REMEGIO E. CARAMIHAN
Address
Mobile #
: Bangga Aton, Brgy. Zone-2,Talisay City Negros Occidental, Philippines
: +639391452486
: +639065169349
Email address
: remegiocaramihan_1964@yahoo.com
Position Applied
: PIPING SUPERVISOR
WORKING EXPERIENCES:
Employer
:
Bechtel International Inc.
Company Address
Position
Inclusive date
Project
:
:
:
:
Soyo Zaire Province, Republic of Angola
Pipe Fitter General Foreman
December 23, 2008 up to September 20, 2011
Angola LNG Project
Duties and responsibilities:
 With proper coordination to American, British and Filipino supervisor prior for work plan
schedule of assignment.
 Prepared reference drawing
 Planning and work scheduling as per priority line/area
 Prepared materials and equipment.
 Prepared manpower grouping and work schedule distribution
 Conducted daily tool box/safety meeting and discuss prior to safety, quality and quantity.
 Supervised and assist to each crew doing fabrication, erection and installation works of
above and underground a 5 kilometer long diesel temporary pipe lines from kuanda base
going to diesel tank area and distribution line from diesel tank area going to power block.
(Temporary generator power supply) and also going to diesel fuel filling station.
 Supervised and assist to each crew doing fabrication, erection and installation work of
above ground piping works at the cryogenic ISBL area as per priority line from 01R cryo
main pipe rack going to different area such as follows:
 a) 01J
g) 1TC-1421
Page 1 of 11





b) 01N
c) 01F
d) 01B
e) 01D
f) 01A





Line checked and monitoring for every prior to quality of works and work target schedule.
Supervised and assist to each crew doing punch list activities.
Supervised and assist to each crew doing restoration activities.
Supervised and assist to each day shift and night shift crew doing air blowing activities.
Monitored and checked every blow path as per unit and line system prior for inspection
and acceptance by the ALNG client.
Employer
Company Address
Position
Inclusive date
Project
h) 1TC-1411
i) 1TC-1621
j) 1TC-1611
:
:
:
:
:
Bechtel / ENKA Joint Venture LLP, Senimdi Kurylys
Tengiz, Kazakhstan
Pipe Fitter Foreman
July 13, 2006 up to February 13, 2008
TENGIZ CHEVROIL SECOND GENERATION GAS
DEVELOPMENT PROJECT
Duties and Responsibilities:
 With proper coordination to (Filipino, Turkish & American) piping supervisor regarding
work schedule.
 Prepared reference drawing.
 .Prepared manpower and work schedule distribution as per line/area priority.
 Conducted daily tool box meeting and discuss prior to safety. Quality and quantity.
 Supervised and assist to each group doing Piping and Pipe support fabrication, erection
and installation activities.
 Test package distribution, punch list activities for category A prior to hydro test, category B
and C to complete line prior for commissioning in the whole crude and Gas area.
 Supervised and assist to each group doing site fabrication activities for missing spools
replacement and line modification as per actual installation activities.
 Supervised and monitored all workable and non-workable lines relevant to the installed,
equipment and available material for category A punch list clearing prior for hydro testing
activities..
 Conducted inspection with client as per test package for acceptance.
 Also involved piping alignment (parallelism) activities for steam turbine (ST-701) nozzle
pipe line :
Flange Connection:
SH - 1038 – 6”x 1500lbs. supply line
SH - 1039 – 6”x 1500lbs. supply line
SH - 1280 – 16”x 300lbs. discharge line
Gas Compressor (GC-701) Nozzle Pipe Line Flange Connection :
GE – 1030 – 14”x 600lbs. discharge line
Page 2 of 11
GE – 1022 – 20”x 600lbs. suction line
Steam Turbine (ST-740) Nozzle Pipe Line Flange Connection :
SH – 1019 – 6” x 1500lbs. supply line
SH – 1281 – 16”x 300lbs. discharge line
Employer
Company Address
Position
Inclusive date
Project
:
:
:
:
:
GAMA ENDUSTRI TESESLERI IMALAT ve MONTAJ A.S
Prigorodnoye, Korsakov, Sakhalin , Russia
Piping Supervisor
September 26, 2005 to January 18, 2006
SAKHALIN II LNG PROJECT
Duties and Responsibilities:





With proper coordination to Piping Superintendent/Engineer regarding of work scheduling
Prepared reference drawing.
Supervised and assigned work schedule for different piping activities
Conducted daily tool box meeting before commence the work activity
Supervised and assist to each group doing Piping and Pipe supports fabrication, erection
and installation activities.
 Supervised and execute some repair works caused by radiographic rejection
 Supervised and assigned a team for test package punch A & B to be cleared
Prior to hydro test activities.
 Supervised and monitor daily progress of daily task.
Employer
Company Address
Position
Exclusive Date
Project
:
:
:
:
:
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD
Assaluyeh, Islamic Republic of Iran
Piping Foreman
January 29, 2004 to Nov.30,2005
AONE PROJECT, South Pars Field Development (Phase 4 &5)
Onshore Gas Plant Facilities
Duties and Responsibilities:






With proper coordination to ( Filipino &Korean ) piping supervisor regarding work schedule
Prepared reference drawing.
Prepared materials, tools and equipment.
Prepared manpower grouping and work schedule distribution as per priority line/area.
Conducted daily tool box/safety meeting discuss prior to safety, quality and quantity.
Supervised and assist to each group doing fabrication of temporary spools, flanges and
manifold for air blowing test, hydro test and pneumatic test preparation activities.
Page 3 of 11
 Supervised and assist to each group doing air blowing test, hydro test and pneumatic test
activities to above and underground pipe lines to the following area as follows:





101 Train 1 & 2 113 Train 1 & 2 107 Train 1 & 2 8 Train 1 & 2
147
LPG Flare
Gas Treating
Caustic Regeneration
NGL Fractionation
Sulfur Recovery and Sulfurine
Propane Storage and Export/Refrigeration and
 Assigned work schedule each work group as per test package.
 Prepared in line & work out material/equipment for site hydro/pneumatic test requirement.
 Conducted pipeline inspection prior of hydro/pneumatic test to assure that all removable
items such as control valve instrument etc. would be out from line.
 Supervised and assist to each group doing air blowing test, hydro test and pneumatic test
activities.
 With proper coordination to client ENI &Hyundai inspector for witnessing air blowing test,
hydro test & pneumatic test activities for acceptance.
 Conducted air drying after hydro testing especially stainless pipe until to re-instatement of
items.
 Hyundai Responsible in taking up two(2) water sample before and after the hydro test of
all stainless steel pipe line for chemical water analysis as per inspection procedure and
witnessed QC Inspector.
 Supervised and monitored daily progress for daily task.
Employer
Company Address
Position
Exclusive Date
Project
:
:
:
:
:
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD
Kuwait City
Piping Foreman
November 20, 2002 to November 27, 2003
Kuwait National Petroleum Company, New Oil Pier Project
Duties and Responsibilities:
 With Proper coordination to Korean supervisor regarding work schedule of upper deck and
below deck of the platform piping activities which covered of different areas:
 LP#1 Loading Plat form #1
 LP#2 Loading Plat form #2
 LP#3 Loading Plat form #3
 LP#4 Loading Plat form #4
 LP#8 Loading Plat form #8
 Prepared reference drawing (general arrangement drawing, isometric drawing and piping
& instrument drawing) which covered of different areas.
 Men grouping and conducted daily tool box meeting before work schedule distribution.
 Materials, equipment & tools preparation and assigned work schedule to each work group
with relevant upper & below deck piping activities as per pipe line priorities.
 Conducted daily tool box/safety meeting and discuss prior to safety, quality and quantity.
 Prepared hot and cold work permit (permit receiver) for different working areas.
Page 4 of 11
 Supervised and assist to each group doing Piping and Pipe supports fabrication, erection
and installation activities.
 Supervised and assist to each group doing modification works & as-built on modified pipe
line activities.
 Conducted walk down on pipe line for category “A” punch clearing prior for hydro test.
 Conducted walk down on the pipe line for category “B” & “C” punch clearing to complete
the line
 Supervised and assist to each group doing punch list activities.
 Supervised and assist to each group doing reinstatement activities..
 Coordinated to KNPC inspector for welding joint’s inspection prior for painting works.
 Supervisory and monitored daily progress of daily task.
Employer
Company Address
Position
Exclusive Date
Project
:
:
:
:
:
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD
Assaluyeh , Islamic Republic of Iran
Piping Foreman
June 09, 2001 to Sept. 24, 2001
STAS PROJECT Total south Pars Field Development (Phase 2& 3)
Onshore Gas Plant Facilities
Duties and responsibilities
 With proper coordination to Korean supervisor regarding of work schedule of above
ground piping at Unit 101-1, 102-1, 103-1, 104-1 and 105-1. Unit 101 Train 1 Gas treating
area piping activities.
 Prepared reference drawing (general arrangement drawing, isometric drawing, piping and
instrument drawing, etc.) relevant to above ground piping activities
 Prepared materials, tools and .equipment.
 Conducted daily tool box meeting before work schedule distribution.
 Prepared manpower grouping and work schedule distribution as per pipe line priorities
 Supervised and assist to each group doing Piping and Pipe supports fabrication, erection
and installation activities.
 Supervisory and assist to each group doing punch list activities.
 Supervisory and assist to each group doing reinstatement activities.
 Monitored of all workable & non workable line relevant the installed, equipment & available
material for category “A” punch clearing prior to hydro test.
 Supervised and monitored daily progress of daily task.
Employer
Company Address
Position
Exclusive Date
Project
:
:
:
:
:
MOHAMMAD AL-MOJIL GROUP
Jubail, Kingdom of Saudi Arabia
Assistant Piping Supervisor
Sept. 09, 1999 to June 30, 2000
Sharq 1 & 2 Polyethylene Debottlenecking Project
Page 5 of 11
Duties and Responsibilities:
 With proper coordination to Filipino and Japanese (AMC/MHI) supervisor with relevant











work schedule which covered the entire feletizing building from ground floor to 4th floor
piping activities.
Prepared reference drawing (general arrangement drawing, isometric drawing and piping
and instrument drawing) relevant to piping and equipment in feletizing area.
Conducted daily tool box meeting before work schedule distribution.
Men grouping and assigned work schedule to each work group as per pipe line priorities.
Prepared materials, tools and equipment, issued to each work group and distribution to
different level of the feletizing building.
Prepared daily hot and cold permit (permit receiver) issuance for every activities would
be done entire feletizing building.
Supervised and assist to each group doing Piping and Pipe supports fabrication, erection
and installation activities.
Monitored of all workable & non workable line relevant the installed equipment & available
material.
Supervisory and assist to each group doing punch list activities.
Supervisory and assist to each group doing reinstatement activities.
Main contractor Arabian Mitsubishi Company / Mitsubishi Heavy Industries Ltd.
(AMC/MHI) appointed to handle all additional works which covered the entire project as
task force team.
Supervised and monitored daily progress of daily task.
Employer
:
ELECTRODYNAMICS
Company Address
Position
Exclusive Date
Project
:
:
:
:
12 Banner st. Green valley village, Pasig city Philippines
Piping Foreman
October 17, 1997 to July 30, 1999
Republic Asahi Glass Corp. Expansion Project
CONSTRUCTION
&
DEVELOPMENT,
INC.
Duties and Responsibilities:
 With proper coordination to our supervisor regarding schedule of piping works which
covers our area of assignments
 Prepared reference drawing
 Prepared materials, tools and equipment.
 Prepared manpower grouping and work schedule distribution as per priority line/area.
 Conducted daily tool box/safety meeting and discuss prior to safety, quality and quantity.
 Supervised and assist to each group doing Piping and Pipe supports fabrication. Erection
and installation activities.
 Supervised and assist to each group doing punch list activities.
 Supervised and assist to each group doing reinstatement activities.
 Supervised and monitored daily progress of daily task.
Page 6 of 11
Employer
Company Address
Position
Exclusive Date
Project
:
:
:
:
:
LAUT / AOC SDN. BHD
Brunei, Darussalam
Marker Fitter
June 23,1997to Aug.25 1997
Brunei Shell Petroleum Co. (Offshore)
Duties and Responsibilities:
 With proper coordination to our Supervisor relevant daily work schedule on Platform piping
activities
 Prepared reference drawing..
 Prepared tools, equipment & materials to be used for daily work schedule.
 Fabricating and installation of pipeline as per isometric drawing.
 Cut and removed all of damage and rejected pipe line and equipment as per work of
scope.
 Involve also of several test like hydro test and pneumatic etc.
Employer
Company Address
Position
Exclusive Date
Project
:
:
:
:
:
HYUNDAI DOZ (M) SDN. BHD.
Bintulu, Malaysia
Piping Foreman
May 19, 1994 to April 26, 1995
MLNG DUA Plant Project
Duties and Responsibilities:
 With proper coordination to Korean supervisor regarding schedule of above ground piping
works which covered to different Unit E, F, & G at module 5 areas.
 Prepared reference drawing (general arrangement drawing, piping, instrument & isometric
drawing) which covered of module 5 area
 Prepared materials, tools and equipment..
 Prepared manpower grouping and work schedule distribution as per priority line/area.
 Conducted tool box/safety meeting and discuss prior safety, quality and quantity.
 Assigned work schedule for different unit to each work group (fabrication, erection and
installation etc.) relevant above ground piping activities.
 Conducted pipe line inspection for category “A” punch clearing prior for hydro test.
 Supervised and assist to each group doing punch list activities.
 Supervised and assist to each group doing reinstatement activities.
 Involved commissioning works & assist to the vendor.
 Supervised and monitored daily progress to daily task.
Page 7 of 11
Employer
Company Address
Position
Exclusive Date
Project
:
:
:
:
:
KOBE STEEL NIGERIA LTD.
NNPC Eleme Petrochemical Complex Port Harcourt, Nigeria
Piping Lead man
Sept.13,1993 to April 18,1994
Polyethylene and Butane – 1 Plant
Duties and Responsibilities:
 With proper coordination to Japanese foreman & supervisor regarding work schedule of
boiler A, B & C piping activities.
 Prepared reference drawing.
 Prepared materials, tools and equipment.
 Assigned work schedule to each work member prior to pipe line schedule.
 Fabrication, erection and installation of the pipe line from boiler to the pipe rack as per
isometric drawing.
 Punch list and reinstatement activities.
Employer
Company Address
Position
Exclusive Date
Project
:
:
:
:
:
ADVANCE TECHNOLOGY CONSTRUCTION CO. LTD.
Jubail, Kingdom of Saudi Arabia
Pipe Fitter
Nov.26,1992 to June 10,1993
Sharq Petrochemical Plant Expansion Project
Duties and Responsibilities:




With proper coordination to Japanese foreman & supervisor regarding work schedule.
Prepared tools, equipment and materials.
Fabricating and installation of pipeline, from the unit going to pipe rack (process area).
Involved hydro test and pipe pig cleaning activities.
Employer
Company Address
Position
Exclusive Date
Project
:
:
:
:
:
SANKO ENGINEERING CORPORATION
Republic of Yemen
Pipe Fitter
Aug.07,1991 to Aug.07,1992
MAFRAQ Cement Plant Project
Duties and Responsibilities:
 With proper coordination to Filipino foreman & Japanese supervisor regarding work
schedule.
Page 8 of 11
 Prepared reference drawing.
 Prepared tools, equipment and materials.
 Fabricating and installing the vertical stabilized tank with diameter of 6 meter and 55
meter long, including pipe line and ducting going to pre-heater.
 Fabricating and installing ducting pipe, 90° degrees elbow with 2 meter diameter from
drop fan # 1 going to EP and main drop fan # 1 going to smoke stock.
 Fabricating and installing pipeline which covered a silo and packing house area.
 Fabricating and installing of 2 meter diameter ducting pipe from main drop fan # 2
going to raw mill.
Employer
:
Company Address
Position
Exclusive Date
Project
:
:
:
:
FIRST FARMER & MARKETING COOPERATIVE ASSOCIATION,
INC.
Talisay City Negros Occidental Philippines
Welder
Aug.04,1989 to Feb.17,1990
First Farmer Sugar Milling Expansion Project
Duties and Responsibilities:
 Tacking and full welding of 400 meter long overhead conveyor structure for sugar
bagged carrier.
 Tacking and full welding of receiver tank and structures for raw sugar liquid
materials.
 Tacking and full welding of coal conveyor structures and chutes for coal materials
supplied to furnace.
 Tacking and full welding of baggage shade structures.
Employer
Company Address
Position
Exclusive Date
Project
:
:
:
:
:
ENGINEER FILICITO O. TAN
San Carlos City Negros Occidental Philippines
Pipe Fitter
Jan.03,1979 to Feb.15,1983
San Carlos City Sugar Milling Company Expansion Project
Duties and Responsibilities:






With proper coordination to foreman and supervisor regarding work schedule.
Prepared reference drawing (general arrangement drawing and isometric drawing etc.).
Prepared tools, equipment and materials.
Fabricate & installed pipe line as per isometric drawing.
Punch list and reinstatement activities.
Involved hydro test activities.
Page 9 of 11
PERSONAL INFORMATION:
Name
Home Address
:
:
REMEGIO E. CARAMIHAN
Bangga Aton, Brgy. Zone-2, Talisay, Negros
Occidental Philippines
Mobile no.
:
:
+639391452486
+639065169349
Email address
Date of Birth
Place of Birth
Sex
Nationality
Passport number
:
:
:
:
:
:
remegiocaramihan_1964@yahoo.com
February 18, 1964
Calatrava, Negros Occidental
Male
Filipino
EB4848272
EDUCATIOANL ATTAINMENT:
Primary
:
Tigbon Elementary School
(SY- 1970 to 1976)
Secondary
:
Leonor Institute Foundation
(SY- 1976 to 1980)
College
:
Paglaum State College
(SY- 1986 to 1988)
TRAINING & SEMINARS:
1. BECHTEL OIL GAS & CHEMICALS ANGOLA LNG PROJECT
 Foreman and General Foreman Training, July 12 to 16, 2010
 Supervisory Training, October 05 to 09, 2010
2. TCO – PFD Training Center, Tengiz, Kazakhstan, January 14, 2008

Cultural Awareness Training Course
3. Asia Pacific Training Center (Philippines-1992)




Fire Fighting
Personal Survival Techniques
First Aid at Sea
Survival Craft (Lifeboat Man)
4. Megamas Training Company Sdn. Bhd. (Malaysia-1995)

Offshore Safety and Survival Course
Page 10 of 11
5
Bruwell Valve & Fitting Sdn. Bhd. Swagelok Co. (Brunei-1995)

Safety Seminar.
6. Eastern Petrochemical Company (Jubail, Saudi Arabia-2000)

Safety Authorization, received work permit
7. Kuwait National Petroleum Company (Kuwait City-2003)

Work permit executor
Reference Person :
1) Cedric Villegas
= Bechtel Sub-Contracts Administrator
Bechtel LNG Soyo, Angola Project.
2) Rommiel Idanan
= Bechtel Piping Engineer
Bechtel LNG Soyo Angola Project.
3) Noel Nerosa
= Bechtel Piping QC.
Second Generation Tengiz Kazakhstan Project.
4) Eduardo Domingo
= Bechtel Piping Superintendent
Bechtel NLG Soyo Angola Project.
5) Arnold Tubeo
= Bechtel Electrical Engineer
Bechtel LNG Soyo, Angola Project.
6) Desiderio Sababan jr. = Bechtel Piping Supervisor
Bechtel NLG Soyo, Angola Project
7) Richard Chan
= ALNG Safety Supervisor
ALNG Soyo, Angola Project
8) Wilmar Yap
= Petrofac Piping Supervisor
9) Edwin Delapena
= Construction Piping/Mechanical Superintendent
KCOI – Kazakhstan Project.
10) Welson Hona
= Piping Supervisor, Tengiz,Chevroil Second
Generation Gas Development Project
Tengiz, Kazakhstan.
I hereby certify that the above information are true and correct the best of my
knowledge and belief.
Remegio E. Caramihan