TORRENT POWER LIMITED

advertisement
Dear Customer,
Sub: Load Regularisation
Thank you for your continued patronage towards Torrent Power. At Torrent, we strive to provide
uninterrupted and quality power to all our customers. This has been possible due to constant
monitoring and upgrade of our network along with continuous investments in new technology for
enhancing the reliability and safety of power supply.
We have observed that over a period of time, customers add various appliances, devices or
equipment in their premises. In some cases, these appliances would require additional load that may
not have been factored in while estimating the connected load when applying for the new
connection. This results in the connected load being greater than the sanctioned load which would
cause instability in the customer’s network. Further, these additions of appliances without increasing
the sanctioned load lead to overloading of the electricity network which causes
interruptions/breakdowns of supply, which would also impact several other customers on the same
network. Such situations may also lead to safety hazards both in the internal wiring as well in
Torrent’s network.
It is therefore very important that customers apply for the necessary load extension in order to
regularize imbalances in the system. On receiving such applications, we will be able to modify, if
required, the network laid for you based on the actual requirement.
It is also worth mentioning that unauthorized extension of load is an offence under Section 126 of
the Electricity Act 2003. In context of the aforesaid, it is imperative that you obtain sanction for the
total connected load in your premises, irrespective of the time period for which the load is used.
For load regularisation, we request you to follow the steps mentioned below:
1. Please compute your total connected load by aggregating the actual rating of the
apparatus/appliance connected in your premises. An indicative list of standard wattage
ratings for assessing the connected load is annexed herewith for your assistance.
2. In case your connected load is higher than the sanctioned load appearing on your bill, you
are requested to submit the attached application form immediately along with test report
from a licensed electrical contractor and applicable charges.
We greatly appreciate your understanding and cooperation in this matter as it will help us continue
to serve you and several other customers better. For any queries, please feel free to contact us on
our Helpline Number 22551912 or visit our Zonal Office.
Assuring you of our best services,
GM - Customer Services
Torrent Power Limited
Encl: As above
TORRENT POWER LIMITED
CIN: L31200GJ2004PLC044068
Naranpura Zonal Office, Sola Road, Ahmedabad-380 013.
Reg. Office: Torrent House, Off Ashram Road, Ahmedabad – 380 009, India. www.torrentpower.com
Rated Load Capacity of Various Electrical Items
Item
Load
per Item
(W)
No. of
Items
Total
Load (W)
Item
1
2
3
4 (2x3 )
1
CFL Tube
11
CFL Tube
Load
per
Item
(W)
2
No. of
Total
Items Load (W)
3
Air Conditioner - 1 Ton
1400
20
Air Conditioner – 1.5 Ton
1800
Bulb
25
Air Conditioner - 2 Ton
2200
Tube Light
55
Air Cooler
170
Ceiling Fan - 56"
60
Refrigerator up to 165
225
Table Fan - 12"/16"
40
Refrigerator above165
300
T.V.
150
Computer
100
Electric Iron
1000
Water Pump
375
4(2x3)
Load Extension
Information regarding Load Extension (up to 100 kW)
Application Registration:
1
Please submit your application at respective zonal office during working hours.
2
You are also required to pay the following charges;
(A)
Registration Charges
(B)
Charges (Rs.)
No.
1
2
No.
Particulars
Single phase
supply
Three phase
supply
Commercial
Industrial
1
100
–
2
100
400
(C)
Service Line Charges
No.
Load kW
1
Up to 2
2
Exceeding 2 but not exceeding 6
3
Exceeding 6 but not exceeding 12
4
Exceeding 12 but not exceeding 20
5
Exceeding 20 but not exceeding 100
Security Deposit
Consumption
Purpose
Non Residential
(Up to 15 kW)
LTMD-2 (More
than 15 kW)
Charges
(Rs. Per kW)
1100
2000
Charges (Rs.)
3500
6500
12000
21000
21000 + 1100 (per kW)
Extension of load within same phase, differential service line charges for applicable new slab and the
existing slab shall be payable.
(D) Test Report Charges
Rs. 20-00
(E) Fee for change of meter, if required
Rs. 100-00
Note: - Before commencement of supply, you are required to complete wiring installation. You are also
required to submit (if not submitted along with application form) an Installation Test Report from the
Licensed Electrical Contractor or by a supervisor holding a certificate of competency issued or
recognized by the Government.