www.public.navy.mil/navsafecen 1 Were the following mishaps preventable? 2 Makes you wonder what happened to #1 Temporary Insanity II A look at the back of the trailer shows just what the impact did to both vehicles. As you can see the impact knocked the trailer section off of its rear axles. One section of wheels are standing alone behind the trailer. The bottom of the trailer crushed the car like an egg carton. Cars are not designed to withstand this kind of impact. Night Time, Weekend Alcohol, Speed are mix for Disaster Service member and cousin were killed when the Acura they were traveling in hit the semi-trailer truck. The Acura, which investigators said was going more than 80 mph, crumpled on impact. Fatal Motorcycle Accident April 2007, 1:00 am Excess of 100 mph July 2005 • • Buckley Air National Guard Base – Denver Lost hydraulics (nose wheel steering and brakes) after landing when arresting gear doughnut bounced up and took out a brake line. What’s the Most Important Take Away Today Have you heard this? Safety First! Do you agree with this statement? Or this one Mission First! How do we get there? Correct application of ORM/TCRM 8 What’s the Most Important Take Away Today Successful Mission Accomplishment Thru Correct Application Of ORM/TCRM Allows Safety to be a by-product Allowing us to Perform our task or mission again and again 9 Overview Operational Risk Management • Why ORM? • Implementation Strategy • Process • Resources • Summary 10 Why Risk Management? 11 Why Risk Management? 12 DoN – FY 2012 Cost AVIATION $791M Total Cost: $865M Current as of 02 Oct 2012 Fatalities PMV 73 Total Fatalities: 122 USN – FY 2012 Cost AVIATION $448M Total Cost: $496M Current as of 02 Oct 2012 Fatalities PMV 42 Total Fatalities: 58 Cost USMC – FY 2012 Fatalities AVIATION $343M Total Cost: $369M Current as of 02 Oct 2012 PMV 31 Total Fatalities: 64 Operational Risk Management Risk Management is the process that assists organizations and individuals in reducing or offsetting risk (by systematically identifying, assessing, and controlling risk arising from operational necessity, task loading, additive conditions and crew or human factors) and making decisions that weigh risks against mission or task benefits. The process can be used both on and off duty. ORM Concepts • ORM is a decision making tool • Reduce loss, increase success • Ability to make informed decisions • Minimizes risks to acceptable levels • Same process in wartime or peacetime • Efficient use of resources Completing the mission effectively is GOAL 1. this is why the Navy uses ORM. Cultural Challenges • Can do “anything, anywhere, anytime, at any cost” mentality • “Do more with less” mindset • Reluctance to say “no” • Making decisions based on “the way we’ve always done it” • Letting others worry about our mission hazards • Doing only what we “have to” and not what we “should do” • Taking advantage of professional courtesies. Accident (aka “Mishap”) So, what is an accident and are they preventable? An unplanned and unfortunate event that results in damage and/or injury. 19 Why do mishaps occur? Mishap investigations (reactive approach) reveal causal factors… Lack of: Abundance of: - Communication - Awareness - Resources - Assertiveness - Teamwork - Knowledge + Distraction + Complacency + Norms + Stress + Fatigue + Pressure Over 85% of all mishap are attributable to human factors failures 20 Are we learning? 21 Are we learning? 22 Bottom-line Action / Inaction by own forces causing losses far exceeding those caused by Red Threat • Degradation in mission readiness • Impact to mission accomplishment • Impact to the Team, Family & Friends ORM is a tactic to help reduce the Blue Threat 23 Reaching the War Fighter The Blue Threat Puts the concepts in to terms the War Fighter understands Hazards = Threats Threat Losses (FY Jan ‘91- Mar ‘11) Red Threat - 18 Aircraft Destroyed vs. Blue Threat - 562 Aircraft Destroyed ORM = Tactics CRM = Skills 24 Integration Strategy Recognize ORM It’s Already in Place, but… Controls derived from In-Depth & Deliberate ORM exist everywhere, in all activities throughout the unit maintenance programs, redundant systems, Standard Operating Procedures, checklists, flight briefs, Rules of Engagement, flight gear, survival equipment, etc. How do you change a mindset? (Who is looking out for whom?) 26 Establishing an ORM Mindset Policy & Leadership • Focus all levels of leadership on key ORM implementation issues • Develop and refine policy and guidance for the Fleet Assessment & Feedback • Accountability • Assist in development and integration of assessment process for the Fleet • Partner with force commanders and readiness evaluators • Institute vehicles for “Best Practice” dissemination Goal: Risk Management is an integral part of Navy Culture 27 Establishing an ORM Mindset Education & Training • Implement an ORM Learning Continuum from accession to retirement • Partner with training and accession commands • Standardize training and education across the Fleet Resources & Tools • Create and share tools to facilitate integration across the Fleet Goal: Risk Management is an integral part of Navy Culture 28 ORM Process ORM is a systematic approach to managing risks to increase mission success with minimal losses. This involves identifying and assessing hazards for risk, controlling risks, supervising and revising as needed. Risk to Mission, Force, and Self 29 What ORM Is Not • About avoiding risk • A ‘zero defect’ mindset • A safety only program • A fail-safe process • Limited to complex-high risk evolutions • A bunch of checklists • Just another program • A bullet in a briefing guide • Only for on-duty • An excuse to violate the law, policies, directives, or procedures • Just for your boss • Someone else’s job • Just a planning tool • A well kept secret • Automatic or Static • Difficult • A replacement for: • About limiting the commander’s flexibility, initiative or accountability – Sound tactical decision making – Rehearsals and TTPs 30 What ORM Is • A methodology, applicable to any activity, to enhance decisionmaking skills • A mindset • Accomplishing the mission with acceptable risk • Skill and knowledge dependent • Planning using a systematic, continuous and repeatable process • Based on experience • Following TTPs • Watching for change • Flexible and scalable • Asking "What's Different" • Sharing experience, lessons learned • About Using available tools and resources – Resource Management • Applied, standardized "common sense" • "Looking before you leap" • As in-depth as time permits • Working as a team 31 Preventing Mishaps A Proactive Approach Organizational Factors Unsafe Supervision Hazard – Condition w/ potential to cause personal injury, damage to property, or mission degradation Unsafe Act Preconditions Unsafe Acts Failed or Absent Controls Remove one causal factor or consequential error Mishap ORM A systematic process 3 Levels In Depth 5 Steps Long term process with extensive research and planning. Deliberate 1. Identify Hazards Pre-mission planning, time available for planning, recorded on paper. Time Critical Little time, done on the run, applied to control hazards introduced by unexpected events and changes to the plan. 4 Principles Accept no unnecessary risk. Anticipate and manage risk by planning. Make risk decisions at the right level. Accept risks when benefits outweigh the costs. 5. Supervise 4. Implement Controls 2. Assess Hazards 3. Make Risk Decisions Risk Management Levels Strategic Tactical Limited / No Time for Planning Time Available for Planning In-Depth • Charts/Flips • Ship / Aircraft (Systems Safety) • Instructions (3710, 5102, 4790) • NATOPS • Equipment (PPE) • Training Deliberate • • • • • Ops Planning SOPs Briefings CO Guidance OJT Time Critical • Mission Execution Checklist • Change Management (Environment, Mission, Emergency Procedures, Crew Change) • Equipment / Systems Degradation Controls from one level become resources for the next Mission & Task Success 4 Principles “Anticipate and manage risk by planning” – risks are more easily controlled when identified early in planning Identify Hazards Receive Tasking & Analyze Supervise Command Decisions Hazards Staff Naval Operational Estimates Planning Process StaffRecommend Options Implement Controls Assess Commander’s Guidance Make Risk Decisions • Integrate risk management into all levels of planning • Dedicate time and resources to apply risk management effectively • Include hazards in orders to assist subordinates • Don’t assume hazards away 35 4 Principles “Accept risk when benefits outweigh the costs” – the goal is not to eliminate risk, which is inherent in what we do, but to manage it so that we can accomplish the mission with minimal losses. Leaders must consider benefits and costs associated with a hazard’s risks to make informed decisions. Sustaining a bold, risk-taking organization is always a challenge in peace and war…ORM helps. 36 4 Principles “Accept no unnecessary risks” – only accept those risks that are necessary to accomplish the mission. • If all detectable hazards and their associated causes have not been detected, then unnecessary risks are being accepted. • ORM process provides a systematic, repeatable approach to identify hazards / threats that otherwise may go undetected. 37 4 Principles “Make risk decisions at the right level” – risk management decisions should be made by the leader directly responsible for the operation. If the hazard’s risk cannot be controlled at his level, leaders shall elevate the risk decision to their chain of command. • • • • • Who has the legal / organizational authority to make the decisions? Who has the maturity and experience to make the decisions? Who has on-scene knowledge? Who has the resources to mitigate the risk? Who will answer in the event of a mishap? 38 5 Step Systematic Process 1. Identify Hazards 5. Supervise 4. Implement Controls 2. Assess Hazards 3. Make Risk Decisions 39 Identify Hazards Operational Analysis Determine specified & implied tasks Break down into small steps Pull from lessons learned List Hazards Spend 30-40% of total ORM time Determine Hazard Root Causes List hazards for each step Use “What if…” tool Focus on “What’s different today?” Target root causes vice symptoms Keep asking “Why?” until answered Involve Operators / Subject Matter Experts 40 Straits Transit Risk Assessment Deliberate ORM Example Hazard/Threat Effect Grounding/Flooding/ Navigation error Blue/White Collision Non-compliant, nonsquawking low slow flyer Tide/current/waves Fog/Reduced visibility/Inclement weather Assess RAC Risk Control Action C, II SUWC: ensure ships' report RMD in effect, fixes every 2 min. w/ confidence & sources, OOD/Conn be proactive w/ identifying & 3 communicating. D, II CHENG: monitor from Control; CO/XO: monitor from bridge; GATOR: report & resolve discrepancies, provide 4 recommendations to OOD C, I SUWC: pass shipping info., ships adhere to Rules of the Road, use Furuno/ARPA, dec. speed in strait, pass contacts to 2 BWC/SUWC on net. D, II CO/XO: monitor from bridge; OOD/CONN: resolve potential conflicts early & contact via 4 radio; CICWO: backup OOD B, I ADC: proactively identify & resolve tracks; CFMCC: set weapons posture & status for threat; IWC: monitor & report 1 I&W to BWC/ADC on net. ALL: report anything in water, wear PPE if topside; 1st LT: ensure proper PPE; 3 LOOKOUTS: continually scan A, III SUWC: plan during favorable conditions, pass to restrict access to wx decks during high 2 seas, update BWC on changes. A, IV B, II SUWC: ensure ships report restrictred visibility detail, use 2 bell & horn, slow as needed. B, IV Terrorist attack D, I ASWC: notify BWC/SUWC of known/unknown sub location; BWC: launch alert ASW if 2 needed. BWC: PPRs; SUWC: man ships' 50-cals.; ADC: direct ATFP/SAR 3 helo Inattention/ complacency A, III 2 ALL: ensure rested & nourished Unknown submarine IVO PIM/Vital Area Re-assess Residual Supervision B, II C, II C, III GATOR: determine impact if delayed; METOC: update 3 emerging weather conditions METOC: report when below 3 NM visibility; OOD: backup 4 METOC if visibility OOD: monitor bridge watch team and correct as necessary; CO/XO: monitor 4 bridge team D, III GUN BOSS: monitor & quiz 5 ATFP watches on PPRs atc es bac up e o B, III watchstanders & supervisors 3 relieve if needed SUWC: limit RMD watch duration; Assess Hazards Assess Probability Assess Severity What’s the impact on mission, people, & things Complete Risk Assessment What’s the probability of all factors Use past data Look at total exposure Use risk assessment matrix Rank hazards by risk level Involve Operators / Subject Matter Experts 42 Risk Assessment Matrix The Risk Assessment Code (RAC) Matrix is used to determine the RAC for a hazard. You must cross probability and severity to obtain this code. PROBABILITY SEVERITY Effect of Hazard Risk Assessment Matrix Frequency of Occurrence Over Time A Likely B Probable C May D Unlikely I Loss of Mission Capability, Unit Readiness or Asset; Death 1 1 2 3 II Significantly Degraded Mission Capability or Unit Readiness; Severe Injury or Damage 1 2 3 4 III Degraded Mission Capability or Unit Readiness; Minor injury or Damage 2 3 4 5 IV Little or No Impact to Mission Capability or Unit Readiness; Minimal Injury or Damage. 3 4 5 5 1 – Critical 2 – Serious Risk Assessment Codes 3 – Moderate 4 – Minor 5 – Negligible Severity and Probability SEVERITY PROBABILITY Category I - The hazard may cause death, loss of facility/asset, or mission failure. Sub-Category A - Likely to occur immediately or within a short period of time. Expected to occur frequently to an individual item or person or continuously to a fleet, inventory or group. Category II - The hazard may cause severe injury, illness, property damage, or serious mission degradation. Category III - The hazard may cause minor injury, illness, property damage, or minor mission degradation. Category IV - The hazard presents a minimal threat to personnel safety or health, property, or mission. Sub-Category B - Probably will occur in time. Expected to occur several times to an individual item or person or frequently to a fleet, inventory or group. Sub-Category C - May occur in time. Can reasonably be expected to occur some time to an individual item or person or several times to a fleet, inventory or group. Sub-Category D - Unlikely to occur. 44 Straits Transit Risk Assessment Deliberate ORM Example Hazard/Threat Effect Grounding/Flooding/ Navigation error Blue/White Collision Non-compliant, nonsquawking low slow flyer Tide/current/waves Fog/Reduced visibility/Inclement weather Assess RAC Risk Control Action C, II SUWC: ensure ships' report RMD in effect, fixes every 2 min. w/ confidence & sources, OOD/Conn be proactive w/ identifying & 3 communicating. D, II CHENG: monitor from Control; CO/XO: monitor from bridge; GATOR: report & resolve discrepancies, provide 4 recommendations to OOD C, I SUWC: pass shipping info., ships adhere to Rules of the Road, use Furuno/ARPA, dec. speed in strait, pass contacts to 2 BWC/SUWC on net. D, II CO/XO: monitor from bridge; OOD/CONN: resolve potential conflicts early & contact via 4 radio; CICWO: backup OOD B, I ADC: proactively identify & resolve tracks; CFMCC: set weapons posture & status for threat; IWC: monitor & report 1 I&W to BWC/ADC on net. ALL: report anything in water, wear PPE if topside; 1st LT: ensure proper PPE; 3 LOOKOUTS: continually scan A, III SUWC: plan during favorable conditions, pass to restrict access to wx decks during high 2 seas, update BWC on changes. A, IV B, II SUWC: ensure ships report restrictred visibility detail, use 2 bell & horn, slow as needed. B, IV Terrorist attack D, I ASWC: notify BWC/SUWC of known/unknown sub location; BWC: launch alert ASW if 2 needed. BWC: PPRs; SUWC: man ships' 50-cals.; ADC: direct ATFP/SAR 3 helo Inattention/ complacency A, III 2 ALL: ensure rested & nourished Unknown submarine IVO PIM/Vital Area = Critical Risk Re-assess Residual Supervision B, II C, II C, III GATOR: determine impact if delayed; METOC: update 3 emerging weather conditions METOC: report when below 3 NM visibility; OOD: backup 4 METOC if visibility OOD: monitor bridge watch team and correct as necessary; CO/XO: monitor 4 bridge team D, III GUN BOSS: monitor & quiz 5 ATFP watches on PPRs atc es bac up e o B, III watchstanders & supervisors 3 relieve if needed SUWC: limit RMD watch duration; = Serious Risk = Moderate Risk = Minor Risk = Negligible Risk Straits Transit Risk Assessment Deliberate ORM Example Hazard/Threat Effect Grounding/Flooding/ Navigation error Blue/White Collision Non-compliant, nonsquawking low slow flyer Tide/current/waves Fog/Reduced visibility/Inclement weather Assess RAC Risk Control Action C, II SUWC: ensure ships' report RMD in effect, fixes every 2 min. w/ confidence & sources, OOD/Conn be proactive w/ identifying & 3 communicating. D, II CHENG: monitor from Control; CO/XO: monitor from bridge; GATOR: report & resolve discrepancies, provide 4 recommendations to OOD C, I SUWC: pass shipping info., ships adhere to Rules of the Road, use Furuno/ARPA, dec. speed in strait, pass contacts to 2 BWC/SUWC on net. D, II CO/XO: monitor from bridge; OOD/CONN: resolve potential conflicts early & contact via 4 radio; CICWO: backup OOD B, I ADC: proactively identify & resolve tracks; CFMCC: set weapons posture & status for threat; IWC: monitor & report 1 I&W to BWC/ADC on net. ALL: report anything in water, wear PPE if topside; 1st LT: ensure proper PPE; 3 LOOKOUTS: continually scan A, III SUWC: plan during favorable conditions, pass to restrict access to wx decks during high 2 seas, update BWC on changes. A, IV B, II SUWC: ensure ships report restrictred visibility detail, use 2 bell & horn, slow as needed. B, IV Terrorist attack D, I ASWC: notify BWC/SUWC of known/unknown sub location; BWC: launch alert ASW if 2 needed. BWC: PPRs; SUWC: man ships' 50-cals.; ADC: direct ATFP/SAR 3 helo Inattention/ complacency A, III 2 ALL: ensure rested & nourished Unknown submarine IVO PIM/Vital Area = Critical Risk Re-assess Residual Supervision B, II C, II C, III GATOR: determine impact if delayed; METOC: update 3 emerging weather conditions METOC: report when below 3 NM visibility; OOD: backup 4 METOC if visibility OOD: monitor bridge watch team and correct as necessary; CO/XO: monitor 4 bridge team D, III GUN BOSS: monitor & quiz 5 ATFP watches on PPRs atc es bac up e o B, III watchstanders & supervisors 3 relieve if needed SUWC: limit RMD watch duration; = Serious Risk = Moderate Risk = Minor Risk = Negligible Risk Straits Transit Risk Assessment Deliberate ORM Example Hazard/Threat Effect Grounding/Flooding/ Navigation error Blue/White Collision Non-compliant, nonsquawking low slow flyer Tide/current/waves Fog/Reduced visibility/Inclement weather Assess RAC Risk Control Action C, II SUWC: ensure ships' report RMD in effect, fixes every 2 min. w/ confidence & sources, OOD/Conn be proactive w/ identifying & 3 communicating. D, II CHENG: monitor from Control; CO/XO: monitor from bridge; GATOR: report & resolve discrepancies, provide 4 recommendations to OOD C, I SUWC: pass shipping info., ships adhere to Rules of the Road, use Furuno/ARPA, dec. speed in strait, pass contacts to 2 BWC/SUWC on net. D, II CO/XO: monitor from bridge; OOD/CONN: resolve potential conflicts early & contact via 4 radio; CICWO: backup OOD B, I ADC: proactively identify & resolve tracks; CFMCC: set weapons posture & status for threat; IWC: monitor & report 1 I&W to BWC/ADC on net. ALL: report anything in water, wear PPE if topside; 1st LT: ensure proper PPE; 3 LOOKOUTS: continually scan A, III SUWC: plan during favorable conditions, pass to restrict access to wx decks during high 2 seas, update BWC on changes. A, IV B, II SUWC: ensure ships report restrictred visibility detail, use 2 bell & horn, slow as needed. B, IV Identified Risk Terrorist attack D, I ASWC: notify BWC/SUWC of known/unknown sub location; BWC: launch alert ASW if 2 needed. BWC: PPRs; SUWC: man ships' 50-cals.; ADC: direct ATFP/SAR 3 helo Inattention/ complacency A, III 2 ALL: ensure rested & nourished Unknown submarine IVO PIM/Vital Area = Critical Risk Re-assess Residual Supervision B, II C, II C, III GATOR: determine impact if delayed; METOC: update 3 emerging weather conditions METOC: report when below 3 NM visibility; OOD: backup 4 METOC if visibility OOD: monitor bridge watch team and correct as necessary; CO/XO: monitor 4 bridge team D, III GUN BOSS: monitor & quiz 5 ATFP watches on PPRs atc es bac up e o B, III watchstanders & supervisors 3 relieve if needed SUWC: limit RMD watch duration; = Serious Risk = Moderate Risk = Minor Risk = Negligible Risk Assessment Pitfalls • • • • • • • Over optimism Misrepresentation Alarmism Indiscrimination Prejudice Inaccuracy Complacency 48 Make Risk Decisions Identify Control Options Determine Control Effects Systems / Engineering: • Material selection, Design • Often not feasible Supervisory / Administrative: • Instructions, Policies, SOPs, ROEs • Flight briefs, checklists • TTPs • Training • Effective if properly used / enforced Personal Protective Equipment: • Eye & hearing protection • Flight & survival Gear • Least effective type of control - does not reduce the probability of a mishap occurring, it only reduces the severity when a mishap does occur. What’s the impact on probability & severity What’s the risk control cost How do they work together Make Risk Decisions Determine residual risk Make risk decisions at right level Ensure benefits outweigh costs Involve Operators / Subject Matter Experts 49 Straits Transit Risk Assessment Deliberate ORM Example Hazard/Threat Effect Grounding/Flooding/ Navigation error Blue/White Collision Non-compliant, nonsquawking low slow flyer Tide/current/waves Fog/Reduced visibility/Inclement weather Assess RAC Risk Control Action C, II SUWC: ensure ships' report RMD in effect, fixes every 2 min. w/ confidence & sources, OOD/Conn be proactive w/ identifying & 3 communicating. D, II CHENG: monitor from Control; CO/XO: monitor from bridge; GATOR: report & resolve discrepancies, provide 4 recommendations to OOD C, I SUWC: pass shipping info., ships adhere to Rules of the Road, use Furuno/ARPA, dec. speed in strait, pass contacts to 2 BWC/SUWC on net. D, II CO/XO: monitor from bridge; OOD/CONN: resolve potential conflicts early & contact via 4 radio; CICWO: backup OOD B, I ADC: proactively identify & resolve tracks; CFMCC: set weapons posture & status for threat; IWC: monitor & report 1 I&W to BWC/ADC on net. ALL: report anything in water, wear PPE if topside; 1st LT: ensure proper PPE; 3 LOOKOUTS: continually scan A, III SUWC: plan during favorable conditions, pass to restrict access to wx decks during high 2 seas, update BWC on changes. A, IV B, II SUWC: ensure ships report restrictred visibility detail, use 2 bell & horn, slow as needed. B, IV Terrorist attack D, I ASWC: notify BWC/SUWC of known/unknown sub location; BWC: launch alert ASW if 2 needed. BWC: PPRs; SUWC: man ships' 50-cals.; ADC: direct ATFP/SAR 3 helo Inattention/ complacency A, III 2 ALL: ensure rested & nourished Unknown submarine IVO PIM/Vital Area = Critical Risk Re-assess Residual Supervision B, II C, II C, III GATOR: determine impact if delayed; METOC: update 3 emerging weather conditions METOC: report when below 3 NM visibility; OOD: backup 4 METOC if visibility OOD: monitor bridge watch team and correct as necessary; CO/XO: monitor 4 bridge team D, III GUN BOSS: monitor & quiz 5 ATFP watches on PPRs atc es bac up e o B, III watchstanders & supervisors 3 relieve if needed SUWC: limit RMD watch duration; = Serious Risk = Moderate Risk = Minor Risk = Negligible Risk Straits Transit Risk Assessment Deliberate ORM Example Hazard/Threat Effect Grounding/Flooding/ Navigation error Blue/White Collision Non-compliant, nonsquawking low slow flyer Tide/current/waves Fog/Reduced visibility/Inclement weather Assess RAC Risk Control Action C, II SUWC: ensure ships' report RMD in effect, fixes every 2 min. w/ confidence & sources, OOD/Conn be proactive w/ identifying & 3 communicating. D, II CHENG: monitor from Control; CO/XO: monitor from bridge; GATOR: report & resolve discrepancies, provide 4 recommendations to OOD C, I SUWC: pass shipping info., ships adhere to Rules of the Road, use Furuno/ARPA, dec. speed in strait, pass contacts to 2 BWC/SUWC on net. D, II CO/XO: monitor from bridge; OOD/CONN: resolve potential conflicts early & contact via 4 radio; CICWO: backup OOD B, I ADC: proactively identify & resolve tracks; CFMCC: set weapons posture & status for threat; IWC: monitor & report 1 I&W to BWC/ADC on net. ALL: report anything in water, wear PPE if topside; 1st LT: ensure proper PPE; 3 LOOKOUTS: continually scan A, III SUWC: plan during favorable conditions, pass to restrict access to wx decks during high 2 seas, update BWC on changes. A, IV B, II SUWC: ensure ships report restrictred visibility detail, use 2 bell & horn, slow as needed. B, IV Terrorist attack D, I ASWC: notify BWC/SUWC of known/unknown sub location; BWC: launch alert ASW if 2 needed. BWC: PPRs; SUWC: man ships' 50-cals.; ADC: direct ATFP/SAR 3 helo Inattention/ complacency A, III 2 ALL: ensure rested & nourished Unknown submarine IVO PIM/Vital Area = Critical Risk Re-assess Residual Supervision B, II C, II C, III GATOR: determine impact if delayed; METOC: update 3 emerging weather conditions METOC: report when below 3 NM visibility; OOD: backup 4 METOC if visibility OOD: monitor bridge watch team and correct as necessary; CO/XO: monitor 4 bridge team D, III GUN BOSS: monitor & quiz 5 ATFP watches on PPRs atc es bac up e o B, III watchstanders & supervisors 3 relieve if needed SUWC: limit RMD watch duration; = Serious Risk = Moderate Risk = Minor Risk = Negligible Risk Straits Transit Risk Assessment Deliberate ORM Example Hazard/Threat Effect Grounding/Flooding/ Navigation error Blue/White Collision Non-compliant, nonsquawking low slow flyer Tide/current/waves Fog/Reduced visibility/Inclement weather Assess RAC Risk Control Action C, II SUWC: ensure ships' report RMD in effect, fixes every 2 min. w/ confidence & sources, OOD/Conn be proactive w/ identifying & 3 communicating. D, II CHENG: monitor from Control; CO/XO: monitor from bridge; GATOR: report & resolve discrepancies, provide 4 recommendations to OOD C, I SUWC: pass shipping info., ships adhere to Rules of the Road, use Furuno/ARPA, dec. speed in strait, pass contacts to 2 BWC/SUWC on net. D, II CO/XO: monitor from bridge; OOD/CONN: resolve potential conflicts early & contact via 4 radio; CICWO: backup OOD B, I ADC: proactively identify & resolve tracks; CFMCC: set weapons posture & status for threat; IWC: monitor & report 1 I&W to BWC/ADC on net. ALL: report anything in water, wear PPE if topside; 1st LT: ensure proper PPE; 3 LOOKOUTS: continually scan A, III SUWC: plan during favorable conditions, pass to restrict access to wx decks during high 2 seas, update BWC on changes. A, IV B, II SUWC: ensure ships report restrictred visibility detail, use 2 bell & horn, slow as needed. B, IV Terrorist attack D, I ASWC: notify BWC/SUWC of known/unknown sub location; BWC: launch alert ASW if 2 needed. BWC: PPRs; SUWC: man ships' 50-cals.; ADC: direct ATFP/SAR 3 helo Inattention/ complacency A, III 2 ALL: ensure rested & nourished Unknown submarine IVO PIM/Vital Area = Critical Risk Re-assess Residual Supervision B, II C, II C, III GATOR: determine impact if delayed; METOC: update 3 emerging weather conditions METOC: report when below 3 NM visibility; OOD: backup 4 METOC if visibility OOD: monitor bridge watch team and correct as necessary; CO/XO: monitor 4 bridge team D, III GUN BOSS: monitor & quiz 5 ATFP watches on PPRs atc es bac up e o B, III watchstanders & supervisors 3 relieve if needed SUWC: limit RMD watch duration; = Serious Risk = Moderate Risk = Minor Risk = Negligible Risk Straits Transit Risk Assessment Deliberate ORM Example Hazard/Threat Effect Grounding/Flooding/ Navigation error Blue/White Collision Non-compliant, nonsquawking low slow flyer Tide/current/waves Fog/Reduced visibility/Inclement weather Assess RAC Risk Control Action C, II C, I SUWC: pass shipping info., ships adhere to Rules of the Road, use Furuno/ARPA, dec. speed in strait, pass contacts to 2 BWC/SUWC on net. D, II CO/XO: monitor from bridge; OOD/CONN: resolve potential conflicts early & contact via 4 radio; CICWO: backup OOD B, I ADC: proactively identify & resolve tracks; CFMCC: set weapons posture & status for threat; IWC: monitor & report 1 I&W to BWC/ADC on net. ALL: report anything in water, wear PPE if topside; 1st LT: ensure proper PPE; 3 LOOKOUTS: continually scan A, III SUWC: plan during favorable conditions, pass to restrict access to wx decks during high 2 seas, update BWC on changes. A, IV B, II SUWC: ensure ships report restrictred visibility detail, use 2 bell & horn, slow as needed. B, IV Terrorist attack D, I Inattention/ complacency A, III 2 ALL: ensure rested & nourished = Critical Risk CHENG: monitor from Control; Residual Risk CO/XO: monitor from bridge; SUWC: ensure ships' report RMD in effect, fixes every 2 min. w/ confidence & sources, OOD/Conn be proactive w/ identifying & 3 communicating. D, II ASWC: notify BWC/SUWC of known/unknown sub location; BWC: launch alert ASW if 2 needed. BWC: PPRs; SUWC: man ships' 50-cals.; ADC: direct ATFP/SAR 3 helo Unknown submarine IVO PIM/Vital Area Re-assess Residual Supervision B, II C, II C, III GATOR: determine impact if delayed; METOC: update 3 emerging weather conditions METOC: report when below 3 NM visibility; OOD: backup 4 METOC if visibility OOD: monitor bridge watch team and correct as necessary; CO/XO: monitor 4 bridge team D, III GUN BOSS: monitor & quiz 5 ATFP watches on PPRs atc es bac up e o B, III watchstanders & supervisors 3 relieve if needed SUWC: limit RMD watch duration; = Serious Risk GATOR: report & resolve discrepancies, provide 4 recommendations to OOD = Moderate Risk = Minor Risk = Negligible Risk Implement Controls Make Implementation Clear Use examples, pictures, or charts Describe expectations clearly Provide Support Establish Accountability Assign individuals clear risk control responsibilities Command provide personnel & resources Make it sustainable Employ a feedback mechanism Integrate into plans Consider control conflicts Involve Operators / Subject Matter Experts 54 Supervise Feedback Review Monitor Measure risk controls’ effectiveness Are the controls working Manage emerging changes (ABCD) Identify new hazards Was mission successful Identify root causes of conditions that led to failures Implement new controls Save all documentation Recommend actionable solutions to prevent other failures Submit lessons learned Involve Operators / Subject Matter Experts 55 Supervise, Monitor & use personal tool - ABCD Action 1: Monitor Assess Action 2: Review Balance Resources Where am I? What is going on? What will happen next? ABCD What are my options? How do I use them? Communicate Who needs to know? Who can help? Who can provide back-up? Revise if necessary. Action 3: Feedback Do – Debrief Carry out the plan. Was mission successful? Did actions reduce the risk? Straits Transit Risk Assessment Deliberate ORM Example Hazard/Threat Effect Grounding/Flooding/ Navigation error Blue/White Collision Non-compliant, nonsquawking low slow flyer Tide/current/waves Fog/Reduced visibility/Inclement weather Unknown submarine IVO PIM/Vital Area Terrorist attack Inattention/ complacency = Critical Risk Assess RAC Risk Control Action Re-assess Residual Supervision C, II SUWC: ensure ships' report RMD in effect, fixes every 2 min. w/ confidence & sources, OOD/Conn be proactive w/ identifying & 3 communicating. D, II SUWC: monitor all vessels & report when any vessel comes w/in 500 yds of shoal 4 water; BWC: backup. C, I SUWC: pass shipping info., ships adhere to Rules of the Road, use Furuno/ARPA, dec. speed in strait, pass contacts to D, II 2 BWC/SUWC on net. SUWC: monitor all vessels for CBDR or min range inside vital area; BWC/ASWC: 4 backup. B, I ADC: proactively identify & resolve tracks; CFMCC: set weapons posture & status for threat; IWC: monitor & report 1 I&W to BWC/ADC on net. C, II 3 A, III SUWC: plan during favorable conditions, pass to restrict access to wx decks during high 2 seas, update BWC on changes. A, IV 3 B, II SUWC: ensure ships report restrictred visibility detail, use 2 bell & horn, slow as needed. B, IV 4 B, II ASWC: notify BWC/SUWC of known/unknown sub location; BWC: launch alert ASW if 2 needed. C, III 4 D, I BWC: PPRs; SUWC: man ships' 50-cals.; ADC: direct ATFP/SAR 3 helo D, III 5 A, III SUWC: limit RMD watch duration; 2 ALL: ensure rested & nourished B, III = Serious Risk = Moderate Risk ADC: monitor all tracks for possible low slow flyers; IWC: monitor I&W; BWC: backup ADC/IWC. SUWC: monitor changing conditions; CSG OPS: call BWC if conditions become sig. different than forecast. SUWC: report when vis<3NM & low visibility set, monitor speed. ASWC: monitor all subsurface contacts & report possible locations for unknown; BWC/SUWC: backup. SUWC/IWC: monitor I&W and use PPRs as required. BWC/ADC: backup. ALL: backup watches & 3 supervisors relieve if needed = Minor Risk = Negligible Risk In the bigger picture • In planning – we conduct risk assessment and develop controls. • In operations – we update risk assessment and implement controls. • In sustainment – we continue to update assessments and adjust controls. • After action – we provide feedback and capture lessons learned to integrate the next time. 58 ORM Mind Set… Change the Perception of Risk Management W DT ? What’s Different Today? – Technique to connect all three levels of ORM – Spurs the use of Time Critical ORM during execution – The missing piece in ORM understanding and proper application 5-Step ORM and ABCD Time Critical Process and Mnemonic A – Assess (your situation, your potential for error) B – Balance Resources (to prevent and trap errors) C – Communicate (risks and intentions) D – Do and Debrief (take action and monitor for change) 5-Step Deliberate and In-depth Process 1. Identify Hazards 2. Assess Hazards 3. Make Risk Decisions 4. Implement Controls 5. Supervise (watch for changes) ABCD Assess Where am I? What is going on? What will happen next? of Risk Management Balance Resources What are my options? How do I use them? Communicate Who needs to know? Who can help? Who can provide back-up? Revise if necessary. Do – Debrief Carry out the plan. Was mission successful? Did actions reduce the risk? Situational Awareness The Green – You catch errors before they occur • Good Situational Awareness • Tools and Procedures in place to catch possible errors The Yellow – Higher chance of errors • Situational Awareness could be decreasing • Tools and Procedures not in place to catch errors The Red – Very high chance of consequential error • Tasking and/or stress may be high, tunnel vision may occur • Resources not effective to catch error ABCD Assess Where am I? What is going on? What will happen next? of Risk Management Balance Resources What are my options? How do I use them? Communicate Who needs to know? Who can help? Who can provide back-up? Revise if necessary. Do – Debrief Carry out the plan. Was mission successful? Did actions reduce the risk? Resources are Tools to get the Job done Balance your resources to catch possible errors Knowledge, Skills and Techniques Understand your situation and required jobs Briefings & External Resources Brief others, share your situational awareness Automation Use automation to increase awareness Checklists Write things down; use a checklist or job aid Policies, Tactics, Procedures and Processes Follow procedures and routines ABCD of Risk Management Assess Where am I? What is going on? What will happen next? Balance Resources What are my options? How do I use them? Communicate Who needs to know? Who can help? Who can provide back-up? Revise if necessary. Do – Debrief Carry out the plan. Was mission successful? Did actions reduce the risk? Why a Common Language? Navy Lingo SPOT ﺗﺷﻐﻳﻝ ﻭﺇﺩﺍﺭﺓ ﺍﻟﻣﺧﺎﻁﺭ TRM Operational R.I.T.E. STORM λειτουργική διαχείρηση κινδύνων SOAP Risk STAR 操作的风险管理 Management CVORRTTEX 작전 위험 관리 ABCD of Risk Management Assess Where am I? What is going on? What will happen next? Balance Resources What are my options? How do I use them? Communicate Who needs to know? Who can help? Who can provide back-up? Revise if necessary. Do – Debrief Carry out the plan. Was mission successful? Did actions reduce the risk? Your Part on a Team • Know your duties and also duties of members on your team • Maintain Situational Awareness for you and your Teammates • Communicate clearly • Be observant of stress levels for you and your Teammates ABCD Put into Action • Review of ABCD and Resources ABCD • • • On duty Off duty What can we do better tomorrow? 69 Reconsider this situation… 70 Reconsider this situation… 71 It’s about informed decisions. 72 Resources & Tools www.public.navy.mil/navsafecen NSC Website: a Valuable Resource 73 Resources & Tools • Web Enabled Safety System (WESS): – – – – Web-enabled reporting and data retrieval system Allows submission & routing of 5102 mishap / hazard notifications & 3750 hazard reports Provides real-time reporting Allows retrieval of data so activities can perform their own analyses (across DOD) • Travel Risk Planning System (TRiPS): – – – – Provides ORM trip assessment and actual mishap cases relevant to planned trip Risk values / models based on National Transportation Safety Board (NTSB) data Trip map, times, distances and other products improve supervisor interaction Computer based training (CBT) course content designed to help change behavior • Total Risk Assessment and Control System (TRACS): – Evolution risk assessment tool – Allows user to assess, manage and report on hazards, risks & controls – Public library of completed assessments available for others to modify for their specific needs 74 Risk management… It is a mindset 75 ORM Where we want to be… W e w ill m anage risk to operate by follow ing a standardized and institutionalized com m on m odel of ORM application and assessm ent across the fleet. Integrate risk management concepts across the fleet as part of every decision made and every action taken by every Sailor and DON Civilian employee – on and off duty 76 Summary Humans are part of all Navy systems Managing the risk of human error improves capabilities and reduces losses ORM: • A proactive, systematic tactic to defeat Blue Threats • A leadership tool to assist in making informed risk decisions • Should be integrated into your command planning, briefing, execution and after action processes • Relies on education, training, experience and teamwork • Requires outstanding communication skills at all levels 77 The Challenge Engaged Leadership Support and actively promote integration of ORM • • • • On and Off Duty Use Deliberate Assessment Process Integrate TCRM - “What’s different today?”; “ABCD” Support ORM Assessment at all levels Use the resources and tools available Establish an environment where hazards can be identified by anyone at any time Provide feedback and share Work together to lookout for our shipmates (on and off duty) and preserve DOD resources in order to ensure mission readiness and help eliminate these… 78 Congratulations! You have completed your annual Operation Risk Management Training PRINT GIVEN NAME SIGNATURE No Nicknames COMPLETION DATE NAF EMPLOYEE ID NUMBER By signing and submitting this certificate, I certify that I have read and understand the content in the training presentation. Fill in the required information above and get this certificate to your Department Training Liaison 79