Work Experience From November 2011 to present : Technical Safety

advertisement
Last Name: AOUDJIT
First Name: Farid
Date of Birth: 06/04/1979
Adress: Cité 8 Mai 45 Bat 17D n 06
Bab-Ezzouar Alger - Algeria
Tel : + 974 33043350
E-mail: faoudjit@yahoo.fr
Marital Status : Single
Work Experience
 From November 2011 to present : Technical Safety Engineer (QATAR)
With: Blackcat Engineering and Construction – Doha - Qatar
BlackCat Eng. & Cont is leading EPC Company in Doha doing projects for Qatar
Petroleum and RasGas, is a member company of QIPCO.
 From March 2010 to November 2011 : Technical Safety Engineer
With: Wood Group Algeria (UK company)

August 2007 – March 2010 : Loss Prevention and Environment Engineer
With: Saipem Contracting Algeria (Italian group: ENI)
Diplomas
 Master Degree in Applied Chemistry
National Institute of Hydrocarbons and Chemistry (INH) – Algeria
 Engineer in Chemical Engineering – Specialization: Petrochemistry
National Institute of Hydrocarbons and Chemistry (INH) – Algeria
 1998 : Baccalaureat (Nature and Life Sciences)
Experience Summary
Experience in oil and gas industry including Detail Engineering, FEED, technical
proposal and commercial proposal.
Experience in LNG project, LPG project and Gas Transportation project.
Responsibilities include preparation of specifications, drawings, datasheets,
requisitions and estimation of man-hour. Participation in HAZOP and HAZID.
Multi-disciplinary interaction and co-ordination with Client.
Main Activities:










Safety and environmental plan
Fire and Gas Detection
Fire Water System Design
Fire Water Demand
Hazardous Area Classification
Fire Proofing
Safety Equipments
Purchase Specification and Requisition
Technical Bid Evaluation
HAZOP and HAZID
Training
 November 2006 – March 2008 : Petrochemical Synthesis Laboratory
National Institute of Hydrocarbons and Chemistry (INHC) - Algeria
Post Graduation Thesis: “Synthesis and characterization of molybdenum
and tungsten catalysts, and their implementation in the naphtha isomerisation process”
 March - July 2004 : Development and Research Center - SONATRACH
(SONATRACH: National hydrocarbon company – Algeria)
Graduation Thesis: “Formulation of unleaded gasoline with high
octane number through naphtha catalytic isomerisation process”
Detailed Professional Experience
Projects carried out with Saipem Contracting Algeria
 LNG - 3Z Project - Arzew, Algeria : (EPC project )
(This project was carried out at Operational Centre of Milan – Italy with Saipem Italy)
Seconded to Operational Centre of Milan to participate in the project’s engineering
LNG – 3Z Project produces 4 million metric tons of LNG per year. The facility consists
of one LNG liquefaction train with associated utilities and off-sites including LNG
storing and loading facilities. The LNG train includes a facility for feed gas compression,
CO2 recovery, dehydration, LNG recovery, liquefaction, propane and mixed refrigeration
systems and fractionation.
Position: Loss Prevention and Environment Engineer
Tasks carried out:
 Loss Prevention and Environmental plan
 Fire proofing (Design Criteria, Data-sheets and Drawings)
 Hazardous Area Classification (Design Criteria, Data-sheets and Drawings)
 Checking of safety distances between equipments
 Identification and implantation of extinguishers in Plant and buildings:
- Extinguishers Drawings
- Extinguishers Data sheets

LPG Project : LPG and condensats recuperation from associated gas
Hassi - Messaoud (Algeria) (EPC project)
The LPG project consists of LPG facility which will allow the recovery of LPG and
condensates from associated gas coming from the crude oil treatment unit. It consists of
three trains with a capacity of 8 million Sm3/day of crude gas for each one.
Position: Loss Prevention and Environment Engineer
Tasks carried out :
 Loss Prevention and Environmental plan
 Active fire protection
 Fire and gas detection (Design Criteria and Drawings)
 Hazardous Area Classification (Design Criteria, Data sheet and Drawings)
 Fire Fighting Equipments (Data sheets, Plans, Technical specification)

GK3 Project : Gazoduc 48” from Hassi R’mel to Skikda and El Kala (Algeria)
GK3 project (EPC project) consists of 785 Km of 48’’ pipeline, 03 pigging station, 02
terminal arrivals, 31 block valve, 10 purge points.
Position: Loss Prevention and Environment Engineer
Tasks carried out :
 Fire and gas detection
 Fire water demand
 Fire water network
 Fire water pumps datasheets
 Fire water tank datasheet
 HAZOP and HAZID
Projects carried out with Wood Group
 BHP Billiton Petroleum Ltd Project : Produced water disposal re-injection
EPC project
The project consists on produced water re-injection; the system will have the capability to
re-inject up to 1 200 m3 /day of produced water.
I realised the: Technical offer + commercial offer + Detail Engineering + Procurement
Tasks carried out:
 Project safety philosophy
 Fire water network
 Fire and gas detection





Technical specification for safety equipments
Purchase specification for safety equipments
Technical Bid evaluation for safety equipments
HAZID and HAZOP
Organe Operating Conjoint « Sonatrach-BHP Billiton » at In-Amenas:
Detailed engineering for the connection of the Ordovician to Boosting
Compressors
The aim of the project t is to connect the facilities of the Ordovician reservoir to the
existing Boosting. The two Devonian and Ordovician fields are at the production centre
CPF / Ohanet.
Proposals carried out with Wood Group
Tasks carried out :





Preparation of a list of deliverables
Estimate of man hour and manpower
Editing of general specifications for the project
Developing a drawings’ guide
Coordination with disciplines and interfaces
 CINA proposal: Study, supply and realisation of new fire water
networks for CINA industrial complex at Hassi -Messaoud (Algeria)
The proposal consists on the realization of new fire water network including fire water
pumps system and fire water storage tank for CINA industrial complex.

BHP Billiton Proposal : Engineering study and realization of
operations base – offices & accommodation for Organe Operating Conjoint
« Sonatrach-BHP Billiton » Company at In-Amenas (Algeria)
The proposal involved the Technical offer + commercial offer
The overall plot area of the operations base is 57725 m2, including: 112 junior
accommodation units, 20 senior accommodation units, 04 VIP accommodation units.

Proposal HMN1 (Sonelgaz): resizing and realization of fire water network for
power plant at Hassi-Messaoud
The proposal involved the Technical offer + commercial offer
The proposal consists on the resizing and realization of new fire water network including
fire water pumps system and fire water storage tank for power plant at Hassi-Messaoud.
Simulation Software
- PIPENET : Hydraulic analysis of firewater systems
- PHAST : Process Hazard Analysis software
- HYSYS: Process simulation
Publications

European Journal of Scientific Research (London) Vol.44 No.3 (2010),
pp.430-436
Aoudji Farid “Isomerization of Light Naphtha (C5, C6) by Catalysts Containing
Molybdenum and Tungsten Prepared by sol-gel Method”
Scientific Communications
 4th International Symposium on Hydrocarbons and Chemistry
March 24 – 26, 2008 – Algeria
Aoudjit Farid, Boucenna Ali: « Synthesis and characterization of molybdenum and
tungsten catalysts, application in the isomerisation process of naphtha »
 International conference « Environnemental degradation : Which solutions ? »
06 - 08 December 2009 University of Skikda
Aoudjit Farid, Boucenna Ali: « Atmospheric pollution by vehicles emissions:
Formulation of unleaded gasoline with high octane numbers by naphta isomerisation
process »
 4th Technical and Scientific Seminar about Environment
June 3 – 5, 2008 University of Tizi Ouzou
Aoudjit Farid, Souag Rafika, Touaibia djelali: « Absorption of heavy metals (Cd,
Zn, Pd) from water using keratin powder prepared from Algerian sheep hoofs»
Language skills
 English: Good
 French: Fluent spoken and written
 Arabic : Mother language
Computing competences
 Good computer skills : Word, Excel ,PowerPoint and Outlook
 AutoCAD
Others
 Familiar with international codes and standards
 Good professional communication skills
Download