Ibrahem Ahmed Saleh - RP-Jobs

advertisement
Shady Mohamed Atia Madany
Dar EL Salam- Cairo - Egypt
Mob Tel: (0100) 6540807
Home Tel: (02) 02 7191746
E–Mail:eng_shadymadany@hotmail.com
Objective
Seeking a position in highly professional organization in the field of
Instrumentation and control systems. Professional organization for Control
services which encourage continues learning and creativity, provides
exposure to new ideas, professional growth, and develops both a technical
and managerial skills
EDUCATION
2006 – 2008
Diploma in Telecommunication Engineering
National Telecommunication Institute (NTI).
Computer and Communication Networks Department
General Grade
Graduation Project
Lab Exercices Modeler
The Project Grade
1999 – 2004
Very Good (80%).
TCP Performance over Wireless LAN
OPNET Modeler (OPNET 10.5)
Excellent
BSc. of Electronic and Electrical Communication Engineering
(Menofia University) Faculty of Electronic Engineering
Electronic and Electrical Communication Department
Graduation Year
General Grade
Graduation Project
The Project Grade
May (2004)
Grade: Good
pass (61%).
Global positioning System (GPS)
Excellent
Summer Training
Summer 2003
Faculty of Electronic Engineer Laboratory of Technology
Cisco (CCNA (640 – 80), Mat lab Program
Summer 2004
Egyptian space communication co
ESC, is the leader in the design, installation and management of state
of – the – art satellite based communications links, using VSAT
Technology
Certificates Training
1- The Arab Republic of Egypt-Ministry of Electricity Cairo Electricity
production Company.
- Shoubra EL-Kheima Power Station Training Center
Basic and site specifics training courses,constituting a program of
concentrated of power plant equipment and system theory and application
( From 20/10/2007 to 19/1/2008)
Group no:28 )
Grade : very Good
- Shoubra EL-Kheima Power Station Training Center
Type of operate the unite (Cold & hot start operation).
( From 14/7/2207 to 19/7/2007 )
2-
ABB s.p.s Power system division (Traning Center Genova –Italy)
1- Harmony Base –Configuration
Subjects included:
Harmony Architecture
Harmony HW & SW Configuration
Module Configuration with Function Code and Composer
PGP 4.1 Operator Workplace Introduction and Operation
(From 15 - 19 June 2009)
2-Power Generation Portal Base and Configuration
Subjects included:
PGP Architecture
PGP HW & SW Configuration
Alarms & Events, Playback Archive
PGP 4.1 Operation
PGP Trends & Historical Archive
(From 22 - 26 June 2009)
3- ABB s.p.s Power system division (Traning Center Genova –Italy)
1-Harmony BMS – Configuration & composer
Subjects included:
Function code overview
Composer application:operation,tune
Harmony off-line & on-line configuration with composer
Harmony SW Download and diagnostic with composer
(From 19 - 23 January 2010)
2-Power Generation Portal FOR BMS Operation and Configuration
Subjects included:
PGP Graphic Display Creation
PGP on-line & off –line configuration
PGP HW & SW Configuration ,database config.
PGP 4.1 Report Creation
(From 25 - 29 January 2010)
4- Training Courses for Steam Turbine Generator I&C
Subjects included:
ALSP -P320 System TGC- V2+
( Centrolog , Controbloc , Controcad )
Bentley Nevada system
(From 28 - 30 July 2010)
WORKING EXPERIENCE
1- El_ NEKHELY & BROTHERS Co. LTD.
Large Background of Electronics components & Electronic Circuits Enable to
maintenance & join with Group to Design circuits.
2- The Arab Republic of Egypt-Ministry of Electricity Cairo Electricity
Production Company.
 Shoubra EL-Kheima Power plant (4 X 315 MW) Steam turbine
+ 35 MW Emergency FIAT Gas Turbine
Job Title:Operatioin engineer
 EL Tebbin Thermal Power Plant (2X350) MW Steam turbine
Job Title:Engineer responsible for project analysis, Instruments
and Control construction supervision
Brief description of duties:
- review and analyze the technical specification of tendered Consultancy
bids and contractors proposals for El Tebbin power Plant Project, Cairo.
And Evaluating different bids and prepared reports on bids and proposals
and participate in meeting with consultant and contractors to amend their
proposal in order to meet the Power Plant requirements for the following: Steam turbine
(ALSTOM)
 Compressor (centac & sierra)
(Ingersoll-Rand)
 Pump house (Circulating water pumps, Service water pumps,
And raw water pumps).
(TM.P)
 Power block (Feed water pumps, Feed water booster pumps,
Condensate pumps and Closed cooling pumps). (KSB)
 Instrumentation construction.
 Distributed Control System (DCS)
(ABB)
- review submittals from contractors and evaluate it to meet the
contracts.
 EL Tebbin Thermal Power Plant (2X350) MW Steam turbine
Job Title:Commissioning & Start up engineer for Field measurements
Instrument (installation & calibration)
 Field instrument (ABB ,YOKOGAWA ,Endress+hauser ,VEGA )
 Positioners (fisher dvc6000series fieldvue. , ABB, Mansoneilan )
 Actuator Valves (Emerson,Mansoneilan ,Drehmo, auma,Rotork )
Controller systems
 ABB - Industrial Harmony INFI90 & Symhony Harmony
 ALSTOM –ALSP- P320-TGS-V2+
 Siemens SIMATIC PCS7

EL Tebbin Thermal Power Plant (2X350) MW Steam turbine
Job Title:I&C Maintenance engineer
Languages
Arabic
English
Native Language
Very Good (Reading) Good (Writing & speaking)
PERSONAL DETAILS
Place of Birth
Date of Birth
Religion
Nationality
Military Status:
Marital Status:
Driving Licence:
Qena – Luxor:
20th January 1983
Moslem
Egyptian
Exempted
Married
1879301
Personal SKILLS
Hard working, ability to work under pressure and meet deadlines.
Ability to learn new tasks quickly.
Excellent communication and presentation skills.
Ability to work individually and as an effective team member.
Download