August 15, 2013 Web: www.BuildingNews.ca Email: info@BuildingNews.ca BuildingNews publish twice a month a list of projects under the form of a report for Ontario. It contains information about commercial, industrial, residential complexes and institutional projects, whether it is for construction, modernization or major supplies. This report is consulted by an established clientele of architects, engineers, contractors, manufacturers and by distributors of products and services. ALL RIGHTS RESERVED - 2013 Sorted by categories Industrial (1A - Agri-Food) GUELPH, Kitchener - Waterloo - Barrie Prebid : FLOUR MILL, GUELPH - Initiator: HORIZON MILLING LLC, 15407 McGinty Rd. W., Wayzata, MN, 55391, (952) 742-7575, Internet: www.cargill.com; POTENTIAL CONTACTS: George Schember, VP; Dan Dye, President; Ken Knight, Project Mgr., ken_knight@cargill.com - Initiator: VAN SICKLE, ALLEN & ASS., 2955 Xenium Lane N., Ste. 10, Plymouth, MN, 55441, (763) 559-9100; POTENTIAL CONTACTS: Mark Glennon, Project Engineer; Quin Vincent, Project Mgr., qvincent@vaaeng.com - Initiator: CARGILL INC., PO Box 9300, Minneapolis, MN, 554409300, (952) 742-7575, Internet: www.cargill.com; POTENTIAL CONTACT: Thomas Hayes, VP Operations ________________ © CCD Data ________________ Industrial (1B - Water Treatment) SIMCOE, Hamilton - Niagara Peninsula Prebid : WATER TREATMENT: WASTEWATER TREATMENT FACILITY & BIOSOLIDS STORAGE FACILITY, C. OF BARRIE NEW WASTEWATER TREATMENT FACILITY (Update) --> this project (Barrie Wastewater Treatment Facility & Biosolids Storage Facility) estimated at $2 731 000 is in the drawings stage. Based on a surface spread on 2 structures, works concern upgrades to a wastewater treatment facility. - Initiator: CITY OF BARRIE, 70 Collier St., PO Box 400, Barrie, ON, L4M 4T5, (705) 726-4242, Fax: (705) 739-4243, email: cityinfo@barrie.ca - Engineer civil: CH2M Hill Canada Ltd, 126 Wellington St. W., Ste. 303, Barrie, ON, L4N 1K9, (705) 722-8800, Fax: (705) 722-6516 www.BuildingNews.ca August 15, 2013, Page 1 of 28 NEW FLOUR MILL (Update) --> this project estimated at $54 590 000 is in the initial stage. It is slated to begin in May 2014 and should be completed in August 2015. Tender is anticipated to be issued in May 2014. Works concern construction of a new flour mill. ________________ © CCD Data ________________ Industrial (1B - Water Treatment) CLARINGTON, Toronto Project : WATER TREATMENT: PORT HOPE AREA INITIATIVE, PORT GRANBY WASTE MANAGEMENT FACILITY, CLARINGTON NEW WASTE MANAGEMENT FACILITY & WASTEWATER TREATMENT PLANT --> this project (Port Hope Area Initiative, Port Granby Waste Management Facility) estimated at $28 800 000 began in February 2012 and should be completed in February 2014. Works concern construction of a new waste management facility and wastewater treatment plant on a 50 ha site 700 m north of the lakeshore. - Contractor: MAPLE REINDERS ENGINEERING & CONSTRUCTION, 2660 Argentia Rd., Mississauga, ON, L5N 5V4, (905) 821-4844 - Consultant: Aecom Canada, 1361 Paris St., Ste. 105, Sudbury, ON, P3E 3B6, (705) 674-8343, Fax: (705) 674-1694 - Consultant: Conestoga Rovers & Ass., 184 Front St. E, Ste 302, Toronto, ON, M5A 4N3, (416) 360-1600 - Consultant: MMM, 100 Commerce Valley Dr. W, Thornhill, ON, L3T 0A1, (905) 882-1100, Fax: (905) 882-0055, email: mmm@mmm.ca - Information: Port Hope Area Initiative, 115 Toronto Rd., Port Hope, ON, L1A 3S4, (905) 885-0291, Fax: (905) 885-9344, Internet: http://phai.ca; MAIN CONTACT: Judy Herod, Stakeholder & Communications Manager ________________ © CCD Data ________________ Industrial (1K - Metal Industry) SIMCOE, Hamilton - Niagara Peninsula Project : TOYOTETSU AMERICA LLC - Initiator: TOYOTETSU AMERICA LLC, 88 Park Rd., Simcoe, ON, N3Y 4J9, (519) 428-6500; POTENTIAL CONTACTS: Michael Burks, Maintenance Mgr.; Eddie Bilopaulovic, Plant Mgr.; Corine Wilkenson, Purchasing Mgr.; Ron Daemean, Engineering Mgr. - Contractor: Hazama Corp., 500 W Wilson Bridge Rd., Ste. 8, Worthington, OH, 43085, (614) 985-4906; POTENTIAL CONTACTS: Norio Miyakawa, Project Mgr.; Schnji Okmura, Project Mgr. ________________ © CCD Data ________________ Industrial (1L - Mines, Drillings & Quarries) BLIND RIVER, Northeastern Ontario Prebid : QUARRY, BLIND RIVER NEW QUARRY --> this project has been proposed and an open house took place July 1, 2013. Town council has passed a motion to delay a decision on rezoning until all outstanding matters identified in a consultant's report are dealt with. The plan calls for the development of a level-4 class ‘A' quarry near Forest Glenn subdivision & Robb Rd. - Initiator: LEROY CONSTRUCTION, Po Box 1444, Blind River, ON, P0R 1B0, (705) 356-1015, Fax: (705) 356-1045 www.BuildingNews.ca August 15, 2013, Page 2 of 28 AUTOMOTIVE STAMPING MANUFACTURING PLANT EXPANSION (Update) --> this project (Toyotetsu America LLC) estimated at $13 500 000 is underway and should be completed in December 2013. Works concern expansion of an automotive stamping manufacturing plant. - Consultant: Tunnock Consulting Ltd, 247 Hearst St., North Bay, ON, P1B 8Z2, (705) 475-0040, (800) 924-0128, Fax: (705) 475-0030 - Information: Town of Blind River, 11 Hudson St., Blind River, ON, P0R 1B0, (705) 356-2251, Fax: (705) 356-7343, Internet: www.blindriver.ca; MAIN CONTACT: Alex Soloman, Councillor ________________ © CCD Data ________________ Industrial (1L - Mines, Drillings & Quarries) SOUTH PORCUPINE, Northeastern Ontario Prebid : PORCUPINE JOINT VENTURE GOLD MINE RESTART (Update) --> this project (Porcupine Joint Venture) estimated at $71 000 000 is in the permitting stage. It is slated to begin in September 2013 and should be completed in October 2014. Tender is anticipated to be issued in August 2013. The Initiators intend to restart an above ground gold mine. - Initiator: PORCUPINE JOINT VENTURE, PO Box 70, 4315 Gold Mine Rd., South Porcupine, ON, P0N, 1H0, (705) 235-3221, Fax: (705) 235-2343, Internet: www.goldcorp.com; POTENTIAL CONTACTS: Dave Bucar, Strategic Development/Project, dave.bucar@goldcorp.com; Paul Miller, Operations Superintendent, paul.miller@goldcorp.com; Marc Lauzier, Mine General Mgr., marc.lauzier@goldcorp.com; Ron Millions, Mill Mgr., ron.millions@goldcorp.com; Darren Fasciano, Project General Foreman, darren.fasciano@goldcorp.com; Mikey Lelievre, Drill & Blast SupervisorHollinger, mike.lelievre@goldcorp.com - Initiator: GOLDCORP INC., 130 Adelaide St. W, Ste. 3201, Toronto, ON, M5H 3P5, (416) 865-0326, Fax: (416) 361-5741, Internet: www.goldcorp.com; POTENTIAL CONTACT: George Burns, VP Operations, Canada & US, george.burns@goldcorp.com - Initiator: GOLDCORP. INC., 3400 - 666 Burrard St., Vancouver, BC, V6C 2X8, (604) 696-3000,; POTENTIAL CONTACT: Barry Olson, Senior VP Project Development, barry.olson@goldcorp.com ________________ © CCD Data ________________ Industrial MINE RESTART & MILL EXPANSION (Update) --> this project estimated at $47 480 000 is in the economic evaluation stage. It is slated to begin in October 2014 and should be completed in May 2015. Tender is anticipated to be issued in July 2014. Works concern mine restart and mill expansion. - Initiator: PROPHECY PLATINUM CORP., 342 Water St., 2nd Floor, Vancouver, BC, V6B 1B6, (604) 569-3690, Fax: (604) 569-3617, Internet: www.prophecyplat.com; POTENTIAL CONTACTS: Neil Froc, Project Mgr., nfroc@prophecyplat.com; Joseph Li, General Mgr., jli@prophecyplat.com; John Lee, Chairman, jlee@prophecyplat.com; Eric Loch, Plant Mgr., ltc@primus.ca; Greg Johnson, President/CEO, gjohnson@prophecyplat.com; John Sagman, Chief Operating Officer, jsagman@prophecyplat.com - Consultant: P&E Mining Consultants Inc., 2 County Court Blvd., Ste. 202, Brampton, ON, L6W 3W8, (905) 595-0575, Fax: (905) 595-0578; POTENTIAL CONTACT: Richard Routledge, Project Geologist, rick@peconsulting.ca ________________ © CCD Data ________________ Industrial (1L - Mines, Drillings & Quarries) ATIKOKAN, Northwestern Ontario Prebid : GOLD MINE, ATIKOKAN www.BuildingNews.ca August 15, 2013, Page 3 of 28 (1L - Mines, Drillings & Quarries) WEBBWOOD, Northeastern Ontario Prebid : MINE, WEBBWOOD NEW GOLD MINE & PROCESS PLANT (Update) --> this project (Osisko Hammond Reef Gold Mine Project) estimated at $632 400 000 is in permiting stage. It is slated to begin in October 2014 and should be completed in November 2015. Tender is anticipated to be issued in June 2014. The plan calls for the development of an open-pit gold mine about 23 km NW of Atikokan, including 2 open pits, waste rock stockpiles, a tailings management area, a processing plant, an explosives plant, offices and maintenance facilities, an access road, a transmission line, a tailings pipeline, and related ancillary mine works or undertakings. The mine is expected to operate for about 14 years with a production rate of approx. 50 000 tonnes per day. - Initiator: OSISKO MINING CORP., 1100 de la Gauchetiere W, PO Box 211, Montreal, QC, H3B 2S2, (514) 735-7131, Fax: (514) 933-3290; MAIN CONTACT: Robert Wares, Exec. VP, wares@osisko.com - Initiator: OSISKO MINING CORP., PO Box 211, Montreal, QC, H3B 2S2, (514) 735-7131; POTENTIAL CONTACT: Line Moreau, Corporate Secretary, lmoreau@osisko.com - Initiator: OSISKO HAMMOND REEF GOLD LTD, Windsor Station, Ste. 300, 1100 Canadiens-deMontreal Ave., PO Box 211, Montreal, QC, H3B 2S2, (514) 735-7131, Fax: (514) 933-3290, email: ir@osisko.com, Internet: www.osisko.com; POTENTIAL CONTACTS: Sean Roosen, President, sroosen@osisko.com; Luc Lessard, VP, P.Eng.ing/Construction, llessard@osisko.com; Sergio Cattalani, VP Exploration, scattalani@osisko.com; Jean-Sebastien David, Senior VP Development, jdavid@osisko.com - Initiator: OSISKO HAMMOND REEF GOLD LTD, PO Box 2020, Atikokan, ON, P0T 1C0, (807) 5974481, Internet: www.osisko.com; POTENTIAL CONTACT: Anne Charland, Project Mgr., acharland@osisko.com - Consultant: Golder Ass. Ltd, 2390 Argentia Rd., Mississauga, ON, L5N, 5Z7, (905) 567-6100 or (905) 567-4444, Fax: (905) 567-6561; POTENTIAL CONTACTS: Rein Jaagumagi, Project Mgr., rjaagumagi@golder.com; Anne Charland, Plant Mgr., (807) 597-4481, acharland@osisko.com - Consultant: SGS Canada Inc., 10 Boulevard de la Seigneurie Est., Ste. 203, Blainville, QC, J7C 3V5, (450) 433-1050; POTENTIAL CONTACT: Michel Dagbert, Project Mgr., michel.dagbert@sgs.com - Information: Canadian Environmental Assessment Agency (CEAA), Place Bell, 160 Elgin St., 22nd Floor, Ottawa, ON, K1A 0H3, (613) 957-0700, Fax: (613) 957-0862, Internet: www.ceaa-acee.gc.ca ________________ © CCD Data ________________ Industrial NEW GOLD MINE (Update) --> this project (Goldstone Resources) estimated at $91 420 000 is in the initial stage. It is slated to begin in April 2015 and should be completed in April 2016. Tender is anticipated to be issued in January 2015. Works concern construction of an underground mine. - Initiator: PREMIER GOLD MINES LTD, 1100 Russell St., Ste. 200, Thunder Bay, ON, P7B 5N2, (807) 346-139; POTENTIAL CONTACTS: Eric Lamontagne, Project Development Mgr., elamontagne@premiergoldmines.com; Stephen McGibbon, VP Corporate & Project Development, smcgibbon@premiergoldmines.com; Ewan Downie, President/CEO, edownie@premiergoldmines.com; Richard Harrisson, Mining Director, rharrisson@premiergoldmines.com - Initiator: GOLDSTONE RESOURCES INC., PO Box 250, Beardmore, ON, P0T 1G0, (807) 875-2876, Fax: (807) 875-2681, Internet: www.goldstoneresourcesinc.com; POTENTIAL CONTACT: George Langstaff, Senior Project Geologist - Initiator: GOLDSTONE RESOURCES INC., 80 Richmond St. W, Ste. 801, Toronto, ON, M5H 2A4, (416) 860-1636, Fax: (416) 360-7375, Internet: http://goldstoneresourcesinc.com; POTENTIAL CONTACT: Philip Cunningham, Chairman www.BuildingNews.ca August 15, 2013, Page 4 of 28 (1L - Mines, Drillings & Quarries) BEARDMORE, Northwestern Ontario Prebid : GOLDSTONE RESOURCES - Initiator: GOLDSTONE RESOURCES INC., 596 Hamilton Rd., London, ON, N5Z 1S6, (519) 455-8127, Fax: (519) 455-1846, Internet: http://goldstoneresourcesinc.com; POTENTIAL CONTACTS: Gary Conn, COO; George Harrison, Chief Financial Officer - Initiator: GOLDSTONE RESOURCES INC., 141 Adelaide St. W., Ste. 301, Toronto, ON, M5H 3L5, (416) 628-6626, Fax: (416) 628-5935, Internet: www.goldstoneresourcesinc.com; POTENTIAL CONTACT: Mike Kilbourne, VP Exploration - Initiator: PREMIER GOLD MINES LTD, 1113 Jade Court, Ste. 401, Thunder Bay, ON, P7B 6M7, (807) 346-1390, Fax: (807) 346-0100, Internet: www.premiergoldmines.com; POTENTIAL CONTACTS: Tim Twomey, VP Exploration, ttwomey@premiergoldmines.com; Stephen McGibbon, VP Corporate & Project Development, smcgibbon@premiergoldmines.com; Ewan Downie, President, edownie@premiergoldmines.com - Initiator: PREMIER GOLD MINES USA INC., 5340 Grass Valley Rd., Winnemucca, Nevada, 89445, (775) 753-9332; POTENTIAL CONTACT: Brian Morris, VP Exploration, bmorris@premiergoldmines.com - Consultant: JDS Energy & Mining Inc., 625 Howe St., Ste. 860, Vancouver, BC, V6C 2T6, (604) 6877545, Fax: (604) 689-5041; POTENTIAL CONTACT: Kevin Mather, VP Project Development, kevinm@jdsmining.ca - Consultant: Micon International Ltd, 390 Bay St., Ste. 900, Toronto, ON, M5H 2Y2, (416) 362-5135, Fax: (416) 362-5763, email: mail@micon-international.com, Internet: www.micon-international.com; POTENTIAL CONTACT: Christopher Jacobs, VP/Sr Minerals Consultant, cjacobs@miconinternational.com - Consultant: Stantec Consulting Ltd, 147 McIntyre St. W, Ste. 200, North Bay, ON, P1B 2Y5, (705) 4948255; POTENTIAL CONTACT: Michael Murphy, Senior Architect, michael.murphy@stantec.com ________________ © CCD Data ________________ Industrial (1L - Mines, Drillings & Quarries) DRYDEN, Northwestern Ontario Prebid : GOLIATH GOLD - Initiator: TREASURY METALS LTD, Exchange Tower, PO Box 99, 130 King St. W, Ste. 3680, Toronto, ON, M5X 1B1, (416) 214-4654, Fax: (416) 599-4959, email: info@treasurymetals.com, Internet: www.treasurymetals.com or www.treasurymetals.com/contact_us.php - Information: Aboriginal People of Wabigoon, 3 Sherbrook St., Wabigoon, ON, P0V 2W0, (807) 9386981, Fax: (807) 938-6440 - Information: Canadian Environmental Assessment Agency, 160 Elgin St., Ottawa, ON, K1A 0H3, 1-866582-1884 or (613) 957-0700, Fax: (613) 957-0862, email: info@ceaa-acee.gc.ca, Internet: www.ceaaacee.gc.ca or www.ceaa.gc.ca; MAIN CONTACT: Sofie McCoy-Astell, Communications Advisor, (613) 960-1519, Sofie.McCoy-Astell@ceaa-acee.gc.ca - Information: Eagle Lake First Nation, PO Box 1001, Migisi Sahgaigan, ON, P0V 3H0, (807) 755-5526 or 1-877-497-9541, Fax: (807) 755-5696, email: eaglereception@migisi.ca, Internet: www.eaglelakefirstnation.ca - Information: Métis Nation of Ontario, 500 Old St-Patrick St., Unit 3, Ottawa, ON, K1N, 9G4, (613) 7981488, or 1-800-263-4889, Fax: (613) 722-4225 - Information: Wabauskang First Nation, PO Box 418, Ear Falls, ON, P0V 1T0, (807) 529-3174, Fax: (807) 529-3007 ________________ © CCD Data ________________ www.BuildingNews.ca August 15, 2013, Page 5 of 28 NEW GOLD MINE (Update) --> this project (Goliath Gold) has been proposed and a federal environmental assessment is underway. The plan calls for the development of a 2 500-tonne-per-day open-pit and underground gold mine, including associated infrastructure. Industrial (1L - Mines, Drillings & Quarries) DRYDEN, Northwestern Ontario Prebid : GOLD MINE & MILL, DRYDEN GOLD MINE RESTART, EXPAND & MILL EXPANSION (Update) --> this project estimated at $87 360 000 is in the preliminary drawings stage. It is slated to begin in October 2014 for open pit/surface facilities construction and should be completed in October 2015. The underground mine construction will begin in January 2015 and should be completed in 2017. Tender is anticipated to be issued in July 2013. Works concern gold mine restart/expand and mill addition. - Initiator: TREASURY METALS INC., Exchange Tower, PO Box 99, 130 King St. W, Ste. 3680, Toronto, ON, M5X 1B1, (416) 214-4654, Fax: (416) 599-4959, email: info@treasurymetals.com, Internet: www.treasurymetals.com; POTENTIAL CONTACTS: Martin Walter, President, martin@treasurymetals.com; Greg Ferron, VP Corporate Development, greg@treasurymetals.com; Ashley Martin, Project Mgr., ashley@treasurymetals.com; John Chulick, Head of Exploration; Mark Wheeler, Senior Mining Engineer, mark@treasurymetals.com - Initiator: TREASURY METALS INC., 899 Tree Nursery Rd., Wabigoon Lake 27, ON, P0V 2W0, (807) 938-6961; POTENTIAL CONTACT: Ashley Martin, Senior Project Mgr., ashley@treasurymetals.com; Norman Bush, VP Goliath Gold Project, norman@treasurymetals.com; Mackenzie Potter, Environmental Technician, mackenzie@treasurymetals.com; Mark Wheeler, Senior Mining Engineer, mark@treasurymetals.com - Initiator: TREASURY METALS INC., PO Box 783, Dryden, ON, P8N 2Z4, (807) 938-6961; POTENTIAL CONTACT: Norman Bush, VP Goliath Gold Project, norm@treasurymetals.com - Contractor: TBT Engineering Consulting Group, 1918 Yonge St., Thunder Bay, ON, P7E 6T9, (807) 6245160, Fax: (807) 624-5161; POTENTIAL CONTACT: Wayne Hurley, VP Eng., whurley@tbte.ca - Consultant: ACA Howe International Ltd, 365 Bay St., Ste. 501, Toronto, ON, M5H 2V1, (416) 368-7041, Fax: (416) 368-2579; POTENTIAL CONTACT: Doug Roy, Associate Mining Engineer - Engineer: Nordmin Engineering Ltd, 160 Logan Ave., Thunder Bay, ON, P7A 6R1, (807) 683-1730; POTENTIAL CONTACT: Jim Filograna, Chief Designer, jim.filograna@nordmin.com ________________ © CCD Data ________________ Industrial NEW COPPER & GOLD MINE (Update) --> this project estimated at $175 000 000 is in the site study stage. It is slated to begin in August 2017 and should be completed in October 2018. Tender is anticipated to be issued in June 2015. Works concern construction of an above ground copper/gold mine. - Initiator: RICE LAKE GOLD CORP., PO Box 1000, Bissett, Manitoba, MB, R0E 0J0, (204) 277-541; POTENTIAL CONTACT: Eric Setchell, General Mgr. - Initiator: SAN GOLD CORP., 145 King St., Ste. 1800, Toronto, ON, M5H 1J8, (416) 214-0024; POTENTIAL CONTACTS: Torben Jensen, Business Dev. Mgr.; Michael Michaud, VP Exploration, mmichaud@sasgoldmines.com - Initiator: SAN GOLD CORP., 212 - 1661 Portage Ave., Winnipeg, MB, R3J 3T7, (204) 772-9149; POTENTIAL CONTACTS: George Pirie, President; Ian Berzins, President - Initiator: SAN GOLD CORP., Rice Lake - PO Box 1000, Bissett, MB, R0E 0J0, (204) 277-5411; POTENTIAL CONTACT: William Ferreira, Exploration Mgr. - Initiator: OPAWICA EXPLORATIONS INC., 300 - 555 W Georgia St., Vancouver, BC, V6B 1Z6, (604) 681-3170, Fax: (604) 681-3552, Internet: www.opawica.com; POTENTIAL CONTACTS: Paul Antoniazzi, Director/Project Coordinator, paulantoniazzi@hotmail.com; Donald Clark, Chairman/Corporate PM www.BuildingNews.ca August 15, 2013, Page 6 of 28 (1L - Mines, Drillings & Quarries) SIOUX NARROWS, Northwestern Ontario Prebid : COPPER & GOLD MINE, SIOUX NARROWS - Initiator: OPAWICA EXPLORATIONS INC., PO Box 10103, Vancouver, BC, V7Y 1C6, (604) 6813170, Fax: (604) 681-3552, Internet: www.opawica.com; POTENTIAL CONTACTS: Sandra Wong, Controller/Project Administrator; Paul Antoniazzi, Project Coordinator; Donald Clark - Consultant: Shaft & Tunnel Engineering Services Ltd, PO Box 1659, Holland, ON, L9N 1P2, (905) 8364836; POTENTIAL CONTACT: Robert Laakso, Project Consulting Geologist ________________ © CCD Data ________________ Industrial (1P - Power Production) HAVELOCK, Muskoka - Kawarthas Prebid : BIOMASS-TO-ENERGY PLANT, HAVELOCK NEW BIOMASS-TO-ENERGY PLANT (Update) --> this project estimated at $35 200 000 is in the permitting stage. It is slated to begin in October 2014 and should be completed in December 2015. Tender is anticipated to be issued in August 2014. Works concern construction of a 9.8-MW new biomass-to-energy plant. - Initiator: PURENERGY INC., 200 Division St., Cobourg, ON, K9A 4S3, (705) 754-1565, POTENTIAL CONTACT: Scott Campbell, Project Mgr., pur.energy@yahoo.ca - Initiator: KAWARTHA BIOGAS INC., 107 S Main St., Ste. C, Eaton Rapids, Michigan, 48827, (517) 663-0663 or (321) 205-3752, Internet: www.kawarthaethanol.ca; POTENTIAL CONTACTS: Bernard Sheff, COO, b.sheff@uts-residuals.com; Floriano Ferreira, Project Mgr., fferreira@uts-residuals.com; Paul Paszt, General Mgr., ppaszt@kawarthaethanol.ca - Consultant: BioEnvironmental Consulting Corp., 59 Parkview Dr., Strathroy, ON, N7G 4A2, (519) 2050096; POTENTIAL CONTACT: Terrie Riley, Project Consultant, triley@bioenviroconsulting.com - Consultant: JDM Designworks, 9335 County Rd. 30, Havelock, ON, K0L 1Z0, (705) 772-2659; POTENTIAL CONTACT: Jeff Menzies, Project Consultant, jeff.menzies@jdmdesignworks.com ________________ © CCD Data ________________ Industrial NEW SOLAR POWER STATION (Update) --> this project (Liskeard 1 PV Solar Station) estimated at between $47 040 000 is in the permitting stage. Tender is anticipated to be issued in September 2013. It is slated to begin in November 2013 and should be completed in July 2014. Works concern construction of a new 10 MW solar power station. - Initiator: CANADIAN SOLAR SOLUTIONS INC., 650 Riverbend Dr., Ste. B, Kitchener, ON, N2K 3S2, (519) 837-1881 or (519) 954-2057, Fax: (519) 578-2097, Internet: www.canadian-solar.ca; POTENTIAL CONTACTS: Jeff Roy, Project Developer, jeff.roy@na.canadiansolar.com; Grace Pasceri, Plant Mgr., grace.pasceri@na.canadiansolar.com - Initiator: CANADIAN SOLAR INC., 545 Speedvale Ave., Guelph, ON, N1K 1E6, (519) 837-1881; POTENTIAL CONTACT: Mark Feenstra, Project Mgr. mark.feenstra@na.canadiansolar.com - Consultant: Dillon Consulting Ltd, 235 Yorkland Blvd., Ste. 800, Toronto, ON, M2J 4Y8, (519) 354-7802; POTENTIAL CONTACT: Bruce McAllister, Project Mgr., bmcallister@dillion.ca; Jerome Trudell, Project Engineer - Consultant: Hatch Ltd, 2800 Speakman Dr., Mississauga, ON, L5K 2R7, (905) 855-7600, Fax: (905) 8558270; POTENTIAL CONTACT: Rob Lydan, Project Mgr., #4374 ________________ © CCD Data ________________ Commercial (2A - Office Buildings & Banks) www.BuildingNews.ca August 15, 2013, Page 7 of 28 (1P - Power Production) TIMISKAMING REGION, Northeastern Ontario Prebid : LISKEARD 1 PV SOLAR STATION ETOBICOKE, Toronto Prebid : OFFICE BUILDINGS, 150 SYMES RD., ETOBICOKE NEW OFFICE BUILDINGS --> 150 Symes Rd., this project estimated at $24 250 000 is in the drawings stage. Based on a surface spread on 3 structures, works concern construction of new office buildings. - Architect: JEDD JONES ARCHITECT LTD, 210 Sheldrake Blvd., Toronto, ON, M4P 2B5, (416) 4290996, Fax: 647-436-8108, email: jja@bellnet.ca - Consultant: Bousfields Inc., 3 Church St., Ste. 200, Toronto, ON, M5E 1M2, (416) 947-9744, Fax: (416) 947-0781 ________________ © CCD Data ________________ Commercial (2A - Office Buildings & Banks + 2C - Retail Trade) NORTH YORK, Toronto Project : EMERALD PARK CONDOS NEW MIXED-USE DEVELOPMENT --> Yonge St., this project (Emerald Park Condos) is underway. Works concern construction of 2 x 42- and 32-storey buildings totaling 564 units with office and commercial space on a shared 3-storey podium, a Metro grocery store and direct indoor access to the Sheppard and Yonge subway lines. - Initiator: BAZIS INC., 30 Casmir Court, Concord, ON, L4K 4J5, (905) 532-0435, Internet: www.bazis.ca - Initiator: METROPIA, 2300 Yonge St., Ste. 807, Toronto, ON, M4P 1E4, (416) 486-4242, Fax: (416) 4863780, Internet: www.metropia.ca - Initiator: PLAZA, 110 - 527 Queen St., Fredericton, NB, E3B 1B8, (506) 451-1826, Fax: (506) 451-1802, email: info@plaza.ca, Internet: www.plaza.ca - Architect: Rosario Varacalli, 30 Casmir Court, Concord, ON, L4K 4JS, (905) 761-9544, email: saro@varchitectureInc.com ________________ © CCD Data ________________ (2A - Office Buildings & Banks + 2C - Retail Trade + 2F - Recreation & Entertainment + 2G - Catering) TORONTO, Toronto Project : PERSPECTIVE CONDOMINIUMS NEW MIXED-USE DEVELOPMENT --> this project (Perspective Condominiums) is underway. Works concern construction of a new mixed-use development, including 12- and 18-storey towers totalling 250 units, building demolition, commercial & retail spaces, outdoor dining and lounging spaces, a stone fireplace, a pool, home theatre space, and a virtual golf simulator. - Initiator: PIANOSI DEVELOPMENT CORP., 3250 Bloor St. W, Ste 118, Etobicoke, ON, M8X 2X9, (416) 231-1297, Fax: (416) 231-1322 - Architect: Turner Fleischer Architects, 67 Lesmill Rd., Toronto, ON, M3V 2T8, (416) 425-2222, Fax: (416) 425-6717, email: info@tfai.com, Internet: www.tfai.com - Architect: The MBTW Group/Watchorn Architect, 255 Wickstead, Unit 1A, Toronto, ON, M4H 1G8, (416) 449 7767, email: contact@mbtw.com, Internet: www.mbtw.com - Consultant: Bryon Patton & Ass., 160 Pears, Toronto, ON, M5R 3P8, (416) 960-6060 ________________ © CCD Data ________________ Commercial (2C - Retail Trade) www.BuildingNews.ca August 15, 2013, Page 8 of 28 Commercial FORT ERIE, Hamilton - Niagara Peninsula Project : LCBO, FORT ERIE RETAIL STORE RENOVATION (Update) --> 310 Garrison Rd., this project (LCBO*, Store #93) estimated at $735 000 has bids in and under review. It is slated to begin in August 2013 and should be completed in October 2013. Works concern renovation of a retail store. - Initiator/achitect: LCBO, 1 Yonge St., Ste. 1404, Toronto, ON, M5E 1E5, (416) 864-6390, Fax: (416) 8646388; MAIN CONTACT: Vince Laviola, Purchasing, vince.laviola@lcbo.com - Contractor: Verly Construction Group Inc., 1321 Matheson Blvd. E, Mississauga, ON, L4W 1R1, (519) 756-2306, Fax: (519) 756-0899; MAIN CONTACT: Ali Isaac, Project ManageR ________________ © CCD Data ________________ Commercial (2C - Retail Trade) HAMILTON, Hamilton - Niagara Peninsula Project : COMMERCIAL BUILDING, HAMILTON NEW COMMERCIAL BUILDING --> James St. N, this project has started pre-construction work. The project is slated to be completed in June 2014. The plan calls for the construction of a new 3-storey, 31 600 sqft commercial building with retail and office space, a rooftop garden and surface/underground parking. - Initiator: JACK BEUME, 100 James St. S., Ste. 105, Hamilton, ON, L8P 2Z2, (905) 525-5991, Fax: (905) 521-8981 ________________ © CCD Data ________________ Commercial (2C - Retail Trade) BARRIE, Kitchener - Waterloo - Barrie Prebid : PARK PLACE, AREA 1B - Initiator/contractor: NORTH AMERICAN DEVELOPMENT GROUP, 2851 John St., Ste. 1, Markham, ON, L3R 5R7, (905) 477-9200, Fax: (905) 477-7390 - Architect: Petroff Partnership Architects, 260 Town Centre Blvd., Markham, ON, L3R 8H8, (905) 4707000, Fax: (905) 470-7001 ________________ © CCD Data ________________ Commercial (2C - Retail Trade) CORNWALL, Ottawa Project : LCBO, CORNWALL RETAIL STORE RENOVATION --> 317 Pitt St., this project (LCBO*, Store #49) estimated at $666 000 is underway and should be completed October 2013. Works concern renovation of a retail store. - Initiator: LCBO, 1 Yonge St., Ste. 1404, Toronto, ON, M5E 1E5, (416) 864-6390, Fax: (416) 864-6388; MAIN CONTACT: Vince Laviola, Purchasing, vince.laviola@lcbo.com www.BuildingNews.ca August 15, 2013, Page 9 of 28 NEW COMMERCIAL BUILDINGS --> 100 Molson Park Dr., this project (Park Place, Area 1B) estimated at $43 910 000 is in the planning stage. Based on a surface of 280 923 sqft, spread on 6 structures, works concern construction of retail buildings. - Contractor: Verly Construction Group Inc., 1321 Matheson Blvd. E, Mississauga, ON, L4W 1R1, (519) 756-2306, Fax: (519) 756-0899; MAIN CONTACT: Ali Isaac, Project Manager ________________ © CCD Data ________________ Commercial (2C - Retail Trade) OTTAWA, Ottawa Prebid : INFINITI, OTTAWA NEW CAR DEALERSHIP --> 1800 Merivale Rd., this project (Infiniti*) estimated at $3 520 000 is in the planning stage, pending approvals. Based on a surface spread over 2 floors above grade, works concern construction of a new car dealership. - Architect: DAVID MAILING ARCHITECT INC., 1347 Stittsville, Ste. 1, Stittsville, ON, K2S 1C6, (613) 836-4040, Fax: (613) 836-4611; MAIN CONTACT: David Mailing, Architect, dmailing@canada.com - Consultant: Everest Engineering Ltd, 6861 Fallowfield Rd., Stittsville, ON, K2S 1B8, (613) 831-5454 ________________ © CCD Data ________________ Commercial (2C - Retail Trade) HALTON HILLS, Toronto Project : VINCE CAMUTO, HALTON HILLS - Initiator: CAMUTO GROUP, 141 W - 36th St., New York, NY, 100186906, (646) 699-2008, Internet: www.camutogroup.com; MAIN CONTACT: Juah Kong, Project Rep, juah.kong@camutogroup.com - Contractor: Construction One Inc., 3045 E - 5th Ave., Columbus, OH, 432192801, (614) 961-1117, Fax: (614) 961-1318 or (206) 339-3921, Internet: www.constructionone.com; MAIN CONTACT: Rob Brown, Estimating, rbrown@constructionone.com - Architect: Patrick G Blees Architect, 219 N - 2nd St., Ste. 301, Minneapolis, MN, 554011454, (612) 5471359, Fax: (612) 338-2995; MAIN CONTACT: Jesse Ludewig, Architect, jludewig@cmarch.com - Engineer mechanics/electricity: Spline Group, 219 - 7025 Tomken Rd., Mississauga, ON, L5S 1R6, (905) 497-8388, email: info@splinegroup.ca ________________ © CCD Data ________________ Commercial (2C - Retail Trade) TORONTO, Toronto Prebid : BIG BOX RETAIL FACILITY, 420 BATHURST, TORONTO NEW BIG BOX RETAIL FACILITY (Update) --> 420 Bathurst, this project estimated at $3 240 000 is in the preliminary drawings stage, with revised rezoning submitted. Based on a surface of 130 161 sqft, spread over 3 floors above grade, works concern construction of a new big box retail facility. - Initiator: RIOCAN REAL ESTATE INVESTMENT TRUST, 2300 Yonge St., SUITE, 500, PO Box 2386, Toronto, ON, M4P 1E4, (416) 864-6479, Fax: (416) 896-5638, email: inquiries@riocan.com ________________ © CCD Data ________________ Commercial (2D - Warehouses & Distribution Centers) www.BuildingNews.ca August 15, 2013, Page 10 of 28 RETAIL STORE TENANT RENOVATION (Update) --> 13850 Steeles Ave., this project (Vince Camuto*) estimated at $280 000 is in the drawings stage. It is slated to begin in October 2013. Works concern tenant interior renovations for a retail store. NORTH BAY, Northeastern Ontario Project : COMSATEC ENERGY MANAGMENT FIRM EXPANSION --> this project (Comsatec) is slated to expand an energy management fire within the next 12 months. - Initiator: COMSATEC INC., 61 High St. North, Callander, ON, P0H 1H0, (705) 752-4342, Fax: (705) 752-4800; MAIN CONTACTS: Paul Waqué, Controller, pamwaque@comsatec.com; Paul Waqué, Jr., Operations Mgr., pwaquejr@comsatec.com ________________ © CCD Data ________________ Commercial (2E - Hotel & Lodging) BURLINGTON, Hamilton - Niagara Peninsula Project : HOLIDAY INN, BURLINGTON HOTEL RENOVATION --> 3063 South Service Rd., this project (Holiday Inn*) estimated at $918 000 is underway and should be completed in November 2013. Works concern exterior renovation for a hotel. - Initiator: INTERCONTINENTAL HOTELS & RESORTS, Vendor Product Department POC, 3 Ravinia Dr., Ste. 100, Atlanta, GA, 303462118, (770) 604-2000, Fax: 770-604-5403, rwilliamson@ihg.com - Contractor: Compass Construction Resources Ltd, 2700 Dufferin St., Unit 77, Toronto, ON, M6B 4J3, (416) 789-9819, Fax: (416) 789-5087; MAIN CONTACT: Max Zhao Estimator - Architect: Hanson & Jung Architects Inc., 317 Adelaide St. W, Ste. 700, Toronto, ON, M5V 1P9, (416) 340-7373, Fax: (416) 340-1717, info@hjarchitects.com; MAIN CONTACT: Heidi Hanson, Architect ________________ © CCD Data ________________ Commercial NEW HOTEL (Update) --> Bay St., this project (Homewood Suites*) is underway and should be completed in October 2013. A grant totalling $875 619 and a loan for $8 896 486 have been approved by city council. Works concern construction of a new 15-storey, 400-guest hotel with 1 823 sqft of retail space on Bay St., an indoor pool, a fitness centre, a lounge and bar, 10 meeting rooms, and 110 parking stalls. Approx. 70 permanent jobs will be created. - Initiator: VRANCOR GROUP, 366 King St. W., Hamilton, ON, L8P 1B3, (905) 540-4800, Fax: (905) 540-4801, email: ptosh@vrancor.com, Internet: www.vrancor.com; MAIN CONTACTS: Olga Katsaros, Executive Assistant; Darko Vranich, Developer - Information: City of Hamilton, 71 Main St. W., 2nd Floor, Hamilton, ON, L8P 4Y5, (905) 546-2489, Fax: (905) 546-2546, Internet: www.hamilton.ca; MAIN CONTACTS: Brian McHattie, Councillor; Bernie Morelli, Councillor ________________ © CCD Data ________________ Institutional (3A - Education) HAMILTON, Hamilton - Niagara Peninsula Project : MCMASTER UNIVERSITY, HEALTH CAMPUS NEW UNIVERSITY CAMPUS (Update) www.BuildingNews.ca August 15, 2013, Page 11 of 28 (2E - Hotel & Lodging) HAMILTON, Hamilton - Niagara Peninsula Project : HOMEWOOD SUITES, HAMILTON --> Main St. & Bay St., this project (McMaster University, Health Campus) estimated at $84 600 000 is underway and should be completed in Fall 2014. Works concern construction of a new health campus with a clinic on the former Hamilton-Wentworth District School Board site. - Initiator: MCMASTER UNIVERSITY, 1280 Main St. W, Campus Service Building, Hamilton, ON, L8S, 4K1, (905) 525-9140, Fax: (905) 521-1504, Internet: www.mcmaster.ca; MAIN CONTACT: Gord Arbeau, Director of Public Relations ________________ © CCD Data ________________ Institutional (3A - Education) HAMILTON, Hamilton - Niagara Peninsula Prebid : REDEEMER UNIVERSITY COLLEGE COLLEGE CAMPUS EXPANSION (Update) --> 452 Springbrook Ave., this project (Redeemer University College) estimated at $5 550 000 is in the initial stage. Works concern expansion of a campus expansion. - Initiator: REDEEMER UNIVERSITY COLLEGE, 777 Garner Rd. E, Ancaster, ON, L9K 1J4, (905) 6482131, Fax: (905) 648-2134 ________________ © CCD Data ________________ Institutional (3A - Education) UNIVERSITY CAMPUS IMPROVEMENTS --> this project (Western University, Don Wright Faculty of Music) estimated at $25 000 000 is underway and should be completed in Winter 2015. The Initiator will provide 80% and 20% will come through fundraising. The plan calls for improvements to existing buildings plus construction of a new building, including a new 5-storey tower in the courtyard space between the east wing of the Music Building and Talbot College with practice rooms, teaching space, studios and piano technology space; renovation of the east wing of the Music Building; reconstruction of the main recital hall and some classroom space; demolition of the west wing of the Music Building; acoustical improvements to the von Kuster Hall; new seminar rooms and classrooms; and a new smaller recital hall and rehearsal spaces. For more information, please refer to the following Web site: music.uwo.ca/resources/renovations . - Initiator: WESTERN UNIVERSITY, 1151 Richmond St., London, ON, N6A 3K7, (519) 661-2111, Internet: www.uwo.ca; MAIN CONTACT: Betty Anne Younker, Music Dean - Architect: Nicholson Sheffield Architects, 358 Talbot St., London, ON, N6A 2R6, (519) 673-1190, Fax: (519) 673-1490, email: info@nicholsonsheffield.ca; MAIN CONTACT: John Nicholson ________________ © CCD Data ________________ Institutional (3A - Education) NORTH YORK, Toronto Prebid : LASSONDE SCHOOL OF ENGINEERING NEW EDUCATIONAL BUILDING (Update) --> 4700 Keele St., this project (Lassonde School of Engineering) estimated at $25 950 000 is in the drawings stage. Based on a surface of 168 618 sqft, spread over 6 floors, works concern construction of a new educational building. www.BuildingNews.ca August 15, 2013, Page 12 of 28 LONDON, London Project : WESTERN UNIVERSITY, DON WRIGHT FACULTY OF MUSIC - Initiator: YORK UNIVERSITY, 4700 Keele St., Toronto, ON, M3J 1P3, (416) 736-2100, Fax: (416) 7365381 - Architect: RMJM Hillier Architecture, 275 - 7th Ave., 24th Floor, New York, NY, 10001, (212) 629-4100, Fax: (212) 629-4487 - Architect: ZAS Architect, 517 Wellington St. W., Ste. 404, Toronto, ON, M5V 1G1, (416) 979-9834, Fax: (416) 979-3763, email: info@zasa.com - Consultant: Arup Canada Inc., 2 Bloor St. E., Ste. 2400, Toronto, ON, M4W 1A8, (416) 515-0915, Fax: (416) 515-1635, email: toronto@arup.com ________________ © CCD Data ________________ Institutional (3A - Education) NORTH YORK, Toronto Prebid : ST. JOSEPH'S MORROW PARK SECONDARY SCHOOL NEW SCHOOL --> 500 Cummer Ave., this project (St. Joseph's Morrow Park Secondary School) estimated at $17 400 000 is in the initial stage. Works concern construction of a new secondary school. - Initiator: TORONTO CATHOLIC DISTRICT SCHOOL BOARD, 80 Sheppard Ave. E., North York, ON, M2N 6E8, (416) 222-8282, Fax: (416) 229-5345 ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) BURLINGTON, Hamilton - Niagara Peninsula Prebid : BURLINGTON EXECUTIVE AIRPORT - Initiator: VINCE ROSSI, Burlington Air Park Inc., 5342 Bell School Line, Burlington, ON, L7M 0P1, (905) 331-0075, email: info@burlingtonairpark.com; MAIN CONTACTS: Tim Crawford, Executive Advisor - Information: Transport Canada, 330 rue Sparks, Ottawa, ON, K1A 0N5, (613) 990-2309, Fax: (613) 9544731, (613) 998-8620, email: CommentairesWeb@tc.gc.ca, Internet: www.tc.gc.ca ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) HAMILTON, Hamilton - Niagara Peninsula Project : TIM HORTONS FIELD NEW STADIUM --> this project (Tim Hortons Field) estimated at $147 500 000 is underway and should be completed in time for the 2015 Pan Am Games. Works concern construction of a new 22 500-seat stadium on the former Ivor Wynne Stadium site. - Information: INFRASTRUCTURE ONTARIO, 777 Bay St., 9th Floor, Toronto, ON, M5G 2C8, (416) 212-7289, Fax: (416) 325-4646, email: info@infrastructureontario.ca, Internet: www.infrastructureontario.ca; MAIN CONTACT: Terence Foran, Project Communications Advisor - Information: Hamilton Tiger-Cats, 1 Jarvis St., Hamilton, ON, L8R 3J2, (905) 547-2287, Fax: (905) 5478423, email: customerservice@ticats.ca, Internet: www.ticats.ca www.BuildingNews.ca August 15, 2013, Page 13 of 28 AIRPORT EXPANSION --> this project (Burlington Executive Airport) has been proposed but some approvals are pending. The plan calls for the expansion of an existing airport, including a new terminal, 30 to 40 new hangars, a paved west taxiway to the north-south runway, and 2 road connections to Appleby Line. ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) THOROLD, Hamilton - Niagara Peninsula Prebid : C. OF THOROLD, FIRE STATION 1 NEW FIRE STATION --> this project (Fire Station 1) estimated at $930 000 is in the initial stage. Works concern construction of a fire station. - Initiator: CITY OF THOROLD, 3540 Schmon Parkway, PO Box 1044, Thorold, ON, L2V 4A7, (905) 227-6613, Fax: (905) 227-5590 ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) ORILLIA, Kitchener - Waterloo - Barrie Project : C. OF ORILLIA, FIRE HALL NEW FIRE HALL (Update) --> 500 Gill St., this project estimated at $1 880 000 is in the initial stage. It is slated to begin in November 2013 and should be completed in October 2014. Based on a surface of 22 034 sqft, spread over 2 floors, works concern construction of a building for the fire hall. - Initiator: CITY OF ORILLIA, 50 Andrew St. South, Orillia, ON, L3V 7T5, (705) 325-1311, Fax: (705) 325-5178 - Contractor: Greystone Project Management, 8 Crescent Rd., Unit A1, Huntsville, ON, P1H 0B3, (705) 789-1418, Fax: (705) 789-8543, email: greystone@greystoneconstruction.ca - Architect: Thomas Brown Architect Inc., 394 King St. E, Toronto, ON, M5A 1K9, (416) 364-5710, Fax: (416) 364-4662 ________________ © CCD Data ________________ (3B - Municipal & Governmental Buildings) LONDON, London Project : ELGIN-MIDDLESEX DETENTION CENTRE JAIL IMPROVEMENTS --> this project (Elgin-Middlesex Detention Centre) is underway. Works concern improvements to a jail. - Initiator: GOVERNMENT OF ONTARIO, 7 Wellesley St. W, Ferguson Block, 3rd Floor, Toronto, ON, M7A 1Z8, (416) 327-9200, Internet: www.mto.gov.on.ca ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) HALIBURTON COUNTY, Muskoka - Kawarthas Project : MINISTRY OF NATURAL RESOURCES NEW FIRE MANAGEMENT HEADQUARTERS FOR AIRPORT --> this project (Ministry of Natural Resources) estimated at $12 200 000 is slated to construct a new 17 800 sqft fire management headquarters for an airport facility and to be completed by spring 2015. This project will have a shipping and receiving area, parking and an apron for 2 helicopters and 2 places. www.BuildingNews.ca August 15, 2013, Page 14 of 28 Institutional - Initiator: MINISTRY OF NATURAL RESOURCES, PO Box 120, Haliburton, ON, K0M 1S0, (705) 4572107, Fax: (705) 457-1884; MAIN CONTACT: Chris Cuthbertson, Supervisor, chris.cuthbertson@ontario.ca ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) SAULT STE. MARIE, Northeastern Ontario Prebid : ART GALLERY OF ALGOMA ART GALLERY EXPANSION --> 10 East St., this project (Art Gallery of Algoma) estimated at $4 229 000 is in the initial stage. Based on a surface of 15 423 sqft, works concern expansion of an art gallery. - Initiator: ART GALLERY OF ALGOMA, 10 East St., Sault Ste. Marie, ON, P6A 3C3, (705) 949-9067 ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) SUDBURY, Northeastern Ontario Prebid : C. OF GREATER SUDBURY, COMMUNITY ARENA ARENA RENOVATION --> 230 Elgin St., this project (Sudbury Community Arena) estimated at $388 000 is in the initial stage. Works concern washroom retrofits for an arena. - Initiator: THE CITY OF GREATER SUDBURY, 200 Brady St., PO Box 5000, Station A, Sudbury, ON, P3A 5P3, (705) 671-2489, Fax: (705) 673-5171 ________________ © CCD Data ________________ Institutional GOVERNMENT OFFICE BUILDINGS & BRIDGES UPGRADES --> this project estimated at $264 000 is in the initial stage. Works concern upgrades to government office buildings and upgrades to bridges. - Initiator: MUNICIPALITY OF TEMAGAMI, 7 Lakeshore Dr., PO Box 220, Temagami, ON, P0H 2H0, (705) 569-3421, Fax: (705) 569-2834 ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) THUNDER BAY, Northwestern Ontario Project : C. OF THUNDER BAY, BUS STOPS BUS STOPS IMPROVEMENTS --> this project is slated to be completed by 2018. The plan calls for improvements to bus stops, including 50 new shelters, better sidewalk access and installation of benches and garbage containers. - Initiator: CITY OF THUNDER BAY, 111 Syndicate Ave. S, PO Box 800, Thunder Bay, ON, P7C 5K4, (807) 625-2252, Fax: (807) 622-0181 www.BuildingNews.ca August 15, 2013, Page 15 of 28 (3B - Municipal & Governmental Buildings) TEMAGAMI, Northeastern Ontario Prebid : ROAD STRUCTURE: GOVERNMENT OFFICE BUILDINGS & BRIDGES, MUN. OF TEMAGAMI - Information: Thunder Bay Transit, 500 Donald St. E., PO Box 800, Thunder Bay, ON, P7C 5K4, (807) 625-2230; MAIN CONTACT: Brad Loroff, Transit Manager ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) ETOBICOKE, Toronto Prebid : C. OF TORONTO, FRANKLIN CARMICHAEL ART CENTRE CULTURAL ARTS CENTRE EXPANSION & RENOVATION (Update) --> 34 Riverdale Dr., this project (Franklin Carmichael Art Centre) estimated at $1 508 000 is in the initial stage. Based on a surface of 460 sqft, spread over 2 floors, works concern expansion and renovation of a cultural arts centre. - Initiator: CITY OF TORONTO, Clerk Department, 100 Queen St. W, Main Floor, Toronto, ON, M5H 2N2, (416) 338-0338, Fax: (416) 338-0685, email: citybids@toronto.ca - Initiator: CITY OF TORONTO, 100 Queen St. W., City Hall, Toronto, ON, M5H 2N2, (416) 338-0338, Fax: (416) 392-2980 - Architect: Kongats Architects, 80 Spadina Ave., Ste. 302, Toronto, ON, M5V 2J3, (416) 504-8998, Fax: (416) 504-6556, email: office@kongatsarchitect.com - Coordinator: Franklin Carmichael Art Group, 34 Riverdale Dr., Etobicoke, ON, M9V 2T3, (416) 7406520, Fax: (416) 740-3344 - Consultant: Quality Performance Ass., 4161 Dundas St. W, Toronto, ON, M8X 1Y2, (416) 234-1833, Fax: (416) 236-7604 ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) TORONTO, Toronto Project : SPADINA-YORK SUBWAY LINE - Initiator: TORONTO TRANSIT COMMISSION (TTC), 5160 Yonge St., 6th Floor, North York, ON, M2N 6L9, (416) 393-4000, Fax: (416) 338-0121 ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) TORONTO, Toronto Project : EGLINTON CROSSTOWN & SCARBOROUGH LRT LINES NEW LIGHT RAIL TRANSIT LINES --> this project (Eglinton Crosstown & Scarborough LRT Lines) estimated at $6 700 000 000 is in the early stages of construction. A Request for Proposals (RFP) should be issued by Fall 2013. Works concern construction of 2 new light rail transit (LRT) lines with up to 32 stations and stops, tunnels, elevated sections, signals, and a storage facility. - Initiator: METROLINX, 20 Bay St., Ste. 901, Toronto, ON, M5J 2N8, (416) 874-5900, Fax: (416) 8745901, Internet: www.metrolinx.com - Initiator: INFRASTRUCTURE ONTARIO, 777 Bay St., 9th Floor, Toronto, ON, M5G 2C8, (416) 2127289, Fax: (416) 325-4646, email: info@infrastructureontario.ca, Internet: www.infrastructureontario.ca; MAIN CONTACT: Paulette den Elzen, Spokesperson www.BuildingNews.ca August 15, 2013, Page 16 of 28 SUBWAY LINE EXTENSION --> this project (Spadina-York Subway Line) estimated at $2 600 000 000 is underway. Works concern the extension of a subway line, including 7 new stations. ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) TORONTO, Toronto Project : LIGHT RAIL TRANSIT LINE, TORONTO LIGHT RAIL TRANSIT LINE EXTENSION --> this project is expected to receive $1 800 000 000 in funding from the provincial government. The plan calls for the extension of a light rail transit line. The 9.9-km line will include 7 stations. - Initiator: METROLINX, 20 Bay St., Ste. 901, Toronto, ON, M5J 2N8, (416) 874-5900, Fax: (416) 8745901, Internet: www.metrolinx.com - Initiator: CITY OF TORONTO, 100 Queen St. W., Main Floor, Toronto, ON, M5H 2N2, (416) 338-0338, Fax: (416) 338-0685, Internet: www.toronto.ca; MAIN CONTACTS: Adam Vaughan, Councillor; Joe Pennachetti, City Manager ________________ © CCD Data ________________ Institutional (3B - Municipal & Governmental Buildings) TORONTO, Toronto Project : C. OF TORONTO, BLOOR-DANFORTH LINE SUBWAY LINE EXTENSION (Update) --> this project (Bloor-Danforth Line) estimated at $1 100 000 000 was approved by city council but funding from the provincial and federal governments has yet to be secured. The plan calls for the extension of a subway line to Scarborough Town Centre. The 7.6-km line will run north and east with 3 stations continuing to Sheppard Ave. E. - Initiator: CITY OF TORONTO, 100 Queen St. W., Main Floor, Toronto, ON, M5H 2N2, (416) 338-0338, Fax: (416) 338-0685, Internet: www.toronto.ca; MAIN CONTACTS: Adam Vaughan, Councillor; Joe Pennachetti, City Manager; Karen Stintz, Councillor (Ward 16) & Chair of the Toronto Transit Commission - Initiator: METROLINX, 20 Bay St., Ste. 901, Toronto, ON, M5J 2N8, (416) 874-5900, Fax: (416) 8745901, Internet: www.metrolinx.com Institutional (3B - Municipal & Governmental Buildings) TORONTO, Toronto Project : FORENSIC SERVICES & CORONER'S COMPLEX NEW FACILITY (Update) --> Keele St. & Morton Shulman Ave., this project (Forensic Services & Coroner's Complex) estimated at $1 000 000 000 is underway and should be completed by Fall 2013. Works concern construction of a new 538 213 sqft, 5-storey police facility with 1 underground floor, 2 courtrooms and several autopsy rooms. It will serve as headquarters for the Ontario Forensic Pathology Service, the Office of the Chief Coroner and the Centre of Forensic Sciences. It was designed to meet LEED Gold standards. - Initiator: INFRASTRUCTURE ONTARIO, 777 Bay St., 9th Floor, Toronto, ON, M5G 2C8, (416) 2127289, Fax: (416) 325-4646, email: info@infrastructureontario.ca, Internet: www.infrastructureontario.ca; MAIN CONTACT: Terence Foran, Project Mgr., eric.gilmore@infrastructureontario.ca - Contractor (design-build): Carillion Canada, 7077 Keele St., 4th Floor, Concord, ON, L4K 0B6, (905) 532-5200, Internet: www.carillion.ca; MAIN CONTACT: Matt Ainley, Chief Construction Mgr., mainley@carillion.ca www.BuildingNews.ca August 15, 2013, Page 17 of 28 ________________ © CCD Data ________________ - Architect: WZMH Architects, 95 St. Clair Ave. W, Ste. 1500, Toronto, ON, M4V 1N6, (416) 961-4111, Fax: (416) 961-3176, Internet: www.wzmh.com - Architect: SmithGroup, 455 N Third St., Ste. 250, Phoenix, AZ, 85004, (602) 265-2200, Fax: (602) 2652244; POTENTIAL CONTACT: Mike Mount, Project Mgr., mike.mount@smithgroup.com - Information: Government of Ontario, Ministry of Community Safety & Correctional Services, 25 Grosvenor St., 18th Floor, Toronto, ON, M7A 1Y6, (416) 326-5000 or 1-866-517-0571, Fax: (416) 3260498, email: jus.g.sgcs.webmaster@ontario.ca, Internet: www.mcscs.jus.gov.on.ca; MAIN CONTACT: Tony Brown, (416) 314-7772 ________________ © CCD Data ________________ Institutional (3D - Day Cares) NORTH BAY, Northeastern Ontario Prebid : DAYCARE CENTRE, 312 GREENWOOD AVE., NORTH BAY NEW DAYCARE CENTRE --> 312 Greenwood Ave., this project estimated at $500 000 is in the preliminary drawings stage, pending council approvals. Works concern construction of a new daycare centre with 25 parking spaces. - Initiator: GREENWOOD AVENUE BAPTIST CHURCH, 312 Greenwood Ave., North Bay, ON, P1B 5G4, (705) 474-0448, Fax: (705) 478-0954, email: contactus@greenwoodbaptist.ca, Internet: www.greenwoodbaptist.ca; MAIN CONTACT: Tim Hawman, Lead Pastor ________________ © CCD Data ________________ Residential (4A - Condominiums) ETOBICOKE, Toronto Project : WESTWOOD CONDOMINIUMS - Initiator: ALTERRA GROUP, 920 Yonge St., Ste. 1000, Toronto, ON, M4C 3C7, (416) 964-1800, Fax: (416) 964-7257, email: info@alterra.com - Architect: EI Richmond Architects, 243 College St., Second Floor, Toronto, ON, M5T 1R5, (416) 9611567, Fax: (416) 961-1321, email: info@eirichmond.com, Internet: www.eirichmond.com ________________ © CCD Data ________________ Residential (4A - Condominiums) NORTH YORK, Toronto Project : NY2 NEW CONDOMINIUM BUILDING --> Sheppard Ave., this project (NY2) is underway and should be completed in Summer 2014. Works concern construction of a new 7-storey, 140-unit condominium with a Wi-Fi café lounge, a fitness room, an indoor/outdoor rooftop party room, and outdoor gardening plots. - Initiator: THE DANIELS CORP., 20 Queen St. W, Ste. 340, 0, Box 50, Toronto, ON, M5H 3R3, (416) 598-2129, Fax: (416) 979-0415 - Architect: Core Architects, 317 Adelaide St. W, Ste. 600, Toronto, ON, M5V 1P9, (416) 343-0400, Fax: (416) 343-0401, email: info@corearchitects.com ________________ © CCD Data ________________ www.BuildingNews.ca August 15, 2013, Page 18 of 28 NEW CONDOMINIUM BUILDING --> this project (Westwood Condominiums) is underway. Works concern construction of a new 6-storey condominium building near Islington Subway Station. Residential (4A - Condominiums) SCARBOROUGH, Toronto Prebid : IMAGINE CONDOS NEW CONDOMINIUM BUILDING --> Kennedy Rd., this project (Imagine Condos) estimated at $9 690 000 is in the drawings stage with sales and marketing underway. Based on a surface spread over 4 floors, works concern construction of a 92-unit condominium building. For more information please refer to the following Web site: www.imaginecondos.com . - Initiator: INSOHO DEVELOPMENTS, 35 Alvin Ave., Toronto, ON, M4T 2A7, (416) 920-8880, Fax: (416) 920-8900 - Architect: Ken Fukushima Architecture Inc., 3300 Bloor St. W, Ste. 3140, Toronto, ON, M8X 2X3, (416) 628-5153, Fax: (416) 207-2071 ________________ © CCD Data ________________ Residential (4A - Condominiums) TORONTO, Toronto Project : IVORY ON ADELAIDE - Initiator: PLAZA, 110 - 527 Queen St., Fredericton, NB, E3B 1B8, (506) 451-1826, Fax: (506) 451-1802, email: info@plaza.ca, Internet: www.plaza.ca - Initiator: PLAZA, 10 Wanless Ave., Ste. 201, Toronto, ON, M4N 1V6, (647) 341-1731, Fax: (647) 3411761, email: info@plazacorp.com, Internet: www.pureplaza.com; MAIN CONTACT: Scott McLellan, Senior VP - Architect: Hariri Pontarini Architects, 602 King St. W., Toronto, ON, M5V 1M6, (416) 929-4901, Fax: (416) 929-8924, email: info@hp-arch.com - Interior Designer: Bryon Patton & Ass. Ltd, 160 Pears Ave., Ste. 414, Toronto, ON, M5R 2T2, (416) 9606060, Fax: (416) 960-2007 - Information: City of Toronto, 100 Queen St. W., Main Floor, Toronto, ON, M5H 2N2, (416) 338-0338, Fax: (416) 338-0685, Internet: www.toronto.ca - Information: Ivory on Adelaide, Sales Centre, 406 Adelaide St. E., Toronto, ON, (416) 862-0888, Internet: www.pureplaza.com ________________ © CCD Data ________________ Residential (4A - Condominiums) TORONTO, Toronto Project : HOWARD PARK CONDOS NEW CONDOMINIUM BUILDING --> Howard Park Ave., this project (Howard Park Condos) is slated to begin in 2013. The plan calls for the construction of a new 8-storey condominium building in the Roncesvalles Ave. and Dundas St. W area, including demolition of a building. - Initiator: TRIUMP DEVELOPMENT, 640 National City Blvd, National City, CA, (619) 477-4199 www.BuildingNews.ca August 15, 2013, Page 19 of 28 NEW CONDOMINIUM TOWER (Update) --> 400 Adelaide St. E., this project (Ivory on Adelaide) is underway and should be completed in 2014. Works concern construction of a new 22-storey condominium building in the St. Lawrence neighbourhood. It will feature 358 condominum suites, retail space at ground level, a reflecting pool, a fitness room, a party room, a guest suite, a barbecue area and a parking garage. - Architect: RAW Design, 317 Adelaide St. W, Unit 405, Toronto, ON, M5V 1P9, (416) 599-9729, Fax: (416) 599-7729, email: rrc@rawdesign.ca ________________ © CCD Data ________________ Residential (4A - Condominiums) TORONTO, Toronto Project : KARMA CONDOS NEW CONDOMINIUM UNITS (Update) --> 21 Grenville St. & College St. & Yonge, this project (Karma Condos) is underway and should be completed in 2015. Works concern construction of a new 495-unit, 50-storey condominium tower with ground level retail space, a fitness centre, a sauna, a steam room, a movie room, a games room, a 4-storey parking garage, and a rooftop terrace. It will include relocation and refurbishment of the John Irwin House at Grenville St. and St. Luke Lane. For more information, please refer to the following Web page: www.karmacondos.com . - Initiator: LIFETIME DEVELOPMENTS, 145 Davenport Rd., Ste. 200, Toronto, ON, M5R 1J1, (416) 987-3344, Fax: (416) 987-5566, email: info@lifetimedevelopments.com, Internet: http://lifetimedevelopments.com - Initiator: CENTRECOURT DEVELOPMENTS, 22 St. Clair Ave. E., Ste. 1010, Toronto, ON, M4T 2S3, (416) 324-5400, Internet: www.centrecourtdevelopments.com - Initiator: LIFETIME DEVELOPMENTS, 270 Drumlin Circle, Ste. 5, Concord, ON, L4K 3E2, (905) 7387850, Fax: (905) 738-7860, Internet: www.lifetimedevelopments.com - Architect: Architects Alliance, 205 - 317 Adelaide St. W., Toronto, ON, M5V 1P9, (416) 593-6500, Fax: (416) 593-4911, email: info@architectsalliance.com, Internet: www.architectsalliance.com; MAIN CONTACT: Rob Cadeau, Associate - Landscape Architect: Strybos Barron King, 5770 Hurontario St., Ste. 320, Mississauga, ON, L5R 3G5, (416) 695-4949, Fax: (905) 712-3101, email: ajohnston@stryboss.com - Interior Designer: Cecconi Simone, 1335 Dundas St. W., Toronto, ON, M6J 1Y3, (416) 588-5900, Fax: (416) 588-7424, email: info@cecconisimone.com ________________ © CCD Data ________________ (4A - Condominiums) TORONTO, Toronto Prebid : CONDOMINIUM BUILDING, 155 REDPATH AVE., TORONTO NEW CONDOMINIUM BUILDING --> 155 Redpath Ave., this project estimated at $33 000 000 is in the drawings stage. It is slated to be completed in October 2017. Based on a surface of 402 510 sqft, spread over 36 floors above grade, works concern construction of a 470-unit condominium building. - Initiator/promoter: FREED DEVELOPMENT LTD, 42 Dufflaw Rd., North York, ON, M6A 2W1, (416) 781-5699 - Architect: Architects Alliance, 317 Adelaide St. W, Ste. 205, Toronto, ON, M5V 1P9, (416) 593-6500 # 228, Fax: (416) 593-6500; MAIN CONTACTS: Peter Clewes, Partner, pclewes@architectsalliance.com; Mark Garber, Architect, mgarber@architectsalliance.com - Interior Designer: Johnson Chou, 1085 Woodbine Ave., Toronto, ON, M4C 4C2, (416) 703-6777, Fax: (416) 703-7009, email: mail@johnsonchou.com, Internet: www.johnsonchou.com ________________ © CCD Data ________________ Residential (4A - Condominiums) www.BuildingNews.ca August 15, 2013, Page 20 of 28 Residential TORONTO, Toronto Project : CUBE LOFTS NEW CONDOMINIUM BUILDING --> 799 College St. & Ossington, this project (Cube Lofts) is underway and the first residents are moving in. Works concern construction of a new 6-storey, 21-unit condominium building. - Initiator: NEILAS INC., 170 University Ave., Toronto, ON, M5H 3B3, (416) 506-1435, Internet: www.cubelofts.com - Interior Designer: Studio CK, 675 Cochrane Dr., East Tower, 6th Floor, Markham, ON, L3R 0B8, (905) 530-2276, Fax: (905) 530-2001, email: info@studiock.ca - Interior Designer: Houndstooth Interior Design, PO Box 125, 53 Main St., Route 517, Oldwick, NJ, 08858, (908) 669-4785, Fax: (908) 439-0089 - Consultant: Quadrangle, 380 Wellington St. W., Toronto, ON, M5V 1E3, (416) 598-1240, Fax: (416) 5983123, email: contactqal@quadrangle.ca, Internet: www.quadrangle.ca - Consultant: RAW, 12 Mercer St., Level 4, Toronto, ON, M5V 1H3, (416) 599-9729, Fax: (416) 599-7729, email: info@rawdesign.ca, Internet: www.rawdesign.ca ________________ © CCD Data ________________ Residential (4A - Condominiums) TORONTO, Toronto Project : FIVE CONDOS - Initiator: MOD, 8 Price St., Toronto, ON, M4W 1Z4, (416) 928-4133 or (416) 928-0555, Fax: (416) 9255022, Internet: www.moddevelopments.com; MAIN CONTACT: Gary Switzer, President - Initiator: GRAYWOOD, 200 King St. W., Ste. 1600, Toronto, ON, M5H 3T4, (416) 599-1930 or (416) 928-0555, Fax: (416) 928-0557, email: five@bakersales.info, Internet: www.fivecondos.ca - Initiator: FIVE ST. JOSEPH DEVELOPMENTS, 5 St. Joseph St., Toronto, ON, M4Y 1J6, (416) 9280555, Fax: (416) 928-0557, Internet: www.fivecondos.ca - Architect: Hariri Pontarini Architects, 245 Davenport Rd., 3rd Floor, Toronto, ON, M5R 1K1, (416) 9294901, Fax: (416) 929-8924, email: info@hp-arch.com, Internet: www.hariripontarini.com; MAIN CONTACT: David Pontarini, Architect - Architect: ERA Architects, 10 St. Mary St., Ste. 801, Toronto, ON, M4Y 1P9, (416) 963-4497, Fax: (416) 963-8761, email: info@era.on.ca, Internet: www.era.on.ca; MAIN CONTACT: Michael McClelland, Heritage Specialist - Landscape Architect: Janet Rosenberg, 148 Kenwood Ave, Toronto, ON, M6C 2S3, (416) 656-6665, Fax: (416) 656-5756, Internet: www.jrala.ca - Interior Designer: Cecconi Simone Interiors, 1335 Dundas St. W., Toronto, ON, M6J 1Y3, (416) 5885900, Fax: (416) 588-7424; MAIN CONTACT: Anna Simone, Interior Designer - Information: Five Condos, Sales Centre, 618 Yonge St., Toronto, ON, M4Y 1Z3, (416) 928-0555, Fax: (416) 928-0557 or (416) 928-0557, email: five@bakersales.info, Internet: www.fivecondos.ca ________________ © CCD Data ________________ www.BuildingNews.ca August 15, 2013, Page 21 of 28 NEW CONDOMINIUM TOWER (Update) --> St. Joseph St., this project (Five Condos) is underway and should be completed in March 2015. Works concern construction of a new 48-storey building north of Wellesley. It will feature 539 units, a piano bar/dining room, billiards room, cocktail lounge with bar and kitchen, TV lounge, party room, change/club rooms with wet and dry steam rooms, experience showers and private lounges, cardio and weight training studio, roof garden, outdoor dining and barbecue area, and an underground garage. The project also includes the restoration of half a block of 19th-century stores. Units ranging in size from 399 sqft to 1 683 sqft are planned. Residential (4A - Condominiums + 4B - Residential Development) TORONTO, Toronto Project : THE HUB' CONDOS NEW CONDOMINIUM DEVELOPMENT --> Eglinton Ave. W & Oakwood Ave., this project ('The Hub' Condos) has been proposed and renderings have been released. The plan calls for the construction of a new condominium development, including a 16storey tower and an 8-storey podium, a special demonstration kitchen, a gym and a yoga Pilates studio. - Initiator: EMPIRE COMMUNITIES, 123 Commerce Valley Dr. E., 8th Floor, Thornhill, ON, L3T 7W7 (905) 307-8102, Fax: (905) 307-8103, email: info@empirecommunities.com, Internet: www.empirecommunities.com - Architect: E.I. Richmond Architects, 243 College St., 2nd Floor, Toronto, ON, M5T 1R5, (416) 961-1567 #26, Fax: (416) 961-1321 ________________ © CCD Data ________________ Residential (4A - Condominiums + 4B - Residential Development) TORONTO, Toronto Prebid : THE NEST NEW CONDOMINIUM DEVELOPMENT --> 829 St. Clair Ave. W & Christie & Oakwood, this project (The Nest) has been proposed. Registrations are being taken for the building and city officials are reviewing an application for Site Plan Approval. The plan calls for the construction of a new 9-storey condominium development at the Residences of Hillcrest Village. - Initiator: THE ROCKPORT GROUP, 170 Donway W., Ste. 307, Don Mills, ON, M3C 2G3, (416) 4447391, Fax: (416) 445-4849; MAIN CONTACT: John Wilkinson, Spokesperson - Architect: RAW, 317 Adelaide St. W., Unit 405, Toronto, ON, M5V 1P9, (416) 599-9729, Fax: (416) 5997729, email: rrc@rawdesign.ca - Interior Designer: II by IV Design Ass., 77 Mowat Ave., Ste. 109, Toronto, ON, M6K 3E3, (416) 5312224 Residential (4A - Condominiums + 4B - Residential Development) TORONTO, Toronto Project : WATERLINK AT PIER 27 NEW CONDOMINIUM DEVELOPMENT (Update) --> Yonge & Queens Quay, this project (Waterlink at Pier 27) is underway. Works concern construction of a new condominium development near the Redpath Sugar refinery. It will include up to 4 x 11-storey buildings joined in 2 pairs each by 3-storey skybridges, with boat slips, a boardwalk, seating, trees, greenery and a swimming pool. - Initiator: CITYZEN DEVELOPMENTS, 56 The Esplanade, Ste. 301, Toronto, ON, M5E 1A7, (416) 7772489, email: info@cityzen.ca, Internet: www.cityzen.ca - Initiator: FERNBROOK HOMES, 2220 Highway 7 W., Unit 5, Concord, ON, L4K 1W7, (416) 667-0447, Fax: (416) 667-8747 - Architect: architectsAlliance, 205 - 317 Adelaide St. W., Toronto, ON, M5V 1P9, (416) 593-6500, Fax: (416) 593-4911, email: info@architectsalliance.com, Internet: www.architectsalliance.com ________________ © CCD Data ________________ www.BuildingNews.ca August 15, 2013, Page 22 of 28 ________________ © CCD Data ________________ Residential (4A - Condominiums + 4B - Residential Development + 4C - Multi Housing) KINGSTON, Kingston - Pembroke Prebid : RESIDENTIAL BUILDING, 363 JOHNSON ST., KINGSTON NEW RESIDENTIAL BUILDING (Update) --> 363 Johnson St., this project estimated at $8 121 000 is in the preliminary drawings stage with zoning approval underway. Based on a surface of 8 169 sqft, spread on 2 structures, over 3 floors above grade, works concern construction of a new residential building. - Initiator: FOTENN CONSULTANTS, The Woolen Mill, 4 Cataraqui St., Kingston, ON, K7K 1Z7, (613) 542-5454, Fax: (613) 730-1136, Internet: www.FoTenn; MAIN CONTACT: John Henderson, Planner - Architect: Hughes Downey Architects Inc., 230 Rideau St., Kingston, ON, K7K 3A4, (613) 544-9183, Fax: (613) 547-0852; MAIN CONTACT: Mikaela J Hughes, Architect, mikaela@hughesdownev.ca - Consultant: Abacus Archaeological Services, 598 Barnsley Cres., Kingston, ON, K7M 8X4, (613) 5307944; MAIN CONTACT: Michael Berry, Architect ________________ © CCD Data ________________ Residential (4A - Condominiums + 4C - Multi Housing) BURLINGTON, Hamilton - Niagara Peninsula Prebid : CONDOMINIUM BUILDING, 1284 GUELPH LINE, BURLINGTON - Initiator/promoter: ADI DEVELOPMENT GROUP, Burlington, ON, L7P 2W2, (905) 592-1140, Fax: (905) 592-1383, Internet: adidevelopments.com; MAIN CONTACT: Tariq Adi, Architect, tariq@adidevelopments.com - Architect: ICON Architects Inc., 5050 Dufferin St., Ste. 200, Toronto, ON, M3H 5T5, (416) 840-9279, Fax: (416) 650-9595; MAIN CONTACT: Reza Eslami, Architect, reza@iconarchitects.ca - Engineer structure: KO and Partners Ltd, 333 Dennison St., Unit 15, Markham, ON, L3R 2Z4, (905) 9409811, Fax: (905) 940-0128 - Engineer mechanics/electricity: B K Consulting, 793 College Manor Dr., Newmarket, ON, L3Y 8R4, (905) 773-0200 ________________ © CCD Data ________________ Residential (4A - Condominiums + 4C - Multi Housing) KINGSTON, Kingston - Pembroke Prebid : CONDOMINIUM BUILDING, 522 JOHNSON, KINGSTON NEW CONDOMINIUM BUILDING (Update) --> 522 Johnson, this project estimated at $1 920 000 is in the preliminary drawings stage, pending zoning approvals. Based on a surface of 1 823 sqft, spread over 3 floors above grade, works concern construction of a new 6-unit condominium building. - Intiator/architect/engineer: IBI GROUP, 650 Dalton Ave., Unit 110, Kingston, ON, K7M 8N7, (613) 5314440, Fax: (613) 531-7789; MAIN CONTACT: Kevin Kaufman, Project Mgr ________________ © CCD Data ________________ Residential (4A - Condominiums + 4C - Multi Housing) www.BuildingNews.ca August 15, 2013, Page 23 of 28 NEW CONDOMINIUM BUILDING --> 1284 Guelph Line, this project estimated at $6 750 000 has the plans complete, pending building permits. Based on a surface of 63 714 sqft, spread over 4 floors above grade, works concern construction of a 78-unit condominium building. KITCHENER, Kitchener - Waterloo - Barrie Prebid : CONDOMINIUM BUILDING, 325 MAX BECKER DR., KITCHENER NEW CONDOMINIUM BUILDING --> 325 Max Becker Dr., this project estimated at $2 200 000 is in the preliminary drawings stage. Based on a surface spread on 3 structures, over 4 floors above grade, works concern construction of a new condominium building. - Initiator/promoter: R B J SCHLEGEL HOLDINGS INC., 325 Max Becker Dr., Ste. 201, Kitchener, ON, N2E 4H5, (519) 571-1873, Fax: (519) 571-0947, email: dhastings@rbjschlegel.com ________________ © CCD Data ________________ Residential (4A - Condominiums + 4C - Multi Housing) BROCKVILLE, Ottawa Prebid : CONDOMINIUM & RETAIL BUILDING, BROCKVILLE NEW CONDOMINIUM & RETAIL BUILDING (Update) --> Water St., this project estimated at $8 775 000 is in the preliminary drawings stage, pending approvals. Based on a surface spread on 2 structures, over 9 floors above grade, works concern construction of a new 65 condominium unit and 16 retail unit. - Initiator/promoter/architect: BLOCKHOUSE SQUARE DEVELOPMENT LTD, 23 King St. W, Brockville, ON, K6V 5V1, (613) 342-3800, email: info@blockhousesquare.com Internet: www.blockhousesquare.com; MAIN CONTACTS: Carlos Canejo, Architect; Ken Kruk, Architect - Architect: Allen & Chui Architects Inc., 100 Sunrise Ave., Ste. 102, Toronto, ON, M4A 1B3, (416) 4620389, Fax: (416) 462-1954, info@ac-architects.com; MAIN CONTACT: David Chui, Partner ________________ © CCD Data ________________ Residential NEW CONDOMINIUM DEVELOPMENT (Update) --> Lakeshore Blvd. W., this project (Waterways) estimated at $17 280 000 is in the planning stage. Based on a surface spread on 3 structures, over 56 floors, works concern construction of a condominium development. - Initiator/contractor: THE CONSERVATORY GROUP, 90 Tiverton Crt, Ste. 200, Markham, ON, L3R 9V2, (416) 798-7236, Fax: (905) 474-9742 - Architect: E I Richmond Architects Ltd, 243 College St., 2nd Floor, Toronto, ON, M5T 1R5, (416) 9611567, Fax: (416) 961-1321, email: eirichmond@bellnet.ca ________________ © CCD Data ________________ Residential (4B - Residential Development) HAMILTON, Hamilton - Niagara Peninsula Project : STINSON LOFTS NEW RESIDENTIAL UNITS --> 211 Stinson St., this project (Stinson Lofts) is underway with occupancy scheduled for September or October 2013. Works concern redevelopment of a former school building. - Initiator: HARRY STINSON, info@stinsonschool.com 200 Stinson St., Hamilton, ON, (289) 389-1377, email: www.BuildingNews.ca August 15, 2013, Page 24 of 28 (4A - Condominiums + 4C - Multi Housing) ETOBICOKE, Toronto Prebid : WATERWAYS ________________ © CCD Data ________________ Residential (4B - Residential Development) HAMILTON, Hamilton - Niagara Peninsula Project : DUNDAS DISTRICT LOFTS NEW RESIDENTIAL DEVELOPMENT --> 397 King St. W., Dundas, this project (Dundas District Lofts) is underway and should be completed in Spring 2014. Works concern construction of a 44-unit loft building in the former Dundas District School building. - Initiator: DAVE & MIKE VALVASORIS , 397 King St. W, Dundas, ON, L9H 1W1, (289) 238-8686 ________________ © CCD Data ________________ Residential (4B - Residential Development) NIAGARA FALLS, Hamilton - Niagara Peninsula Prebid : TOWNHOUSES, 6570 FREDERICA ST., NIAGARA FALLS NEW TOWNHOUSES --> 6570 Frederica St., this project estimated at $7 350 000 is in the preliminary drawings stage, pending approvals. It is slated to begin in 2014. Based on a surface of 57 239 sqft, spread on 7 structures, works concern construction of 40 townhouse units. - Initiator/promoter: ALFIDOME CONSTRUCTION LTD, 1701 Thorold Townline Rd., Niagara Falls, ON, L2E 6S5, (905) 371-1701, Fax: (905) 371-1744; MAIN CONTACT: Eric Henry, PM, eh.alfidome@lastmilenet.ca ________________ © CCD Data ________________ Residential NEW MIXED-USE COMPLEX --> this project estimated at $9 100 000 will receive $6 000 000 in funding from the municipal and provincial governments. Phase 1 is underway and it should be completed in 2014. A fundraising campaign is also underway. Works concern construction of a new mixed-use complex. The first phase involves the development of a 3-storey building which will replace the Initiator's current office at 108 Sydney St. S It will provide life skills training, employment counselling, social activities and exposure to horticulture and the arts. The new facility, fronting Ottawa St. S., is being built directly behind the current structure. The old building at 108 Sydney St. S will be demolished to make way for a 22-unit residential complex overlooking Rockway Golf course which will house a mix of adults with developmental disabilities and low-income residents. - Initiator: K-W HABILITATION, 108 Sydney St. S., Kitchener, ON, N2G 3V2, (519) 744-6307, email: generalinquiries@kwhab.ca; MAIN CONTACT: Ann Bilodeau, Executive Director - Information: Region of Waterloo, 150 Frederick St., Kitchener, ON, N2G 4J3, (519) 575-4400, Internet: www.region.waterloo.on.ca; MAIN CONTACT: Deb Schlichter, Director of Housing ________________ © CCD Data ________________ Residential LONDON, London (4B - Residential Development) www.BuildingNews.ca August 15, 2013, Page 25 of 28 (4B - Residential Development) KITCHENER, Kitchener - Waterloo - Barrie Project : MIXED-USE COMPLEX, KITCHENER Prebid : JACOB'S RIDGE NEW TOWNHOUSES --> 1010 Fanshawe Park Rd. E, this project (Jacob's Ridge) estimated at $4 100 000 is in the planning stage. Based on a surface spread over 2 floors, works concern construction of 30 townhouse units. - Initiator/designer: REMBRANDT HOMES, 1560 N Routledge Park, London, ON, N6H 5L6, (519) 6571200, Fax: (519) 473-9850 - Contractor: Westmar Construction, 1560 Routledge Park N., London, ON, N6H 5L6, (519) 657-1200, Fax: (519) 473-9850 ________________ © CCD Data ________________ Residential (4B - Residential Development) NORTH BAY, Northeastern Ontario Prebid : HOUSING DEVELOPMENT, NORTH BAY NEW HOUSING DEVELOPMENT --> this project has been proposed and a public meeting took place. It will be presented to city council on August 12, 2013. The plan calls for the construction of a new 48-unit housing development on the Scollard St. Civic hospital site. It will include 11 single detached homes, 8 semi-detached, 17 townhouse condominiums and approx. 12 vacant land condominiums. - Initiator: ARG DEVCO INC., 76 Loach's Rd., Sudbury, ON, P3E 2P7, (705) 522-9444; MAIN CONTACT: Celia Teale, Development Manager - Consultant: Miller & Urso Surveying Inc., 1501 Seymour St., North Bay, ON, P1A 0C5, (705) 474-1210, Fax: (705) 474-1783; MAIN CONTACT: Rick Miller - Information: City of North Bay, 200 McIntyre St. E., PO Box 360, North Bay, ON, P1B 8H8, (705) 4740400, (800) 465-1882, email: info@cityofNorthBay.ca, Internet: www.city.north-bay.on.ca; MAIN CONTACTS: Dave Mendicino, Chair, Community Services Committee; Bev Hillier, Manager of Planning Services; Peter Carello, Senior Planner ________________ © CCD Data ________________ (4B - Residential Development) OTTAWA, Ottawa Prebid : TOWNHOUSE, BLOCK 1, OTTAWA NEW TOWNHOUSE DEVELOPMENT --> Meadowglen Dr., this project (Townhouse, Block 1) estimated at $1 888 000 is in the planning stage, pending zoning approvals. Based on a surface spread over 3 floors above grade, works concern construction of 8 townhouse units. - Initiator/promoter: DOMICILE DEVELOPMENTS, 371-A Richmond Rd., Ste. 1, 2nd Floor, Ottawa, ON, K2A 0E7, (613) 728-0388, Fax: (613) 728-0046, email: contactus@domicile.ca, Internet: www.domicile.on.ca; MAIN CONTACT: David Chick, Administration - Architect: Douglas Hardie Architects Inc., 311 Richmond Rd., Ste. 301, Ottawa, ON, K1Z 6X3, (613) 792-3200, Fax: (613) 792-3209; MAIN CONTACT: Douglas Hardie, Architect, dhardie@hardiearchitects.ca - Consultant: FoTenn Consultants Inc., 223 McLeod St., Ottawa, ON, K2P 0Z8, (613) 231-4733, Internet: www.fotenn.com; MAIN CONTACT: Miguel Tremblay, Consultant ________________ © CCD Data ________________ Residential (4B - Residential Development) www.BuildingNews.ca August 15, 2013, Page 26 of 28 Residential OTTAWA, Ottawa Prebid : COMMERCIAL & RESIDENTIAL DEVELOPMENT, OTTAWA NEW COMMERCIAL & RESIDENTIAL DEVELOPMENT --> this project estimated at $35 400 000 is in the preliminary drawings stage, pending development land acquisition and approvals. Works concern construction of a new commercial and residential development consisting of hotel, restaurants, condominiums and commercial space. - Initiator/promoter: WINDMILL DEVELOPMENT GROUP, 1749 Woodward Dr., Nepean, ON, K2C 0P9, (613) 820-5600, Internet: www.windmilldevelopments.com; MAIN CONTACT: Jeff Westeinde, Cofounder, jonathan@windmilldevelopments.com ________________ © CCD Data ________________ Residential (4B - Residential Development) TORONTO, Toronto Project : 36HAZELTON NEW RESIDENTIAL COMPLEX --> Bloor-Yorkville, this project (36Hazelton) is underway and should be completed in 2014. Works concern construction of a new 7-storey, 19-unit residential complex with a billiard rooms, a gymnasium, dog grooming spaces, a private carwash station and private terraces. The former St. Basil's Catholic School façade will be preserved. ________________ © CCD Data ________________ Residential (4C - Multi Housing) GUELPH, Kitchener - Waterloo - Barrie Project : APARTMENT BUILDING, 89 RAYMOND ST., GUELPH APARTMENT BUILDING IMPROVEMENTS --> 89 Raymond St., this project is slated to begin in October 2013 and be completed 6 to 8 weeks later. The plan calls for improvements to an apartment building, including a new elevator. - Initiator: GUELPH CITY REALTY, 147 Wyndham St. N., Ste 401, Guelph, ON, N1H 4E9, (519) 8214610, Fax: (519) 822-6821, email: admin@guelphcityrealty.ca; MAIN CONTACT: Kristyn Robins, Property Manager - Consultant: OTIS, 1402 - 20 Eglinton Ave. W, PO Box 2040, Toronto, ON, M4R 1K8, (416) 489-2833, Fax: (416) 486-6017, email: markeplett@rogers.com, Connecticut; MAIN CONTACT: Jeremy Katz, Spokesperson - Information: City of Guelph, 59 Carden St., Guelph, ON, N1H 3A1, (519) 822-1260, (519) 826-9771, email: info@guelph.ca, Internet: http://guelph.ca www.BuildingNews.ca August 15, 2013, Page 27 of 28 - Initiator: ALTERRA GROUP OF COMPANIES, 920 Yonge St., Ste. 1000, Toronto, ON, M4C 3C7, (416) 964-1800, Fax: (416) 964-7257, email: info@alterra.com - Initiator: ZINC DEVELOPMENTS, 1459 Pearl St. S, Denver, CO 80210, (720) 890-1900 - Architect: Goldsmith Borgal & Company Architects, 410 Adelaide St. W., Ste. 500, Toronto, ON, M5V 1S8, (416) 929 6556, Fax: (416) 929-4745, email: office@gbca.ca - Architect: Quadrangle Architects, 901 King St. W., Ste. 701, Toronto, ON, M5V 3H5, (416) 598-1240, Fax: (416) 598-3123, email: contact@quadrangle.ca - Landscape Architect: Ronald Holbrook & Ass. Landscape Architects, 483 Dupont St., Ste. 101, Toronto, ON, M6G 1Y6, (416) 924-8165, Fax: (416) 924-7164, email: info@ronaldholbrook.com - Interior Designer: Union31, 183 Bathurst, Ste. 201, Toronto, ON, M5T 2R7, (416) 597-1576, Fax: (416) 597-2139, email: info@designdg.com ________________ © CCD Data ________________ Residential (4C - Multi Housing) OTTAWA, Ottawa Prebid : UNIVERSITY OF OTTAWA, HENDERSON RESIDENCE NEW STUDENT RESIDENCE --> 206 Henderson Ave. & Templeton St., this project (University of Ottawa, Henderson Residence) estimated at $12 000 000 is seeking Expressions of Interest (EOI) from architectural firms. The plan calls for the construction of a new 165-bed student residence by August 1, 2015. - Initiator: UNIVERSITY OF OTTAWA, 141 Louis Pasteur St., Ottawa, ON, K1N 6N5, (613) 562-5800, Fax: (613) 562-5182, Internet: www.uottawa.ca - Information: City of Ottawa, 110 Laurier Ave. W, Ottawa, ON, K1P 1J1, (613) 580-2400 or 1-866-2619799, Fax: (613) 580-2495, Internet: ottawa.ca ________________ © CCD Data ________________ Residential (4C - Multi Housing) TORONTO, Toronto Prebid : APARTMENT BUILDING, 33 HOLLY ST., TORONTO NEW APARTMENT BUILDING --> 33 Holly St., this project estimated at $10 350 000 is in the drawings stage. Based on a surface spread over 6 floors, works concern construction of new rental apartment building. - Initiator: SHIPLAKE MANAGEMENT COMPANY, 20 Eglinton Ave. W, Ste. 1700, Toronto, ON, M4R 2H1, (416) 322-4001, Fax: (416) 482-1508 - Architect: Quadrangle Architects, 901 King St. W, Ste. 701, Toronto, ON, M5V 3H5, (416) 598-1240, Fax: (416) 598-3123, email: contact@quadrangle.ca ________________ © CCD Data ________________ (4C - Multi Housing + 4D - Elderly & Specialized Residences) OTTAWA, Ottawa Prebid : VIVA RETIREMENT HOME NEW RETIREMENT HOME --> 275 Tartan Dr., this project (Viva Retirement Home) estimated at $18 960 000 is in the preliminary drawings stage with geotechnical studies, pending approvals. Based on a surface spread over 5 floors above grade, works concern construction of a 145-unit retirement home with on-site parking. - Initiator: VIVA RETIREMENT LIVING CORP., 3845 Bathurst St., Ste. 206, Toronto, ON, M3H 3N2, (416) 256-5675, monica@vivalife.ca, Internet: www.vivalife.ca; MAIN CONTACT: Monica Dashwood, Director Development - Engineer: Novatech Engineering Consultants Ltd, 240 Michael Copland Dr., Ste. 200, Ottawa, ON, K2M 1P6, (613) 254-9643, Fax: (613) 254-5867, email: novainfo@novatech-eng.com, Internet: www.novatecheng.com; MAIN CONTACT: Drew Blair, Project Engineer - Contractor: Inspec-sol Inc., 1225 Gardiners Rd., Unit 104, Kingston, ON, K7P 0G3, (613) 389-9812, Fax: (613) 389-5287; MAIN CONTACT: Joseph Bennett, VP www.BuildingNews.ca August 15, 2013, Page 28 of 28 Residential