Plymouth City Council Project Management System Project Deliverables and Design Approvals <Project Title> Project Deliverables and Design Approval Purpose of this document Project Board and DMT approvals are required for the following documents and are to be secured using this form. Once signed by all parties this form is to be scanned as a .pdf file and kept in the Project Approvals folder in the project filing system. Document History Revision History Revision date Author Summary of Changes New Version Ref: 11/09/09 John London Locked form V1.1 Distribution History Name Title Date of Issue Version Contents Contents .............................................................................................................................. 1 Background.......................................................................................................................... 2 Appendix A – Sign-off pro-forma .......................................................................................... 4 Appendix B – Typical Stage C Report Contents .................................................................. 6 Appendix C – Typical Stage D Report Contents .................................................................. 7 Appendix D – Typical Stage E Report Contents .................................................................. 8 Project Services team Filename: 1.12.4 Project Deliverables & Design Approval.doc Comments: Status: Final Author: John London Page Page 1 of 18 of 8 Date of Issue: 07/03/2016 Plymouth City Council Project Management System Project Deliverables and Design Approvals Background At the commencement of the project, in conjunction with the development of the Project Brief and Project Execution Plan, the design approvals must be reviewed. The documents that will be produced throughout the life of the project must be scheduled out and this schedule approved by the Project Board. Comments should be returned in an electronically recorded format (eg e-mail) to the Project Manager by the advised date. Any individual or department that does not submit comments by this date will be deemed to have 'no comment'. Following receipt of comments the Project Manager, together with the design team, or other relevant parties will: Adjust/amend the review information to reflect the comments received; Agree a strategy with the individual/ department to ensure implementation of the comments within the next stage; Agree with the individual/department that their comments will/will not be implemented and record the reasons for the decision. Responsibility: Project Manager supported by Design Team Output: Sign-off (Design Stage & Brief) Following the design stage review the Project Manager will facilitate the production of stage end review information comprising: The original stage review information amended where appropriate; A separate report enclosing all comments and 'close out' of the issues raised, including any dissents/dissatisfaction raised where comments have not been implemented; The final documentation will be made available for viewing to all participants of the review and one copy will receive formal sign-off by the Project Client, User Co-ordinator, Project Manager and Estates authorities confirming that the project can progress to the next stage. Responsibility: Project Manager Output: Design Stage (End) Review Report Design briefings generated for all projects anticipated to cost over £500,000 must be approved and signed off by the Project Board before they are sent to professional advisers. Verbal briefings must be followed up by a written note within two working days of the initial briefing and the note must be approved and signed off by the SRO. Project Services team Filename: 1.12.4 Project Deliverables & Design Approval.doc Comments: Status: Final Author: John London Page Page 2 of 28 of 8 Date of Issue: 07/03/2016 Plymouth City Council Project Management System Project Deliverables and Design Approvals Responsibility: Project Manager, SRO Output: Design Brief Approvals Documents requiring this sign-off include, but are not limited to, the following: Statement of Need – DMT signature only Project Mandate – DMT signature only Initial Project Proposal (IPP) – DMT signature only Project Brief Business Case Communications Plan CPBC Feasibility reports Stage reports Cost Plans CPB/Cabinet Papers Post Project Review Etc............. Project Services team Filename: 1.12.4 Project Deliverables & Design Approval.doc Comments: Status: Final Author: John London Page Page 3 of 38 of 8 Date of Issue: 07/03/2016 Plymouth City Council Project Management System Project Deliverables and Design Approvals Appendix A – Sign-off pro-forma SIGN-OFF BRIEF & DESIGN Project Number: Project Title: Project Manager: Location: Design Brief Please tick relevant Design stage: Feasibility Report :/ :/ Concept Design /:/ /:/ Detail Design Production Information w w /:/ / :/ w w An Initial Brief sign off is mandatory for all projects w /w the Project Brief and Design at the Project Design /w Also, the Project Client and Project Manager must sign-off Stage for w w w all projects. w w .i .i w w Approval to proceed to Detail Design is required for all projects. w w c c .i .i w The Project Client shall be deemed to be the Head of Service. PM action on comments .w .c c .i .i a a .c . Project Manager: Date: c c c a .a Comments ..c .c a a u u .c . Asst. Director of P&ED: Date: c k k (Projects) u ./ .u /k k Comments u u h h /k / k q q HoS: Date: h /h (above £500K) //q /q h h e e /q / Comments q s s e /e User Co-ordinator: Date: t/s ts e e a a t t Comments s ts t a te ta Project Client: Date: e ta t a s s e Comments t/ te /s s e e Project Design Review: p p /s / s rp r / /p SRO o o r r p PM jp j o r ro Etc. etc. e e jo j o c c e e the project This form is intended to assist Project Managers in their consultation exercises with all interested parties at each stage of j j tc tc brief and design. Use the following key to indicate the action taken with regard toethe above Council Duty Holders during this Design Stage e Review: s s tc tc /s / A Comments invited, received and attached t(available on request) ts B Comments invited, received and filede e / C Comments invited and not received /s s p p D Comments received e / /e X Comments not required p p p p e e /p /p p p s Project Services team Status: s Final Page 4 of 48 of 8 /p / Page p Filename: 1.12.4 Project Deliverables & Design Author:p John London Date of Issue: 07/03/2016 p s Approval.doc / /s e e Comments: p p s s c c e e p p if if c c e e Design Proposals Plymouth City Council Project Management System Project Deliverables and Design Approvals SIGN-OFF BRIEF & DESIGN Project Number: Project Title: Project Manager: Location: Project Services team Filename: 1.12.4 Project Deliverables & Design Approval.doc Comments: Status: Final Author: John London Page Page 5 of 58 of 8 Date of Issue: 07/03/2016 Plymouth City Council Project Management System Project Deliverables and Design Approvals Appendix B – Typical Stage C Report Contents Stage C Report – Typical Table of Contents Section 9: Health and Safety Summary Integration of H&S Issues and Risk into Design Priority H&S Issues Section 1: Introduction General Project Information Project Team Section 10: Key Performance Indicators Recommend KPI targets to be set for project Section 2: Architectural Introduction History and Conservation Design Brief Functional Layouts Outline Design Information Circulation / Operational Strategy Access Phasing / Demolition / Decanting Strategies Planning / Building Authorities Health and Safety Risk Register (Architectural, Health & Safety) Section 11: Way Forward Way Forward Section 3: Structural Engineering Introduction Desk Study / Site Analysis Design Criteria / Aims and Objectives Outline Design Information Drainage Sustainability Cleaning / Maintenance Environmental Demolition Risk Register (Structural, Geotechnical, Health & Safety) Section 4: Environmental / Mechanical & Electrical Engineering Introduction Desk Study / Site Analysis (existing gas, water, electrical, mechanical, etc. services) Design Criteria / Aims and Objectives Design Concept / Proposed Services Strategy / Basis of Design Outline Design Information Risk Register (Mechanical, Electrical, Health & Safety Section 5: Cost Stage C Cost Plan Section 6: Programme and Planning Phasing Overall Project Programme Programme Improvement Proposals Section 7: Procurement Proposed Procurement Strategy OJEU Notices (If applicable) Section 8: Risk Summary Risk Register (including preliminary Architectural, Structural, M&E and Cost Risks) Project Services team Filename: 1.12.4 Project Deliverables & Design Approval.doc Comments: Status: Final Author: John London Page Page 6 of 68 of 8 Date of Issue: 07/03/2016 Plymouth City Council Project Management System Project Deliverables and Design Approvals Appendix C – Typical Stage D Report Contents Stage D Report – Typical Table of Contents Section 1: Introduction General Project Information Project Team Section 9: Health and Safety Summary Integration of H&S Issues and Risk into Design Priority H&S Issues Section 10: Key Performance Indicators Assessment of current ability to meet KPI targets Action required to meet targets Section 2: Architectural Introduction History and Conservation Design Brief Functional Layouts Outline Design Information Circulation / Operational Strategy Access Phasing / Demolition / Decanting Strategies Planning / Building Authorities Health and Safety Risk Register (Architectural, Health & Safety) Section 11: Way Forward Way Forward Section 3: Structural Engineering Introduction Desk Study / Site Analysis Design Criteria / Aims and Objectives Outline Design Information Drainage Sustainability Cleaning / Maintenance Environmental Demolition Risk Register (Structural, Geotechnical, Health & Safety) Section 4: Environmental / Mechanical & Electrical Engineering Introduction Desk Study / Site Analysis (existing gas, water, electrical, mechanical, etc. services) Design Criteria / Aims and Objectives Design Concept / Proposed Services Strategy / Basis of Design Outline Design Information Risk Register (Mechanical, Electrical, Health & Safety) Section 5: Cost Stage C Cost Plan Section 6: Programme and Planning Phasing Overall Project Programme Programme Improvement Proposals Section 7: Procurement Proposed Procurement Strategy OJEU Notices (If applicable) Section 8: Risk Summary Risk Register (including preliminary Architectural, Structural, M&E and Cost Risks) Project Services team Filename: 1.12.4 Project Deliverables & Design Approval.doc Comments: Status: Final Author: John London Page Page 7 of 78 of 8 Date of Issue: 07/03/2016 Plymouth City Council Project Management System Project Deliverables and Design Approvals Appendix D – Typical Stage E Report Contents Stage E: Detailed Design Information Deliverables Section 1: Architectural Final and complete information from Stage D Specifications / Schedules Detailed specifications and schedules for all architectural elements Drawings to include: Ceiling layouts Major builder's work for service installation Final positions for services terminals Section 2: Structural Final and complete information from Stage D Specifications / Schedules Detailed specifications and schedules for all structural elements Drawings to include: Major builder's work for service installation Final positions for services terminals Complete sizing of all Structural Elements Section 3: Mechanical Final and complete information from Stage D Specifications / Schedules Detailed specifications and schedules for all mechanical elements Drawings to include: Ceiling layouts Major builder's work for service installation Final positions for services terminals Complete sizing of all Mechanical Elements Section 4: Electrical Final and complete information from Stage D Specifications / Schedules Detailed specifications and schedules for all electrical elements Drawings to include: Ceiling layouts Major builder's work for service installation Final positions for services terminals Complete sizing of all electrical Elements Section 5: Key Performance Indicators Assessment of current ability to meet KPI targets Action required to meet targets Project Services team Filename: 1.12.4 Project Deliverables & Design Approval.doc Comments: Status: Final Author: John London Page Page 8 of 88 of 8 Date of Issue: 07/03/2016