NOTICE INVITING QUOTATION
NO. 30 / SDEE / P-II / BSNL / 09-10 /162
Dated:
19.03.2010
The Sub-Divisional Engineer [E], Bharat Sanchar Nigam Limited, Electrical Sub-Division-II, 2nd
Floor, Telephone Exchange Building, Model Colony, Lakaki Road, Shivajinagar, PUNE 411 016,
invites on behalf of the B.S.N.L. sealed item rate quotations for the following work, from the
eligible contractors satisfying the following conditions.
Sl.
Name of Work
Estimated Cost
No.
Time Limit
(Rupees)
Replacement of power cable of submersible pump Rs.3920/at TE Aundh. (NIQ NO. 22 / SDEE/ P-II/ BSNL/0910)
Eligibility Criteria:
1
Seven days.
The eligible contractors should have been enlisted in BSNL in a category whose financial limit is
more than the estimated cost.
Last date & time of submission of quotation
: 24.03.10 at 15.00 hours
Last date & time of opening of quotation
: 24.03.10 at 15:30 hours
Conditions and quotation forms can be obtained from this office or can be downloaded
from following websites: (i)www.maharashtra.bsnl.co.in
Sub Divisional Engineer (E),
BSNL Elect. S/Dn-II, Pune-16
Copy to: 1. DGM (Vigilance), O/o CGM Telecom, Maharashtra Telecom Circle, 9 th Floor, Fountain
Telecom Building II, MG Road, FORT, MUMBAI. Fax No. 022-22677300.
2. The Superintending Engineer (E), BSNL Electrical Circle, Pune 37.
3. The Executive Engineer (E), BSNL Electrical Division, Pune 37.
4. SDE (E), BSNL Electrical Sub-Dn I & III, Pune / Baramati / Narayangaon / Satara.
5. Concerned Contractors by U.P.C.
6. Notice Board.
Page 1 of 8
CONTRACTOR
SDE(E)
UNDERTAKING BY CONTRACTOR
ONLY IF THE QUOTATION DOCUMENT IS DOWNLOADED FROM WEBSITE
I / We wish to state that the quotation document was downloaded by me / us from the
website and the same quotation document is sealed and submitted. In case, if there is any
change between the document submitted by me / us and the Draft NIQ, then, the Draft NIQ shall
prevail.
Signature of Contractor with SEAL
Page 2 of 8
CONTRACTOR
SDE(E)
SCHEDULE OF QUANTITY
Name of Work : Replacement of power cable of submersible pump at TE Aundh.
Sr
No
1
Descritpion of Item
Qty
Rate
Unit
Amount
Supplying & laying of submersible flat copper conductor cable of size
3core 2.5 sq.mm. alongwith submersible pump as required.
( ISI
Mark)
70
CONTRACTOR
Mtr
Total Rs.
SUB DIVISIONAL ENGINEER(E),
Page 3 of 8
CONTRACTOR
SDE(E)
CONDITIONS & SPECIFICATIONS :
The work shall be carried out as per current CPWD / Departmental specifications for electrical
works as amended time to time and in accordance with Indian Electricity Rules 1956, as
amended up-to-date.
1) A qualified supervisor shall supervise the work.
2) The Engineer-in-Charge or his authorized representative at site of work will give the layout of
the work.
3) Unapproved materials if brought at the site of the work shall have to be removed from the
site immediately at own cost & risk; failing which BSNL will remove the same at risk & cost of
the contractor.
4) Unless and otherwise specified in this entire document, only ISI marked materials shall be
used at the site of the work.
5) The sample of the material fittings, accessories, I/C gears etc. shall be got approved from the
engineer in charge before using the same on the work. The rejected material shall be
removed from the site of work.
6) No T & P will be issued to the contractor.
7) Any damage to the building/equipment by the contractor during the execution of work shall
have to be made good at his cost & risk. If he does not do it himself within a reasonable time,
determined by the Executive Engineer (E), then the same will be got done at his cost
departmentally after giving notice to him.
8) The departmental materials will be supplied to the contractor from stores, free of cost the
contractor will have to take at his own cost & risk, to the site of work octroi paid, if any, will be
reimbursed on production of original vouchers.
9) In case of damage of the materials supplied by the department free of cost, recovery will be
made from the contractor at the rates stipulated against each item or at Market Rate
whichever is higher.
10) All materials and equipments supplied by the agency shall be new.
11) All sundry fittings, assemblies, hardware items, foundation bolts, termination lugs and all
other sundry items which are useful and necessary for proper assembly & efficient working of
various components of the work shall be deemed to have been included in the tender,
whether such items are specifically mentioned in the tender document or not.
12) Good workmanship is an essential requirement to be complied with. The entire work of
manufacture / fabrication, assembly & installation shall confirm to sound engineering
practice.
13) Opening, cutouts where modifications require or where provisions are to be made such
contingent works shall be carried out by the contractor at his cost.
14) All chases required in connection with electrical works shall be provided and filled up by the
contractor at his own cost.
15) The work shall be treated as on work contract basis and the rates tendered shall be for
complete items of work inclusive of all taxes ( i/c works contract tax if any), duties & levies
etc and all charges for items contingent to the work, such as packing, forwarding, insurance,
freight and delivery at site for materials to be supplied by the agency, watch and ward of all
materials.
16) Being an individual works contract, sales tax, excise duty etc are not payable separately.
17) Works contract tax if any shall be included within the quoted rates for various items. The
work contract tax shall be deducted from the bills of the contractor, if applicable in the state in
which the work is carried out.
Page 4 of 8
CONTRACTOR
SDE(E)
18) Octroi shall not be paid separately for the materials supplied by the contractor, but the
department on demand can furnish octroi exemption certificate. However the Department is
not liable to reimburse the octroi duty in case concerned authorities do not honour such
exemption certificate.
19) Service tax
The rates offered by the firm shall be exclusive of the service tax as applicable. The firm
shall claim service tax with the bill clearly furnishing the complete details of service tax so
included. BSNL, under no circumstances, will consider any claim of service tax not included in
the bill. It will be the firm’s responsibility to settle service tax with service tax authorities.
20) No labourer below the age of eighteen years shall be employed on the work.
21) The contractor shall pay not less than minimum wages, as per the labour laws, to the labour
engaged by him on the work.
22) The contractor shall arrange for the safety provision for the labours as per the CPWD safety
code framed from time to time, at his own cost.
23) The Engineer-in-charge shall have the right to deduct any sum required or estimated to be
required for the payment of labour wages, from any amount of money due to the contractor.
24) All work executed shall be paid according to the measurements taken by or ordered by the
engineer-in-charge and not according to the quantity given in the estimate.
25) The engineer-in-charge can accept or reject the work according to his judgment, without
assigning any reason.
26) This order can be cancelled and the work stopped at any time by the engineer-in-charge or
any officer superior to him in authority, without assigning any reason.
SDE(E)
Page 5 of 8
CONTRACTOR
SDE(E)
LIST OF APPROVED MAKES FOR E.I & FAN, PUMP SET, COMPOUND LIGHT
1. ACB
2. MCCB
L&T/Siemens/Crompton/Control & Switchgear/GE Power Controls
Siemens/L&T/GE Power Controls/Control and Switchgear/Crompton
For Maharashtra Zone:
i) Standard upto 600A (valid upto 31/7/04)
3. TPN Switches & Siemens/L&T/GE Power Controls/Havells/H-H Elecon/Crompton/
HRC fuses
LK- HPL (upto 27/5/05)/Standard (up to 400 A)/ /Indo Asian- 6A630A(valid upto 16/10/05
For Maharashtra Zone:
i) Standard upto 630A (valid upto 31/7/04)
4. C.T
AE/MP/Marshal/Pactil/Kappa/L&T/Ashmor/Indcoil/Waco/Meco
5. AMMETER/
VOLMETER
AE/IMP/Universal/Reshabh/Kaycee/Meco/Enercom.
For Maharashtra Zone:
i) Yokins (analogue type) (upto 10/9/04)
6.SELECTOR
SWITCH
L&T/KAYCEE/AE/IMP/Thakoor/Reco/Vaishno/Selzer/Rasscontrol
7.INDICATING LAMP
8. CAPACITOR
Vaishno/Siemens/L&T/AE/IMP/Rass Control/Teknic/
Crompton/Kaycee.
For Maharashtra Zone: i) Veeco (up to 10.6.04)
ii) Altos (upto 31/3/05)
Khatau Junkar/Crompton/L&T/Universal Electric/Usha/Asian/AE/IMP
For Maharashtra Zone: i) Subodhan (up to 30 KVAR)(valid upto 31/3/05)
9. Cables ISI Mark
(a) Up to 1.1 KV ISI mark
grade
(b) Above 1.1 KV
ISI mark
grade
10.PVC insulated
copper conductor
wire.
11. Fire Extinguishers
12. RUBBER
MATTING
13. Cable Joint Kit
ISI mark
ISI mark
ISI mark
Raychem/M-Seal/DENSONs
14. Single phasing
L&T/Minilac/Zerotrip/Siemens.
Preventor
15a) Timers
L&T/Siemens/Minilac/Telemechanique/AE.
b) Time switches &
Page 6 of 8
CONTRACTOR
SDE(E)
Devices
c) Limit switches
Theben (Valid upto 16.10.05)
Vecco (Valid upto 10.06.04)
16. MCBs/Isolators &
Distribution Board
Bentex/Clariton/Havells/Siemens/Standard/ Crompton/Indokopp/
MDS (PROTEC)/ HPL (upto 27/5/05
For Maharashtra Zone:
i) Schneider MCB & Isolator (upto 1/6/04)
17. Change Over
switch
Standard/Havells/Control and Switch Gear/H-H Elecon./ HPL-Socomec
(upto 27/5/05)
18.Piano Switch
ISI mark
19.Mono block
pump set
Beacon/Batliboi/Kirloskar/Jyoti/Mather & platt/KSB/Crompton/WASP/
BE/PEC.
20. Starter
L&T/Siemens/BCH/ABB/MEI/GE Power Control.
21. G.I /M.S.PIPE
Tata/ATL/ITC/ATC/IIA/JST/ITS/JINDAL/ZENITH/GSI/TTA/BST.
22. Footvalve
ISI mark
23. Gate valve
Sant/Leader/Trishul/Fountain/Annapurna.
24. M.S. Conduit
ISI mark
25. Submersible
pump
26(a). ELCB
KSB/Calama/Amrut/Kirloskar/PEC/BE
Standard/MDS/Havells/Datar/Siemens/GE Power Control/ HPL-Techno.
(upto 27/5/05)
26(b). RCCB
27. Contactors
28. Rotary
Switches
Indo Asian- 25A/ 40A/ 63 A (valid upto 16/10/05)
Siemens/L&T/GE Power controls/Crompton/MEI/Laxmi.
HPL- Elektra ( upto 63 A) - (upto 27/5/05)
29. a) Industrial plug
& Socket
HPL- Elektra ( up to 63A) - (upto 27/5/05)
b) Metal clad
plug socket Vecco (valid upto 10/6/04)
30. On load switch
fuse change over
HPL- Socomec ( upto 800A) - (upto 27/5/05)
31. Isolator (Load
Break) switches HPL- Socomec ( upto 3150A) - (upto 27/5/05)
Page 7 of 8
CONTRACTOR
SDE(E)
32. On-load by pass
switch
HPL- Socomec ( upto 630A) - (upto 27/5/05)
33. On load motorized
switch
HPL- Socomec ( upto 630A) - (upto 27/5/05)
34. Rewirable switch
fuse unit
HPL ( up to 320A) - (upto 27/5/05)/Indo Asian- upto 100 A
(valid upto 16/10/05)
35a). Fuse switch unit
: HPL ( up to 800A) - (upto 27/5/05)
b) Switch Disconnector : Indo-Asian upto 800 A(valid upto 16.10.05)/
Fuse
LK-HPL- upto 800A (upto 27/5/05)
36. Off load change
over switch
HPL ( up to 2000A) - (upto 27/5/05)/Indo Asian- 16A- 400A
(valid upto 16/10/05)
37. On Load Change
over switches HPL- Socomec ( up to 3150 A) (upto 27/5/05)/Indo Asian- 63A-630A(valid
upto 16/10/05)
Page 8 of 8