PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS (Seventh Edition July 2014) SUPPLEMENT CONTENTS 1. APPENDIX 2. FORM OF TENDER 3. AGREEMENT 4. PERFORMANCE GUARANTEE APPENDIX APPENDIX CLAUSE OPTION MODULES 1.1(c) ............................................................ EMPLOYER 1.1(m) ............................................................ 2.1 ............................................................ LIMITATIONS ON THE AUTHORITY OF THE SUPERINTENDING OFFICER ............................................................ SECURITY DEPOSIT 4.5(1) Number of days to deposit after Letter of Acceptance (14 days if none stated) ……………………………………... Amount ........................................................... TIME FOR COMPLETION 14.1 Whole of the Works ............................................................ Phase or Part of the Works ............................................................ ............................................................ ............................................................ ............................................................ ............................................................ ............................................................ LIQUIDATED DAMAGES (The cumulative amount of liquidated damages payable by the Contractor for all occasions of delay under the Contract shall not exceed $50m or the Contract Sum, whichever is lower.) Whole of the Works 16.1 ............................................................ Phase or Part of the Works ............................................................ ............................................................ ............................................................ ............................................................ ............................................................ ............................................................ CLAUSE DEFECTS LIABILITY PERIOD (12 months if none stated) 18.1 ............................................................ 27.1(1)(b) ............................................................ 28.1(1) ............................................................ 32.6 ............................................................ RATE OF INTEREST UPON UNPAID SUMS 32.6 ............................................................ FLUCTUATIONS 33.1 LIMITATIONS ON EXTENT OF LIABILITY FOR ANY ONE ACCIDENT PERCENTAGE OF PROFESSIONAL FEES PERIOD FOR HONOURING CERTIFICATE (21 days if none stated) Specified Materials Tender Closing Month Concrete Steel Reinforcements ........................................................... Base Unit Rate of Materials (to be filled in by bidders)* Concrete $..................................................../m3 Steel Reinforcements $..................................................../tonne *To delete accordingly FORM OF TENDER FORM OF TENDER NAME OF CONTRACT: *.......................................................................................................... ..........................................................……..................................................................................... TO:*........................................................................................……............................................... ......................................................................................................……......................................... ............................................................................................................……................................... Gentlemen, 1. Having examined the Tender Documents comprising: (a) (b) (c) (d) (e) the Conditions of Contract comprising (i) the Standard Conditions (ii) the Particular Conditions ................................................ (iii) the Appendix; the Specifications; the Drawings; the Bills of Quantities/Schedule of Rates* ; and the Addenda Nos ................................................ for the execution of the above-named Works we the undersigned offer to design (to the extent provided for in the Contract) execute and complete the Works and remedy any defects therein in conformity with the Conditions of Contract Specifications Drawings Bills of Quantities/Schedule of Rates* and Addenda for the Sum of: ..................................................................................................……………..................................... .....................................................................................................................…………….................. ...................................................................................................................................…………….... ( ........................................................................................…………….............................. ............. ) 2. We undertake if our Tender is accepted to commence the Works on the date or dates specified in the Employer's Letter of Acceptance and if there is no such date or dates then as soon as is reasonably possible after the receipt of an order to that effect from the Superintending Officer and to complete the whole of the Works comprised within the Contract by the Time for Completion or Times for Completion stated in the Appendix. 3. In consideration of your considering this Tender we agree to abide by this Tender for the period of *............................. days from the date fixed for receiving the same and it shall remain binding upon us and may be accepted at any time before the expiration of that period. 4. Unless and until a formal Agreement is prepared and executed this Tender together with your written acceptance thereof shall constitute a binding Contract between us. 5. We understand that you are not bound to accept the lowest or any tender you may receive. Dated this .................................…................ day of ...........…..........…….................... 20........….... Signature .........................…............ in the capacity of ..............................………........................ ... duly authorised to sign tenders for and on behalf of ..............…….................................................... ................................................................................................……………....................................... (IN BLOCK LETTERS) Address: .....................................……………................................................................................... .......................................................................................……………................................................ ..........................................................................................................……………........................….. Witness: …………............................................................................................................................. Address:………………………….………….................................................................................... ...............................……………........................................................................................................ Occupation: ..............................…………….............................................................................. ....... 6. Our Service Address (as referred in Clause 36.2(1) of the Standard Conditions) is ..…….….……. ...........................…………….................................................................................................... .…… .......................................................................................……………...........................…................... ..........................................................................................................……………......…..................... Our telephone number is...........................……………...................................................................... Our cable/telex number is...........................…………….................................................................... Our facsimile number is...........................…………….................................................................….. (Note: All details marked * shall be inserted before issue of Tender Documents or deleted as appropriate). AGREEMENT AGREEMENT THIS AGREEMENT is made the .......................……........ day of .......….......................... 20 .……..... between ................................………………............................................................................... ........... of .......................................................…………………........................................................................... ........................................................................................................………………….............................. (hereinafter called the 'Employer') of the one part and ............................................……….................... .............................................................................................................................…........………………. of ................................................................................................................................………….………. .....................................................................................................................................…………………. (hereinafter called the 'Contractor') of the other part. WHEREAS the Employer is desirous that certain Works should be executed by the Contractor viz .....................................................................................................................…………………................ ....................................................................................................................................…………………... and has accepted a Tender by the Contractor for the design (to the extent provided for by the Contract), execution and completion of such Works and remedying any defects therein. NOW THIS AGREEMENT WITNESSETH as follows: 1. In this Agreement words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract herein after referred to. 2. "Contract" shall bear the same meaning as that in Sub-Clause 1.1(d) in the Conditions of Contract and shall be a fixed price Contract subject only to adjustments or measurements (if any) and additional payments expressly provided for in the Conditions. 3. The following documents shall be deemed to form and be read and construed as part of this Agreement, viz:(1) (2) The Employer's Letter of Acceptance; The said Tender; (3) The Conditions of Contract comprising (a) the Standard Conditions; (b) *the Particular Conditions ; and (c) the Appendix; (4) The Specifications; (5) The Drawings; (6) The Bills of Quantities/Schedule of Rates*; and (7) The Addenda Nos................................................ The aforesaid documents shall be read and construed as a whole and no special priority other than that accorded by law or expressly provided in the Contract documents shall apply to any one document or group of documents nor shall the contra proferentem rule apply to this Agreement. 4. In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned the Contractor hereby covenants with the Employer to design (to the extent provided for by the Contract) execute and complete the Works and remedy any defects therein in conformity in all respects with the provisions of the Contract for the Contract Sum of Singapore Dollars ............................................................................…………………...............................................…....... …........................................................................................................…………………............. ............. (S$ ................................. ) only or such sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by the Contract. 5. The Employer hereby covenants to pay the Contractor in consideration of the design (to the extent provided for by the Contract), execution and completion of the Works and the remedying of defects therein, the Contract Sum or such other sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by the Contract. IN WITNESS WHEREOF the day and year first above written (hand of the Employer has been hereunto set ) the* ( (Common Seal of the Employer has been hereunto affixed ) ) *Signed by the said ................................................................................. ................................................................................. ....................................................... Signature *The Common Seal of ................................................................................. ................................................................................. was hereunto affixed in the presence of Name........................................................................ Address..................................................................... ................................................................................. Description............................................................... and the* ( hand of the Contractor has been hereunto set ( (Common Seal of the Contractor has been hereunto affixed ) ) ) *Signed by the said ................................................................................. ................................................................................. * The Common Seal of ................................................................................. ................................................................................. was hereunto affixed in the presence of Name........................................................................ Address..................................................................... ................................................................................ Description................................................................ * Delete as appropriate ....................................................... Signature PERFORMANCE GUARANTEE PERFORMANCE GUARANTEE (FOR NON-FIXED PERIOD CONTRACTS) To: ___________________________ and his successors in office for and on behalf of the Government of the Republic of Singapore (hereinafter called "the Employer"). Whereas on the _____ day of _____________ an Agreement (hereinafter called "the Contract") was made between _______________________ (name of Contractor) of ______________ (address) (hereinafter called "the Contractor") of the one part and the Employer of the other part whereby the Employer agreed to ____________ _________________ (state nature of contract) for the sum of Singapore Dollars ______________ (S$ ___________ ). And Whereas the Contractor is required under the Contract to pay ___ per cent of the total value of the Contract as a Security Deposit for the performance of his obligations under the Contract. Now in consideration of the Employer not insisting on the Contractor paying ___ per cent of the total value of the Contract as a security deposit for the said Contract, we (at the request of the Contractor) hereby agree as follows: 1 In the event of the Contractor failing to fulfil any of the terms and conditions of the said contract, we shall indemnify the Employer against all losses, damages, costs, expenses or otherwise sustained by the Employer thereby up to the sum of Singapore Dollars _________ (S$ _______ ) ("the Guaranteed Sum") upon receiving your written notice of claim for payment made pursuant to Clause 4 hereof. 2 We shall not be discharged or released from this guarantee by any arrangement between yourself and the Contractor with or without our consent or by any alteration in the obligations undertaken by the Contractor or by any forbearance whether as to payment, time, performance or otherwise. 3 Our liability under this guarantee shall continue and this guarantee shall remain in full force and effect from [insert effective date: _____________ ] until [insert initial expiry date:_________ ] [insert if expiry date is subject to automatic extention: provided always that the expiry date of this guarantee and our liability thereunder shall be automatically extended for successive periods of [specify duration of each extension: _______ days / months] unless we give you 90 days' written notice prior to the expiry of our liability of our intention not to extend this guarantee in respect of any future extension and provided further that you shall be entitled, upon receiving such notice of our intention (and within the period specified in Clause 4 hereof), either to: (a) * (b) make a claim under this guarantee; or direct us to pay such amount (not exceeding the Guaranteed Sum) as you may specify into a suspense account to be governed and disbursed by us subject to the Association of Banks in Singapore's Guidelines for operation of a Suspense Account; or * Not applicable for Insurance Bond issued by insurance companies (c) direct us to extend the validity of this guarantee for a further period not exceeding ________ days / months (and this guarantee shall then expire at the end of such further period)]. 4 This guarantee is conditional upon a claim or direction as specified herein being made by you by way of a notice in writing addressed to us and the same being received by us at [insert address of Bank’s notification office: ___________________ ] within 90 days from the expiry of this guarantee. Thereafter this guarantee shall become null and void notwithstanding that this guarantee is not returned us for cancellation except for any claim(s) or direction submitted to us in writing not later than 90 days from the expiry of this guarantee. 5 We shall be obliged to effect the payment required under such a claim or direction within 30 business days of our receipt thereof. We shall be under no duty to inquire into the reasons, circumstances or authenticity of the grounds for such claim or direction and shall be entitled to rely upon any written notice thereof received by us (within the period specified in Clause 4 hereof) as final and conclusive. 6 The Employer may make more than one claim on, or direction under, this guarantee so long as the claims or directions are made pursuant to Clause 4 hereof and within the period specified therein and the aggregate amount specified in all such claims and directions does not exceed the Guaranteed Sum. 7 This guarantee is issued subject to the laws of the Republic of Singapore and the jurisdiction of the Singapore courts. Dated this _______ day of ______________ AS WITNESS our hand Signed by: _______________________________ (Name and designation of officer) for and on behalf of the ________________________________ (Name of **Bank/Insurance Company) _____________________ (Signature) in the presence of Name ___________________ Designation ______________ ** Delete whichever is not applicable. _____________________ (Signature of Witness)