<Insert Project Name> Change Control Plan Document Version: <Insert Version Number> AUTHORS This document was prepared by: <Insert contact information for each author as follows:> Name, Title Organization Address Office phone email address <Example:> <Example:> John Doe, Project Manager Ministry of X Roundabout A Office Phone: xxx-xxxx johndoe@mox.gov.qa Jane Doe, IT Coordinator Ministry of X Roundabout A Office Phone: xxx-xxxx janedoe@mox.gov.qa VERSION HISTORY Date Document Version <Insert version completion date> <Insert version number> Document Revision History Document Author/Reviser <Briefly describe work completed to create the version> <Name author or reviser> <Example:> May 15, 2006 1.0 Initial draft John Doe May 28, 2006 2.0 Reviewed with IT Coordinator and revised John Doe June 2, 2006 3.0 Reviewed and revised following meeting with Project Sponsor Jane Doe APPROVALS Date Document Version Approver Name and Title <Insert version approved> <Provide name and title of approver> June 30, 2006 3.0 James Doe, Project Sponsor and Director, IT June 30,2006 3.0 John Doe, Project Manager <Insert approval date> Approver Signature <Example:> <Insert Project Name> – Change Control Plan (i) TABLE OF CONTENTS 1. Purpose ____________________________________________________________________________ 1 2. Objectives of Change Control Process __________________________________________________ 1 3. Terms, Acronyms and Abbreviations ____________________________________________________ 1 4. Approval Authority for Changes ________________________________________________________ 1 5. Change Control Board ________________________________________________________________ 1 6. Change Control Process ______________________________________________________________ 1 6.1 Change Control Process Map ............................................................................................................ 2 6.2 Change Control Process Narrative .................................................................................................... 3 7. Roles and Responsibilities ____________________________________________________________ 3 <Insert Project Name> – Change Control Plan Table of Contents 1. PURPOSE <This section provides the purpose of the document.> <Recommended text:> The Change Control Plan outlines the change control approach for <insert name of project> It provides standard terminology, clear roles and responsibilities, a detailed description of the approved change control process, and the standard templates used in that process. It is designed to guide the project team and stakeholders. 2. OBJECTIVES OF CHANGE CONTROL PROCESS <This section provides readers with the objectives of change control.> 3. TERMS, ACRONYMS AND ABBREVIATIONS <This section informs readers where they can access the definitions used in this document.> 4. APPROVAL AUTHORITY FOR CHANGES <This section outlines who has the authority to approve change requests.> Role 5. Approval Authority for Changes CHANGE CONTROL BOARD <If the project has a Change Control Board, provide the purpose and membership of the Board here.> Role 6. Title Organization CHANGE CONTROL PROCESS <This section specifies the change control process for the project and includes how a change request is initiated, analyzed, logged, tracked, approved, and implemented. It includes a process map (diagram outlining steps) and a process narrative (text describing each step).> <Insert Project Name> – Change Control Plan Page 1 6.1 Change Control Process Map <Insert process map depicting the change control process for the project.> <Insert Project Name> – Change Control Plan Page 2 6.2 Change Control Process Narrative <The steps in the above change control process are listed and described in the table below.> Step Number 7. Responsible Action ROLES AND RESPONSIBILITIES <This section describes roles and responsibilities for change control. They must be consistent with the approval authorities outlined in section four and the process provided in section six.> Role <Insert Project Name> – Change Control Plan Responsibilities Page 3 APPENDIX A: CHANGE REQUEST FORM <Insert the Change Request Form template if one is required in the change control process. A sample template is available at www.qnpm.gov.qa> <Insert Project Name> – Change Control Plan Page 4 APPENDIX B: CHANGE IMPACT STATEMENT <Insert the Change Impact Statement template if one is required in the change control process. A sample template is available at www.qnpm.gov.qa> <Insert Project Name> – Change Control Plan Page 5 APPENDIX C: CHANGE LOG <Insert the Change Log used in the change control process in this appendix. A sample template is available at www.qnpm.gov.qa> <Insert Project Name> – Change Control Plan Page 6