REMEGIO E. CARAMIHAN Address Mobile # : Bangga Aton, Brgy. Zone-2,Talisay City Negros Occidental, Philippines : +639391452486 : +639065169349 Email address : remegiocaramihan_1964@yahoo.com Position Applied : PIPING SUPERVISOR WORKING EXPERIENCES: Employer : Bechtel International Inc. Company Address Position Inclusive date Project : : : : Soyo Zaire Province, Republic of Angola Pipe Fitter General Foreman December 23, 2008 up to September 20, 2011 Angola LNG Project Duties and responsibilities: With proper coordination to American, British and Filipino supervisor prior for work plan schedule of assignment. Prepared reference drawing Planning and work scheduling as per priority line/area Prepared materials and equipment. Prepared manpower grouping and work schedule distribution Conducted daily tool box/safety meeting and discuss prior to safety, quality and quantity. Supervised and assist to each crew doing fabrication, erection and installation works of above and underground a 5 kilometer long diesel temporary pipe lines from kuanda base going to diesel tank area and distribution line from diesel tank area going to power block. (Temporary generator power supply) and also going to diesel fuel filling station. Supervised and assist to each crew doing fabrication, erection and installation work of above ground piping works at the cryogenic ISBL area as per priority line from 01R cryo main pipe rack going to different area such as follows: a) 01J g) 1TC-1421 Page 1 of 11 b) 01N c) 01F d) 01B e) 01D f) 01A Line checked and monitoring for every prior to quality of works and work target schedule. Supervised and assist to each crew doing punch list activities. Supervised and assist to each crew doing restoration activities. Supervised and assist to each day shift and night shift crew doing air blowing activities. Monitored and checked every blow path as per unit and line system prior for inspection and acceptance by the ALNG client. Employer Company Address Position Inclusive date Project h) 1TC-1411 i) 1TC-1621 j) 1TC-1611 : : : : : Bechtel / ENKA Joint Venture LLP, Senimdi Kurylys Tengiz, Kazakhstan Pipe Fitter Foreman July 13, 2006 up to February 13, 2008 TENGIZ CHEVROIL SECOND GENERATION GAS DEVELOPMENT PROJECT Duties and Responsibilities: With proper coordination to (Filipino, Turkish & American) piping supervisor regarding work schedule. Prepared reference drawing. .Prepared manpower and work schedule distribution as per line/area priority. Conducted daily tool box meeting and discuss prior to safety. Quality and quantity. Supervised and assist to each group doing Piping and Pipe support fabrication, erection and installation activities. Test package distribution, punch list activities for category A prior to hydro test, category B and C to complete line prior for commissioning in the whole crude and Gas area. Supervised and assist to each group doing site fabrication activities for missing spools replacement and line modification as per actual installation activities. Supervised and monitored all workable and non-workable lines relevant to the installed, equipment and available material for category A punch list clearing prior for hydro testing activities.. Conducted inspection with client as per test package for acceptance. Also involved piping alignment (parallelism) activities for steam turbine (ST-701) nozzle pipe line : Flange Connection: SH - 1038 – 6”x 1500lbs. supply line SH - 1039 – 6”x 1500lbs. supply line SH - 1280 – 16”x 300lbs. discharge line Gas Compressor (GC-701) Nozzle Pipe Line Flange Connection : GE – 1030 – 14”x 600lbs. discharge line Page 2 of 11 GE – 1022 – 20”x 600lbs. suction line Steam Turbine (ST-740) Nozzle Pipe Line Flange Connection : SH – 1019 – 6” x 1500lbs. supply line SH – 1281 – 16”x 300lbs. discharge line Employer Company Address Position Inclusive date Project : : : : : GAMA ENDUSTRI TESESLERI IMALAT ve MONTAJ A.S Prigorodnoye, Korsakov, Sakhalin , Russia Piping Supervisor September 26, 2005 to January 18, 2006 SAKHALIN II LNG PROJECT Duties and Responsibilities: With proper coordination to Piping Superintendent/Engineer regarding of work scheduling Prepared reference drawing. Supervised and assigned work schedule for different piping activities Conducted daily tool box meeting before commence the work activity Supervised and assist to each group doing Piping and Pipe supports fabrication, erection and installation activities. Supervised and execute some repair works caused by radiographic rejection Supervised and assigned a team for test package punch A & B to be cleared Prior to hydro test activities. Supervised and monitor daily progress of daily task. Employer Company Address Position Exclusive Date Project : : : : : HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD Assaluyeh, Islamic Republic of Iran Piping Foreman January 29, 2004 to Nov.30,2005 AONE PROJECT, South Pars Field Development (Phase 4 &5) Onshore Gas Plant Facilities Duties and Responsibilities: With proper coordination to ( Filipino &Korean ) piping supervisor regarding work schedule Prepared reference drawing. Prepared materials, tools and equipment. Prepared manpower grouping and work schedule distribution as per priority line/area. Conducted daily tool box/safety meeting discuss prior to safety, quality and quantity. Supervised and assist to each group doing fabrication of temporary spools, flanges and manifold for air blowing test, hydro test and pneumatic test preparation activities. Page 3 of 11 Supervised and assist to each group doing air blowing test, hydro test and pneumatic test activities to above and underground pipe lines to the following area as follows: 101 Train 1 & 2 113 Train 1 & 2 107 Train 1 & 2 8 Train 1 & 2 147 LPG Flare Gas Treating Caustic Regeneration NGL Fractionation Sulfur Recovery and Sulfurine Propane Storage and Export/Refrigeration and Assigned work schedule each work group as per test package. Prepared in line & work out material/equipment for site hydro/pneumatic test requirement. Conducted pipeline inspection prior of hydro/pneumatic test to assure that all removable items such as control valve instrument etc. would be out from line. Supervised and assist to each group doing air blowing test, hydro test and pneumatic test activities. With proper coordination to client ENI &Hyundai inspector for witnessing air blowing test, hydro test & pneumatic test activities for acceptance. Conducted air drying after hydro testing especially stainless pipe until to re-instatement of items. Hyundai Responsible in taking up two(2) water sample before and after the hydro test of all stainless steel pipe line for chemical water analysis as per inspection procedure and witnessed QC Inspector. Supervised and monitored daily progress for daily task. Employer Company Address Position Exclusive Date Project : : : : : HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD Kuwait City Piping Foreman November 20, 2002 to November 27, 2003 Kuwait National Petroleum Company, New Oil Pier Project Duties and Responsibilities: With Proper coordination to Korean supervisor regarding work schedule of upper deck and below deck of the platform piping activities which covered of different areas: LP#1 Loading Plat form #1 LP#2 Loading Plat form #2 LP#3 Loading Plat form #3 LP#4 Loading Plat form #4 LP#8 Loading Plat form #8 Prepared reference drawing (general arrangement drawing, isometric drawing and piping & instrument drawing) which covered of different areas. Men grouping and conducted daily tool box meeting before work schedule distribution. Materials, equipment & tools preparation and assigned work schedule to each work group with relevant upper & below deck piping activities as per pipe line priorities. Conducted daily tool box/safety meeting and discuss prior to safety, quality and quantity. Prepared hot and cold work permit (permit receiver) for different working areas. Page 4 of 11 Supervised and assist to each group doing Piping and Pipe supports fabrication, erection and installation activities. Supervised and assist to each group doing modification works & as-built on modified pipe line activities. Conducted walk down on pipe line for category “A” punch clearing prior for hydro test. Conducted walk down on the pipe line for category “B” & “C” punch clearing to complete the line Supervised and assist to each group doing punch list activities. Supervised and assist to each group doing reinstatement activities.. Coordinated to KNPC inspector for welding joint’s inspection prior for painting works. Supervisory and monitored daily progress of daily task. Employer Company Address Position Exclusive Date Project : : : : : HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD Assaluyeh , Islamic Republic of Iran Piping Foreman June 09, 2001 to Sept. 24, 2001 STAS PROJECT Total south Pars Field Development (Phase 2& 3) Onshore Gas Plant Facilities Duties and responsibilities With proper coordination to Korean supervisor regarding of work schedule of above ground piping at Unit 101-1, 102-1, 103-1, 104-1 and 105-1. Unit 101 Train 1 Gas treating area piping activities. Prepared reference drawing (general arrangement drawing, isometric drawing, piping and instrument drawing, etc.) relevant to above ground piping activities Prepared materials, tools and .equipment. Conducted daily tool box meeting before work schedule distribution. Prepared manpower grouping and work schedule distribution as per pipe line priorities Supervised and assist to each group doing Piping and Pipe supports fabrication, erection and installation activities. Supervisory and assist to each group doing punch list activities. Supervisory and assist to each group doing reinstatement activities. Monitored of all workable & non workable line relevant the installed, equipment & available material for category “A” punch clearing prior to hydro test. Supervised and monitored daily progress of daily task. Employer Company Address Position Exclusive Date Project : : : : : MOHAMMAD AL-MOJIL GROUP Jubail, Kingdom of Saudi Arabia Assistant Piping Supervisor Sept. 09, 1999 to June 30, 2000 Sharq 1 & 2 Polyethylene Debottlenecking Project Page 5 of 11 Duties and Responsibilities: With proper coordination to Filipino and Japanese (AMC/MHI) supervisor with relevant work schedule which covered the entire feletizing building from ground floor to 4th floor piping activities. Prepared reference drawing (general arrangement drawing, isometric drawing and piping and instrument drawing) relevant to piping and equipment in feletizing area. Conducted daily tool box meeting before work schedule distribution. Men grouping and assigned work schedule to each work group as per pipe line priorities. Prepared materials, tools and equipment, issued to each work group and distribution to different level of the feletizing building. Prepared daily hot and cold permit (permit receiver) issuance for every activities would be done entire feletizing building. Supervised and assist to each group doing Piping and Pipe supports fabrication, erection and installation activities. Monitored of all workable & non workable line relevant the installed equipment & available material. Supervisory and assist to each group doing punch list activities. Supervisory and assist to each group doing reinstatement activities. Main contractor Arabian Mitsubishi Company / Mitsubishi Heavy Industries Ltd. (AMC/MHI) appointed to handle all additional works which covered the entire project as task force team. Supervised and monitored daily progress of daily task. Employer : ELECTRODYNAMICS Company Address Position Exclusive Date Project : : : : 12 Banner st. Green valley village, Pasig city Philippines Piping Foreman October 17, 1997 to July 30, 1999 Republic Asahi Glass Corp. Expansion Project CONSTRUCTION & DEVELOPMENT, INC. Duties and Responsibilities: With proper coordination to our supervisor regarding schedule of piping works which covers our area of assignments Prepared reference drawing Prepared materials, tools and equipment. Prepared manpower grouping and work schedule distribution as per priority line/area. Conducted daily tool box/safety meeting and discuss prior to safety, quality and quantity. Supervised and assist to each group doing Piping and Pipe supports fabrication. Erection and installation activities. Supervised and assist to each group doing punch list activities. Supervised and assist to each group doing reinstatement activities. Supervised and monitored daily progress of daily task. Page 6 of 11 Employer Company Address Position Exclusive Date Project : : : : : LAUT / AOC SDN. BHD Brunei, Darussalam Marker Fitter June 23,1997to Aug.25 1997 Brunei Shell Petroleum Co. (Offshore) Duties and Responsibilities: With proper coordination to our Supervisor relevant daily work schedule on Platform piping activities Prepared reference drawing.. Prepared tools, equipment & materials to be used for daily work schedule. Fabricating and installation of pipeline as per isometric drawing. Cut and removed all of damage and rejected pipe line and equipment as per work of scope. Involve also of several test like hydro test and pneumatic etc. Employer Company Address Position Exclusive Date Project : : : : : HYUNDAI DOZ (M) SDN. BHD. Bintulu, Malaysia Piping Foreman May 19, 1994 to April 26, 1995 MLNG DUA Plant Project Duties and Responsibilities: With proper coordination to Korean supervisor regarding schedule of above ground piping works which covered to different Unit E, F, & G at module 5 areas. Prepared reference drawing (general arrangement drawing, piping, instrument & isometric drawing) which covered of module 5 area Prepared materials, tools and equipment.. Prepared manpower grouping and work schedule distribution as per priority line/area. Conducted tool box/safety meeting and discuss prior safety, quality and quantity. Assigned work schedule for different unit to each work group (fabrication, erection and installation etc.) relevant above ground piping activities. Conducted pipe line inspection for category “A” punch clearing prior for hydro test. Supervised and assist to each group doing punch list activities. Supervised and assist to each group doing reinstatement activities. Involved commissioning works & assist to the vendor. Supervised and monitored daily progress to daily task. Page 7 of 11 Employer Company Address Position Exclusive Date Project : : : : : KOBE STEEL NIGERIA LTD. NNPC Eleme Petrochemical Complex Port Harcourt, Nigeria Piping Lead man Sept.13,1993 to April 18,1994 Polyethylene and Butane – 1 Plant Duties and Responsibilities: With proper coordination to Japanese foreman & supervisor regarding work schedule of boiler A, B & C piping activities. Prepared reference drawing. Prepared materials, tools and equipment. Assigned work schedule to each work member prior to pipe line schedule. Fabrication, erection and installation of the pipe line from boiler to the pipe rack as per isometric drawing. Punch list and reinstatement activities. Employer Company Address Position Exclusive Date Project : : : : : ADVANCE TECHNOLOGY CONSTRUCTION CO. LTD. Jubail, Kingdom of Saudi Arabia Pipe Fitter Nov.26,1992 to June 10,1993 Sharq Petrochemical Plant Expansion Project Duties and Responsibilities: With proper coordination to Japanese foreman & supervisor regarding work schedule. Prepared tools, equipment and materials. Fabricating and installation of pipeline, from the unit going to pipe rack (process area). Involved hydro test and pipe pig cleaning activities. Employer Company Address Position Exclusive Date Project : : : : : SANKO ENGINEERING CORPORATION Republic of Yemen Pipe Fitter Aug.07,1991 to Aug.07,1992 MAFRAQ Cement Plant Project Duties and Responsibilities: With proper coordination to Filipino foreman & Japanese supervisor regarding work schedule. Page 8 of 11 Prepared reference drawing. Prepared tools, equipment and materials. Fabricating and installing the vertical stabilized tank with diameter of 6 meter and 55 meter long, including pipe line and ducting going to pre-heater. Fabricating and installing ducting pipe, 90° degrees elbow with 2 meter diameter from drop fan # 1 going to EP and main drop fan # 1 going to smoke stock. Fabricating and installing pipeline which covered a silo and packing house area. Fabricating and installing of 2 meter diameter ducting pipe from main drop fan # 2 going to raw mill. Employer : Company Address Position Exclusive Date Project : : : : FIRST FARMER & MARKETING COOPERATIVE ASSOCIATION, INC. Talisay City Negros Occidental Philippines Welder Aug.04,1989 to Feb.17,1990 First Farmer Sugar Milling Expansion Project Duties and Responsibilities: Tacking and full welding of 400 meter long overhead conveyor structure for sugar bagged carrier. Tacking and full welding of receiver tank and structures for raw sugar liquid materials. Tacking and full welding of coal conveyor structures and chutes for coal materials supplied to furnace. Tacking and full welding of baggage shade structures. Employer Company Address Position Exclusive Date Project : : : : : ENGINEER FILICITO O. TAN San Carlos City Negros Occidental Philippines Pipe Fitter Jan.03,1979 to Feb.15,1983 San Carlos City Sugar Milling Company Expansion Project Duties and Responsibilities: With proper coordination to foreman and supervisor regarding work schedule. Prepared reference drawing (general arrangement drawing and isometric drawing etc.). Prepared tools, equipment and materials. Fabricate & installed pipe line as per isometric drawing. Punch list and reinstatement activities. Involved hydro test activities. Page 9 of 11 PERSONAL INFORMATION: Name Home Address : : REMEGIO E. CARAMIHAN Bangga Aton, Brgy. Zone-2, Talisay, Negros Occidental Philippines Mobile no. : : +639391452486 +639065169349 Email address Date of Birth Place of Birth Sex Nationality Passport number : : : : : : remegiocaramihan_1964@yahoo.com February 18, 1964 Calatrava, Negros Occidental Male Filipino EB4848272 EDUCATIOANL ATTAINMENT: Primary : Tigbon Elementary School (SY- 1970 to 1976) Secondary : Leonor Institute Foundation (SY- 1976 to 1980) College : Paglaum State College (SY- 1986 to 1988) TRAINING & SEMINARS: 1. BECHTEL OIL GAS & CHEMICALS ANGOLA LNG PROJECT Foreman and General Foreman Training, July 12 to 16, 2010 Supervisory Training, October 05 to 09, 2010 2. TCO – PFD Training Center, Tengiz, Kazakhstan, January 14, 2008 Cultural Awareness Training Course 3. Asia Pacific Training Center (Philippines-1992) Fire Fighting Personal Survival Techniques First Aid at Sea Survival Craft (Lifeboat Man) 4. Megamas Training Company Sdn. Bhd. (Malaysia-1995) Offshore Safety and Survival Course Page 10 of 11 5 Bruwell Valve & Fitting Sdn. Bhd. Swagelok Co. (Brunei-1995) Safety Seminar. 6. Eastern Petrochemical Company (Jubail, Saudi Arabia-2000) Safety Authorization, received work permit 7. Kuwait National Petroleum Company (Kuwait City-2003) Work permit executor Reference Person : 1) Cedric Villegas = Bechtel Sub-Contracts Administrator Bechtel LNG Soyo, Angola Project. 2) Rommiel Idanan = Bechtel Piping Engineer Bechtel LNG Soyo Angola Project. 3) Noel Nerosa = Bechtel Piping QC. Second Generation Tengiz Kazakhstan Project. 4) Eduardo Domingo = Bechtel Piping Superintendent Bechtel NLG Soyo Angola Project. 5) Arnold Tubeo = Bechtel Electrical Engineer Bechtel LNG Soyo, Angola Project. 6) Desiderio Sababan jr. = Bechtel Piping Supervisor Bechtel NLG Soyo, Angola Project 7) Richard Chan = ALNG Safety Supervisor ALNG Soyo, Angola Project 8) Wilmar Yap = Petrofac Piping Supervisor 9) Edwin Delapena = Construction Piping/Mechanical Superintendent KCOI – Kazakhstan Project. 10) Welson Hona = Piping Supervisor, Tengiz,Chevroil Second Generation Gas Development Project Tengiz, Kazakhstan. I hereby certify that the above information are true and correct the best of my knowledge and belief. Remegio E. Caramihan Page 11 of 11