meters. The total investment 270 million yuan. Construction:******* Postal Code:******* Contact:******* Tel:******* Construction:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal address:******* Postal Code:******* Contact System People: License (architect) Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Shanghai Shun Wah Toys Co., Ltd. new plant and villa projects Progress stage: construction design Construction period: 2011 December - December 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Minhang District, Shanghai Ji Zhai Road No. 1058, the construction of three fivestorey factory building and two two-storey villa, with a total construction area of 24,668 square meters. The total investment 64 million yuan. Construction:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Progress stage: engineering design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2012 March - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shanghai Pudong New Area [original Nanhui District] Jinqiao Export Processing Zone 16 residents, a seven-storey complex, with two-storey underground parking garage, an area of 46,538 square meters, total construction area of approximately 210,000 square meters. The total investment 320 million yuan. Construction:******* Postal Code:******* Contact:******* Tel:******* Construction:******* Postal Code:******* Contact:******* Tel:******* Construction:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Design:******* Postal Address:******* Tel:******* Project Name: China National Aero-Technology Research Institute Comprehensive Test and Measurement Center research space construction projects Progress stage: construction preparation Construction period: 2011 September - December 2015 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Yanqi project is located in Beijing Economic Development Zone, Huairou District, an industrial development, with a total construction area of 104,170 square meters. The total investment 450 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction:******* Postal Address:******* Tel:******* Fax:******* Design:******* Postal Address:******* Tel:******* Design:******* Postal Code:******* Contact:******* Stages of progress: preliminary design Construction period: 2012 July - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in North Tucheng Road, Chaoyang District, Beijing, construction of a 12-storey office building with a total floor area of approximately 40,000 square meters. The total investment 200 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction:******* Postal Address:******* Tel:******* Project Name: Shenzhen International Energy Building Project Progress stage: construction design Construction period: 2012 March - March 2014 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Project is located in the central area of Shenzhen in the east axis, Jin Tian Road, Binhai Avenue and northeast of the junction of the construction of a 47-storey main building and an approximately 23-storey ancillary office building, with a four-storey basement , covers an area of about 6,427 square meters, total construction area of approximately 120,000 square meters. The total investment 300 million yuan. Construction:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Construction:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Project is located in Nanhai District, South Street Road Guicheng 18. Project east, south of Guangdong Pearl River Switch Factory; west of South Road, across South Road as a single shop; north of Hoi Fai Road, across Fai Road for the clothing factory, a residential, Guicheng traffic police squadron. The total investment of about 180 million yuan, from a commercial office component, the planned total land area of 4021.3 square meters, total construction area of 28923.54 square meters, 20% green space, ground floor, Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. underground garage, basement , 1 layer 3 layers of business, four layers of equipment conversion layer, 5 layers to 19 layers for the office. Supporting motor vehicle parking spaces 140. Supporting public facilities, including commercial (including catering), underground garage, power distribution room, backup generator room, pump house, cooling tower. The total investment 180 million yuan. Construction Unit:******* Contact:******* Tel:******* Fax:******* Project Name: Chong Hong Huiyuan projects Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Nanhai District, Foshan City, Guicheng street 58 blocks east of South Avenue, sixway north of the sea. The site is divided into A, B two districts in the middle separated by the South China Sea area rural credit cooperatives. A distance of 10m east of the project area to the East China Sea Garden, B District, east distance of 15m for the Royal Garden, A area 120m away from the water to hit Hong Yun still have (under construction); B for the sea area south of the six-way, away from 15m to Lianhua Tower (under construction), 40m away from the police station for the Guicheng, 110m away from China Mobile; B area southwest of the South China Sea Road, 110m away from the garden for the North and the base; the Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. South China Sea west road, 60m away from property trading center for the South China Sea area, Lake Village, South Mountain clinic, Industrial Village; A sea area north of seven road, 20m away from the sea for the greenery in the garden (under construction). The total investment of about 651.975 million yuan, from the A area of a 5-storey commercial center and B of 6 (12 small buildings) 26-31 storey high-rise residential component, the planned total land area of 55,052.8 square meters, total construction area of 260,777 square meters, the total planned area of 16,516 square meters green land, green space was 30.00%, planned residential households 1345, the number of 4,300 is expected to live. 1536 motor vehicle parking facilities, including motor vehicle parking spaces 1243 residential, commercial motor vehicle parking spaces 293. Supporting public facilities, including commercial (including catering), property management, underground garage, garbage collection points, public toilets, power distribution room, backup generator room, pump room, multi-line air conditioning. The total investment 651,975,000 yuan. Construction units:******* Contact System By: Wen Yucheng Tel:******* Designer:******* Postal Code:******* Contact System : Chen Yuan Tel:******* Fax:******* Project Name: Daya Bay, Huizhou City, Guangdong Province Economic and Technological Development Zone, south of the stove village relocation project Residential Area Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Huizhou, Guangdong Daya Bay Economic and Technological Development Zone West, covering about 146,430 square meters, total construction area of approximately 441,000 square meters, including: residential buildings, shops, parking. The total investment 600 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Fax:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction units:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Project Name: Tianjin Ninghe product quality inspection center project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Ninghe located in Tianjin Economic Development Zone project, the construction of three single-storey office building to 12, with a single high basement, with a total construction area of 10,655 square meters. The total investment of 30 million. Construction Unit:******* Postal address:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Fax:******* Design Unit: Stone Architectural Design Co., Ltd. Tianjin is Postal Address:******* Postal Address:******* Postal Address:******* Postal Address:******* Tel:******* Fax:******* Project Name: Yuanping Xue isolated towns and villages west of basic farmland consolidation project Progress stage: pre-feasibility study prepared Construction period: 2011 - 2013 Main equipment: excavators, bulldozers, cranes, etc. (reference) Project: Project is located in Yuanping City West towns and villages, the construction scale of 2056 ha. The total investment is not detailed, the provincial investment. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Qinghai Salt Lake Industry Group Co., Ltd. magnesium integration project office building quality inspection center of the main building and civil engineering project scheduling Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Golmud City, Qinghai Salt Lake, office building type of structure: reinforced concrete frame shear wall structure, the height of fifth floor, height 63.6 meters, construction area: 21147.28 square meters; dispatch inspection center structure type: steel concrete frame structure, fourstorey, height 23.9 meters, building area: 8200 square meters. The total investment is not detailed. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Project Name: Jilin Longtan Siniora Street Manchu new primary school buildings the town center project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Jilin City Longtan Siniora Street Culture Street Manchu town, with a total construction area of 11050.5 square meters, of which: teaching building construction area of 5524.9 square meters ①, 5 floors, height 19.8 m, the frame structure; teaching building floor area of 5203.6 square meters ② , 5 floors, height 19.8 m, the frame structure; guard ③ construction area of 35 square meters, 1st floor, Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. height of 4 meters, brick-concrete structure; ④ pump house building area of 287 square meters, 1st floor, height of 9 meters, brick mixed structure. The total investment is not detailed. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Jilin Longtan River teaching building a new secret project peak secondary Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Jilin City Longtan River close-town Yucai Road No. 18, with a total building area of 9172.2 square meters. Of which: teaching building construction area of 3700.6 square meters ①, 2-5 ground level, height 20.5 m, the frame structure; teaching building construction area of 5385.6 square meters ②, 2-4 ground level, height 15.8 m, the frame structure; guard ③ construction area 38 m2, 1st floor, height of 4 meters, brick-concrete structure; pump ④ construction area of 480,000 square meters, 1st floor, height of 3 meters, brick structure. The total investment is not detailed. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Design Unit: Jilin City Park Institute Co., Ltd. Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Reconstruction Hui County human resources market and social protection counties as units of service centers and office building projects Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Hui County Street north, with a total construction area: 23,043.8 square meters, basement, ground and 20 floors frame shear wall structure. The total investment of 50 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Pass Fax:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Cape Town Pingliang mysterious star 10 #, 15 #, 16 #, 21 #, 22 # residential building projects Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located south of Willow Lake Road, Crane Road, east of the mysterious, fire brigade north, with a total construction area of 15551.05 square meters. Divided into five tenders: first residential building in Lot # 10, Lot 15 # residential second and third tenders residential building # 16, Lot 21 # residential building fourth, fifth Lot 22 # residential buildings. The total investment 49.48 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact System By: Kim Chun-yuan Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Guizhou Radio and TV University campus three new projects Jinyang Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Jinyang New Area project is located in Guiyang, Guizhou Province, with a total construction area of 50,546 square meters, of which 27,846 square meters dormitory, canteen facilities and living space 6,700 square meters, the library 13,000 square meters, hall 3000 square meters. The total investment of 30 million. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Fax:******* Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Project Name: Energy saving heating system transformation projects Progress stage: the record Construction period: 2011-8 to 2012-8 Major equipment: Film Dust devices, to water distribution installations, chimneys, etc. (for reference)Project: Project is located in Wenzhou City of Zhejiang village of Huangshi Pukou plant, heating system, energysaving technological transformation projects, the construction of a boiler room, an area of about 400 square meters, construction area of about 200 square meters, equipped with two coal-fired boiler steam , were 6 tons and 4 tons of peripherals supporting devices, including water film dust removal device for water distribution installations, chimneys, etc., in addition to the implementation of several transformation-related equipment and facilities. The total investment is unknown. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Guiyang City Longdongbao administrative office building of the airport expansion project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Guiyang, Guizhou Longdongbao International Airport, construction area of about 1.8 million square meters. The total investment of 90 million. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Construction units:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: capacity of 7000 m3 chemical products warehouse project Progress stage: the record Construction period: 2011-8 to 2013-8 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Project is located in Quzhou City Kecheng Garden Township village idle wish barren streets, the project is not a new levy of industrial land, 14.4 acres of land leased enterprises. The total investment 500 million. Construction Unit:******* Postal Code:******* Contact System By: Qiang Weihong Yan Tel:******* Project Name: New City Sports Center on behalf of County Engineering Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in a new city on behalf of the county, total project area of 15 hectares, construction area of 7323.16 square meters, the stadium area of 14,052 square meters. The total investment 120 million yuan. Construction unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Jilin Yinglong Buddha Mountain Cultural Park Project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project area is located in White Township Fengman bergamot Yoshimura Hill, ① Museum: Frame structure, steel roof, a total layer, 2482m2, ② Hall (1): frame structure, steel roof, a total of three, 3428m2, ③ Hall (2): frame structure, steel roof, a total of four , 4364m2, ④ services space: frame structure A total Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. of three, 2641m2, ⑤ landscape bell tower (1): framework Total floor, 53.03m2, ⑥ landscape bell tower (2): frame structure Total floor, 53.03m2, ⑦ landscape porch: frame structure, steel roof, total floor, 1162m2, ⑧ Building: frame structure A total of four, 3914m2, ⑨ toilet: frame structure, 220 m2. The total investment 15.99 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal address:******* Postal Code:******* Contact System By: Peng Bo Tel:******* Project Name: No. 64 Alexander Road, Jinan City residential development projects Progress stage: construction design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Jinan City, No. 64 Alexander Road, construction area of the ground floor area: 201.46 million square meters, ground floor area: 09,860 square meters. The total investment is not detailed. Construction unit:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Power Supply Company Jinzhong new employee training center project Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Jinzhong power project is located in the North Branch field training base, building area of 17,900 square meters. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment 29.53 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Yue Lan Mountain residential community construction project sites Progress stage: the record Construction period: 2011-8 to 2013-12 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Seven projects are located in Xinchang Village and Temple streets Hou Village, Yue Lan mountain mansion estate construction commercial and residential projects with a total land area of 33,442 square meters, total construction area of 61,867 square meters (not including the basement, carport area of 22,976 square meters) , where commercial buildings 5,000 square meters, 56,867 square meters of residential space Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment 350 million yuan, of which Investment in fixed assets: 32,000 million (construction 30000; equipment 300; install 500; other costs of construction 1200;), construction period interest $ 10 million initial working capital of 20 million. Construction unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Zhuhai Campus Culture Park Middle School District Project Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Guangdong, Zhuhai District, north of Garden Village, a total of approximately 14,369 square meters floor area (including elevated floor area of 2341 square meters), in which ordinary classroom building area of about 3350 square meters, specialized area of about 3127 square meters building classrooms, public classroom building area of about 4131 square meters, office building area of about 1316 square meters of living space service area of about 2083 square meters building, other building area of approximately 361 square meters. The total investment 54.85 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction units:******* Postal Address:******* Tel:******* Fax:******* Construction units:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Project Name: Tangshan City School Police Road affordable housing project Progress stage: construction preparation Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Road project is located in Hebei Province auspicious east sides of the road planning, road planning recruits north, with a total construction area of approximately 42 million square meters of residential floor area of about 28 million square meters, all of the low-cost housing (50 square meters below), housing prices (90 sq m), 3300 total units, public buildings and commercial building area of 50,000 square meters, the underground area of about 90,000 square meters, with parking and storage-based. The total investment is not detailed. Construction unit:******* Postal Address:******* Tel:******* Design by: Beijing Orient Huatai architectural engineering Co., Ltd. Postal Address:******* Tel:******* Fax:******* Project Name: Wen'an often works long Yiyuan 2 #, 5 #, 6 #, 7 # Building Project Progress stage: construction started in Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: ANALYSIS projects are located in a building area of 19,180 square meters. The total investment 17 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction units:******* Postal Address:******* Tel:******* Project Name: Wan Yee Tai Town home county home-hole 3 # -10 # Residential Building Project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Wan Town Democratic Strand county home-hole, Dongsheng Road East, building area of 67896.9 square meters. The total investment 14.62 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Suzhou City, the construction of Radio and Television Entertainment Suzhou International City project Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Project is located in Jinshan Road, Suzhou, Mudu Town West, Zhang Jin Bang Hebei. Project covers an area of 138,028.4 square meters, total construction area of 320,000 square meters designed, namely, capacity building area of 220,845 square meters. The total investment 1.5 billion yuan. Construction:******* Postal Address:******* Tel:******* Design unit: Development and Investment in Environmental Protection Technology Co., Ltd. Sheng (EIA agencies) Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: District Court two Zhangbei macros Top Bright Commercial Building Project Progress stage: construction started in Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Zhangbei, construction area of 22341.6 square meters. The total investment 23.73 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction units:******* Postal Address:******* Tel:******* Project Name: Jiangsu Chengde Run Properties Limited to the Soviet Union No. 2010-B-52 block commercial complex project Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Project is located in the town of Sioux Road North Mudu Wuzhong District, Shen Lane Road West. The total area of 55697.2m2, total construction area of 167325m2. Building type for commercial complexes. The total investment 980 million yuan. Construction unit:******* Postal Address:******* Tel:******* Design by: Suzhou Institute of Environmental Science (EIA agencies) Postal Address:******* Tel:******* Project Name: Real Estate Development Co., Suzhou River, Su Xu to No. 2009-B-48 land projects Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Suzhou City xukou Town Xin Luxi side, Xujiang north. Project covers an area of 114,508.8 square meters, total construction area of 181,660 square meters designed, namely, capacity building area of 129,534 square meters. The total investment 1.1 billion yuan. Construction Unit:******* Postal Address:******* Tel:******* Design unit: Development and Investment in Environmental Protection Technology Co., Ltd. Sheng (EIA agencies) Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Town beach Yongnian County Joint School Pro ALFA project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Pro ALFA project is located in Yongnian County Town beach village, the new restaurant project, a layer, the frame structure, construction area of 321 square meters; new dormitory construction, a layer of brickconcrete structure, construction area of 261 square meters; New sports hall project, a layer, the frame structure, construction area of 563 square meters; new toilet, guard, gates, fences and playground campus sclerosis and other ancillary works. The total investment 2.19 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Yongnian County, South West towns and villages along the inter-school projects Daci Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Yongnian County, towns and villages along the south along the South Village, the new restaurant project, a layer, the frame structure, construction area of 321 square meters; new dormitory construction, a layer of brick-concrete structure, construction area of 261 square meters; New sports hall project, a layer, the frame structure, construction area of 562 square meters; new toilet, guard, gates, fences and playground campus sclerosis and other ancillary works. The total investment 2.28 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Sichuan Chengdu Eastern maintenance base construction also Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in Sichuan, Chengdu International Airport, the airline built hangar floor, special garage, cafeteria, duty floor, maintenance ramp and ancillary facilities, with a total construction area of 35,183 square meters. The total investment is not detailed. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Construction Unit:******* Postal Address:******* Tel:******* Project Name: Jizhou low-rent housing project off Jiayuan Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. New West Project is located south of Hebei, Friendship Avenue, west side, with a total area of 25,000 square meters, a total of 420 sets. The total investment of 35 million, sources of funding for government investment. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Hebei provincial second phase of apartments for the elderly Progress stage: construction preparation Construction period: 2011 - 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shijiazhuang, Hebei Street, North Second Ring Road intersection with the northwest corner of Thailand, the construction of a 21-storey apartments for the elderly, with a two-storey basement, with a total construction area of 32,180 square meters, including: elderly living room , kitchen, restaurant, Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. function rooms, gym, nursing stations, treatment rooms, staff quarters, underground garage, the engine room. The total investment 100 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Project Name: detachment of Fuzhou Jinshan border project office and residential areas Progress stage: engineering design Construction period: 2011 November - November 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Jinshan Cangshan build a new middle road, with a total construction area of about 42,000 square meters. The total investment 72 million yuan. Construction unit:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Weng'an county center next to the old South, with a total construction area of 15788.5 square meters, including stadium construction area of 10343.5 square meters, construction area of 5455 square meters stadium. The total investment 77,646,600 yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction units:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in the Eastern zone, building area of 2,800 square meters. The total investment of 25 million, funding sources for the funding. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Fax:******* Project Name: Shanghai International Automobile City, Hong Kong Science and Technology R & D projects Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Yokogawa project is located in Anting Town to Hong Kong, south to Ann Rainbow Road, west An Extension Road, north to road safety research, construction area of 202,609.15 square meters. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment of 1.5 billion. Construction:******* Postal Code:******* Contact System : Chen roots Tel:******* Fax:******* Design:******* Postal Code:******* Contact:******* Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Taicang City, Jiangsu Shaxi, construction area of 6765 square meters. The total investment 10 million yuan. Construction unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Design unit: good architectural design Taicang Branch Company Postal Address:******* Tel:******* Project Name: Shijiazhuang, Hebei, Shijiazhuang City, Town, Pingshan Pingshan Xibaipo level secondary school construction project Progress stage: engineering design Construction period: 2011 - 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shijiazhuang, Hebei Pingshan Town flat, with a total area of about 200,100 square meters, total construction area of 120,935 square meters, including: teaching building, dormitory, office, library, cafeteria. The total investment 150 million yuan. Construction Unit:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Design Unit: Hebei Institute of Architectural Design Co., Ltd. Postal Address:******* Progress stage: verification of project approval Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Fuzhou, Fujian 227 Lake Road, the construction of several buildings the library, with a total construction area of 10,000 square meters, including: Book Centre, reading room, stacks, offices. The total investment 31 million yuan. Construction units:******* Postal Address:******* Tel:******* Fax:******* Design units: Fujian Institute of Architectural Design Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Fax:******* Project Name: Chengdu Wuhou Industrial Park Kindergarten Project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Chengdu, Sichuan Wuhou Wu Xing Industrial Park all the way, covering about 6.6 acres, building area of about 4,600 square meters (3 floors for kindergarten, library basement for cars, a total of 12 classes, frame structure, story the ground is: 3.6m, ground to 3.8m, building height of 12.75m, the highest point height 17.75m. basement part of the basic use of reinforced concrete column under the independent Canadian-based water-resistant floor, on the ground part of the basic use of reinforced concrete columns using an independent basis under the ). The total investment of 16 million. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction units:******* Contact System People: Wencheng You Electricity Tel:******* Project Name: Zhongxiang City Public Security Bureau projects the business technology space Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Shicheng Avenue project is located south of the construction area of 20675.83 square meters. The total investment 29.88 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Wuhan Jiangxia Hidden Dragon School of Engineering Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Long Island project office is located in Jiangxia Li Tibetan Village, Building floor area: 5235 square meters, the ground floors: 4, primary school buildings, lecture hall floor area: 5352.07 square meters, the ground floors: 4, canteens, dormitories floor area: 5346.65 square meters, the ground floors: 5, middle school, administration building floor area: 4023.69 square meters, the ground floors: 3, rain playground construction area: 1234.75 square meters, the floor layers: 1, kindergarten building area : 3206.46 square meters, the ground floors: 3, total construction area: 24398.62 square meters. The total investment 45.05 million yuan. Construction unit:******* Postal Address:******* Tel:******* Construction units:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Sanmenxia industry cluster BT standard industrial plant construction projects Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Henan, with a total floor area of approximately 26,500 square meters, a Lot: 2 73mx25m four standardized plant and supporting facilities; two tenders: 2 61mx24m four standard industrial plant and facilities. The total investment 34.5 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Star City Jinnan District River drainage works infrastructure supporting projects Advanced stage: being approved Construction period: November 2011 - 2012 Major equipment: grill, pumps, pipes, valves, automation control systems, submersible pumps, cranes, lightning protection grounding, flow meters, transmitters, ozone generator, anti-fishing type grate discharge machine. (Reference) Project: Double town project is located in Jinnan District (Hong Nihe east, south to Tianjin Road, west of the Outer Ring Road, north to Hai) The main construction content and scale: Star City for the Riverside residential area five storm sewer system, paved roads, water pipes length of 4,500 meters, total length of 4500 meters of sewage pipes. One: Planning Road: water pipe diameter 1200mm-1350mm, length 750 meters, sewer diameter 400mm-500mm, 750 meters long; planning of two: water pipe diameter 600mm1350mm, length 1250 m, diameter sewers 300mm, length 1250 m; planning of three: water pipe diameter 600mm-1100mm, length 1,100 meters, sewage pipe diameter 300mm-400mm, length 1100 m; planning of four: water pipe diameter 600mm-1200mm, length 800 meters, sewage pipe diameter 300mm, length 800 meters; planning of five: water pipe diameter 1200mm-1350mm, length 600 meters, sewer diameter 300mm, length 600 meters. The total investment 64,735,800 yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact System By: Wei Zhi Chao Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Hefei New Century Center project Progress stage: engineering design Construction period: 2011 December - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in downtown Hefei Economic and Technological Development Zone, Lianhua Road intersection with the northeast, a comprehensive development, covers an area of 30,762 square meters, total construction area of 220,000 square meters, including: office buildings, shops. The total investment of 250 million yuan. Construction Unit:******* Postal Code:******* Contact System People: as manager Tel:******* Project Name: Changzhi Vocational and Technical College new campus construction projects Stages of progress: preliminary design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2012 March - December 2015 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in north Shanxi Changzhi long suburban lines, a two-to six-storey development of education, partial basement with a single layer, with a total floor area of approximately 210,000 square meters, including: teaching buildings, student dormitories, cafeteria, administrative offices floor, sports games, life ancillary buildings, libraries, halls. The total investment 300 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Changzhi Medical School new campus construction projects Stages of progress: preliminary design Construction period: 2012 March - December 2015 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in north Shanxi Changzhi long suburban lines, a two-to six-storey development of education, partial basement with a single layer, with a total floor area of approximately 120,000 square meters, including: teaching buildings, student dormitories, cafeteria, administrative offices floor, sports games, life ancillary buildings. The total investment 200 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal address:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Focus Southern prison police staff housing relocation project Progress stage: engineering design Construction period: 2012 January - November 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Jiaozuo, Henan Central Prison, south side, north side of Black River, Mengzhou Road east, west road of democracy, 11-story building 29 to 26-storey residential building, with a single layer of basement, with a total construction area of 428,360 square meters, including: residential buildings, shops. The total investment 856 million yuan. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction unit:******* Postal Address:******* Tel:******* Project Name: Chemical Technology Co., Ltd. Jiangsu Yi Geluo New Project Progress stage: engineering design Construction period: 2011 November - November 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Salt Chemical Industrial Park, Jiangsu Huai Ze Area, an industrial development, including: factories, warehouses. The total investment of 80 million. Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Fax:******* Project Name: Suzhou Wujiang Green Center and Lakeside Park Project Stages of progress: preliminary design Construction period: 2012 January - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Wujiang City, Jiangsu Province, Suzhou Lakeside Park, a comprehensive development area of approximately 466,900 square meters, including: residential buildings, office buildings. The total investment 500 million yuan. Construction:******* Postal Code:******* Contact System People: not disclosed Tel:******* Fax:******* Project Name: Nantong Tong Hai Qu County Center Hospital Project Progress stage: construction design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2012 March - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: County project is located in Nantong, Jiangsu Hai Qu Qu Town water, a medical development, with a total floor area of approximately 10,900 square meters, including: a three-story outpatient building, a fourstorey ward floor. The total investment of 20 million. Construction Unit:******* Postal Address:******* Tel:******* Design unit: Survey Design Co., Ltd. Nantong Postal Address:******* Postal Address:******* Postal Address:******* Postal Address:******* Progress stage: construction preparation Construction period: 2011-10 - October 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Beibei District, Chongqing, partition A91-1/17 A standard plot, the construction of a seven-storey office building, with a two-storey basement, with a total construction area of 17,543 square meters. The total investment of 35 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Progress stage: construction design Construction period: 2011 12 Month - October 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Ningbo city center, the construction of 10-20 six-to 11-storey residential building, total construction area of 125,637 square meters. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment 250 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Stages of progress: preliminary design Construction period: 2012 March - May 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Taizhou, Zhejiang Taizhou Economic Development Zone, west of Avenue, a comprehensive development area of approximately 26,132 square meters, total construction area of approximately 17,104 square meters. The total investment of 25 million. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction Unit:******* Postal Code:******* Contact System : Wang Yong Tel:******* Project Name: Tianjin Eco-city blue-collar apartment block No. 99, a construction project Progress stage: verification of project approval Construction period: 2012 April - October 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Tanggu District, Tianjin Eco-City 99 01-03-04 land plot, building a few blocks of blue and white apartment building with a total construction area of 157,470 square meters. The total investment 300 million yuan. Construction Unit:******* Postal Code:******* Contact System People: management Qing Friends Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Tianjin Industrial Real Estate New construction projects Progress stage: engineering design Construction period: 2011 November - December 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Tianjin Jinnan District gegu town, the construction of 21 two to three-storey R & D plant, with a total construction area of 10,396 square meters. The total investment of 50 million yuan. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Progress stage: Design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011-10 - April 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Dongcheng District, Beijing Bell and Drum Tower area, the construction of a threestory museum, with a three-storey basement, total floor area of approximately 14,970 square meters. The total investment 199 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Postal Address:******* Stages of progress: preliminary design Construction period: 2011-10 - October 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Xicheng District, Beijing, No. 49 Fu Xing Men Nei Street, on a 13-storey complex building for indoor and outdoor decoration and renovation, with a two-story basement, with a total floor area of approximately 30,003 square meters. The total investment 173 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Contact System By: Dan Tel:******* Project Name: Beijing Hong Bohao days Technology Co., Ltd. Digital Printing base construction projects Progress stage: engineering design Construction period: 2011 September - September 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Daxing District of Beijing Economic and Technological Development Zone in the southern district, a two-to seven-storey integrated development, with a single layer of basement, with a total area of approximately 30,015 square meters, total construction area of approximately 47,360 square meters, include: workshops, office buildings, R & D building, laboratory building. The total investment 100 million yuan. Construction Unit:******* Postal Code:******* Contact System People: Ye Changsong Tel:******* Design:******* Postal Address:******* Progress stage: Design Construction period: 2012 March - December 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Guanghua Road, Chaoyang District, Beijing CBD core area Z3 land, construction of a complex building with a total area of approximately 10,490 square meters, total construction area of approximately 169,800 square meters, including: commercial, office, underground garage. Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. The total investment is 10 million. Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Address:******* Progress stage: construction design Construction period: 2011 December - June 2013 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Panyu District, Guangzhou, Guangdong Xiaoguwei University City district, the construction of several blocks of about 18-storey residential building, covers an area of 22,378 square meters, total construction area of 62,658 square meters. The total investment 200 million yuan. Construction unit:******* Postal Code:******* Contact:******* Tel:******* Design unit: Guangzhou Panyu City Architectural Design Institute Co., Ltd. Postal Address:******* Progress stage: construction preparation Construction period: 2011 September - May 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Shenzhen, Guangdong Greeting pit-like streets of Portland Road and Dan King Azusa Avenue interchange, a residential development area of approximately 53,113 square meters, total construction area of approximately 163,220 square meters. The total investment 400 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Tel:******* Design:******* Postal Address:******* Tel:******* Project Name: Shenzhen Investment Real Estate Co., Ltd. Shenzhen Sea World residential development Progress stage: engineering design Construction period: 2012 March - March 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shekou, Nanshan District, Shenzhen, Guangdong, Sea World Area, a residential development with a total floor area of approximately 160,000 square meters. The total investment 220 million yuan. Construction:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Fax:******* Project Name: Foshan Yuan Chong Hong Construction Project Meeting Progress stage: engineering design Construction period: 2011 December - December 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Nanhai District, Foshan, Guangdong Guicheng street 58 blocks east of South Avenue, six-way north of the sea, a residential development, an area of 55,053 square meters, total construction area of 260,777 square meters. The total investment 300 million yuan. Construction units:******* Postal Code:******* Contact System By: Wen Yucheng Tel:******* Fax:******* Project Name: Shenzhen Heng Run Park construction project is still Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction design Construction period: 2012 February - February 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Bao'an District, Shenzhen, Guangdong, the central area (Bin Long Road, Baoan Road Interchange in the southeast, a residential development area of approximately 38,174 square meters, total construction area of 146,100 square meters, including: residential buildings, shops , parking. The total investment 350 million yuan. Construction:******* Postal Address:******* Tel:******* Project Name: Changchun International Forte net monthly 4.1, 4.2 projects Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Net project is located in Changchun City on Development, learned Road, south of Atlas Street, east of the tree, with a total construction area of 269,189.5 square meters. The total investment is not detailed. Construction Unit:******* Postal Address:******* Contact:******* Tel:******* Fax:******* Construction Unit:******* Postal Code:******* Contact System : Xu Feng Tel:******* Project Name: Langfang Vocational and Technical College three Yanjing teach 职工宿舍楼 Project # 9 Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Qi Li Xijing Town project is located north of Ha Road, east of Three Rivers Vocational Education Center, building area of 6851.76 square meters as shown in the drawings, covers an area of 1450.1 square meters, ground five, building height of 16.75 m, the frame structure, raft foundation . The total investment 15,019,700 yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Silver Dragon Properties Ltd. Suzhou Su to 2010-B-43 construction project plot Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Suzhou City Economic Development Zone, Wu Guo Lane street looking west, Guo Xindong Road, south side. Project covers an area of 120,107.5 square meters, total design capacity of 216,193.5 square meters building area, floor area ratio of 1.8. Total investment $ 298 million. Construction Unit:******* Postal Address:******* Tel:******* Design unit: Development and Investment in Environmental Protection Technology Co., Ltd. Sheng (EIA agencies) Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Real Estate Development Co., Ltd. Suzhou Su dragon to 2010-B-46 construction project plot Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Suzhou City Economic Development Zone, Kuo Lane Street, Lake Road West, accessible way east. Project covers an area of 112,310 square meters, total construction area of 168,456 square meters capacity, the volume was 1.5. Total investment $ 220 million. Construction Unit:******* Postal Address:******* Tel:******* Design unit: Development and Investment in Environmental Protection Technology Co., Ltd. Sheng (EIA agencies) Postal address:******* Postal Code:******* Contact:******* Tel:******* Project Name: Hebei Huarui International Garden District 3-5 #, 7-9 # Building, Commercial Building Project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Project is located in the town of Chu Yuxian songjiazhuang Village West, the scale of 47,210.34 square meters, of which 3-5 #, 7-9 # F 44688.84 m2, brick, six-floor, basement, commercial buildings 2521.5 square m, the frame structure, the ground floors. The total investment is not detailed. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Project Name: Yongnian County, a small town eight Longma Wang Joint School Project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project: Rabbit Project is located in Yongnian County, Township, Village West, Cao eight Wang, the new dormitory building a two-story, brick-concrete structure, construction area of 488 square meters; new restaurant, one floor, the frame structure, construction area of 321 square meters; new sports hall project, a layer, the frame structure, construction area of 640 square meters; new toilet, guard, gates, fences and playground campus sclerosis and other ancillary works. The total investment 2.61 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Fairmont Hotel Co., Ltd. Suzhou New Project Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Project is located in Suzhou Wuzhong Feng Jin Road No. 36, project leasing Soochow Industry and Trade Co., Ltd. Suzhou Industrial Park area in the Wu-chun Feng Road 36, the buildings have been built interior operations. The project covers an area of 988.2m2, total construction area of approximately 5000m2, 8 buildings, 1-2 for the catering, hotel accommodation 3-7 layer, 8 layers for the office. The project has 60 rooms (120 beds), dining area of 1000 m2, including the kitchen area of 500m2. The total investment 55 million yuan, of which environmental protection investment of $ 600,000. Construction Unit:******* Postal Address:******* Tel:******* Design:******* Contact:******* Tel:******* Project Name: Yongnian County River River Village at Fort Union Township School Project Progress stage: construction started in Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project River Township is located in River Village, Yongnian County, New restaurant construction, a layer of brick-concrete structure, construction area of 308 square meters; New sports hall project, a layer, the frame structure, construction area of 640 square meters; toilet, guard, gates, fences, school and playground sclerosis and other ancillary works. The total investment 2.15 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Suzhou Co., Ltd. Xin Yun real estate project Stages of progress: environmental impact assessment Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Dongshan District, Suzhou City Road, east of the landscape, with a total investment 900 million yuan, covers an area of 117388.4 m2, construction area of 175066m2, building into a residential and business-oriented high-standard residential and commercial projects. The total investment 900 million yuan. Construction:******* Postal Code:******* Contact System People: money manager Tel:******* Designer:******* Postal Code:******* Contact:******* Tel:******* Project Name: Rural Ambrose Liu Yongnian County Solid Joint School Project Progress stage: construction started in Construction period: 2011 - 2012 Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Yongnian County Solid Ambrose Lau village west village, new toilets, guards, gates, fences and playground campus sclerosis and other ancillary works. Total investment 940,000 yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Project Name: Hillside Place convenient delivery of professional health services Progress stage: under construction Construction period: 2011-01 January --2013-12 months Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Huadu District, Xinhua Industrial Zone, Road No. 20, Daphne, dietary Square convenience of professional health services delivery , The size of 2500.00 square meters building, the main buildings are food processing workshop, information center room, a dormitory building The total investment of 20 million. Construction unit:******* Postal Code:******* Contact:******* Progress stage: the record Construction period: 2011-12 to 2013-12 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting (for reference)Project: Project is located in the town of Ge Xiang Cun former warehouse, commercial office space project proposed commercial office space, with a total construction area of 99,990 square meters, of which the ground floor area of 71,990 square meters, ground floor area of 28,000 square meters, the project land area of 20683 square meters (31.02 acres), land transfer contract number 3301102010A21090. Specific issues by planning the implementation of approved comments. The total investment 360 million yuan, including fixed assets investment: 343 million yuan (Civil 21400; equipment 3000; installation of 4000; construction of other costs 4900; reserve fund 1000), construction period interest on 17 million yuan. Construction unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Project Name: Wuhan Economic and Technological Development Zone, the military community a Huangling Hill Street, 28, 29 Building project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Wuhan Economic and Technological Development Zone, a new group village. The total investment 31.28 million yuan. Construction unit:******* Postal Address:******* Tel:******* Construction:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Jiangsu Suzhou Dulwich International School Project Progress stage: construction preparation Construction period: 2011 September - September 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Suzhou, Jiangsu Su Sheng South Road, Xinghua Street East, with a total construction area of about 2.6 million square meters, the largest single area of 23,000 square meters, sixstory frame structure on the ground locally, school buildings with indoor swimming pool and gymnasium. The largest single-span nine meters. The total investment of 100 million. Construction:******* Postal Address:******* Electricity Tel:******* Fax:******* Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Wuhu International Culture Square Hualun a pile foundation engineering projects Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Wuhu City, Anhui Province Yijiang District Limin West Road and Zhongshan Road intersection, a construction area of about 150,000 square meters, frame shear wall structure, containing 2 to 4 # 8 # 6 high-rise residential and basement. The total investment is not detailed. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Construction:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Hubei Science and Technology Parks Corporation Gold Hill rental (office building and basement) Engineering Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Gold Hill project is located in Industrial Area, on the ground about 10797.24 square meters, about 5238.86 square meters underground, the structure type as a framework, a total of 15 layers. The total investment of 20 million. Construction:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Construction:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Hubei Chibi Hospital hospital building project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Chibi Hospital project is located in the hospital. The total investment 113.97 million yuan, sources of funding for investment and self-government. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Construction Unit:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Hebei economic zone around Beijing Planning Exhibition Hall Project Green Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the town of movie Zhuozhou City Pier Road South, with a total construction area of 33,000 square meters, covers an area of about 110 acres. The total investment is not detailed. Owner:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Chenxi County Daqian Jinsiou mountain area 2 - 3 phase Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chenxi County Pioneer Road project is located, a bid of (two): A total of 10, mixed 14-layer frame, area 47157 square meters; two tenders (three): 1, frame-wall layer 21, an area of 35,000 square meters. The total investment of 57.5 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Fax:******* Project Name: Wuhan Xiao farmers squeezed Fangcun also built Village (Phase I) Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Wuhan Development Zone, Xiao Jiangxia Miaoshan virgin Fangcun. The total investment 30.01 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Project Name: Shanghai Tang Lane five neighbors A block matching real estate projects Progress stage: verification of project approval Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shanghai Pudong New District Industrial Park East Cambridge in key areas, building civil construction: residential area, factory living area, with a total construction area of 93,992 square meters; underground of underground space for a total construction area of 13,792 square meters. The total investment 360 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Progress stage: engineering design Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Pudong New Area, Tang Zhenhong two villages 11 / 1 hill (ie, bank card industry park two 1 - 2, 1 - 3, 1 - 4 blocks), east to Fanchang Road, south of Union Road, Tang Gu Road, west , north to King Nga Road, area: 39,301 square meters (58.95 acres), can be built on the ground floor area of approximately 5.9 million square meters. The total investment 600 million yuan. Construction:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Progress stage: construction design Construction period: 2011 - 2013 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low-voltage distribution cabinet. (Reference) Project: Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project is located in Shanxi Changzhi Changzhi County Lidu Dong Street north, Changling Road, west side, construction of a 10-storey office building, with a single layer of basement, total floor area of approximately 11,925 square meters. The total investment 29 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Designer:******* Postal Code:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Contact:******* Progress stage: construction design Construction period: 2011 October - December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Hohhot, Inner Mongolia Genghis Khan Avenue, south of New City, Overseas Chinese Village, west of the original building materials warehouse to the north east of the New World home, the construction of an office building with underground garage single high, with a total floor area of approximately 20,000 square meters . The total investment of 100 million. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal address:******* Postal Code:******* Contact:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Designer:******* Postal address:******* Postal Code:******* Contact:******* Progress stage: construction preparation Construction period: 2011 August - November 2011 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the East County town of Siping Siping Village, two small groups, building area: 10,775 square meters, Layers: 6 layers, structure type: the underlying framework of the brick; forestry affordable housing, building area: 5005 square meters, number of storeys: 5-layer structure Type: brickconcrete structure. The total investment is not detailed. Construction unit:******* Postal Address:******* Tel:******* Design Unit: Liaoning Institute of Architectural Design Co., Ltd. North Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting, barricades machine. (Reference) Project: Shennongxi residential project is located in Badong County, with a total construction area of 11757.72 square meters. The total investment 29.84 million yuan, sources of funding arrangements for the central and provincial financial burden. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Construction Unit:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Project Name: Shenzhen Royal Lake peak home construction general contracting projects Progress stage: construction started in Construction period: 2011 - 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Luohu District, Shenzhen Yanhe Interchange Road and patriotism, the tender area of 64865.3 square meters. The total investment 437.25 million yuan. Construction:******* Postal Address:******* Tel:******* Fax:******* Construction unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Shantou CITIC Pu River Beach Resort holiday apartment project dragon Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shantou CITIC dragon Pu River Beach Resort, a construction of 66 holiday apartments and a clubhouse, each with 2 to 3 layers, with a total construction area of 39318.36 square meters. The total investment 99.99 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Project name: Jinan City, the body of China Railway Construction International Fair Area City construction projects Progress stage: engineering design Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 - 2012 Major equipment: ventilation systems, fire equipment, instrumentation, lightning protection and grounding, glass doors and windows, waterproof anti-corrosion, paint, wall tile, light fixtures, low voltage electrical appliances, power distribution, wire and cable, weak systems, water supply equipment, pipe parts, valve components, outdoor drainage, hardware, plumbing, recreational facilities, landscaping, access control systems. (Reference) Project: Fair Project Area is located in the body of the heart, the liberation of the north East, west of the body of West, about 40 million square meters, which block A building area of about 170,000 square meters of land area of about 230,000 construction B square meters. The total investment 2.2 billion. Construction Unit:******* Postal Address:******* Tel:******* Designer:******* Postal Address:******* Tel:******* Project Name: Second Hospital of Henan Province, Luoyang City, Ward Building Integrated Project Progress stage: construction preparation Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators, medical equipment, electronic display. (Reference) Project: Project is located in Luoyang, Henan Province, Nanchang Changjiang Road junction 3, the total construction area of 33,507 square meters, including a fine 20 storey building decorated rooms, with singlelayer high in the basement, providing approximately 700 beds. The total investment of 45 million. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Construction Unit:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Fax:******* Designer:******* Postal Address:******* Tel:******* Fax:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Guangzhou Pearl City sporadic projects Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Guangzhou City, the core business district of Pearl River New City B1-8 block, the project is located in Pearl City, Pearl River New City, Guangzhou City, the core business district, the project is positioned as an international landmark Grade A office space. The main building includes the main building 71-story office and conference center 3-layer skirt, with a total construction area of 210,000 square meters, the main building of 309.6 meters. The total investment 9,302,970.96 yuan. Construction unit:******* Postal Address:******* Tel:******* Fax:******* Construction unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Fax:******* Project Name: Guangdong Shenzhen Huamei heavy industrial plant engineering plant Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: construction materials, wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak systems, lightning protection systems, low voltage power distribution equipment, steel structures. (Reference) Project: Project is located in Bao'an District, Shenzhen, Guangdong Huamei Industrial Park, Song Gang, an area of 13,596 square meters. The total investment 10.92 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Construction unit:******* Postal address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Code:******* Contact:******* Tel:******* Project Name: West Street, Chongqing, Chongqing Nanchuan Nanchuan District Adult Education Training Center Project Area Progress stage: construction preparation Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Xicheng District, Chongqing Nanchuan streets, construction of a training building, total construction area of 12,000 square meters. The total investment 15 million yuan. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Design:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Project Name: Shishi City, administrative services Yongning town center project Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Shishi City, Fujian Yongning town, building area of 15,892.48 square meters, tenstory frame structure. The total investment of 25 million, funding sources for the funding. Construction Unit:******* Postal Address:******* Tel:******* Construction Unit:******* Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Project Name: Shanghai Waigaoqiao Town E08-05 block new nursery projects Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in the east and south west of the community planning supporting schools to supporting commercial land north latitude nine road construction area 5526.83m2. The total investment 21.82 million yuan. Construction Unit:******* Postal address:******* Postal Code:******* Contact:******* Tel:******* Fax:******* Construction:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Fax:******* Project Name: Quanzhou Xing North Peak District project Xiamei Progress stage: verification of project approval Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located in Quanzhou, Fujian Feng Xia U.S. North Area, with a total of about 307.6 acres of land. The total investment of 800 million, sources of funds for government investment and financing. Construction Unit:******* Postal Address:******* Tel:******* Fax:******* Construction units:******* Postal Address:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Tel:******* Fax:******* Project Name: Second Experimental Kindergarten project Lienchiang Progress stage: construction started in Construction period: 2011 - 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation, lighting. (Reference) Project: Project is located east of Fujian Lianjiang Aojiang Road, Hsin Tung Yang Foods plant north of total construction land area of 1580 square meters, total construction area of 4907.6 square meters. The total investment of 12 million, sources of funding for domestic government funds. Construction Unit:******* Postal address:******* Postal Code:******* Contact System : Cheng teacher, Luo Tel:******* Construction Unit:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese government. If you are interested in the E-journal with contact, please Contact us. Postal Address:******* Tel:******* Chinabidding 11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing, China 100044 Phone : +86-10-82744588 Fax : +86-10-82743720 E-Mail : contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn http://www.chinabidding.com.cn www.chinabidding.org