R2.3 Name: IMO No: P&I CONDITION SURVEY REPORT VESSEL TYPE: Oil tanker Ship Name: IMO No: Survey date of first attendance: Survey date of last attendance: Survey port: Surveyor: Surveyors Ref No.: West of England Ref No.: Disclaimer This report, and any accompanying documentation or photographs, has been compiled for the sole use of the Association for insurance purposes only and should not be disclosed to third parties without prior written permission from the Association. The information contained in this report, and any accompanying documentation or photographs, is not exhaustive as to the general condition of the ship and should not be relied upon by members or by any other party as any assurance, representation or warranty as to the condition of the ship and nothing herein shall prejudice the Club’s rights under the insurance policy in the event of a dispute between the Club and the member relating to the condition of the ship.'' 1.3. R2.3 Name: IMO No: Index 1. 2. 3.1 3.2 3.3 3.4 3.5 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 5.1 5.2 5.3 5.4 5.5 5.6 5.7 Part A Survey details Executive summary Vessel’s particulars Circumstances of survey Overall survey summary List of defects/deficiencies & list of uninspected items Summary of safety and operational tests Surveyor’s comments List of supporting documentation Part B Certificates Shipboard management Crew Safe working Hygiene standard and house keeping Fire safety Life saving appliances Pollution control Bridge, navigation and communication Hull and deck Lifting appliances Ballast tanks & void spaces Machinery spaces Part C Cargo and ballast systems Inert gas system Tank cleaning system Cargo control and safety Documentation – general Cargo control / documentation – chemical carriers Documentation – combination carriers 2 Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to Go to R2.3 Name: IMO No: PART A EXECUTIVE SUMMARY 3 R2.3 Name: IMO No: 1. VESSEL’S PARTICULARS 1.1 Particulars 1.1.1 Ship's Name: 1.1.2 Previous Name(s): 1.1.3 IMO No: 1.1.4 Flag/Port of registry: 1.1.5 Year built: 1.1.6 Builder: 1.1.7 Class society: 1.1.8 Class notations: 1.1.9 Recognised Organisation issuing ISM certification: 1.1.10 Ship type: 1.1.11 GT: 1.1.12 Summer DWT: 1.1.13 Last docking: 1.1.14 Last Class Special Survey: 1.1.15 Ship’s trading pattern: 1.1.16 Master’s name: 1.1.17 Name of owner’s representative attending survey: 1.1.18 Time under present management: 1.1.19 Owners: 1.1.20 Managers (crewing, technical & operational): 4 R2.3 Name: IMO No: 2. CIRCUMSTANCES OF SURVEY (Describe in brief the circumstances under which the survey was carried out, such as, but not limited to, the date and the time the survey commenced and date and time of completion, if the Master was aware of the visit, the operational status of the vessel at the time, type of cargo handled if applicable, and particular observations or information the Surveyor may consider to be of interest for the Club. Please also specify ballast tanks and cargo holds/cargo tanks inspected. Areas not covered at the current inspection and the reason for not carrying out a full inspection should be stated – if applicable!) 5 R2.3 Name: IMO No: 3. SUMMARY OF SURVEY 3.1 Overall Survey summary Following completion of the survey, and based on his overall impression of the vessel, the surveyor should complete the overall summary below: Y N Remarks 3.1.1 Do you consider the vessel to be structurally sound? 3.1.2 Do you consider the vessel to be cargo worthy? 3.1.3 Do you consider the vessel’s overall safety policy to be effective? 3.1.4 Do you consider the vessel’s pollution prevention equipment and documented anti-pollution procedures effective? 3.1.5 Do you consider the vessel’s navigational routines and navigational equipment to be satisfactory? 3.1.6 Has the vessel been provided with properly documented safety and operational procedures and are all key areas covered? 3.1.7 Were officers and ratings cooperative during your visit? 3.1.8 Was the crew able to communicate satisfactorily in a common language? 3.1.9 From your contact with various officers during the survey, would you say that they appeared motivated, experienced and competent? 3.1.10 Do you believe that the vessel and its crew are receiving adequate support from shore management? 3.1.11 Do you consider that the standards of crewing and operational practices aboard this ship are satisfactory and do not need examining in greater detail? 6 R2.3 Name: IMO No: 3.2 List of Defects/Deficiencies & List of Uninspected Items A list of all defects/deficiencies noted during the survey is to be given to the owner’s representative or master on completion of the survey. A copy of this list, in WORD format, is to be attached to this executive summary. If appropriate, please also repeat this for any survey items that could not be inspected, stating the reason(s) why inspection was not possible. 7 R2.3 Name: IMO No: 3.3 Summary of Safety and Operational Tests The Safety and Operational Tests witnessed by the Surveyor, together with the results, are to be listed below. If due to vessel operations some tests cannot be carried out the reason needs to be entered in the remarks column. Please note testing may have a Y or N result and should be marked accordingly as per instructions for filling out the form. Y N NI NA Results / Remarks 3.3.1 Cargo heating systems. (back to 5.1.18) 3.3.2 Cargo tank high level alarms. (back to 5.4.6) 3.3.3 Cargo pump emergency stops. (back to 5.4.7) 3.3.4 Pump room gas and bilge alarms. (back to 5.4.9) 3.3.5 High temperature alarms for cargo, stripping and ballast pumps. (back to 5.4.15) 3.3.6 Hydro test ballast spaces surrounding the cargo area to main deck level. (back to 4.12.1) 3.3.7 Engine room bilge high-level alarms (back to 4.13.1). 3.3.8 Main fire pump on hydrant. (back to 4.6.2) 3.3.9 Emergency fire pump on hydrant. (back to 4.6.2) 3.3.10 Emergency power sources. (back to 4.9.3) (back to 4.13.6) 3.3.11 Emergency lighting. (back to 4.13.10) 3.3.12 Decontamination showers and eye baths on deck. (back to 5.4.17) 3.3.13 Remote stops and shutdowns (back to 4.13.13) 3.3.14 Quick closing valves (back to 4.13.11) 3.3.15 Remote closing devices (back to 4.13.12) 3.3.16 Oily water separator 15 ppm monitor. (back to 4.8.8) 3.3.17 Steering gear (back to 4.13.21) 3.3.18 Emergency steering gear (back to 4.13.21) 3.3.19 Lowering lifeboats (back to 4.7.1) 3.3.20 Running lifeboat engines (back to 4.7.3) 8 R2.3 Name: IMO No: 3.3.21 Navigation light failure alarm (back to 4.9.11) 3.3.22 BNWAS alarms (back to 4.9.7) 3.3.23 General emergency alarm 3.3.24 Smoke/fire alarm (back to 4.6.1) 3.3.25 Self test of DSC radio sets (back to 4.9.2) 3.3.26 Test of emergency communications between bridge/engine room and bridge/steering gear compartment. (back to 4.9.13) 3.3.27 Main switchboard earth monitoring system. (back to 4.13.9) fault Additional information: 3.4 Surveyor’s comments To include clarification of answers given above and further remarks regarding any additional observations or reservations. Particular reference should be made of any items affecting the vessel’s sea or cargo worthiness. 9 R2.3 Name: IMO No: 3.5 List of supporting documentation Class Certificates Class Listings Hatch Cover Tightness Report Crew List Etc…… Surveyors name: Signature: Date: 10 R2.3 Name: IMO No: PART B SURVEY QUESTIONNAIRE ALL SHIP TYPES 4. SURVEY QUESTIONNAIRE – ALL SHIP TYPES 4.1 Certificates Y 4.1.1 Are the relevant class and statutory certificates valid? 4.1.2 Are all class and statutory certificates clean? Any conditions, restrictions, recommendations, exemptions or memoranda should be noted in the Remarks column. 4.1.3 Are all required certificates and documents onboard as per FAL.2Circ.127 ? N NI NA Results / Remarks Additional information: 4.2 Shipboard Management Questions 4.2.1 to 4.2.4 are only to be answered if the current Manager has operated vessel in excess of 3 months. Y N NI NA Results / Remarks 4.2.1 Are internal audits of the Safety Management System (SMS) carried out at regular intervals and are they satisfactorily reported? 4.2.2 Are safety meetings carried out at a regular interval and records kept? Give details of ship’s safety officer in remarks column. 4.2.3 Are non-conformity / accident / near accident reports raised and handled in a satisfactory manner? 11 R2.3 Name: IMO No: 4.2.4 Are Masters’ Reviews of the SMS carried out and satisfactorily reported? 4.2.5 Is a Planned Maintenance System (PMS) implemented and kept up to date? 4.2.6 Is efficient access control in place? Was surveyor’s identification checked and verified upon boarding? 4.2.7 Are there contingency plans onboard to deal with emergencies and spills, as applicable? 4.2.8 Are muster lists, general arrangement plans and capacity plans available, current and prominently posted in relevant areas? 4.2.9 Is an adequate emergency command structure in place? 4.2.10 Has the vessel been detained during the last few months? If not, have defects / deficiencies identified in the last PSC Inspection report been dealt with properly? Date and place of last PSC inspection to be noted in remarks column. If vessel has been detained, attach a copy of that PSC Inspection report. 4.2.11 Is the vessel regularly visited by a company superintendent? Note date of last visit and numbers of visits annually in remarks column. 4.2.12 Is an approved stability book on board and are stability/stress calculations being carried out as required? 4.2.13 Is an approved loading computer on board and in use? 4.2.14 Are stability records being properly maintained, including sailing draughts? Additional information: 12 R2.3 Name: IMO No: 4.3 Crew Y N NI NA 4.3.1 Are officers proficient in Maritime English to communicate efficiently? 4.3.2 If crew is multinational is there a common language understood by all? List number of nationalities and common language in remarks column. Append copy of crew list to the report. 4.3.3 Did you observe any communication difficulties between crew members? (see notes on filling out the form before replying to this question) 4.3.4 Does the company have a briefing/de-briefing policy for Masters/Chief Engineers prior to joining/after signing off? 4.3.5 Are “hand over” reports completed by the Master/Chief Engineers and records kept on board? 4.3.6 Does the crew complement correspond with the Safe Manning Certificate? Actual and safe manning complements to be entered in remarks column. 4.3.7 Are officers recruited and employed directly by the company? If supplied by crewing agents give details in remarks column. 4.3.8 Do officers consider themselves to be permanent employees of the company? 4.3.9 In your view are there sufficient officers and crew on board to handle both routine activities and emergencies? 4.3.10 Was the Master aware that a P & I condition survey had been arranged? 13 Results / Remarks R2.3 Name: IMO No: 4.3.11 Are random or specific drug and alcohol testing carried out? 4.3.12 Are the vessel’s records of crew rest and working hours up to date, and do the records confirm compliance with STCW and ILO Convention requirements? Additional information: 4.4 Safe Working Y 4.4.1 Are manufacturers’ instruction and maintenance manuals available for all onboard equipment & machinery? 4.4.2 Are standing orders, procedures, instructions and manufacturers’ manuals written in a language which can be understood by the crew? 4.4.3 Are general and emergency instructions posted and written in a language which can be understood by the crew? 4.4.4 Are “No Smoking” areas on board clearly marked and were smoking regulations observed during your visit? 4.4.5 As observed, are work procedures implemented adhered to? 4.4.6 Are enclosed space entry rescue drills being made? 4.4.7 Are portable oxygen and detection meters provided regularly calibrated? 4.4.8 Are relevant personal protective equipment and clothing, as it affects the vessel type provided and in use? 4.4.9 Is adequate lighting throughout the vessel? permit and gas and provided 14 N NI NA Results / Remarks R2.3 Name: IMO No: 4.4.10 Are “locked in” handles and alarms from cold stores and freezers in satisfactory condition? 4.4.11 Is the CO2 installation protected against unauthorized release? 4.4.12 Are walkways, stairways, catwalks, ladders, platforms, and handrails, as applicable, in satisfactory condition throughout the vessel? 4.4.13 Are mobile safety guards, such as rails, lines, and wires etc., provided and in use? 4.4.14 Are accommodation ladders, pilot ladders, gangways, etc. in satisfactory condition? Are means of embarkation/disembarkation being inspected & maintained in accordance with MSC.1/Circ.1331? Check monthly inspection records. 4.4.15 Did you observe any unsafe working practices during your visit? (see notes on filling out the form before replying to this question) Additional information: 4.5 Hygiene Standard and House Keeping Y 4.5.1 Are galleys, pantries, stores and accommodation areas clean, tidy and free of fire hazards (pay particular attention to galley range hood vent ducting)? 4.5.2 Is fitted equipment satisfactory condition? 4.5.3 Are the vessel’s sanitary systems and washrooms in a satisfactory condition? in apparent 15 N NI NA Results / Remarks R2.3 Name: IMO No: 4.5.4 Are provision and cold stores clean, tidy and maintained at correct temperatures? 4.5.5 Is the general housekeeping standard throughout the vessel satisfactory? 4.5.6 Are proper food handling procedures in place? Additional information: 4.6 Fire Safety Y 4.6.1 Is the fire detection system in satisfactory condition? State type of system in remarks column. (Test 3.3.24 ) 4.6.2 Are main and emergency fire pumps in good operational condition? (Tests 3.3.8 and 3.3.9) 4.6.3 Are the fire hydrants and fire main in a satisfactory condition? 4.6.4 Are fire stations in tidy condition and fully equipped? (Hoses and nozzles should be randomly selected from fire stations for testing during tests of fire pumps.) 4.6.5 Are fire fighting drills being carried out in accordance with SOLAS requirements? 4.6.6 Are self-contained breathing apparatuses in good condition, sufficiently charged and cylinders within test date? 4.6.7 Are emergency provided? 4.6.8 Are portable fire extinguishers in a satisfactory condition, correctly secured and inspections in date? escape sets 16 N NI NA Results / Remarks R2.3 Name: IMO No: 4.6.9 Are fire hose lockers, fire hoses and nozzles in satisfactory condition and fully equipped? 4.6.10 Are fixed fire-extinguishing systems, including any fixed deck/engine room/paint locker systems, in apparent satisfactory condition with operating instructions posted? List areas covered and type of system in remarks column. 4.6.11 Are all combustible and hazardous liquids stored in designated spaces and provided with Material Safety Data Sheets? 4.6.12 Are acetylene and oxygen bottles fitted with flashback arrestors and stored in separate, well ventilated and designated places? 4.6.13 Were any fire hazards noted on the vessel? (see notes on filling out the form before replying to this question) 4.6.14 Are emergency escape route fluorescent markings fitted in accordance with IMO requirements? 4.6.15 Are main and unobstructed? emergency exits 4.6.16 Is the fire integrity including fire doors, fire dampers and shutters throughout the vessel in satisfactory structural and operational condition, and are they correctly marked with open/closed position and space served? 4.6.17 Is the international shore connection readily available? 4.6.18 Are fire control plans posted, properly maintained and also available externally? Additional information: 17 R2.3 Name: IMO No: 4.7 Life Saving Appliances All life saving appliances must fulfill SOLAS requirements. Y N NI NA Results / Remarks 4.7.1 Are lifeboats and davits, including rescue boat(s) in a satisfactory condition, correctly stored and equipped? (Test 3.3.19) 4.7.2 Are davit falls in satisfactory condition and well-greased? Pay particular attention to areas passing through standing sheaves. Confirm inspection / maintenance complies with SOLAS III 20.4 / MSC.1/Circ.1206 Rev.1 4.7.3 Are lifeboat engines well maintained and easy to start? (Test 3.3.20) 4.7.4 Has the lifeboat on-load release been evaluated in accordance with MSC.1/Circ.1392? If not, have fall preventer devices been fitted in accordance with MSC.1/Circ.1327 ? 4.7.5 Are life rafts and hydrostatic releases properly secured / fitted, serviced and in satisfactory condition? 4.7.6 Are EPIRB’s correctly coded, batteries in date, and hydrostatic releases serviced? 4.7.7 Are lifebuoys, lights and smoke floats of approved type, in correct locations and satisfactory condition? (Check weight of quick release lifebuoys attached to smoke floats – these need to be a minimum of 4 kg as opposed to general lifebuoy minimum weight of 2.5 kg) 4.7.8 Are life jackets, immersion suits and thermal protective aids of approved type, properly stowed and sufficient in numbers? 18 R2.3 Name: IMO No: 4.7.9 Is the medicine locker, and hospital if provided, sufficiently stocked (including cargo specific antidotes), tidy & with medical stores in date? 4.7.10 Is an oxygen resuscitator provided? 4.7.11 Are all signs for safety equipment in place, marked with IMO symbols and instructions written in the working language of the vessel? 4.7.12 Are lifeboat drills being carried out in accordance with SOLAS requirements? Note in remarks column date when lifeboats last lowered to the water. 4.7.13 Are distress flares and line throwing apparatus provided in accordance with SOLAS requirements and in date? Additional information: 4.8 Pollution Control Y 4.8.1 Are deck save-alls fitted as required, provided with drain plugs, and in a satisfactory condition? 4.8.2 Are scupper plugs readily available? 4.8.3 Is the vessel free from any hull, bulkhead, valve or pipeline leakage, including hydraulic lines, liable to cause pollution or affect safe operations? 4.8.4 Is the vessel provided with a class approved SOPEP / SMPEP and/or, if applicable, a VRP, with an updated IMO coastal state contact listing 4.8.5 Is oil spill available? clean-up equipment 19 N NI NA Results / Remarks R2.3 Name: IMO No: 4.8.6 Is the Oil Record Book Part I and Part II properly filled out and up to date? 4.8.7 Are bunkering/oil transfer procedures in place, and if observed, adhered to? 4.8.8 Is oily water separator in apparent good condition, instructions posted and 15ppm monitor calibrated? (Test 3.3.16) 4.8.9 Is the Garbage Record Book up to date? 4.8.10 Are waste receptacles in good condition and made of ‘noncombustible material’ (required by SOLAS Ch II-2 Reg. 4.4.2)? 4.8.11 For operations within Emission Control Areas is fuel change over written procedure onboard and are records being kept in accordance with MARPOL Annex VI Regulation 14.6? 4.8.12 Is a list of equipment containing Ozone Depleting Substances (ODS) onboard? Is an ODS record book being maintained (MARPOL Annex VI Regulation 12)? 4.8.13 For crude oil tankers, is an approved Volatile Organic Compound (VOC) Management Plan onboard and implemented in accordance with MARPOL Annex VI Regulation 15.6? 4.8.14 Is there an approved Ballast Management Plan on board and is the Ballast Water Record Book properly completed as appropriate? Additional information: 20 R2.3 Name: IMO No: 4.9 Bridge, Navigation and Communication Y 4.9.1 Is the bridge and navigational equipment in good order and in accordance with SOLAS requirements? 4.9.2 Is the communications equipment in good order and in accordance with SOLAS requirements? (Test 3.3.25) 4.9.3 Are the emergency batteries in good condition and fully charged? (Test 3.3.10) 4.9.4 Is the radio log being maintained correctly? 4.9.5 Do the nautical charts and navigational publications carried onboard cover vessel’s trading areas and are procedures in place for their correction and up dating? 4.9.6 If applicable (SOLAS Chap V Reg 19.2.10), is an approved Electronic Chart Display and Information System (ECDIS) fitted and is an appropriate back-up system available? 4.9.7 If applicable, (SOLAS Chap V Reg 19.2.2.3) is a Bridge Navigation Watch Alarm System (BNWAS) fitted and operational (Test 3.3.22)? 4.9.8 If applicable, have officers undergone an approved ECDIS training course and type specific familiarisation training for the equipment onboard? 4.9.9 If fitted, is the Voyage Data Recorder operational? Are clear instructions posted on how to save data in the event of an incident? 4.9.10 Are Bridge Procedures, Company and Master’s standing orders in place and followed? 4.9.11 Are navigation lights in a satisfactory condition? (Test 3.3.21) 4.9.12 Is passage planning properly carried out and covering berth to berth? 21 N NI NA Results / Remarks R2.3 Name: IMO No: 4.9.13 Is emergency communication between bridge-engine room and bridge-steering gear compartment satisfactory? (Test 3.3.26) 4.9.14 Is external weather routing in use for ocean voyages? Additional information: 4.10 Hull and Deck Y 4.10.1 Is the visible condition of shell plating satisfactory? 4.10.2 Is the visible condition of deck plating satisfactory? 4.10.3 Are hull markings legible? 4.10.4 Are ventilators and air/sounding pipes on deck in satisfactory condition with efficient closing devices and clearly marked with the compartment they serve? 4.10.5 Are weather tight doors and stores hatches fully operational and providing effective sealing? 4.10.6 Are windlasses, winches, rollers, fair leads, capstans, bollards and mooring lines in satisfactory condition? 4.10.7 Are non-slip arrangements in place about mooring equipment? Have Snap-back zones been marked? 4.10.8 Is ancillary deck piping (cable ducting, fresh water, compressed air etc.) in satisfactory condition? 4.10.9 Are emergency towing procedures /equipment in order? 4.10.10 Are visible sections of anchor cables in satisfactory condition? 22 N NI NA Results / Remarks R2.3 Name: IMO No: 4.10.11 Are the mooring ropes and wires in satisfactory condition? 4.10.12 Are heaving lines unweighted and in good/safe condition? Inspect and report any dangerous use of weights Additional information: 4.11 Lifting Appliances Y 4.11.1 Are all derricks, cranes and other lifting equipment properly maintained and marked? (Include engine room and provision cranes). 4.11.2 Have periodical inspections, maintenance and testing been carried out on all lifting equipment? Date of last inspection to be noted in remarks column. 4.11.3 Is the apparent structural condition of derricks/cranes satisfactory? 4.11.4 Confirm that SWL is clearly marked on all items (including loose gear). 4.11.5 Are wires and sheaves in apparent satisfactory condition with no signs of excessive wear (pay particular attention to standing parts)? 4.11.6 Are alarms, limit switches and other safety devices apparently operational and regularly tested? 4.11.7 Are the holding down bolts in apparent satisfactory condition? Is there evidence that any have been withdrawn for testing (eg, evidence being unpainted bolts, bolts with reduced paint covering or comments in the ship's lifting gear maintenance records)? 23 N NI NA Results / Remarks R2.3 Name: IMO No: 4.11.8 Is the slewing ring in apparent satisfactory condition? Are “Rocking Tests” being made as per manufacturers’ recommendations? 4.11.9 Is loose gear apparently free from excessive wear and corrosion? 4.11.10 Are crane / derrick electrical / hydraulic systems in apparent satisfactory condition? 4.11.11 Are crane access ladders and platforms in apparent satisfactory condition and allow for safe access? 4.11.12 Are operating controls in apparent good order? Confirm that windows are clear and unobstructed. Additional information: 4.12 Ballast Tanks & Void Spaces Specify number and arrangement of ballast tanks and void spaces in “Additional information” section. Tanks inspected are to be listed in remarks column. Y N NI NA Results / Remarks 4.12.1 Are tanks and void spaces free from significant wastage, pitting and scale? (Test 3.3.6) 4.12.2 Is the corrosion protection (coating / anodes) in satisfactory condition? 4.12.3 Is the steel structure free from buckling / fractures / doublers / temporary repairs / poor alignment etc.? 4.12.4 Are manhole covers and seals in satisfactory condition? 4.12.5 Are tanks free from any sign of oil contamination? 4.12.6 Is pipe work passing through tanks / void spaces in satisfactory condition? 24 R2.3 Name: IMO No: 4.12.7 Are valves system in condition? and valve operating apparent satisfactory Additional information: 4.13 Machinery Spaces Provide full details of the main and auxiliary engines in “Additional information” section. Y 4.13.1 Are all engine compartments, including bilges, clean, tidy and free from combustible materials? (Test 3.3.7) 4.13.2 Is all main and auxiliary machinery in good condition and free from significant oil or water leakages and/or temporary drains? 4.13.3 Is main and auxiliary machinery being maintained in accordance with manufacturers’ specified intervals? (Check running hours) 4.13.4 Is the engine monitoring and control system fully operational and regularly tested? 4.13.5 If UMS vessel is an engineers call alarm fitted and tested regularly? 4.13.6 Is the emergency generator in good condition and regularly tested? (Test 3.3.10) 4.13.7 Is the stern gland in a satisfactory condition? 4.13.8 Is main switchboard protectively located and surrounded by nonconducting mat? 25 N NI NA Results / Remarks R2.3 Name: IMO No: 4.13.9 Is main switchboard earth fault monitoring system operational and indicating a satisfactory status? (Test 3.3.27) 4.13.10 Are the machinery space lighting and emergency lighting systems adequate? (Test 3.3.11) 4.13.11 Are the quick closing valves in a satisfactory condition? (Test 3.3.14) 4.13.12 Are remote closing devices, for skylights, watertight doors etc, in a satisfactory condition? (Test 3.3.15) 4.13.13 Are remote stops and shutdowns for main engines, vent fans etc, in a satisfactory condition? (Test 3.3.13) 4.13.14 Are self closing devices of oil-level gauge glasses on all oil tanks fully operational? 4.13.15 Are self closing devices on engine room sounding pipes fully operational? 4.13.16 Are exhaust manifolds on machinery free from leaks and shielded with intact insulation? 4.13.17 Are FO/LO pipes adequately shielded? and flanges 4.13.18 Are FO/LO purifiers and FO heaters/LO coolers and filters in apparent good condition? 4.13.19 Are ER pipe systems, sea suction and overboard valves free from deterioration, leaks, temporary repairs and cement boxes? 4.13.20 Are ER gratings in place, secured and in a clean and safe condition? 4.13.21 Is the steering gear free from hydraulic leaks and in satisfactory condition? (Tests 3.3.17 and 3.3.18) 4.13.22 Are instructions and equipment for emergency steering provided? 26 R2.3 Name: IMO No: 4.13.23 Are adequate engine spares onboard, properly stored and well secured? 4.13.24 Is the vessel provided with a workshop and equipped with an acceptable range of tools? 4.13.25 Are reasonable quantities of consumables carried onboard (e.g. paint, grease, hydraulic oil, gaskets, packing etc.)? Additional information: Surveyors name: Signature: Date: 27 R2.3 Name: IMO No: PART C SURVEY QUESTIONNAIRE SPECIFIC SHIP TYPES 5. LIQUID CARGO 5.1 Cargo and Ballast Systems Specify number and arrangement of cargo, ballast tanks and void spaces, together with details of number of segregated cargoes the vessel can carry, in the additional information section. For items 5.1.1 to 5.1.4 and if inspection of tanks is not possible, consult the vessel’s ESP-file last “Condition Evaluation Report” Y N NI NA Results / Remarks 5.1.1 Are cargo tank coatings in satisfactory condition and cargo tanks suitable for the carriage of nominated cargoes? 5.1.2 Is the overall steel structure in cargo tanks free from significant corrosion, pitting, scaling, buckling, dents, fractures, wastage, doublers, temporary repairs, etc.? 5.1.3 Is plating under suction bell mouths in satisfactory condition? 5.1.4 Is the condition of all pipe work in the cargo tanks, including valves and operating spindles, in a satisfactory condition? 5.1.5 Are tank hatches and other openings (including vapour locks etc.) in a satisfactory condition? 5.1.6 Are cargo pumps and tank stripping arrangements fully operational, including associated monitoring instrumentation, controls and alarms? 5.1.7 Are cargo piping systems, manifolds and relevant equipment on deck in a satisfactory condition and correctly marked? 5.1.8 Are cargo pipelines and tank cleaning lines pressure tested and marked accordingly? 28 R2.3 Name: IMO No: 5.1.9 Are the manifolds fitted with drain lines and purge points and are they valved and capped? 5.1.10 Are PV valves tested on a regular basis and are all flame screens apparently intact and free from debris? 5.1.11 Are PV settings and alarm set points clearly displayed? 5.1.12 Is the cargo venting system in a satisfactory condition and designed and operated in accordance with SOLAS requirements? 5.1.13 Are cargo hoses, reducers, removable U-bends if carried, in satisfactory condition with records of tests and inspections maintained on board? 5.1.14 Are hoses regularly pressure tested & certified ? 5.1.15 Are hoses regularly electrical continuity ? tested for 5.1.16 Are spill trays and savealls in satisfactory condition and free from oil? 5.1.17 Are ballast pumps and ballast systems fully operational, including associated monitoring instrumentation, controls and alarms? 5.1.18 Is the cargo heating system fully operational and well maintained? (Test 3.3.1) 5.1.19 Has the ship been inspected by OCIMF-Sire and/or CDI recently? Additional information: 29 R2.3 Name: IMO No: 5.2 Inert Gas System 5.2.1 Is the IGS, including instrumentation, alarms, trips, and pressure and oxygen recorders, fully operational? 5.2.2 Are fans, scrubber, deck seals, and non-return valve in satisfactory condition? 5.2.3 Is the liquid level in PV breaker satisfactory and is it suitably protected against cold weather? 5.2.4 If fitted, is the nitrogen generator system apparently operating satisfactorily? 5.2.5 Is a log kept of IGS operations, equipment maintenance, together with testing and calibration records? Y N NI NA Results / Remarks Y N NI NA Results / Remarks Additional information: 5.3 Tank Cleaning System 5.3.1 Is the tank cleaning system in satisfactory condition and fully operational? 5.3.2 Is an approved tank cleaning system manual provided and are tank cleaning plans prepared and adhered to? 5.3.3 Are records maintained of all tank cleaning operations? 5.3.4 Is an industry standard tank cleaning guide carried onboard? Additional information: 30 R2.3 Name: IMO No: 5.4 Cargo Control and Safety Y 5.4.1 Are all cargo control room monitoring indicators, control panels and mimic panels in a satisfactory condition? 5.4.2 Are detailed cargo handling plans prepared, including a ship-shore checklist, and are operations carried out and logged in accordance with the agreed plan? 5.4.3 Is adequate cargo information, including Material Safety Data Sheets, available? 5.4.4 Are procedures available, and being followed, for loading and discharging segregated cargoes while maintaining at least two valve isolation or equivalent? The number of segregated cargoes that can be carried with two valve isolation or equivalent, to be noted in remarks column. 5.4.5 Is the tank gauging system, including temperature reading if fitted, operational and cross checked with manual readings? (State type of fixed and/or portable equipment and describe the system in use under additional information) 5.4.6 Are all cargo tank high level alarms in a satisfactory condition? (Test 3.3.2) 5.4.7 Are cargo pump emergency stops properly located and regularly tested? (Test 3.3.3) 5.4.8 Is the ship provided with portable gas analysers as required, is span/calibration gas available and are records of calibrations kept? 5.4.9 Are pump room gas detection systems and bilge alarms operational, regularly tested and with results recorded? (Test 3.3.4) - 31 - N NI NA Results / Remarks R2.3 Name: IMO No: 5.4.10 If fixed gas detection and monitoring system is not fitted, are routines in place for regular monitoring of ballast tanks, void spaces, pipe tunnels etc. with portable instruments? 5.4.11 Is the pump room in an overall satisfactory condition, bilges clean and ladders/floor plates secure? 5.4.12 Are safe pump room procedures complied with? entry 5.4.13 Are pump room fans operational and pumprooms adequately ventilated? 5.4.14 Are deep well pump cofferdams purged as per manufacturer’s guidance and are records maintained onboard? 5.4.15 Are high temperature alarms for cargo, stripping and ballast pump bearings, casings and bulkhead shaft glands in an operational condition? (Test 3.3.5) 5.4.16 Are safety guidelines regarding static hazards in place and strictly adhered to? 5.4.17 Are decontamination showers and eyebaths in satisfactory condition (Test 3.3.12)? 5.4.18 Are fixed and portable electrical equipment approved for use in hazardous areas? 5.4.19 Are superstructure and deckhouse doors, windows, air inlet flaps, etc. facing the cargo area in satisfactory condition? 5.4.20 Is oil discharge monitoring equipment (ODME) fitted and operational? Additional information: - 32 - R2.3 Name: IMO No: 5.5 Documentation – General Y 5.5.1 Is the enhanced survey report file (ESP) maintained on board? 5.5.2 Is suitable medical advice and medicines/antidotes carried (e.g. MFAG, Ship Captains Medical Guide including Chemical Supplement, if applicable)? 5.5.3 Are cargo sampling routines implemented and is the cargo sample locker satisfactory? 5.5.4 Is the cargo record book correctly completed and up to date? 5.5.5 Do Officers have chemical/tanker cargo endorsements? N NI NA Results / Remarks Additional information: 5.6 Cargo Control / Documentation – Chemical Carriers Y 5.6.1 Is the vessel provided Certificate of Fitness? with 5.6.2 Is an approved Procedures and Arrangements manual available onboard? 5.6.3 Is the ship provided with cargo and coating compatibility chart? 5.6.4 Is the vessel provided with safety equipment (including chemical suits) as required by the IBC and BCH Codes? 5.6.5 Is there a contingency plan specific to chemical spills? Additional information: - 33 - a N NI NA Results / Remarks R2.3 Name: IMO No: 5.7 Documentation – Combination Carriers Y 5.7.1 Are the relevant procedures and instructions for changing mode available on board? Additional information: Surveyors name: Signature: Date: - 34 - N NI NA Results / Remarks