NOTICE INVITING QUOTATION NO. 30 / SDEE / P-II / BSNL / 09-10 /162 Dated: 19.03.2010 The Sub-Divisional Engineer [E], Bharat Sanchar Nigam Limited, Electrical Sub-Division-II, 2nd Floor, Telephone Exchange Building, Model Colony, Lakaki Road, Shivajinagar, PUNE 411 016, invites on behalf of the B.S.N.L. sealed item rate quotations for the following work, from the eligible contractors satisfying the following conditions. Sl. Name of Work Estimated Cost No. Time Limit (Rupees) Replacement of power cable of submersible pump Rs.3920/at TE Aundh. (NIQ NO. 22 / SDEE/ P-II/ BSNL/0910) Eligibility Criteria: 1 Seven days. The eligible contractors should have been enlisted in BSNL in a category whose financial limit is more than the estimated cost. Last date & time of submission of quotation : 24.03.10 at 15.00 hours Last date & time of opening of quotation : 24.03.10 at 15:30 hours Conditions and quotation forms can be obtained from this office or can be downloaded from following websites: (i)www.maharashtra.bsnl.co.in Sub Divisional Engineer (E), BSNL Elect. S/Dn-II, Pune-16 Copy to: 1. DGM (Vigilance), O/o CGM Telecom, Maharashtra Telecom Circle, 9 th Floor, Fountain Telecom Building II, MG Road, FORT, MUMBAI. Fax No. 022-22677300. 2. The Superintending Engineer (E), BSNL Electrical Circle, Pune 37. 3. The Executive Engineer (E), BSNL Electrical Division, Pune 37. 4. SDE (E), BSNL Electrical Sub-Dn I & III, Pune / Baramati / Narayangaon / Satara. 5. Concerned Contractors by U.P.C. 6. Notice Board. Page 1 of 8 CONTRACTOR SDE(E) UNDERTAKING BY CONTRACTOR ONLY IF THE QUOTATION DOCUMENT IS DOWNLOADED FROM WEBSITE I / We wish to state that the quotation document was downloaded by me / us from the website and the same quotation document is sealed and submitted. In case, if there is any change between the document submitted by me / us and the Draft NIQ, then, the Draft NIQ shall prevail. Signature of Contractor with SEAL Page 2 of 8 CONTRACTOR SDE(E) SCHEDULE OF QUANTITY Name of Work : Replacement of power cable of submersible pump at TE Aundh. Sr No 1 Descritpion of Item Qty Rate Unit Amount Supplying & laying of submersible flat copper conductor cable of size 3core 2.5 sq.mm. alongwith submersible pump as required. ( ISI Mark) 70 CONTRACTOR Mtr Total Rs. SUB DIVISIONAL ENGINEER(E), Page 3 of 8 CONTRACTOR SDE(E) CONDITIONS & SPECIFICATIONS : The work shall be carried out as per current CPWD / Departmental specifications for electrical works as amended time to time and in accordance with Indian Electricity Rules 1956, as amended up-to-date. 1) A qualified supervisor shall supervise the work. 2) The Engineer-in-Charge or his authorized representative at site of work will give the layout of the work. 3) Unapproved materials if brought at the site of the work shall have to be removed from the site immediately at own cost & risk; failing which BSNL will remove the same at risk & cost of the contractor. 4) Unless and otherwise specified in this entire document, only ISI marked materials shall be used at the site of the work. 5) The sample of the material fittings, accessories, I/C gears etc. shall be got approved from the engineer in charge before using the same on the work. The rejected material shall be removed from the site of work. 6) No T & P will be issued to the contractor. 7) Any damage to the building/equipment by the contractor during the execution of work shall have to be made good at his cost & risk. If he does not do it himself within a reasonable time, determined by the Executive Engineer (E), then the same will be got done at his cost departmentally after giving notice to him. 8) The departmental materials will be supplied to the contractor from stores, free of cost the contractor will have to take at his own cost & risk, to the site of work octroi paid, if any, will be reimbursed on production of original vouchers. 9) In case of damage of the materials supplied by the department free of cost, recovery will be made from the contractor at the rates stipulated against each item or at Market Rate whichever is higher. 10) All materials and equipments supplied by the agency shall be new. 11) All sundry fittings, assemblies, hardware items, foundation bolts, termination lugs and all other sundry items which are useful and necessary for proper assembly & efficient working of various components of the work shall be deemed to have been included in the tender, whether such items are specifically mentioned in the tender document or not. 12) Good workmanship is an essential requirement to be complied with. The entire work of manufacture / fabrication, assembly & installation shall confirm to sound engineering practice. 13) Opening, cutouts where modifications require or where provisions are to be made such contingent works shall be carried out by the contractor at his cost. 14) All chases required in connection with electrical works shall be provided and filled up by the contractor at his own cost. 15) The work shall be treated as on work contract basis and the rates tendered shall be for complete items of work inclusive of all taxes ( i/c works contract tax if any), duties & levies etc and all charges for items contingent to the work, such as packing, forwarding, insurance, freight and delivery at site for materials to be supplied by the agency, watch and ward of all materials. 16) Being an individual works contract, sales tax, excise duty etc are not payable separately. 17) Works contract tax if any shall be included within the quoted rates for various items. The work contract tax shall be deducted from the bills of the contractor, if applicable in the state in which the work is carried out. Page 4 of 8 CONTRACTOR SDE(E) 18) Octroi shall not be paid separately for the materials supplied by the contractor, but the department on demand can furnish octroi exemption certificate. However the Department is not liable to reimburse the octroi duty in case concerned authorities do not honour such exemption certificate. 19) Service tax The rates offered by the firm shall be exclusive of the service tax as applicable. The firm shall claim service tax with the bill clearly furnishing the complete details of service tax so included. BSNL, under no circumstances, will consider any claim of service tax not included in the bill. It will be the firm’s responsibility to settle service tax with service tax authorities. 20) No labourer below the age of eighteen years shall be employed on the work. 21) The contractor shall pay not less than minimum wages, as per the labour laws, to the labour engaged by him on the work. 22) The contractor shall arrange for the safety provision for the labours as per the CPWD safety code framed from time to time, at his own cost. 23) The Engineer-in-charge shall have the right to deduct any sum required or estimated to be required for the payment of labour wages, from any amount of money due to the contractor. 24) All work executed shall be paid according to the measurements taken by or ordered by the engineer-in-charge and not according to the quantity given in the estimate. 25) The engineer-in-charge can accept or reject the work according to his judgment, without assigning any reason. 26) This order can be cancelled and the work stopped at any time by the engineer-in-charge or any officer superior to him in authority, without assigning any reason. SDE(E) Page 5 of 8 CONTRACTOR SDE(E) LIST OF APPROVED MAKES FOR E.I & FAN, PUMP SET, COMPOUND LIGHT 1. ACB 2. MCCB L&T/Siemens/Crompton/Control & Switchgear/GE Power Controls Siemens/L&T/GE Power Controls/Control and Switchgear/Crompton For Maharashtra Zone: i) Standard upto 600A (valid upto 31/7/04) 3. TPN Switches & Siemens/L&T/GE Power Controls/Havells/H-H Elecon/Crompton/ HRC fuses LK- HPL (upto 27/5/05)/Standard (up to 400 A)/ /Indo Asian- 6A630A(valid upto 16/10/05 For Maharashtra Zone: i) Standard upto 630A (valid upto 31/7/04) 4. C.T AE/MP/Marshal/Pactil/Kappa/L&T/Ashmor/Indcoil/Waco/Meco 5. AMMETER/ VOLMETER AE/IMP/Universal/Reshabh/Kaycee/Meco/Enercom. For Maharashtra Zone: i) Yokins (analogue type) (upto 10/9/04) 6.SELECTOR SWITCH L&T/KAYCEE/AE/IMP/Thakoor/Reco/Vaishno/Selzer/Rasscontrol 7.INDICATING LAMP 8. CAPACITOR Vaishno/Siemens/L&T/AE/IMP/Rass Control/Teknic/ Crompton/Kaycee. For Maharashtra Zone: i) Veeco (up to 10.6.04) ii) Altos (upto 31/3/05) Khatau Junkar/Crompton/L&T/Universal Electric/Usha/Asian/AE/IMP For Maharashtra Zone: i) Subodhan (up to 30 KVAR)(valid upto 31/3/05) 9. Cables ISI Mark (a) Up to 1.1 KV ISI mark grade (b) Above 1.1 KV ISI mark grade 10.PVC insulated copper conductor wire. 11. Fire Extinguishers 12. RUBBER MATTING 13. Cable Joint Kit ISI mark ISI mark ISI mark Raychem/M-Seal/DENSONs 14. Single phasing L&T/Minilac/Zerotrip/Siemens. Preventor 15a) Timers L&T/Siemens/Minilac/Telemechanique/AE. b) Time switches & Page 6 of 8 CONTRACTOR SDE(E) Devices c) Limit switches Theben (Valid upto 16.10.05) Vecco (Valid upto 10.06.04) 16. MCBs/Isolators & Distribution Board Bentex/Clariton/Havells/Siemens/Standard/ Crompton/Indokopp/ MDS (PROTEC)/ HPL (upto 27/5/05 For Maharashtra Zone: i) Schneider MCB & Isolator (upto 1/6/04) 17. Change Over switch Standard/Havells/Control and Switch Gear/H-H Elecon./ HPL-Socomec (upto 27/5/05) 18.Piano Switch ISI mark 19.Mono block pump set Beacon/Batliboi/Kirloskar/Jyoti/Mather & platt/KSB/Crompton/WASP/ BE/PEC. 20. Starter L&T/Siemens/BCH/ABB/MEI/GE Power Control. 21. G.I /M.S.PIPE Tata/ATL/ITC/ATC/IIA/JST/ITS/JINDAL/ZENITH/GSI/TTA/BST. 22. Footvalve ISI mark 23. Gate valve Sant/Leader/Trishul/Fountain/Annapurna. 24. M.S. Conduit ISI mark 25. Submersible pump 26(a). ELCB KSB/Calama/Amrut/Kirloskar/PEC/BE Standard/MDS/Havells/Datar/Siemens/GE Power Control/ HPL-Techno. (upto 27/5/05) 26(b). RCCB 27. Contactors 28. Rotary Switches Indo Asian- 25A/ 40A/ 63 A (valid upto 16/10/05) Siemens/L&T/GE Power controls/Crompton/MEI/Laxmi. HPL- Elektra ( upto 63 A) - (upto 27/5/05) 29. a) Industrial plug & Socket HPL- Elektra ( up to 63A) - (upto 27/5/05) b) Metal clad plug socket Vecco (valid upto 10/6/04) 30. On load switch fuse change over HPL- Socomec ( upto 800A) - (upto 27/5/05) 31. Isolator (Load Break) switches HPL- Socomec ( upto 3150A) - (upto 27/5/05) Page 7 of 8 CONTRACTOR SDE(E) 32. On-load by pass switch HPL- Socomec ( upto 630A) - (upto 27/5/05) 33. On load motorized switch HPL- Socomec ( upto 630A) - (upto 27/5/05) 34. Rewirable switch fuse unit HPL ( up to 320A) - (upto 27/5/05)/Indo Asian- upto 100 A (valid upto 16/10/05) 35a). Fuse switch unit : HPL ( up to 800A) - (upto 27/5/05) b) Switch Disconnector : Indo-Asian upto 800 A(valid upto 16.10.05)/ Fuse LK-HPL- upto 800A (upto 27/5/05) 36. Off load change over switch HPL ( up to 2000A) - (upto 27/5/05)/Indo Asian- 16A- 400A (valid upto 16/10/05) 37. On Load Change over switches HPL- Socomec ( up to 3150 A) (upto 27/5/05)/Indo Asian- 63A-630A(valid upto 16/10/05) Page 8 of 8 CONTRACTOR SDE(E)