Supplier Support Committee (SSC)

advertisement
SUPPLIER SUPPORT COMMITTEE (SSC) MEETING
OCTOBER 2015
UNCONFIRMED
UNCONFIRMED MINUTES
TUESDAY, OCTOBER 20, 2015
PITTSBURGH, PENNSYLVANIA
These minutes are not final until confirmed by the SSC LT in writing or by vote at a subsequent
meeting. Information herein does not constitute a communication or recommendation from the
SSC LT and shall not be considered as such by any agency.
TUESDAY, OCTOBER 20, 2015
1.0
OPENING COMMENTS
1.1
CALL TO ORDER/QUORUM CHECK
The Supplier Support Committee (SSC) was called to order at 5:00 PM by Dale Harmon.
A quorum was established with the following representatives in attendance:
Supplier Support Committee Leadership Team Members Present
NAME
Lei
Lisa
Dale
Jonathan
Eric
Jim
Gary
COMPANY NAME
Bao
Donahoe
Harmon
Hebben
Jacklin
Ringer
White
NCS Testing Technology Co., LTD.
Howmet Corporation
CTS
CIRCOR Aerospace Inc.
F.M. Callahan
Tech Met Inc.
Orbit Industries Inc.
Supplier Support Committee Sub-Team Leads Present
NAME
Steve
COMPANY NAME
Payne
Praxair Surface Technologies
Suppliers/Guests Present
NAME
COMPANY NAME
Roy
Mark
Matthew
Zubair
Daniel
Leandro
Glen
Adkins
Airey
Akin
Alam
Antos
Aparicio
Attridge
Jesse
Andy
Alban
Ali
Efren
Jay
Mark
Steven
Nicholas
Patrick
Donald
Owe
Avalos
Bakewell
Bakia
Bakr
Benson
Berndt
Blevins
Booker
Bradley
Brueckner
Camus
Carlsson
Braddock Metallurgical Daytona Beach
Robert Stuart Ltd
TrueLogic Company, LLC
Exactatherm Ltd
Canton Drop Forge
Advanced Coating Techniques
West-Tech Finishing Inc.
General Dynamics Ordnance & Tactical
Sys.
E M Inspection Co Ltd
Alcoa Titanium & Engineered Products
Nico Products, Inc.
PPG Aerospace, Inc.
Toray Composites (America), Inc.
Fluid Conditioning Products, Inc.
DuPont
Spectrum Thermal Processing
Aero Gear Inc.
Talley Metals
Alcoa Fastening Systems & Rings
Chair
Secretary
Past Chair Advisor
SUPPLIER SUPPORT COMMITTEE (SSC) MEETING
OCTOBER 2015
UNCONFIRMED
Jennifer
Sean
Isabella
Joanne
Andrew
Matthew
Charles
John
Jim
Joan
Douglas
Nick
Ed
Suzanna
Leo
Gary
Sheldon
Carpenter-McTyer
Carvalho
Chavis
Chiarolanzio
Clements
Clive
Costello
Cristman
Cummings
Curfman
Davies
De Luca
Deeny
DeMoss
Dooren
Eisenman
Emmanuel
Bryan
Edward
Engel
Engelhard
Ben
Bob
Kenneth
Gary
Rick
Dennis
Yifei
Susan
Michelle
Jonathan
Dave
Debra
Joanne
Brian
Dean
James
Kerry
Eubanks
Ferry
Forest
Fox
Foxx
Fried
Gao
Generalovich
Glass
Gonzalez
Gray
Hagar
Harvala
Hoffa
Houser
Howarth
Hunsicker
Steve
Tiffani
Scott
Anita
Kurt
Steve
Amanda
Boyko
Cindy
Charissa
Kris
Kris
Hutchinson
Ivins
Jones
Joseph
Jungheim
Kaunike
Kirchner
Kirilov
Klingler
Kobyluck
Krishnamoorthy
Krishnamoorthy
John
Steven
John
Michael
Mike
Johanna
Kunkle
Kyriakides
Lane
LaPlante
Liccketto
Lisa
Chrome Plus International, LLC
Strite Precision Machining Limited
Alcore
Alcoa
NMG Aerospace
Alcoa
Sun-Glo Plating Company
X-R-I Testing
Metal Finishing Company Inc.
FN America LLC
Alcoa Fastening Systems & Rings
Aerospace Coatings Inc.
Laboratory Testing Inc.
3M
Senior Aerospace Bosman b.v.
Aero Gear Inc.
DCI Aerotech
Consolidated Precision Products CPP Syracuse
Solar Atmospheres Inc.
Crow Precision Components dba W. Pat
Crow Forgings
FPM HEAT TREATING
Nor-Ral
Anodyne Inc.
RFC Aerospace
Carpenter Technology Corp.
NCS Testing Technology Co., LTD.
Solar Atmospheres of Western PA
Kennametal Satellite LP
Alcoa Fastening Systems and Rings
Mitchell Labs
NORDAM Interiors and Structures
3M Company - Aerospace Division
Cartech
Applied Thermal Technologies
Advanced Coating Techniques
Canton Drop Forge Inc.
Braddock Metallurgical Aerospace Service,
Inc.
Acuren
Integral Products, Inc.
Toray Composites America Inc.
Modern Forge Indiana
Carpenter Technology
beyondRelations LLC
Alcoa
Quality Systems Coaching, LLC
Coating Technologies
Applus RTD Canada LP
Applus RTD Canada LP
Howmet Castings and Services, Inc. Dover
Casting
Toray Composites (America), Inc.
Integral Products, Inc.
Flame Metals Processing Corp
CDM Electronics Inc.
Continental Heat Treating
SUPPLIER SUPPORT COMMITTEE (SSC) MEETING
OCTOBER 2015
UNCONFIRMED
Jing
John
Connie
Jim
Sarah
Steven
Owen
David
Cy
Silvia
Mark
Simone
Craig
Abdul
Mitch
Ken
Michael
Yusuke
James
Phil
Lee
Gregory
Claudia
Frank
Robert
Scott
John
Gordon
Michael
Steve
Barry
James
Manuel
Catherine
Vicente
Robert
Bryan
Kevin
Bill
Frank
Mike
Carol
Douglas
Kevin
Dave
Chetan
David
Parvin
Stephen
Allison
Vern
Mitch
Scott
Jim
Liu
Ludeman
Mackey
MacMillan
Mansuetti
Marsh
McLain
Michaud
Miller
Aerospace Metal Finishing Inc.
Advanced Heat Treat Corp.
Advanced Heat Treat Corp
ATS
REX Heat Treating
Alcoa Inc.
Bodycote
Guest
Jorgensen Forge
Centro de Investigación en Materiales
Miranda Navarro
Avanzados
Mougey
Techmetal's Inc.
Murphy-Fickenworth Chrome Plus International
Nairn
HEANY Industries, Inc.
Nathani
Hi-Tech Metal Finishing
Nelson
Bodycote Thermal Processing
Nelson
Continental Heat Treating
Niedzinski
Constellium
Noguchi
Toray Industries, Inc.
Olejarczyk
Alcoa
Pacey
Canton Drop Forge
Parsley
Click Bond, Inc.
Penny
Black Oxide Industries Inc.
Centro de Investigación en Materiales
Peregrino Ibarra
Avanzados
Peszka
Laboratory Testing Inc.
Peters
R Peters Consulting, LLC.
Peterson
beyondRelations LLC
Peterson
Wolkerstorfer Co Inc.
Porterfield III
Solar Atmospheres Inc.
Quann
Pacific Metallurgical Inc.
Radelich
Jorgensen Forge Corp
Rafan
Dunkirk Specialty Steel, LLC
Rauckhorst
Tensile Testing Metallurgical Laboratories
Rebelo
Freudenberg Sealing Technologies
Renfer
Consolidated Precision Products
Reyes
Albany Engineered Composites
Rich
SPS Technologies
Roberts
HEANY Industries, Inc.
Rodriguez
Castle Industries of California
Rogers
Alcoa
Saenz
Hi-Tech Metal Finishing
Schleckman
VOSS INDUSTRIES, LLC
Schmidt
ATI Forged Products - Cudahy Operations
Schueller
AbelConn LLC
Seidel
Universal Stainless
Serbousek
Olympic Scientific
Shah
Flex Interconnect Technologies
Sherrill
LMI Aerospace
Sidhu
Northstar Aerospace Canada Inc.
Simacek
Hytek Finishes Company
Tackett
Specialty Steel Treating
Howmet Casting-Thermatech Coatings
Talmadge
(HCT)
Tanner
Triumph Processing, Embee Division, Inc.
Haynes International (Midwest Service
Tansy
Center)
Tuminello
Tech Met
SUPPLIER SUPPORT COMMITTEE (SSC) MEETING
OCTOBER 2015
UNCONFIRMED
Victoria
Matthew
Deborah
Costantino
Jennifer
Noel
Nathan
Jack
David
Chris
Don
Brian
Brian
Rob
Blanca
Van Patten
VanDyke
Viva
Volpe
Wagner
Wessely
Wheeler
Winteringham
Wintor
Wolkerstorfer
Woodward
Yazumbek
Yetman
Yocom
Zilli-Huerta
SPS Technologies
Cannon Muskegon Corp
Electrolurgy, Inc.
Senior Operations LLC
Ducommun
Rexnord Industries
RAM Company
Alcoa Power & Propulsion
Olympic Scientific
Wolkerstorfer Company, Inc.
Consolidated Precision Products
Modern Drop Forge Co
Hi-Tech Metal Finishing
Imagineering Finishing Technologies
Bowman Plating Company Inc.
Subscriber Members/Participants Present
NAME
Cary
Ron
Mario
Baker
Cohen
Simard
COMPANY NAME
The Boeing Company
ISRAEL AEROSPACE INDUSTRIES
Bombardier Aerospace
PRI Staff Present
Connie
Shannon
Linda
1.2
Hess
McMeans
Novak
INTRODUCTIONS/ROUTING OF ATTENDANCE LIST/CODE OF ETHICS/REVIEW AGENDA
The Code of Ethics, Anti-Trust & Conflict of Interest (pg. 7 Attendees Guide) were reviewed.
The SSC viewed the PRI anti-trust video. The safety information, including fire exits, was
reviewed.
As Tom Newton has stepped down as SSC Chair, Dale Harmon was approved as the new Chair
at NMC Steering on 20-OCT-2015.
Gary White is now part of the SSC Leadership Team, representing the Americas sector.
Roy Adkins has been reinstated as the HT SSC Task-Group Representative.
Jonathan Gonzalez is now the MMM SSC Task-Group Representative.
Eric Jacklin is now the CP SSC Task-Group Representative.
David Sherrill is now the M&I SSC Task-Group Representative.
1.3
MINUTES
The minutes of the June 2015 Nadcap meeting in Montreal were approved.
1.4
AWARDS & RECOGNITION
Dale Harmon was honored with an award for attendance at 50 consecutive meetings.
David Michaud was honored with an award for his service to the SSC and Nadcap.
Tom Newton was honored with an award for his service to the SSC and Nadcap.
2.0
POINTS OF EMPHASIS
Dale Harmon presented.
SUPPLIER SUPPORT COMMITTEE (SSC) MEETING
OCTOBER 2015
UNCONFIRMED
3.0

Focus on accountability of SSC Team Members

Looking for greater participation of the SSC Task Group Representatives

Starting to plan two meetings ahead to allow the SSC Leadership Team to notify suppliers
earlier of what is scheduled for the next meeting

Exploring avenues to communicate the results of SSC actions

Looking to recruit more suppliers to the SSC
SUPPLIER NEWS
Dale Harmon presented.
Supplier News Oct
2015
4.0
SUB-TEAM ROUNDTABLES
All attendees were given the opportunity to learn about four of the SSC Sub-Teams; SSC Task
Group Representatives, Flow down, Supplier Helpdesk and Communications with an opportunity
to get involved with current projects.
Roundtables.ppt




SSC Task Group Representatives
o
Starting to track attendance at meetings and conference calls
o
Looking for TG Representatives for: SEALS, SLT
Flow Down
o
Looking for new members to assist the team
o
Need volunteers to provide data on flow down issues their sites are seeing
Supplier Helpdesk
o
A suggestion was made to add voice-overs to the presentations for later viewing
o
A suggestion was made to provide a list of other hotels in the area of a Nadcap
meeting as the meeting hotel gets booked early. Connie Hess identified that there is
a hotel wait list that suppliers can be added to, by calling PRI
Communications
o
5.0
A suggestion was made that the SSC communicate information on the Supplier
Symposia
NEW BUSINESS

Question: Is the audit feedback available to the SSC?
SUPPLIER SUPPORT COMMITTEE (SSC) MEETING
OCTOBER 2015
UNCONFIRMED
o

Suggestion: Improve the visibility of the presentations by changing to stadium seating
o

Response: There are metrics being developed for measuring the performance of the
Mentoring Program, but at this time there is not sufficient data to draw any
conclusions. Once sufficient data is compiled, it will be reported.
Question: Is there anything PRI or the SSC can do to help market the suppliers?
o
6.0
Response: Unfortunately, limitation in configuration of meeting rooms
Question: Are there any metrics on the performance of the SSC Mentoring Program?
o

Response: This is data meant for the TG and is not currently available to the SSC
Response: There is some information on the PRI website on how to market your
company’s Nadcap accreditation.
ADJOURN
ADJOURNMENT – 20-OCT-2015 – Meeting was adjourned at 6:30 p.m.
Minutes Prepared by: Shannon McMeans, smcmeans@p-r-i.org
***** For PRI Staff use only: ******
Are procedural/form changes required based on changes/actions approved during this meeting? (select
one)
YES* ☐ NO ☒
*If yes, the following information is required:
Documents requiring revision:
Who is responsible:
Due date:
Download