Daily Services and Capacity Portfolio This section describes the exchange format for data relating to the Daily Services and Capacity Portfolio, in short referred to as "PSCJ”. 1. FILE DEFINITION The Services and Capacity Portfolio is a document specific to a transmission contract. It summarizes the Capacities and Services subscribed by the holder of the transmission contract. The PSC allows the shipper to visualize the liberally subscribed Capacities and Services and the administered allocated Capacities. The PSC is built around three sections : An upstream Network Capacities section (contractual points types : PIP, PIR, PITP, PITS and PITTM). A downstream Network Capacités section (contractuel points type : ZS, PITD, PIRR, PLC, PLCd). A Services section : Access to the PEGs, Test Service, Short-notice Interruptible Service, ALIZES. The upstream and downstream Networks sections group for each gas month, the subscribed Capacities, the acquired or assigned Capacities through a Full Transfer or Transfer of Capacity Right-of-Use, and the Operational Subscribed Capacities, and finally the UIOLI Capacity that will be billed. The Services section lists the subscribed Services during the PSC period. The daily PSC is published the 1st of each gas month for the future month, then during the next full hour after a new capacity subscription concerning the current month M, the next month M+1 or the past months M-1 to M-n. This guide does not constitute a contractual document – It is not binding on GRTgaz Programme TRANS@ctions 2. WHERE TO FIND THE DOCUMENT(S) The PSCJ file can be downloaded from the TRANS@ctions web portal via the publication search page: This guide does not constitute a contractual document – It is not binding on GRTgaz 2/18 Programme TRANS@ctions 3. FILE NAME AND FORMAT The file is published in the CSV and XML formats. It will be named according to the following rule: No. Designation Type Length Format 1 Mode of exchange Alphanumeric 4 PSCJ 2 Contract code Alphanumeric 3 Gas month Date 6 YYYYMM 4 Date Date 14 DDMMYYYYhhmmss 5 Extension Alphanumeric 4 .csv ou .xml 6 Separators 4 «_» In consequence, the final complete file name will be: PSCJ_CODECONTRAT_ YYYYMM_ DDMMYYYYhhmmss .csv PSCJ_CODECONTRAT_ YYYYMM_ DDMMYYYYhhmmss.xml This guide does not constitute a contractual document – It is not binding on GRTgaz 3/18 Programme TRANS@ctions 4. FILE DESCRIPTION 4.1. CSV format The tables presented in this section contain the following columns: No.: No. of field in the line Name: description of field content Type: type of field Length Unit Format: Data format. Compulsory: determines whether the field is mandatory or not; if not, the field is kept empty. Value: type of values specific to the data or example(s) of values. Comment: additional information. In the following tables, the types of values are as follows: N: numeric X, AN: alphanumeric D: date H: time E: 1-character enumeration. The decimal separator is a dot. This guide does not constitute a contractual document – It is not binding on GRTgaz 4/18 Programme TRANS@ctions No. Name Type Length Unit Format Compulsory Example Comment Service data header (each part on 1 line) Portefeuille de Services et de 1 Capacités Journalier / AN X Capacités Journalier / Daily Y : CODE_FLUX-x Capacity Portfolio Réseau / Network Portefeuille de Services et de / LIBELLE_FLUX_EN Daily Services and 2 LIBELLE_FLUX_FR AN X Text Services and Capacity Portfolio : PSCJ-123456789 Y Réseau / Network : GRTgaz DD/MM/YYYY 3 Période / Period D hh:mm - X DD/MM/YYYY Période / Period : Y 01/07/2010 06:00 – 17/07/2010 06:00 hh:mm 4 5 6 7 ID contrat / ID contract ID expéditeur / ID shipper Nom de l’expéditeur / Name of the shipper Date de mise à jour / Last update AN X Texte Y AN X Texte Y AN X Texte Y D X Date DD/MM/YYYY hh:mm:ss ID contrat / ID contract : GFxxxx01 ID expéditeur / ID shipper : GFxxxx Nom de l’expéditeur / Name of the shipper : YYYY PSCJ – x where x refers to an order number Constant Beginning and end publication dates GRTgaz ref. no. for the contract GRTgaz shipper code Name of the shipper Date de mise à jour / Last Y update : 17/07/2010 File generation date 15:54:12 Network section (1 lign with column labels separated by semi-colons, then 1 lign for each PCR/JG/indicator) 1 2 3 Réseau / Network Type de PCR / PCR type ID point contrat / ID service point AN X Text Y AN X Text Y AN X Text Y This guide does not constitute a contractual document – It is not binding on GRTgaz Upstream Networks, Downstream Networks PIP, PIR, PITP, PITS, PITTM, ZS, PITD, PIRR, PLC, PLCd Example: IR0013/14 5/18 Network label Contractual Point type Contractual Point code Programme TRANS@ctions No. Name 4 Libellé / Label 5 6 7 8 9 Zone d’équilibrage/ Balancing Zone Sens / Direction Journée gazière / Gasday Sous-section / Subsection Indicateur_0 / Indicator_0 10 Valeur_0 / Value_0 11 Unité_0 / Unit_0 Type Length AN Unit Format Compulsory Example X Text Y Example: TAISNIERES H AN X Text Y NORD, SUD Balancing zone of the PCR AN X Text Y Rec, Del Contractual Point direction D X DD/MM/YYYY Y Example: 17/07/2010 AN X Text Y ENERGIE AN X Text Y Ex : CS Ferme, Total N 9 Integer Y AN X Text Y Date Comment Contractual Point label Gas day Sub-section label Indicator 0 label. See the note at the end of the table. Indicator 0 value kWh 25°C Indicator 0 unit This field is for the indicators of 12 Code CAD / CAD code standardized capacities at AN X Text N PITDs. It can contain the Code of Transmission Distribution Contract or the “Total” indicator 13 Indicateur_1 / Indicator_1 14 Valeur_1 / Value_1 15 Unité_1 / Unit_1 AN X Text N N 9 Integer N AN X Text N Ex : CS Ferme Annuelle Indicator 1 label. See the note at the end of the table. Indicator 1value kWh 25°C Indicator 1 unit Services section (1 lign with column labels separated by semi-colons, then 1 lign for each service/PCR/validity beginning date) Accès aux PEG Réservation à Préavis Court 1 Service / Service AN X Text Y Tolérance Contractuelle Optionnelle Offre Essai This guide does not constitute a contractual document – It is not binding on GRTgaz 6/18 Service type Programme TRANS@ctions No. Name Type Length Unit Format Compulsory Example Comment ALIZES 2 3 4 Type de PCR / PCR type ID point contrat / ID service point Libellé / Label AN X Text Y PEG, CEE, PLC, PLCd Contractual Point type AN X Text Y Example: EG000N Contractual Point code AN X Text Y Example: PEG ZONE NORD H Contractual Point label D X DD/MM/YYYY Y Service validity beginning date D X DD/MM/YYYY Y Service validity end date N 9 Float Y Date de début de 5 validité / Validity start date 6 7 Date de fin de validité / Validity end date Quantité souscrite / Subscribed quantity This guide does not constitute a contractual document – It is not binding on GRTgaz Quantity / subscribed Optional Balancing Tolerance % 7/18 Programme TRANS@ctions N.B : Possible values for Indicators 0 and corresponding Indicators 1: In case of PIP, PIR, PITP, PITS, PITTM : Indicator 0 Indicator 1 CS Ferme CS Ferme Annuelle CS Ferme Annuelle Restituable CS Ferme Trimestrielle CS Ferme Mensuelle CS Ferme Saisonnier Eté CS Ferme Saisonnier Hiver CS Ferme Intermédiaire CS Ferme Quotidien Total CS Ferme Infrajournalière CS Ferme Quotidien Enchères Dont CC acquises Ferme Dont CC cédées Ferme CDU Ferme CDU acquises Ferme CDU cédées Ferme CS Interruptible CS Interruptible Annuelle CS Interruptible Trimestrielle CS Interruptible Mensuelle CS Interruptible Saisonnier Eté CS Interruptible Saisonnier Hiver CS Interruptible Intermédiaire CS Interruptible Quotidienne Dont CC acquises Interruptible Dont CC cédées Interruptible CDU Interruptible This guide does not constitute a contractual document – It is not binding on GRTgaz CDU acquises Interruptible 8/18 Programme TRANS@ctions CDU cédées Interruptible Capacité UIOLI COS Ferme COS Interruptible This guide does not constitute a contractual document – It is not binding on GRTgaz 9/18 Programme TRANS@ctions In case of PIRR : Indicator 0 Indicator 1 CS Ferme Livraison CS Ferme Annuelle Livraison CS Ferme Acheminement=Livraison CS Ferme Annuelle Acheminement=Livraison CS Ferme Mensuelle Livraison CS Ferme Mensuelle Acheminement=Livraison CS Ferme Quotidien Livraison CS Ferme Quotidien Acheminement=Livraison CS Interruptible Livraison CS Interruptible Annuelle Livraison CS Interruptible Acheminement=Livraison CS Interruptible Annuelle Acheminement=Livraison CS Interruptible Mensuelle Livraison CS Interruptible Mensuelle Acheminement=Livraison CS Interruptible Quotidien Livraison CS Interruptible Quotidien Acheminement=Livraison COS Ferme Livraison COS Ferme Acheminement=Livraison COS Interruptible Livraison COS Interruptible Acheminement=Livraison In case of ZS : Indicator 0 Indicator 1 CS Ferme CS Ferme Annuelle CS Ferme Mensuelle CS Ferme Quotidien Dont CS Ferme Quotidien Préavis court 24h CDU Ferme CDU acquises Ferme CDU cédées Ferme CS Interruptible This guide does not constitute a contractual document – It is not binding on GRTgaz CS Interruptible Annuelle 10/18 Programme TRANS@ctions CS Interruptible Mensuelle CS Interruptible Quotidien Dont CS Interruptible Quotidien Préavis court 24h CDU Interruptible CDU acquises Interruptible CDU cédées Interruptible COS Ferme COS Interruptible This guide does not constitute a contractual document – It is not binding on GRTgaz 11/18 Programme TRANS@ctions In case of PITD : Indicator 0 Indicator 1 CS Ferme Annuelle Livraison CS Ferme Annuelle Acheminement=Livraison Dont CS Ferme Annuelle non profilées Livraison CS Ferme Livraison Dont CS Ferme Annuelle non profilées Acheminement=Livraison CS Ferme Acheminement=Livraison CS Ferme Mensuelle Livraison CS Ferme Mensuelle Acheminement=Livraison CS Ferme Quotidien Livraison CS Ferme Quotidien Acheminement=Livraison CS Interruptible Livraison CS Interruptible Annuelle Livraison CS Interruptible Acheminement=Livraison CS Interruptible Annuelle Acheminement=Livraison NP Livraison NP Acheminement=Livraison P011 Livraison P011 Acheminement=Livraison P012 Livraison P012 Acheminement=Livraison P013 Livraison P013 Acheminement=Livraison Consommation annuelle de référence par CAD Livraison Consommation annuelle de référence par CAD Acheminement =Livraison P014 Livraison P014 Acheminement=Livraison P015 Livraison P015 Acheminement=Livraison P016 Livraison P016 Acheminement=Livraison P017 Livraison P017 Acheminement=Livraison P018 Livraison P018 Acheminement=Livraison P019 Livraison This guide does not constitute a contractual document – It is not binding on GRTgaz 12/18 Programme TRANS@ctions Indicator 0 Indicator 1 P019 Acheminement=Livraison CS Ferme par CAD Livraison CS Ferme par CAD Acheminement=Livraison CS Ferme Annuelle normalisées Livraison CS Ferme Annuelle normalisées Acheminement=Livraison CS Ferme Mensuelle normalisées Livraison CS Ferme Mensuelle normalisées Acheminement=Livraison CS Ferme Quotidien normalisées Livraison CS Ferme Quotidien normalisées Acheminement=Livraison This guide does not constitute a contractual document – It is not binding on GRTgaz 13/18 Programme TRANS@ctions In case of PLC/PLCd : Indicator 0 Indicator 1 CS Ferme journalière Annuelle Livraison CS Ferme journalière Annuelle Acheminement=Livraison CS Ferme journalière Mensuelle Livraison CS Ferme journalière Livraison CS Ferme journalière Mensuelle Acheminement=Livraison CS Ferme journalière Acheminement=Livraison CS Ferme journalière Quotidien Livraison CS Ferme journalière Quotidien Acheminement=Livraison Dont CS Ferme journalière Quotidien Préavis court 24h Livraison Dont CS Ferme journalière Quotidien Préavis court 24h Acheminement=Livraison CDU cédées journalière Ferme Livraison CDU journalière Ferme Livraison CDU cédées journalière Ferme Acheminement=Livraison CDU journalière Ferme Acheminement=Livraison CDU acquises journalière Ferme Livraison CDU acquises journalière Ferme Acheminement=Livraison CS Ferme horaire Annuelle Livraison CS Ferme horaire Annuelle Acheminement=Livraison CS Ferme horaire Mensuelle Livraison CS Ferme horaire Livraison CS Ferme horaire Mensuelle Acheminement=Livraison CS Ferme horaire Acheminement=Livraison CS Ferme horaire Quotidien Livraison CS Ferme horaire Quotidien Acheminement=Livraison Dont CS Ferme horaire Quotidien Préavis court 24h Livraison Dont CS Ferme horaire Quotidien Préavis court 24h Acheminement=Livraison CDU cédées horaire Ferme Livraison CDU horaire Ferme Livraison CDU cédées horaire Ferme Acheminement=Livraison CDU horaire Ferme Acheminement=Livraison CDU acquises horaire Ferme Livraison CDU acquises horaire Ferme Acheminement=Livraison CS Interruptible journalière Annuelle Livraison CS Interruptible journalière Livraison CS Interruptible journalière Annuelle Acheminement=Livraison CS Interruptible journalière Acheminement=Livraison CS IAPC journalière Livraison CS IAPC journalière Acheminement=Livraison This guide does not constitute a contractual document – It is not binding on GRTgaz 14/18 Programme TRANS@ctions Indicator 0 Indicator 1 CS Interruptible journalière Quotidien Livraison CS Interruptible journalière Quotidien Acheminement=Livraison Dont CS Interruptible journalière Quotidien Préavis court 24h Livraison Dont CS Interruptible journalière Quotidien Préavis court 24h Acheminement=Livraison CDU cédées journalière Interruptible Livraison CDU journalière Interruptible Livraison CDU cédées journalière Interruptible Acheminement=Livraison CDU journalière Interruptible Acheminement=Livraison CDU acquises journalière Interruptible Livraison CDU acquises journalière Interruptible Acheminement=Livraison CS Interruptible horaire Annuelle Livraison CS Interruptible horaire Annuelle Acheminement=Livraison CS IAPC horaire Livraison CS Interruptible horaire Livraison CS Interruptible horaire Acheminement=Livraison CS IAPC horaire Annuelle Acheminement=Livraison CS Interruptible horaire Quotidien Livraison CS Interruptible horaire Quotidien Acheminement=Livraison Dont CS Interruptible horaire Quotidien Préavis court 24h Livraison Dont CS Interruptible horaire Quotidien Préavis court 24h Acheminement=Livraison CDU cédées horaire Interruptible Livraison CDU horaire Interruptible Livraison CDU cédées horaire Interruptible Acheminement=Livraison CDU horaire Interruptible Acheminement=Livraison CDU acquises horaire Interruptible Livraison CDU acquises horaire Interruptible Acheminement=Livraison CS Complémentaire Foisonnée journalière Annuelle Livraison CS Complémentaire Foisonnée journalière Annuelle Acheminement=Livraison CS Complémentaire Foisonnée horaire Annuelle Livraison CS Complémentaire Foisonnée horaire Annuelle Acheminement=Livraison COS Ferme journalière Livraison COS Ferme journalière Acheminement=Livraison COS Ferme horaire Livraison COS Ferme horaire Acheminement=Livraison This guide does not constitute a contractual document – It is not binding on GRTgaz 15/18 Programme TRANS@ctions Indicator 0 Indicator 1 COS Interruptible journalière Livraison COS Interruptible journalière Acheminement=Livraison COS Interruptible horaire Livraison COS Interruptible horaire Acheminement=Livraison COS Complémentaire Foisonnée journalière Livraison COS Complémentaire Foisonnée journalière Acheminement=Livraison COS Complémentaire Foisonnée horaire Livraison COS Complémentaire Foisonnée horaire Acheminement=Livraison This guide does not constitute a contractual document – It is not binding on GRTgaz 16/18 Programme TRANS@ctions 4.2. XML format The PSCJ file in the XML format is described as follows: This guide does not constitute a contractual document – It is not binding on GRTgaz 17/18 Programme TRANS@ctions Finally the file composing the xsd for the PSCJ exchanges: File sample in csv format : PSCJ_GFXXXX01_20 1208_28092012121113.csv File sample in xml format : PSCJ_GFXXXX01_20 1208_28092012120119.xml This guide does not constitute a contractual document – It is not binding on GRTgaz 18/18