Dear Customer, Sub: Load Regularisation Thank you for your continued patronage towards Torrent Power. At Torrent, we strive to provide uninterrupted and quality power to all our customers. This has been possible due to constant monitoring and upgrade of our network along with continuous investments in new technology for enhancing the reliability and safety of power supply. We have observed that over a period of time, customers add various appliances, devices or equipment in their premises. In some cases, these appliances would require additional load that may not have been factored in while estimating the connected load when applying for the new connection. This results in the connected load being greater than the sanctioned load which would cause instability in the customer’s network. Further, these additions of appliances without increasing the sanctioned load lead to overloading of the electricity network which causes interruptions/breakdowns of supply, which would also impact several other customers on the same network. Such situations may also lead to safety hazards both in the internal wiring as well in Torrent’s network. It is therefore very important that customers apply for the necessary load extension in order to regularize imbalances in the system. On receiving such applications, we will be able to modify, if required, the network laid for you based on the actual requirement. It is also worth mentioning that unauthorized extension of load is an offence under Section 126 of the Electricity Act 2003. In context of the aforesaid, it is imperative that you obtain sanction for the total connected load in your premises, irrespective of the time period for which the load is used. For load regularisation, we request you to follow the steps mentioned below: 1. Please compute your total connected load by aggregating the actual rating of the apparatus/appliance connected in your premises. An indicative list of standard wattage ratings for assessing the connected load is annexed herewith for your assistance. 2. In case your connected load is higher than the sanctioned load appearing on your bill, you are requested to submit the attached application form immediately along with test report from a licensed electrical contractor and applicable charges. We greatly appreciate your understanding and cooperation in this matter as it will help us continue to serve you and several other customers better. For any queries, please feel free to contact us on our Helpline Number 22551912 or visit our Zonal Office. Assuring you of our best services, GM - Customer Services Torrent Power Limited Encl: As above TORRENT POWER LIMITED CIN: L31200GJ2004PLC044068 Naranpura Zonal Office, Sola Road, Ahmedabad-380 013. Reg. Office: Torrent House, Off Ashram Road, Ahmedabad – 380 009, India. www.torrentpower.com Rated Load Capacity of Various Electrical Items Item Load per Item (W) No. of Items Total Load (W) Item 1 2 3 4 (2x3 ) 1 CFL Tube 11 CFL Tube Load per Item (W) 2 No. of Total Items Load (W) 3 Air Conditioner - 1 Ton 1400 20 Air Conditioner – 1.5 Ton 1800 Bulb 25 Air Conditioner - 2 Ton 2200 Tube Light 55 Air Cooler 170 Ceiling Fan - 56" 60 Refrigerator up to 165 225 Table Fan - 12"/16" 40 Refrigerator above165 300 T.V. 150 Computer 100 Electric Iron 1000 Water Pump 375 4(2x3) Load Extension Information regarding Load Extension (up to 100 kW) Application Registration: 1 Please submit your application at respective zonal office during working hours. 2 You are also required to pay the following charges; (A) Registration Charges (B) Charges (Rs.) No. 1 2 No. Particulars Single phase supply Three phase supply Commercial Industrial 1 100 – 2 100 400 (C) Service Line Charges No. Load kW 1 Up to 2 2 Exceeding 2 but not exceeding 6 3 Exceeding 6 but not exceeding 12 4 Exceeding 12 but not exceeding 20 5 Exceeding 20 but not exceeding 100 Security Deposit Consumption Purpose Non Residential (Up to 15 kW) LTMD-2 (More than 15 kW) Charges (Rs. Per kW) 1100 2000 Charges (Rs.) 3500 6500 12000 21000 21000 + 1100 (per kW) Extension of load within same phase, differential service line charges for applicable new slab and the existing slab shall be payable. (D) Test Report Charges Rs. 20-00 (E) Fee for change of meter, if required Rs. 100-00 Note: - Before commencement of supply, you are required to complete wiring installation. You are also required to submit (if not submitted along with application form) an Installation Test Report from the Licensed Electrical Contractor or by a supervisor holding a certificate of competency issued or recognized by the Government.