RISK ASSESSMENT

Date Complete: 13 th Sept 2013 What is being Assessed: Fife Open Day – General Risk Assessment

Date Amended: Name(s) of Risk Assessor(s): Mike McAdams

Practical Advice:

Hazard Identified &

Existing control measures:

Fire: Injury to Members of the Public & Tree Personnel.

& Property damage.

Area risk assessed via specific Fire Risk Assessment.

Control Measure

Testing Regimes for fire protection / detection systems controlled through Tullis Russell Papermakers.

Smoking only permitted in a designated area

Falls from Height: Associated injury to Members of the Public &

Tree Personnel.

Control Measure

Handrails & guards provided on high level access routes.

Doorway to upper levels of the Airspace to be kept locked at all times during the public visits.

Contact with hot surfaces / substances: Burns & Scolds to members of the Public & TREE Personnel.

Control Measure

Kitchen restricted to TREE Volunteers by securing the doorways.

No access to members of the public

Hot drinks only to be given to adults and young persons under the supervision of an adult.

No Hot drinks to be provided to children.

Children to be supervised by an appropriate adult at all times to ensure correct behaviour.

Designated refreshment area.

Hot surfaces are either out of reach or lagged

Electrical Hazards: Associated injury to Members of the Public

& TREE Personnel.

Control Measure

Electrical cupboards are secured and locked.

All Exhibits (except Lunch) are enclosed with no electrical contact points accessible.

Lunch Exhibit supervised by TREE Volunteers, with voltage reduced to max 3.75v d.c.

L

1

1

1

1

S

5

5

4

5

R Plan of Action -- ALARP:

As Low As Reasonably Practicable.

5

5

4

5

Compliance Advice

As Low As Reasonably Practicable.

As Low As Reasonably Practicable.

As Low As Reasonably Practicable.

Ref :

L S R

Mechanical Hazards: Impact from winding handle to members of the public.

Control Measure

Exhibit supervised to ensure two handed operation.

Violence: Associated injury to TREE Personnel from members of the public.

Control Measure

Approx. 10 volunteers to assist.

Contact with Chemicals: Associated injury to Members of the

Public & Tree Personnel.

Control Measure

MSDS consulted, with No Hazardous glues being used.

MSDS printed out for issue to emergency services if required.

Slips, Trips & Falls: Associated injury to Members of the Public &

Tree Personnel.

Control Measure

Cabling routed in a safe manner within buildings

Designated & signed walkways for pedestrian access from A92 junction to Tree Centre with approx. 10 volunteers to assist.

Spills to be cleaned up with signage posted if required.

Likelihood

1 – Rare

2 - Unlikely

3 - Possible

4 - Likely

5 – Almost certain

2 2 4

2 2 4

2 2 4

2 2 4

SEVERITY

1

Insignificant

1

2

2

Minor

2

4

3

Moderate

3

6

3

4

5

6

8

10

9

12

15

As Low As Reasonably Practicable.

As Low As Reasonably Practicable.

As Low As Reasonably Practicable.

As Low As Reasonably Practicable.

4

Major

4

8

12

16

20

5

Catastrophic

5

10

15

20

25

Suggested time scales

No immediate action

Action Prioritised e.g Tracker

Immediate Action or control with SSOW

Stop until control measures are in place

Likelihood: - Take into account the controls already in place and do they minimise the risk, also how likely is it that such an incident could occur? Apply a score according to the scale

Descriptor Description Level

5

4

3

2

1

Almost Certain

Likely

Possible

Unlikely

Rare

Likely to occur on many occasions, a persistent issue

Will probably occur but not a persistent issue

May occur occasionally

Do not expect it to happen but it is possible

Unlikely to occur even over a longer time scale

Severity: - Take into account the controls already in place and do they minimise the risk, also how likely is it that such an incident could occur? Apply a score according to the scale

Level Descriptor Actual or potential impact on

Individual(s)

Death or Permanent damage

Actual or Potential impact on Tullis Russell

5

4

3

Catastrophic

Major

Moderate

Permanent injury or illness

Semi-permanent injury or illness e.g. takes 6 – 12 months to resolve

HSE Investigation / Litigation expected / certain

RIDDOR reportable / long term sickness.

Litigation expected / certain

RIDDOR reportable / long term sickness / litigation possible

2

1

Minor

Insignificant

Short term injury / damage or illness e.g. resolved with in a month

No injury or adverse outcome

Minimal risk to Tullis / short term sickness / litigation unlikely

No risk to Tullis / litigation remote