Shady Mohamed Atia Madany Dar EL Salam- Cairo - Egypt Mob Tel: (0100) 6540807 Home Tel: (02) 02 7191746 E–Mail:eng_shadymadany@hotmail.com Objective Seeking a position in highly professional organization in the field of Instrumentation and control systems. Professional organization for Control services which encourage continues learning and creativity, provides exposure to new ideas, professional growth, and develops both a technical and managerial skills EDUCATION 2006 – 2008 Diploma in Telecommunication Engineering National Telecommunication Institute (NTI). Computer and Communication Networks Department General Grade Graduation Project Lab Exercices Modeler The Project Grade 1999 – 2004 Very Good (80%). TCP Performance over Wireless LAN OPNET Modeler (OPNET 10.5) Excellent BSc. of Electronic and Electrical Communication Engineering (Menofia University) Faculty of Electronic Engineering Electronic and Electrical Communication Department Graduation Year General Grade Graduation Project The Project Grade May (2004) Grade: Good pass (61%). Global positioning System (GPS) Excellent Summer Training Summer 2003 Faculty of Electronic Engineer Laboratory of Technology Cisco (CCNA (640 – 80), Mat lab Program Summer 2004 Egyptian space communication co ESC, is the leader in the design, installation and management of state of – the – art satellite based communications links, using VSAT Technology Certificates Training 1- The Arab Republic of Egypt-Ministry of Electricity Cairo Electricity production Company. - Shoubra EL-Kheima Power Station Training Center Basic and site specifics training courses,constituting a program of concentrated of power plant equipment and system theory and application ( From 20/10/2007 to 19/1/2008) Group no:28 ) Grade : very Good - Shoubra EL-Kheima Power Station Training Center Type of operate the unite (Cold & hot start operation). ( From 14/7/2207 to 19/7/2007 ) 2- ABB s.p.s Power system division (Traning Center Genova –Italy) 1- Harmony Base –Configuration Subjects included: Harmony Architecture Harmony HW & SW Configuration Module Configuration with Function Code and Composer PGP 4.1 Operator Workplace Introduction and Operation (From 15 - 19 June 2009) 2-Power Generation Portal Base and Configuration Subjects included: PGP Architecture PGP HW & SW Configuration Alarms & Events, Playback Archive PGP 4.1 Operation PGP Trends & Historical Archive (From 22 - 26 June 2009) 3- ABB s.p.s Power system division (Traning Center Genova –Italy) 1-Harmony BMS – Configuration & composer Subjects included: Function code overview Composer application:operation,tune Harmony off-line & on-line configuration with composer Harmony SW Download and diagnostic with composer (From 19 - 23 January 2010) 2-Power Generation Portal FOR BMS Operation and Configuration Subjects included: PGP Graphic Display Creation PGP on-line & off –line configuration PGP HW & SW Configuration ,database config. PGP 4.1 Report Creation (From 25 - 29 January 2010) 4- Training Courses for Steam Turbine Generator I&C Subjects included: ALSP -P320 System TGC- V2+ ( Centrolog , Controbloc , Controcad ) Bentley Nevada system (From 28 - 30 July 2010) WORKING EXPERIENCE 1- El_ NEKHELY & BROTHERS Co. LTD. Large Background of Electronics components & Electronic Circuits Enable to maintenance & join with Group to Design circuits. 2- The Arab Republic of Egypt-Ministry of Electricity Cairo Electricity Production Company. Shoubra EL-Kheima Power plant (4 X 315 MW) Steam turbine + 35 MW Emergency FIAT Gas Turbine Job Title:Operatioin engineer EL Tebbin Thermal Power Plant (2X350) MW Steam turbine Job Title:Engineer responsible for project analysis, Instruments and Control construction supervision Brief description of duties: - review and analyze the technical specification of tendered Consultancy bids and contractors proposals for El Tebbin power Plant Project, Cairo. And Evaluating different bids and prepared reports on bids and proposals and participate in meeting with consultant and contractors to amend their proposal in order to meet the Power Plant requirements for the following: Steam turbine (ALSTOM) Compressor (centac & sierra) (Ingersoll-Rand) Pump house (Circulating water pumps, Service water pumps, And raw water pumps). (TM.P) Power block (Feed water pumps, Feed water booster pumps, Condensate pumps and Closed cooling pumps). (KSB) Instrumentation construction. Distributed Control System (DCS) (ABB) - review submittals from contractors and evaluate it to meet the contracts. EL Tebbin Thermal Power Plant (2X350) MW Steam turbine Job Title:Commissioning & Start up engineer for Field measurements Instrument (installation & calibration) Field instrument (ABB ,YOKOGAWA ,Endress+hauser ,VEGA ) Positioners (fisher dvc6000series fieldvue. , ABB, Mansoneilan ) Actuator Valves (Emerson,Mansoneilan ,Drehmo, auma,Rotork ) Controller systems ABB - Industrial Harmony INFI90 & Symhony Harmony ALSTOM –ALSP- P320-TGS-V2+ Siemens SIMATIC PCS7 EL Tebbin Thermal Power Plant (2X350) MW Steam turbine Job Title:I&C Maintenance engineer Languages Arabic English Native Language Very Good (Reading) Good (Writing & speaking) PERSONAL DETAILS Place of Birth Date of Birth Religion Nationality Military Status: Marital Status: Driving Licence: Qena – Luxor: 20th January 1983 Moslem Egyptian Exempted Married 1879301 Personal SKILLS Hard working, ability to work under pressure and meet deadlines. Ability to learn new tasks quickly. Excellent communication and presentation skills. Ability to work individually and as an effective team member.