8 Step Problem Solving Method • Deepen your awareness of the importance of the 8 step process to effective problem solving • Apply the process to your own work situation during class discussion • Experience how the A-3 tool communicates the process thinking • Apply in the work environment that will work both in the field and in the on-campus lab Learning Goals 2 8 Step Problem Solving Process 8 Step Process for Problem Solving Steps Depth Zero level Go deeply on each step Complete Step 1 Step 2 Step 3 Step 4 Root Cause Step 5 Step 6 Step 7 Step 8 Toyota strength‐ standardize 3 1 Be adaptable to the work process needs-- take action quickly If necessary, use TEMPORARY measures -when a problem occurs, take action quickly Keep at it until TRUE countermeasures are in place -that which if implemented prevents problem from returning Speedy Action in a Timely Manner 4 Difference between “Temporary Measure" and “Countermeasures” Problem Why? Machine over travels Limit switch not activated (Fact) Why ? Limit switch Arm is Frozen (fact) (Temporary measure) Replace the limit switch Prevents the recurrence Why? Root Cause Limit switch is in Coolant air flow (Countermeasure) shield limit switch from coolant Temporary Measure Example 5 Action to stop or contain the problem-can add necessary extra work to the process. ( + $ / + / + ) • When a problem occurs, take action quickly • Purpose is to contain the problem, not solve it. Temporary Measure 6 2 Select the optimal containment action on the following criteria: • Simplicity • Minimal modification to current process • Time to implement Option 1 Simplicity Modification Time 10 9 10 29 Option 2 Option 3 8 7 10 5 9 7 27 17 Sum the score and select the option with the highest score Rate each option relative to each other for each criteria Short-Term Containment 7 Problem Identified C/M Identified C/M Implemented Follow up Complete Temporary Measure Implementation Plan 8 A problem is … The current situation gap to the standard = PROBLEM • Fact based • Discovery driven Standard Gap = Problem Current Situation What Defines a problem in the 8 Step method? 9 3 Non Value Added Work = Waste • Waste is any factor which does not contribute to the process by adding value. • The goal of Lean is to eliminate any factors which raise cost without adding value to the product. What Defines a problem in the 8 Step Method? 10 Motion Overproduction Inventory Quality Defects The 7 Wastes! Waiting Over Processing Transportation What Defines a problem in the 8 Step Method? 11 Would you like to work in this place? What Defines a problem in the 8 Step Method? 12 4 See normal vs abnormal After Racks and Containers for Small Lot SOP Andon Cord Andon Board Information Charts Scoreboard 5-S Safety Glasses On Foot-printing Floor Walking Aisle Ergo Aid Table 13 What Defines a problem in the 8 Step Method? Step1.Clarify the Problem Step 2. Break Down the Problem P Step 3. Target Setting Step 4. Root Cause Analysis Step 5. Develop Countermeasures D Step 6. See Countermeasures Through C Step 7. Monitor Both Results and Processes A Step 8. Standardize Successful Processes 8 Step Process for Problem Solving 14 • See handout Example of Problem A-3 Report 15 5 Proceedings 8 Steps Step 1. Clarify the Problem (1) Clarify the “Ultimate Goal” of your responsibilities & work (2) Clarify the “Standard” of your work (3) Clarify the “Current Situation” of your work (4) Visualize the gap between the “Current Situation” and the “Standard” Step 1 - Clarify the Problem 16 Visualize the gap between the “Current Situation” and the “Standard” Defects Problem The Standard .5 .4 .3 The Current Situation .2 Visualize the gap between the current situation and the standard .1 Aug Sep Oct Nov Step 1 - Clarify the Problem 17 Process1. Clarify the “Ultimate Goal” of your responsibilities & work Ultimate Goal My job’s purpose My work & Responsibilities To provide customers with highly functional and high-quality cars at reasonable prices in a timely manner To meet customer demand To meet Production Plans Step 1 - Clarify the Problem 18 6 1. Clarify the Problem Ultimate Goal: Assure TMMK cars meet customer requirement for quality Standard: Zero audit defects from sealer area Current Situation: 7 water leaks on 7/28 15 10 7 Gap=7 0 5 Example: Step 1 0 Actual Standard 19 1. Clarify the Problem Ultimate Goal: TMs are compensated for work completed and paid timely and fairly Standard: 100% (3300) of TM’s paychecks are deposited error free Current Situation: 80% (2640) of TM’s paychecks are deposited error free GAP 20% (600) paychecks Need a manual check To correct errors 100 80 60 40 20 0 3300 2640 Gap=(20%) 660 80% 100% Current Standard Example: Step 1 20 8 Steps Step 1. Clarify the problem Step 2. Break down the problem Proceedings (1) Clarify the “Ultimate Goal” of your responsibilities & work (2) Clarify the “Standard” of your work (3) Clarify the “Current Situation” of your work (4) Visualize the gap between the “Current Situation” and the “Standard” (1) Break down the problem (2) Identify the prioritized problem (3) Specify the point of occurrence by checking the process through GENCHI GENBUTSU Step 2 - Break Down the Problem 21 7 Big Problem Problem Problem What Where When Who Problem NOT Why! Problem Problem Problem Problem Problem Problem Problem Prioritized Problem Prioritized Problem at the Point of Occurrence Step 2 - Break Down the Problem 22 • Formulating a clear, concise statement from your Gap • The statement describes the difference between the standard and current situation • During this step, break the large problem into smaller, more specific problems • If you can’t describe it, you can’t solve it! Step 2: Break Down the Problem 23 Narrow the problem sufficiently Classify and quantify 7 Water leaks 1 on Avalon 1 in Mohican 6 on Camry Vehicle Type 1 side Process 5 Tail light Many water leaks in the tail light Prioritized Problem Priority decision: tackle the biggest impact problem FIRST Step 2 - Break Down the Problem 24 8 3% increase in SCRATCHES found on vehicle at Final Inspection Classify Then Quantify Trunk=0% Trunk Left=95% Roof=0% Left Roof Right=5% Hood=0% Right Hood Frt Door= 80% RR Door= 15% Fender=0% Qtr Pnl= 5% 80% Window Frame Prioritized Problem 15% Door Handle 5 % Side Pnl Step 2 - Break Down the Problem 25 • The point of occurrence (POO) is the actual work element at the physical location where the problem is first seen • For example, walk the line back. Check each work station, until you arrive at the station where the problem is no longer seen 8 Step Problem Solving (Locate Point of Occurrence) 26 Standard Work Pick seat from back w/carrier Set seat to car Align seat to rail Remove carrier Shoot bolts (POO) Defect was found here Process steps Scuffed / Damaged Cup Holder @ CSA Scuffed / Damaged Cup Holder @ start of final Scuffed / Damaged Cup Holder @ after Front seat install No damage @ before Front seat install Back track Locate Point of Occurrence (POO) 27 9 Where is Point of Occurrence? Prioritized Problem at the Point of Occurrence Why is Point of Occurrence important? For efficient use of time & effort Step 2 - Break Down the Problem 28 2. Break Down the Problem 7 Water leaks 1 on Avalon 1 in Mohican 6 on Camry Vehicle Type 1 side Process 5 Tail light Many water leaks in the tail light Go and See Investigation for Point of Occurrence 1) Floor Brush--Finish lower seam on end panel Prioritized Problem 2) Engine Room Finish--Finsh the area just above and below the tail light Processes Standard Work 1st Application Engine Room Finish Hood Corner Trunk Brush Floor Brush Finish Rear Hood Finish Mirror Plate Finish Upper end panel 2nd Application Finish Side tail light Example: Step 2 Engine Room Finish Point of Occurrence (POO) Finish below tail light Point of Occurrence 29 2. Break Down the Problem 20% (660/3300) manual checks being issued Group Leader Error 35% (231/660) Time Execution 61% (142/231) Other 23% (151/660) Other 39% (90/231) Salary Continuation 42% (277/660) STD Not Paid 30% (83/277) FMLA PTO Not Paid 70% (193/277) Prioritized Problem FMLA Process Flow T/M obtains FMLA form Point of Occurrence (POO) T/M submits form to TMR by deadline TMR reviews form - submits by deadline Payroll system updated by deadline T/M received paycheck with correct amount Problem: FMLA paperwork is not received from TMR by the payroll deadline. Example: Step 2 30 10 8 Steps Step 1. Clarify the problem Step 2. Break down the problem Step 3. Set a target Proceedings (1) Clarify the “Ultimate Goal” of your responsibilities & work (2) Clarify the “Standard” of your work (3) Clarify the “Current Situation” of your work (4) Visualize the gap between the “Current Situation” and the “Standard” (1) Break down the problem (2) Identify the prioritized problem (3) Specify the point of occurrence by checking the process through GENCHI GENBUTSU (1) Make a commitment (2) Set measurable, concrete and challenging targets Step 3) Set a Target 31 <STEP2> <STEP1> Prioritized Problem Standard Problem Big Problem Current Situation Point of Occurrence <STEP3> Target Problem Problem Step 3 - Set a Target 32 3. Target Setting Target: Eliminate 5 tail light area water leaks on Camry by 7/29 Example: Step 3 33 11 3. Target Setting Target: Eliminate 100% late submissions of FMLA forms to meet payroll deadline by arch 2009. (193 of 660 total gap) Example: Step 3 34 Example through Steps 1, 2, & 3 1. Clarify the Problem Ultimate Goal: No waterleaks in TMMK produced cars Ideal Situation (Standard): Zero audit defects from Sealer area 15 Current Situation: 7 waterleaks on 7/28 10 7 5 Gap = 7 Goal Actual 2. Break Down the Problem 7 Water leaks 1 on Avalon 6 on Camry 1 in Mohican 5 Tail light Vehicle Type Process 1 side Many water leaks in the tail light Prioritized Problem Go and See Investigation for Point of Occurrence 1) Floor Brush--Finish lower seam on end panel 2) Engine Room Finish--Finsh the area just above and below the tail light 1st Application Engine Room Floor Brush Trunk Brush 2nd Application Finish Hood Corner Finish Rear Hood Finish Mirror Plate Finish Upper end panel Finish Side tail light Engine Room Finish Finish below tail light Point of Occurrence 3 5 3. Target Setting Target: Eliminate 5 tail light area water leaks on Camry by 7/29 3 1. Clarify the Problem Ultimate Goal: TMs are compensated for work completed and paid timely and fairly 3300 100 80 60 40 20 0 Standard: 100% (3300) of TM’s paychecks are deposited error free Current Situation: 80% (2640) of TM’s paychecks are deposited error free 2640 80% Gap=(20%) 660 100% Current Standard 2. Break Down the Problem 20% (660/3300) manual checks being issued Group Leader Error 35% (231/660) Time Execution 61% (142/231) Other 39% (90/231) FMLA Process Flow T/M obtains FMLA form T/M submits form to TMR by deadline Other 23% (151/660) Salary Continuation 42% (277/660) STD Not Paid 30% (83/277) FMLA PTO Not Paid 70% (193/277) Prioritized Problem Point of Occurrence (POO) T/M received TMR reviews Payroll system paycheck with form - submits updated by correct amount by deadline deadline Problem: FMLA paperwork is not received from TMR by the payroll deadline. 3. Target Setting Target: Eliminate 100% late submissions of FMLA forms to meet payroll deadline by March 2009. (193 of 660 total gap) 36 12 Example through Steps 1, 2, & 3 37 8 Steps Step 1. Clarify the problem Step 2. Break down the problem Step 3. Set a target Step 4. Analyze the Root Cause Proceedings (1) Clarify the “Ultimate Goal” of your responsibilities & work (2) Clarify the “Standard” of your work (3) Clarify the “Current Situation” of your work (4) Visualize the gap between the “Current Situation” and the “Standard” (1) Break down the problem (2) Identify the prioritized problem Specify the point of occurrence by checking the process through GENCHI (1)(3) Make a commitment GENBUTSU (2) Set measurable, concrete and challenging targets 1) Examine the Point of Occurrence and think of possible causes without prejudice (2) Gather facts through GENCHI GENBUTSU and keep asking “Why?” (3) Specify the root cause Step 4 - Analyze the Root Cause 38 Time for WHY Prioritized Problem at the Point of Occurrence Possible cause Possible cause Possible cause Possible cause Not a fact Not a fact Not a fact Fact Possible cause Possible cause Possible cause Not a fact Not a fact Fact Possible cause Not a fact Think of all meaningful possible causes Go and See to confirm Possible cause Repeat Fact Root cause Step 4) Analyze the Root Cause 39 13 (Example) Bad polishing of painted parts Man (Human): Standard work being followed? Machine: RPMs correct? Material: Correct compound? Method: Polishing standard correct? Environment: Work place temperature correct? Step 4 - Analyze the Root Cause 40 Example: Welding robot stops in the middle of its operation. Why? A fuse in the robot has blown. Why? Circuit overloaded. Why? The bearings have damaged one another and locked up. Why? There was insufficient lubrication on the bearings. Why? Oil pump on robot is not circulating suffi Why? Pump intake is clogged with metal shavings. Why? No filter on pump intake (as designed) Root Cause Step 4 - Analyze the Root Cause 41 4. Root Cause Analysis Waterleaks on the left side tail light T/M leaving gaps in finish T/M not turning spatula into the seam T/M not instructed in proper angle of finish when trained No specification in STW for proper spatula angle when finishing ROOT CAUSE *Apply the “therefore” test to check thinking Example through Step 4 Step 4 - Analyze the Root Cause 42 14 4. Root Cause Analysis FMLA paperwork is not received from TMR by the payroll deadline Form doesn't pass review Form was submitted incorrectly Part "D" not complete T/M thought HR was to complete Instructions not clear in Part "D" *Apply the “therefore” test to check thinking Example through Step 4 Step 4 - Analyze the Root Cause 43 Example Step 4 44 8 Steps Proceedings Step 1. Clarify the problem Step 2. Break down the problem (1) Clarify the “Ultimate Goal” of your responsibilities & work (2) Clarify the “Standard” of your work (3) Clarify the “Current Situation” of your work (4) Visualize the gap between the “Current Situation” and the “Standard” (1) Break down the problem Step 3. Set a target (2)Make Identify the prioritized problem (1) a commitment (3)Set Specify the point of occurrence by checking (2) measurable, concrete and challenging targets the process through GENCHI GENBUTSU Step 4. Analyze the root cause (1) Examine the point of occurrence and think of possible causes without (1)prejudice Develop as many potential countermeasures Step 5. Develop countermeasures (2) Gather through GENCHI GENBUTSU and keep asking “Why?” as facts possible (3) Specify the root cause (2) Select the highest value added countermeasures (3) Build consensus with others (4) Develop a clear and detailed action-plan Step 5) Develop Countermeasures 45 15 Procedure for developing countermeasures Countermeasure Countermeasure Countermeasure Root Cause Countermeasure Countermeasure with the highest value-added Countermeasure Countermeasure Countermeasure Step 5 - Develop Countermeasures 46 Select the highest value added Countermeasures Evaluate all potential Countermeasures Effectiveness Truly eliminates the Root Cause Meets the Target Cost/Manpower The cost and time Number of people required to implement/to sustain Risk The risks when implementing Safety? Quality? Workability? Impact on other previous or following processes Step 5 - Develop Countermeasures 47 Build consensus with others Present to management for approval to go forward— A-3 format is a standardized and efficient tool •Explain and discuss plans with all relevant parties • Set up a cross functional committee • Organize the meeting to present the analysis and countermeasure ideas/plans • Hold update meetings to share latest info/progress Note: thru Process step 5, planning phase is completed Step 5 - Develop Countermeasures 48 16 Select the highest value-added Countermeasures Make an evaluation matrix: Countermeasure for assembling mismatched parts Risk Overall judgment Workability Problems to other processes Safety problem Quality problem Technical difficulty Expected effort Options Cost / Man-hour Factors Change parts color Change parts shape X X X X X X Good Acceptable Change sequence of operation NG Optimal Confirm the facts by interviewing related people and departments Step 5 -Develop Countermeasures 49 Develop a clear and detailed action-plan When creating the action-plan, be sure to clearly identify the four W’s of the countermeasures Who – What – Where – When? Clarify the roles and responsibilities of people and departments involved Keep updates (point to be checked) through reporting, informing, and consulting Clarify the schedule and order of actions to implement (Example)Action Plan Action items Determine the best color for parts per model Operator A July August September 1W 2W 3W 4W 1W 2W 3W 4W 1W 2W 3W Discuss color Discuss and decide in a team meeting Request to prepare Prepare trial parts Test by using trial parts B Confirm test results Report to managers Step 5 - Develop Countermeasures 50 5. Develop Countermeasure R.C. No spec in standard work for spatula angle Cost Safety Add inspection process ∆ ∆ O ∆ ∆ Train T/M's in correct angle to hold spatula Effort ∆ O O Effectiveness O Overall O Repair in CART X X O X X Temp Action Add inspection key points at quality gate and feeback to T/M's ‐ 7/28 Make a Plan Example: Step 5 51 17 5. Countermeasure Options & Evaluation Options Effectiveness Budget Speed Quality Overall Assessment Post clearer instructions on T/M board X O O X X O O O O Update instructions on form Have TMR instruct T/M Update instructions on form along with TMR communications O O Comments -Create awareness of enhancement -Help T/Ms who review board -Not helpful at home -Would document enhancement as new standard -Dependent on T/M reading it -Verbally communicate the enhancement -Cannot ensure that T/M will remember the instructions if not written down O O -Would document enhancement as new Standard while confirming the instructions Example: Step 5 52 8 Steps Step 1. Clarify the problem Step 2. Break down the problem Step 3. Set a target Step 4. Analyze the root cause Step 5. Develop countermeasures Proceedings (1) Clarify the “Ultimate Goal” of your responsibilities & work (2) Clarify the “Standard” of your work (3) Clarify the “Current Situation” of your work (4) Visualize the gap between the “Current Situation” and the “Standard” (1) Break down the problem (2) Identify the prioritized problem (3) Specify the point of occurrence by checking the process through GENCHI GENBUTSU (1) Make a commitment (2) Set measurable, concrete and challenging targets (1) Examine the point of occurrence and think of possible causes without prejudice (2) Gather facts through GENCHI GENBUTSU and keep asking “Why?” (3) Specify the root cause (1) Develop as many potential countermeasures as possible (2) Narrow down the countermeasures to the most practical and effective (3) Build consensus with others (4) Develop a clear and detailed action-plan Step 6 - See Countermeasures Through 53 8 Steps Step 6. See countermeasures through Proceedings (1) With all members united, implement countermeasures with speed and persistence (2) Share information with others by informing, reporting and consulting (3) Never give up, and proceed to the next step quickly Step 6 - See Countermeasures Through 54 18 Implement Countermeasures with speed and persistence after consensus (Nemawashi) building 1) Concentrate efforts 2) Check progress regularly “On-the-floor” standup at the progress boards— relate to “jishuken” room Step 6) See Countermeasures Through 55 6. See Countermeasure Through Countermeasure Plan - Train T/M's in correct spatula angle What Who When Status Rewrite Standard Work T/L 7/28 100% Develop SWES with Key Points T/L 7/29 100% Train T/M's T/L 7/30&31 100% Check for 3 Shifts T/L 8/3 100% Remove Temp Action T/L 7/30 100% Additional tracking method - 100%Complete 25% Complete 75% Complete 50% Complete Example: Step 6 56 6. Action Plan Item (What) (When) Resp (Who) Timing Feb W1 Draft form with clearer instructions W2 W3 Mar W4 W1 W2 W3 W4 TH Sample T/M response; revise as needed TH Consensus/Approval throughout HR RK Coordinate communication method with TMR and roll out SE Example: Step 6 57 19 Good Acceptable NG Optimal Example through Steps 5 & 6 58 8 Steps Step 1. Clarify the problem Step 2. Break down the problem Step 3. Set a target Step 4. Analyze the root cause Step 5. Develop countermeasures Proceedings (1) Clarify the “Ultimate Goal” of your responsibilities & work (2) Clarify the “Standard” of your work (3) Clarify the “Current Situation” of your work (4) Visualize the gap between the “Current Situation” and the “Standard” (1) Break down the problem (2) Identify the prioritized problem (3) Specify the point of occurrence by checking the process through GENCHI GENBUTSU (1) Make a commitment (2) Set measurable, concrete and challenging targets (1) Examine the point of occurrence and think of possible causes without prejudice (2) Gather facts through GENCHI GENBUTSU and keep asking “Why?” (3) Specify the root cause (1) Develop as many potential countermeasures as possible (2) Narrow down the countermeasures to the most practical and effective (3) Build consensus with others (4) Develop a clear and detailed action-plan Step 7 - Evaluate Both Results and Processes 59 8 Steps Step 6. See Countermeasures Through Step 7. Evaluate Both Results and Processes Proceedings (1) With all members united, implement countermeasures with speed and persistence (2) Share information with others by informing, reporting and consulting (3) Never give up, and proceed to the next step quickly (1) Evaluate the results and the processes, and share it with members involved (2) Evaluate from three key perspectives: Customer’s, 8 Step’s, and Your Own (3) Understand the reasons of success and failure Step 7 - Evaluate Both Results and Processes 60 20 Evaluate results and process, and share it with stakeholders Evaluate the process for achieving the results Did we analyze the true root cause? What was most effective? Did we follow the Problem solving 8 steps completely? Step 7 - Evaluate Both Results and Processes 61 Evaluate results and processes, and share it with stakeholders Confirm positive and negative effects Positive effects Repair hours Achieved target Negative effects Cost for machine modification Step 7 - Evaluate Both Results and Processes 62 Develop a tracking chart or graph (make the standard/target easy to see • Where do we get the data? • What data is needed? • What is the required time period? • Who will collect and summarize data? Step 7 Execution 63 21 7. Monitor Both Results and Processes Tail light Waterleak Tracking 7/28 8 defects 7/29 0 defects 7/30 0 defects 7/31 0 defects 8/1 8/2 0 defects 0 defects 8/3 0 defects Tail Light Waterleaks Remove Temp Action 10 8 6 4 2 0 # of defects 7/28 7/29 7/30 7/31 8/1 8/2 8/3 Date Example: Step 7 64 7. Monitor Both Results and Processes Number of FMLA forms from TMR not meeting payroll deadline 250 200 193 150 100 100 98 W2 W3 50 20 19 W4 May W1 6 0 W2 W3 0 April W1 Example: Step 7 65 8 Steps Step 1. Clarify the problem Step 2. Break down the problem Step 3. Set a target Step 4. Analyze the root cause Step 5. Develop countermeasures Proceedings (1) Clarify the “Ultimate Goal” of your responsibilities & work (2) Clarify the “Standard” of your work (3) Clarify the “Current Situation” of your work (4) Visualize the gap between the “Current Situation” and the “Standard” (1) Break down the problem (2) Identify the prioritized problem (3) Specify the point of occurrence by checking the process through GENCHI GENBUTSU (1) Make a commitment (2) Set measurable, concrete and challenging targets (1) Examine the point of occurrence and think of possible causes without prejudice (2) Gather facts through GENCHI GENBUTSU and keep asking “Why?” (3) Specify the root cause (1) Develop as many potential countermeasures as possible (2) Narrow down the countermeasures to the most practical and effective (3) Build consensus with others (4) Develop a clear and detailed action-plan Step 8 - Standardize Successful Processes 66 22 8 Steps Step 6. See Countermeasures Through Step 7. Evaluate Both Results and Processes Step 8. Standardize Successful Processes Proceedings (1) With all members united, implement countermeasures with speed and persistence (2) Share information with others by informing, reporting and consulting (3) Never give up, and proceed to the next step quickly (1)Evaluate the results and the processes, and share it with members involved (2)Evaluate from three key perspectives: Customer’s, 8 Step’s, and Your Own (3)Understand the reasons of success and failure (1) Set successful processes as new standard (2) Share the new standard (YOKOTEN) (3) Start the next round of KAIZEN Step 8 - Standardize Successful Processes 67 Procedure for Standardizing successful processes (1) Successful processes as new standard Overall Company Own work area (2) Share the new standard (YOKOTEN) Ideal Situation KAIZEN Standardization (3) Start the next round of KAIZEN YOKOTEN KAIZEN Standardization YOKOTEN KAIZEN Success Standardization YOKOTEN Implementation Step 8 - Standardize Successful Processes 68 Start the next round of KAIZEN Kaizen Standardize Solve one problem Repetition of problem solving process KAIZEN KAIZEN KAIZEN Step 8 - Standardize Successful Processes 69 23 8. Standardize Successful Processes Yokoten: Contact other NAMC's to confirm no problem Follow-up: Have Pilot add special check for finish angle in Standardized work development Example: Step 8 70 8. Standardize Successful Performance Document reason for adding additional instructions to form Standardize electronic form in database with revision date Yokoten: Share the new form with other NAMCs by June 30 Example: Step 8 71 5. Develop Countermeasure 1. Clarify the Problem Ultimate Goal: No waterleaks in TMMK produced cars R.C. No spec in standard work for spatula angle Effort Zero audit defects from Sealer area Ideal Situation (Standard): Current Situation: 7 waterleaks on 7/28 10 ∆ Effectivenes s Ove rall O ∆ ∆ O O O O X X O X X Temp Action Add inspection key points at quality gate and feeback to T/M's ‐ 7/28 Gap = 7 Actual ∆ Safety ∆ Repair in CART 7 5 Cost Train T/M's in correct angle to hold spatula Add inspection process 15 Goal 2. Break Down the Problem 6. See Countermeasure Through 7 Water leaks 1 on Avalon Countermeasure Plan - Train T/M's in correct spatula angle 6 on Camry 1 in Mohican 5 Tail light 1 side Vehicle Type Many water leaks in the tail light What Who Rewrite Standard Work T/L Develop SWES with Key Points When Status 7/28 100% T/L 7/29 100% Train T/M's T/L 7/30&31 100% Check for 3 Shifts T/L 8/3 100% Remove Temp Action T/L 7/30 100% Process Prioritized Problem C/M Complete C/M Identified C/M Tracking C/M Implemented Go and See Investigation for Point of Occurrence 1) Floor Brush--Finish lower seam on end panel 2) Engine Room Finish--Finsh the area just above and below the tail light Engine Room Floor Brush Trunk Brush 2nd Application Finish Hood Corner Finish Rear Hood Finish Mirror Plate Finish Upper end panel Finish Side tail light 7. Monitor Both Results and Processes Engine Room Finish Tail light Waterleak Tracking Finish below tail light Point of Occurrence 3. Target Setting 7/28 8 defects 7/29 0 defects 7/30 0 defects 7/31 0 defects 8/1 0 defects 8/2 0 defects 8/3 0 defects Tail Light Waterleaks # of defects 1st Application Remove Temp Action 10 8 6 4 2 0 7/28 7/29 7/30 7/31 8/1 8/2 8/3 Date Target: Eliminate 5 tail light area water leaks on Camry by 7/29 8. Standardize Successful Processes 4. Root Cause Analysis Yokoten: Contact other NAMC's to confirm no problem Waterleaks on the left side tail light T/M leaving gaps in finish T/M not turning spatula into the seam Follow-up: Have Pilot add special check for finish angle in Standardized work development T/M not instructed in proper angle of finish when trained No specification in STW for proper spatula angle when finishing ROOT CAUSE Example: Steps 1-8 72 24 Example: Steps 1-8 73 Example: Steps 1-8 74 25