Planning and Development Department Current Planning Division NOTICE OF AVAILABILITY DRAFT ENVIRONMENTAL IMPACT REPORT ACHESON COMMONS PROJECT AND NOTICE OF PUBLIC HEARINGS State Clearinghouse #2011102035 Notice is hereby given that the City of Berkeley has completed a Draft Environmental Impact Report (Draft EIR), pursuant to the California Environmental Quality Act (CEQA), for the proposed Acheson Commons Project in downtown Berkeley. PUBLIC HEARINGS: The Zoning Adjustments Board (ZAB) is scheduled to receive public comments on the Draft EIR on June 14, 2012 at 7:00 p.m. at 2134 Martin Luther King Jr. Way, Second Floor Council Chambers, Berkeley, CA. The Landmarks Preservation Commission (LPC) is scheduled to receive public comments on the Draft EIR on July 12, 2012 at 7:00 p.m. at the North Berkeley Senior Center, 1901 Hearst Avenue, Berkeley, CA. PUBLIC REVIEW TIMELINE: The public review and comment period for the Draft EIR begins May 30, 2012 and ends July 16, 2012. The City must receive all written comments regarding the adequacy of the Draft EIR within this time period. Written comments may be submitted in person, by mail or by e-mail. The mailing address is Greg Powell, Land Use Planning Division, 2120 Milvia Street, Berkeley, CA 94704 and the email address is GPowell@ci.berkeley.ca.us DOCUMENT AVAILABILITY: Copies of the Draft EIR are available for review Monday through Friday, between the hours of 8:30 a.m. and 4:00 p.m. at the City of Berkeley Planning and Development Department, 2120 Milvia Street, Berkeley, California or online at http://www.ci.berkeley.ca.us/ ContentDisplay.aspx?id=62168 Copies are also available at the City Clerk, 2180 Milvia Street; the Berkeley Main Public Library Reference Desk, 2090 Kittredge Street; and the Moffitt Library Reference Desk, University of California, Berkeley. PROJECT LOCATION: The project site is located in Downtown Berkeley, on a block bounded by Shattuck Avenue on the west, University Avenue on the south, Walnut Street on the east and Berkeley Way on the north. The project site is located in the Commercial, Downtown Mixed-Use (CDMU) Zoning District. The site includes Assessor’s Parcel Numbers (APNs): 057-2046-004-00; 0572046-005-00; 057-2046-006-00; 0572046-008-02 to -03; 057-2046-010-00; and 057-2046-011-00. EXISTING CONDITIONS: The approximately 47,560-square foot project is currently developed with multiple structures, including the MacFarlane Building (1970-1987 Shattuck Avenue and 2101-2109 University Avenue); the Krishna Copy Center building (2111-2113 University Avenue); the Crepes a Go-Go building (2125 University Avenue); the Acheson Physicians Building (2127 and 2135½ University Avenue); the Ace Hardware Building (2145 University Avenue); and 2 residential buildings (1922/1924 and 1930 Walnut Street). The Bachenheimer Building, located at 2119 University Avenue, bisects the project site, and is not part of the proposed project. Existing land uses on-site include retail, restaurant, and office; the residential buildings on the site are vacant. Several structures are recognized as historically significant by the City of Berkeley and according to the criteria set forth by 2120 Milvia Street, Berkeley, CA 94704 Tel: 510-981-7410 E-mail: planning@ci.berkeley.ca.us Fax: 510-981-7420 the State Office of Historic Preservation, appear eligible for listing in the National Register of Historic Places. PROJECT DESCRIPTION: The proposed project would involve the construction of 202 new dwelling units, 3 live/work units and the rehabilitation of approximately 33,250 square feet of commercial space. New five-story residential structures would be built above the MacFarlane, Krishna Copy Center and the Ace Hardware Buildings. Existing ground floor commercial space would continue as commercial use. The historic building façades along University Avenue would be retained and rehabilitated. The Acheson Physicians Building would be converted from office use to residential use. The two vacant residential buildings on Walnut Street would be demolished or relocated, and a new mixed-use structure would be built. The ground floor of the Walnut Street Building would include a 50 stall parking garage. No other buildings on the site would include parking. ENVIRONMENTAL EFFECTS: The Initial Study (circulated in October 2011, and included as an Appendix to the Draft EIR) identified no impacts or less-than-significant impacts to the following environmental issues: Agricultural and Forestry Resources; Biological Resources; Land Use and Planning; Mineral Resources; Population and Housing; Public Services; Recreation; and, Utilities and Service Systems. The Initial Study identified potentially significant impacts to the following environmental issues; however, these were mitigated to a less-than-significant level with mitigation measures recommended in the Initial Study: Archaeological and Paleontological Resources; Geology and Soils; Hazards and Hazardous Materials; and, Hydrology and Water Quality. The Draft EIR provides an evaluation of the following environmental issues: x Aesthetics x Cultural Resources x Transportation and Traffic x Air Quality x Greenhouse Gas Emissions x Noise Impacts to Aesthetics, Transportation and Traffic, and Greeenhouse Gas Emissions would be less than significant. Impacts to Air Quality and Noise would be mitigated to a less-than-significant level. Impacts to Cultural Resources, specifically the additions to the MacFarlane, Krishna Copy Center and Ace Hardware Buildings, and the demolition of the two Walnut Street Buildings, even with proposed mitigation measures, would be significant and unavoidable. The project site is not listed on the Cortese List, Govt. Code Section 65962.5 (an annually updated list of hazardous materials release sites). ALTERNATIVES: The CEQA Guidelines require analysis of a range of reasonable alternatives to the project, or to the location of the project, which would feasibly attain most of the project’s basic objectives and avoid, or substantially lessen, any of the significant effects of the project. The range of alternatives required in an EIR is governed by a “rule of reason” that requires the EIR to set forth only those alternatives necessary to permit a reasoned choice. The Draft EIR analyzes the following three alternatives: 1) No Project alternative; 2) Full Compliance with Secretary of Interior Standards alternative; and 3) Increased Stepbacks alternative. QUESTIONS: If you have any questions about this project, contact Greg Powell at (510) 981-7414 or GPowell@ci.berkeley.ca.us 2