Curriculum Vitae

advertisement
CURRICULUM VITAE
1)
2)
PERSONAL INFORMATION
Name
:
Muhd Zaimi bin Abd Majid
I.C. No.
Citizenship
Date of Birth
Health
Marital Status
:
:
:
:
:
570415-05-5965
Malaysian
15-04-1957
Normal
Married
Office Address
:
Faculty of Civil Engineering
Universiti Teknologi Malaysia
81310 UTM Skudai Johor
Malaysia.
Telephone (Off)
:
07-5533114 / 07-5533105
Handphone
:
019-7563142 / 019-7536100
Residence Address
:
7, Jalan Meranti 8
Taman Sri Pulai
81110 Kangkar Pulai
Malaysia.
E-mail
:
mzaimi@utm.my
drmzaimi@yahoo.com
Fax
:
07-5533106
QUALIFICATIONS
1997
Doctor of Philosophy (PhD) in Construction Management
Loughborough University, United Kingdom.
1992
Master of Science in Construction Management,
Loughborough University, United Kingdom.
1984
Bachelor of Science (Hons) in Civil Engineering,
University of Glasgow, United Kingdom.
1980
Diploma in Civil Engineering,
Institut Teknologi Mara, Malaysia.
1/24
3)
PROFESSIONAL MEMBERSHIP
Graduate Member :
4)
PREVIOUS AND CURRENT POST
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
5)
Board of Engineer Malaysia.
Lecturer since November 1995
Head of Panel of Construction Management at Civil Engineering Faculty
since 1998 until to-date.
Manager of Continuing Education for Construction Technology and
Management Centre (CTMC), UTM from July 1999 until June 2001
Director of CTMC, UTM from July 2001 until June 2007
Head of R&D Construction and Infrastructure Technologies Cluster since 2004 –
2008
Deputy Dean of Academics, Faculty of Civil Engineering, 2007 until 2008
Dean of School of Professional and Continuing Education, 2008 until March 2009
Research Dean of Construction Research Alliance, April 2009 till present
ADMINISTRATIVE POSTS/ EXTENDED RESPONSIBILITIES






























Member of Faculty Examination Board (1998 - 1999)
Ketua Makmal Pembinaan (1993 -1994)
Ahli Lembaga Pentadbiran Jabatan Struktur dan Bahan (1998)
Ketua Makmal Pembinaan (1998)
Penyelaras Latihan Praktik 3SKA, menyelaras Projek Bekalan Air yang
melibatkan 20 orang pensyarah dan 167 pelajar (1989-1990)
Penyelaras Seminar 3 DKA (1993- 1994)
Ketua Panel Pengurusan Pembinaan (1998- 2000)
Wakil Fakulti ke Institut Kemahiran Mara bagi menyemak silabus Sekolah
Vokasional (1989)
Jawatankuasa Teknikal untuk Suruhanjaya DiRaja Keselamatan dan peraturan
sekolah-sekolah Malaysia untuk Kementerian Pelajaran (1990 – 1991)
Ahli Jawatankuasa Teknikal Bagi Modular Coordination Dalam Industri
Pembinaan, menyediakan ‘Code of Practice on Large Pre-fabricated Concrete
Panel’ (1993)
Ahli Jawatankuasa Kurikulum dan Silabus Fakulti (1988-1989, 1998)
Ahli Jawatankuasa Program Pembelajaran Cemerlang (1989-1990)
Ahli Jawatankuasa Seminar Kebangsaan Masalah Geoteknik Dirantau Tropika
(1990)
Ahli Jawatankuasa bagi cadangan kursus Sarjana Pengurusan Teknologi untuk
matapelajaran SPT 3263 (1988-89)
Ahli Jawatankuasa Seminar RCCACE (1994)
Ahli Jawatankuasa Buletin FKA (1994)
Ahli Jawatankuasa Pengajian Siswazah (1998-2000)
Ahli Jawatankuasa ‘Benchmarking’ Fakulti (1998 - 2002 )
Ahli Jawatankuasa Akreditasi Makmal (1998-2002)
Ahli Jawatankuasa Penilai Kurikulum dan Silabus Pasca Ijazah, FKA
(1998 - 2002)
Ahli Jawatankuasa Penilai Silabus Diploma Institusi Pengajian Tinggi
(1998- 2000)
Ahli Jawatankuasa Khidmat Masyarakat (1998 - 2000)
Pengerusi Kursus Pembinaan Modular (1999 - 2000)
Ahli Jawatankuasa Seminar APSEC (1999 -2000)
Ahli Jawatankuasa Akademik FKA (2001-sekarang)
Naib Pengerusi Persidangan CIB, October 2003, KUALA LUMPUR
Naib Pengerusi APSEC 2003
Technical Committee, APSEC 2003
Ahli Jawatankuasa Penyelidikan dan pembangunan FKA (2003-sekarang)
Ahli Jawatankuasa Teknikal MICRA 2004
2/24










6)
Jawatankuasa Penyelarasan Penyelidikan (FKA 2001-sekarang)
Ahli Sidang Editor Journal Teknologi (Ogos 2003-Ogos 2005)
Ahli Jawatankuasa Penyelaras Laporan Penilaian Tender (JPLPT) dan
Jawatankuasa Tender IDB peringkat Fakulti.
Juruaudit Dalaman Kelab Keluarga FKA (2003-2005)
Technical Committee, APSEC 2006
Head of Construction Focus Group (2004-2006)
Director, Construction Technology and Management Centre (2001-2007)
Head of Construction of R&D Construction and Infrastructure Technologies
Cluster (2006-2008)
Deputy Dean of Academics, Faculty of Civil Engineering (2007-2009)
Dean of School of Professional and Continuing Education (SPACE).
PAST EXPERIENCES
6.1
Outside UTM
Sept. 1986 - Nov. 1988 :Site Manager for GKM Dev. Bhd. Managing the site
organisation in the construction of 7-storey car park and office block at Bangsar,
Kuala Lumpur, Malaysia. (Project cost RM8.5 million)
Oct. 1985 - Aug. 1986 : Civil Engineer at GKM Dev. Bhd. Involved in
administration, tendering and co-ordination works
Jan. 1985 - Oct. 1985 : Site engineer , involved in supervision, co-ordination
and liaison work for
5-storey Telecommunication exchange at Dungun, Terengganu (Project cost
RM2.8 million)
July 1984 – Jan. 1985 : Site Engineer for Teamwork (M) Sdn. Bhd. Supervised a
sub-structure works worth about RM3.0 million
6.2
Within UTM
1988 – 1992 :
Assistant Lecturer A at the Fac. of Civil Engineering, UTM
1993 – 1994 :
Head of Construction Laboratory
1991 – 1992 :
Further studies (Master in Construction Management)
1995 - to date:
Appointed as Lecturer
1995 – 1997 :
Further Studies (PhD)
1999 - 2001 :
Manager of Continuing Education for CTMC
(Construction Technology and Management Centre)
June 2000
Associate Professor
:
October 2006 :
Professor
3/24
7)
FIELD OF EXPERTISE
Construction Management specifically the application of Artificial Intelligent and IT in
construction.
8)
TEACHING
Teaching at Post Graduate Level
(MSc. Construction Management by Taught Course)
MID
MID
MID
MID
MID
1413
1113
1043
1253
1012
Site Management and Safety Control
Construction Project Management
Financial Management
Project Planning and Scheduling
Principle of Engineering Management
Teaching at Undergraduate level, includes :
SKA 4023
SAM 5113/SAA 4113
SKA 3012
SAA 4133
9)
Amalan Pengurusan dan Pembinaan
Pengurusan Projek dan Pembinaan
Peraturan Kontrak dan Taksiran
Teknologi Pembinaan dan Taksiran
SUPERVISION
Supervision at Doctorate level – Graduated
1)
Implementation of Quality Management System, A Case Study
Kuala Lumpur International Airport. Student: Eva Rita, 1999-2002.
2)
Constructability Improvement of Project Design
Student: Rosli Mohammad Zin, 2000-2003
3)
Digitalizing the Construction Monitoring System
Student: Zubair Ahmed Memon, 2003 – 2007
4)
Knowledge Management (KM) Framework for the Malaysian
Construction Consultant Companies
Student: Ade Asmi, 2004-2007
5)
Maximising the Effectiveness of Health and Safety Management System in
Malaysian Construction Industry
Student : Faridah Ismail (UiTM), 2003-2007
On going
1)
Probabilistic Forecasting of Project Performance
Siti Rashidah Mohd Nasir, 2006-2009
2)
Communication in Construction Organisation
Wan Zahran Wan Zakaria, 2004-2010 (Engineering Doctorate)
3)
4)
Construction Delays
Ibnu Abbas Majid, 2006 - 2009
Quantitative Build ability assessment for Building Design
Shaik Hussein Bin Maidin, 2007-2010
4/24
5)
Constructbility Implementation at Construction
Erman Surya Bakti, 2007-2010
6)
Design Consideration for Improving the Level Of User Comfort in Office Building
Ali Keyvanfar
7)
Labour Productivity Related To Safety In Construction
Yulia Setiani
8)
Constructibility Infrastructure in Jakarta
Pito Sumarno 2011-2014
9)
Green Index for Road Infrastructure Work
Raja Faridah 2011-2014
10)
Managing Labour in Construction Industry
Leli Honesti 2011-2014
11)
Critical Success Factor in Project Performance
Pooria Rashvand 2010-2014
Co-Supervisor
Graduated
1)
Modelling of Non Conforance Cost in Construction Projects
Student: Ammar Mohammed Salim Al-Ojaili, 2004-2006
2)
Maximising the Effectiveness of Health and Safety Management System in
Malaysian Construction Industry
Student : Faridah Ismail (UiTM), 2003-2007
Supervision at Masters by Research – Graduated
1)
Forecasting Low-Cost House Demand Using Artificial Neural Network.
Student: Khairulzan Yahya, 1999-2001
2)
Computerised Forecasting Model Based on Artificial Neural Networks for Low
Income Group Housing in Urban Area.
Student : Noor Yasmin Zainun, 2001 – 2003
3)
Model on Sub Contractor Selection Using Fuzzy Logic
Student : Efni Uslinda Syamsuri, 2001 – 2003
4)
Safety Best Practices in Indonesia (A case study).
Student : Inda Eka Permana, 2000 - 2007
Supervision at Masters by Taught Course
1)
2)
3)
4)
5)
An investigation on payment system for construction project
-Sesi I/1999 - Student: Ida Syuryanti Rinaldy
Cost of delays for road construction in West Sumatra
-Sesi I/1999 - Student: Radam
Forecasting project completion dates
-Sesi I/1999- Student: Bachan Singh
Recovery of project delays
-Sesi II/1998- Student: Shinta Adiwati
Pengawalan projek pembinaan
-Sesi II/1999- Student: Yutiar
5/24
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)
24)
25)
26)
27)
28)
29)
30)
31)
32)
Application of Network Compression on projects
-Sesi II/1998- Student : Putri Lyanna A. Luthan (Co-Supervisor)
Monitoring Techniques for Road Projects
-Sesi II/1998- Student : Khalawi (Co-Supervisor)
Risk Management in Construction Tenders
-Sesi I/1999-Student : Thavarajah a/l Munisamy
Excusable Delays: A Case Study
-Sesi II/1999-Student - Zubair Ahmed
Leadership Qualities for Quantity Surveyor
-Sesi II/1999-Student :Saravanan a/l Subramaniam
Integrating Construction Scheduling and Knowledge-based System for Material
Scheduling
-Sesi II/1999-Student -Narimah binti Kasim (Co-Supervisor)
Kajian terhadap Perlaksanaan ‘Design and Build’
-Sesi II/1999- Student :Faridah binte Ismail (Co-Supervisor)
Determination of Factors of Delays in Construction Project by using linked bar
chart planning method : A case study
-Sesi 1/2000 – Student : Hew Kin Yoong
Excusable Delays: A Case Study
- Sesi 1/2000 – Student: Zubair Ahmed
Leadership Qualities Necessary for Quantity Surveyor as a Successful Project
Manager
- Sesi 1/2000 – Student: Saravanan a/l Subramaniam
Integrating Construction Scheduling and Knowledge Based Systems for
Generating Material Scheduling
-Sesi 1/2000 – Student: Narimah bt Kasim
Kajian Terhadap Perlaksanaan ‘Design and Build’ bagi Projek Jambatan
-Sesi 1/2000 – Student: Faridah bt Ismail
Critical factors that influence the success of implementing value management in
Malaysia construction industry
-Sesi 1/ 2003 – Student : Chua Tee Khoon
Refurnishment project management system for commercial highrise buildings in
Malaysia
-Sesi 1/ 2003 – Student : Seong Pick Choong
Project success factors for design build system
-Sesi 1/ 2003 – Student : Mohd Saupi Ab. Wahab
Housing Contractor Problems and poor performance in Selangor housing project
-Sesi 1/ 2003 – Student : Wong Ing Hua
Pembaziran Bahan di Tapak Binaan
-Sesi 1/ 2003 – Student : Khairunisa bt Abdullah @ Muthusamy
Budaya Keselamatan dalam Pembinaan
-Sesi 1/ 2004 – Student : Kumarason a/l V.Rasiah
Project Management for Architects
-Sesi I/ 2004 – Student : Normadiah Hj Kamal
Sewarage Planning System
-Sesi I/ 2004 – Student : Azuawati bt Zainal
Design Consideration, Practices and Problems
-Sesi I/ 2004 – Student : Neza Ismail
The Effects of Delays in Construction Industry
-Sesi I/ 2004 – Student : Azhan b. Seth
Penggunaan Perisian Penjadualan Pegawai Penyelia Projek JKR Malaysia
-Sesi I/ 2004 – Student : Mohd Shah Samsuri
A Comparison Between Traditional Pavement Rehabilitation Method as Compared
to Recycling Method
-Sesi II/ 2004 – Student : Siti Mazzuana Shamsuddin
Manpower needs in Construction Industry : Foreign Labour Issues and
Implications
-Sesi II/ 2004 – Student : Ling Sok Ping
Factors affecting the ‘S’ Curve in Project Monitoring
-Sesi II/ 2004 – Student : Callixtus Tamin
Critical Success Factors For The Construction Organisation
6/24
33)
34)
35)
36)
37)
-Sesi I/2005 – Student : Irma Azreen Mazri
Introducing Environmental Management System Within Construction Sites
-Sesi I/2005 – Student : Siti Fairuz Hj. Zakaria
Maintenance Management System through Strategic planning for Public School
in Malaysia
-Sesi I/2005 – Student : Syamilah Yacob
Causes and Effects of Delays in Aceh Construction Industry
-Sesi II/2006 – Student : Ibnu Abbas Majid
Masalah yang dihadapi dalam penyediaan perumahan Polis Diraja Malaysia
-Sesi II/2006 – Student : Azizee Ismail
The performance of FELDA Plantations Sdn. Bhd. Contractors
- Sesi II/2006 – Student : Ramzi Ibrahim
Supervision at Under-graduate level
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
Pentadbiran Kontrak secara tradisional ‘BOT’ dan Pengurusan Projek
Sesi 89/90 – Roslan Marjuki
Masalah Berpunca dari Kekurangan Sumber
- Sesi 90/91- Kam Ther Hwa
Pemulihan dari Kelewatan
- Sesi 90/91-Tan Kah Chai
Ramalan Kegagalan Syarikat Dalam Industri Pembinaan
-Sesi 93/94-Chan Yee Kong
Mengurangkan Risiko Kegagalan dalam Syarikat Pembinaan
- Sesi 93/94-Chai Yoke Fong
Audit Keselamatan Projek Pembinaan
-Sesi 98/99-Haryati Sulaiman
Pengenalan dan Perlaksanaan Sistem Jaminan Kualiti ISO
9002 dalam Industri Pembinaan
-Sesi 98/99-Che Kam Seng
Peranan Pengurus Projek Dalam Menangani Masalah
Pengawalan Masa dan Kos dalam Sektor Pembinaan
- Sesi 98/99-Mohd Hazri Moh Khambali
Model Logik Fuzzi Bagi Komunikasi diTapak Bina
- Sesi 99/00-Kwong Yan Wen
Masalah Berpunca dari Kekurangan Sumber
-Sesi 99/00-Roswirza Mat Hassan
Penilaian Prestasi Kontraktor di Peringkat Tender
-Sesi 99/00-Lee Man Hong
Demolition of Building Structure
- Sesi 99/00-Teo Say Cheong
Maintenance of High Rise Residential Buildings
-Sesi 99/00-Fok Kok Liang
Pengurusan Sumber Yang Efektif untuk Meningkatkan Produktiviti
- Sesi 99/00-Chew Boon Cheong
Pengurusan Keselamatan menurut kehendak CIDB dan OSHA dalam industri
pembinaan
-Sesi 99/00-Jawahar Nesan
Kajian Kes Keberkesanan Program Rawatan Air Semburan Pendingin Tuangan
Terus
-Sesi 00/01 – Awang Abd Rahman
Perlaksanaan dan Pemantauan Mengikut Akta Keselamatan dan Kesihatan
Pekerja
-Sesi 00/01 – Azman Umar
Mengenalpasti Keberkesanan Penggunaan Jadual di dalam Projek Pembinaan
-Sesi 00/01 – Mohd Reduan Bidin
E-Commerce in Construction
-Sesi 00/01 – Hoo Sze Yen
Perisian Pengurusan dalam Pengurusan Pembinaan
7/24
21)
22)
23)
24)
25)
26)
27)
28)
29)
30)
31)
32)
33)
34)
35)
36)
37)
38)
39)
40)
41)
42)
43)
44)
45)
-Sesi 00/01 – Ong Wei How
Pengurusan Risiko bagi Usahasama Pembinaan Antarabangsa Dalam Industri
Pembinaan
-Sesi 00/01 – Toh Chin Koh
Organisasi Usahasama dalam Industri Pembinaan
-Sesi 00/01 – Gan Kok Leong
Pengamalan Bahan Binaan di tapak Bina
-Sesi 00/01 – Loh Eng Keng
Kajian Kes Kos Penyelengaraan Sistem Automasi Bangunan TNB
-Sesi 00/01 – Ku Haliza Ku Muhammad
Keselamatan dan Kesihatan di dalam Industri Pembinaan dan Industri Petroleum
(Kajian Kes)
-Sesi 01/02 – Nur Aishah bt Rahim
Amalan yang Sesuai di dalam Proses Susun Atur Tapak
-Sesi01/02 – Tengku Nur Shahrul Ezami bt Tengku Zham
Kepentingan Perancangan dan Pengurusan bagi Mengelakkan Kejadian Tanah
Runtuh
-Sesi01/02 – Norazlina bt Muhamad
Kajian tentang beberapa projek sekolah sakit di Daerah Johor Bahru
-Sesi 01/02-Muhammad Fitri Abd. Wahab
Aplikasi Perisian Expedition (Primavera)
-Sesi 01/02 – Chee Soon Cheong
Sistem Membaik Paip dan Kesan Kes Sosial ke atas Penggunaan di Kawasan
Jalanraya – Kajian Kes
-Sesi 01/02 – Mohd Khir Abd Rahman
Kajian Kes Amalan Keselamatan yang Baik di Tapak Binaan
-Sesi 01/02 – Muhammad Alias Yusof
Kajian Prestasi Pihak-pihak yang Terlibat di dalam Pengurusan Pembinaan di
Rancangan Tebatan Banjir – JPS
-Sesi 01/02 – Arifin Muhamad
Penggunaan Microsoft Project 2000 dalam Pengurusan Kos Projek
-Sesi 01/02 – Izwan Misni
Penyelenggaraan Bangunan di Institut Kemahiran Belia Negara Dusun Tua
-Sesi 01/02 – Churemi Seini
Kajian Masalah Kelewatan di dalam Proses Mendapatkan Sijil Kelayakan
Menduduki bagi Bangunan Peralatan Telekom Malaysia.
-Sesi 01/02 – Murni Paiman
Kajian Kelewatan dalam Proses Kelulusan Kebenaran Merancang – Kajian Kes
-Sesi 01/02 – Mazlifah Hj. Isa
Sistem Pengurusan Bahan Binaan di Tapak Bina – Kajian Kes
-Sesi 01/02 – Shaharudin Musa
Peranan Perunding Pengurusan Projek dan Masalah yang Dihadapi Dalam
Pengurusan Projek
-Sesi 02/03 – Tan Sir Ang
Pembaziran Bahan Binaan di Tapak Bina
-Sesi 02/03 – Chua Tee Siew
Bank Sebagai Sumber Pembayaran Projek Perumahan – Kajian Kes
-Sesi 02/03 – Wan Ahmad Suffian Wan Hassan
Perbandingan di antara Perisian Microsoft Project 2002 dan Primavera
-Sesi 02/03 – Noor Hisham Mohammad
Pengawalan Pembaziran Bahan Binaan di Tapak Bina
-Sesi 02/03 – Ng Kar Boon
Kajian masalah antara kontraktor utama dengan sub kontraktor dalam industri
pembinaan
-Sesi 02/03-Nurlaila Abd. Jalil
Pandangan Pihak Pengurusan tentang isu keselamatan dan kesihatan pekerjaan
di tapak bina
-Sesi 02/03 – Lee Yew Siong
Kebolehsenggaraan di dalam Projek Pembinaan
8/24
46)
47)
48)
49)
51)
52)
53)
54)
55)
56)
57)
58)
59)
60)
61)
62)
10)
-Sesi 03/04 – Aisyah bt Che Amran
Masalah Penggunaan Loji dan Langkah Mengatasinya
-Sesi 03/04 – Suhaizam Kamarudin
Kajian Perbandingan di antara Penggunaan Kaedah Letupan dan Jentera dalam
Kerja Meruntuhkan Bangunan
-Sesi 03/04 – Mohd Sharul Afizee Mohd So’d
Penyelenggaraan Bangunan Sultan Ibrahim, Bukit Timbalan, Johor Bahru
-Sesi 03/04– Azahari Mamat
Teknologi Maklumat dalam perancangan dan penjadualan projek
-Sesi 03/04 – Rezuan Mohamed
Application of Sustainable Construction Principles in Construction Industry
-Sesi 04/05 – Siti Hawa Adila Mohd Yusof
Anggaran Kadar Kos yang Diperuntukkan Dalam Program Keselamatan
-Sesi 04/05 – Mohd Mujahid Mohd
Kaedah Menganalisis Kelewatan Dalam Projek Pembinaan
-Sesi 04/05 – Mohd Sharil Fazry Ibrahim
Kehendak Klien Dalam Pemliihan Kontraktor
-Sesi 04/05 – Mohd Yazee Mat Yatim
Peranan Perunding Pengurusan Projek Dalam Industry Pembinaan di Malaysia
-Sesi 04/05 – Md Nasir Mat Ali
Pengswastaan Pengurusan Air di Selangor
-Sesi 04/05 – Muzaitul Akma Musleh
Kelewatan Projek oleh Kontraktor Kelas F
-Sesi 04/05 – Mohd Ridzuan Yahaya
Kepentingan Keselematan di Tapak Pembinaan
-Sesi 04/05 – Azmi Osman
Pengurusan Penyelenggaraan Bangunan: Kajian Kes Bangunan Asrama Baru di
UTM Skudai, Johor
-Sesi 05/06 – Irwan Ishak
Masalah-masalah Pengubahsuaian rumah terhadap kontraktor
- Sesi 05/06 – Mohamad Akram Seman
Fire & Safety in High Rise Building
-Sesi 05/06 – Logendran A/L Subramaniam
Comparing material wastage levels between conventional and prefabrication
construction
- Sesi 05/06 – Chua Ai Wei
RESEARCH
1.
Kajian Keselamatan Sekolah-Sekolah Malaysia untuk Suruhanjaya Diraja
Malaysia.
Funding RM200,000, Appointed as the technical investigator for one year in
1990. (Vot 95192)
2.
Life cycle cost for low-cost residential building throughout Malaysia for
Ministry of housing. Funding approximately RM375,000 (appointed as a
researcher for a period of 1999-2000)
3.
An alternative indicator to assess site communication.
RM15,000, 1998-1999 (Project Leader)
4.
Research and Development needs in construction industry of Malaysia.
Funded by RMC RM20,000 – 1998-99 (Researcher)
5.
Improving material scheduling for construction industry in Malaysia.
Fund obtained from RMC for RM20,000 – 1998-99 (Researcher)
6.
Non-Excusable Delays, European Construction Institute, UK. 1995-1996
(International Level) (Project Leader)
9/24
11)
7.
Artificial Neural Networks Model to Determine the Needs of Housing for
Low Income Group in Urban Area.
Funded by RMC for RM20,000 2000 -2001 (Project Leader)
8.
Forecasting Low Cost Housing Demand In Malaysia Using an Artificial
Neural Networks for RM176,000.
Funded by IRPA-2000-2003 (Project Leader)
9.
Teleconstruction for Construction Industry for RM 227,900.
Funded by IRPA 2002-2005 (Project Leader)
10.
Knowledge Management (KM) Framework for the Malaysian Construction
Consultant Companies (Researcher) RM147,616.00.
Funded by IRPA 2004-2006.
11.
Projek Pembinaan Rumah di bawah Program Bantuan Rumah Kementerian Luar
Bandar dan Wilayah. (Researcher), 2006, RM130,000 Funded by UTM.
12.
Computerized Work Elements Extraction from the Approved Structural
Digital Drawing (Project Leader) RM1,100,000,000
Funded by CIDB 2007-2009.
13.
Future Buildeing Performance Factors In Regional Development
Towards Energy Efficient Travel Plan, (Project Leader) RM43,000.00
Funded by MOHE 2010-2011
14.
Assessment Analysis Model for Energy Efficiency and Environmental Quality in
Road Infrastructure, (Project Leader) RM300,000.00
Funded by UTM 2011-2013
CONSULTANCY
1.
Jabatan Parit dan Saliran: Feasibility study and investigation on coastal erosion
at Morib, Selangor and Penang in 1990. Cost of investigation RM100,000.
2.
Preliminaries Environmental Impact Assessment for resort project (Marina, golf
courses, residential and commercial uses), Pengerang, Kota Tinggi, Johor in
1993 for Dunlop Estates Bhd. Project cost RM60,000 (1994).
3.
Preliminaries Environmental Impact Assessment for Mixed development consists
of golf course, hotel condominium and bungalows at Pulau Besar, Melaka,
Malaysia (1994) For Pembangunan Pulau Bertuah Sdn. Bhd.
4.
Preliminaries Environmental Impact Assessment for Condominium and Hotel
project at Desaru, Johor, Malaysia (1994). For Ghahas Sdn. Bhd.
5.
Preliminaries Environmental Impact Assessment for Hotel development at 2,
Jln. Skudai, Johor Bahru, Johor, Malaysia (1994). For Yayasan Pelajaran Johor
Hotels and Resorts Sdn. Bhd.
6.
Engineering survey on Skudai – Johor Bahru Highways for Jabatan Kerja Raya
(1993).
7.
Preparation of tender document on ‘Flood mitigation project at Muar’ for
Department of Irrigation and Drainage, Malaysia (1993-1994).
10/24
12)
8.
Consultation Services to Provide Plan Submission Services of Development Plan
to Local Council For Radio Base Transceiver Station with DIGI
Telecommunication Sdn. Bhd. (2004).
9.
Cadangan Menaiktaraf dan analisis struktur tangki air konkrit milik Syarikat Air
Johor Sdn. Bhd. (SAJ) (2006).
PUBLICATION
12.1
International Journal
12.1.1
M.Z. Abd Majid and Ronald McCaffer, “Factors of Non-excusable delays
that influence Contractors’ Performance”, Journal of Management in
Engineering, ASCE, Vol. 14, No. 3, 1998.
12.1.2
M.Z. Abd Majid and Ronald McCaffer, Discussion of ‘Assessment of
Work Performance of Maintenance Contractors in Saudi Arabia’, Journal
of Management in Engineering, ASCE, Vol. 13, No. 5, 1997.
12.1.2
Zubair A. Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar, ‘An
integrated Model for Digitalizing the Construction Monitoring by
implementing Information Technology’. Journal of Quality and
Management Technology, Punjab University, Pakistan Vol. 1 2005.
12.1.3
Amran Rasli, Ade Asmi and M.Z. Abd. Majid, “The Identification and
Classification of the Implementation of Knowledge Management Factors
in Malaysian Construction Consulting Companies : An Exploratory
Study”, International Journal of Management Studies, UUM Vol. 13
Special Issue, Sept 2006.
12.1.4
Zubair Ahmed Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar
(2007), “A Systematic Procedure for Developing the 3D Model to
evaluate the Construction Project Progress”, The Journal of Construction
Innovation (JCI), UK. (Vol. 7, 2007).
12.1.5
Ade Asmi, Amran Rusli, Muhd Zaimi Abd Majid, Ismail Abdul Rahman,
“Malaysian Practitioners Perception on Knowledge Management in
Construction Consulting Companies,” The Journal of Modern Applied
Science, (Volume 3, Number 7) July 2009.
12.1.6
Faridah Ismail, Ahmad Ezanee Hashim, Razidah Ismail, Muhd Zaimi Abd
Majid, “The Operationalisation of Safety Culture for the Malaysia
Construction Organisation International”, Journal of Business and
Management. (Volume 4, Number 9) September 2009.
12.1.7
Muhd Zaimi Abd Majid, Hasannudin Bin Lamit, Ali Keyvanfar, Arezou
Shafaghat, 2011, CONCEPTUAL INTELLIGENT BUILDING (IB) DESIGN
FRAMEWORK TO IMPROVE THE LEVEL OF USER COMFORT TOWARDS
SUSTAINABLE ENERGY EFFICIENT STRATEGIES: PROPOSAL
VALIDATION, International Journal of Sustainable Development,
proceeding of International Conference on Sustainable Development
OIDA 2011, ISSN 1923-6654, (ISI Index)
12.1.8
Muhd Zaimi Abd Majid, Hasannudin Bin Lamit, Ali Keyvanfar, Arezou
Shafaghat, 2011, Executive Information Site Management System for
Monitoring Project Performance: System Requirement Study,
International Journal of Sustainable Development, proceeding of
11/24
International Conference on Sustainable Development OIDA 2011,
Malaysia, ISSN 1923-6654, (ISI Index)
12.1.9
Hasannudin Bin Lamit, Muhd Zaimi Abd Majid, Arezou Shafaghat, Ali
Keyvanfar, SIDEWALK DESIGN DECISIONMAKING MODEL BASED
ONWALKING BEHAVIOUR PATTERN RECOGNITION: PROPOSAL
VALIDATION, International Journal of Sustainable Development,
proceeding of International Conference on Sustainable Development
OIDA 2011, Malaysia, ISSN 1923-6654, (ISI Index)
12.1.10 Journal of Engineering, Construction and Architectural Management
(accepted) "Constructability Improvement in Sea Water Intake
Structure" Erman Surya Bakti, Muhd Zaimi bin Abdul Majid and Rosli
Muhamad Zin Construction Technology and Management Centre,
Faculty of Civil Engineering, University Teknologi Malaysia, Johor Bahru,
Malaysia and Bambang Trigunarsyah School of Urban Development,
Queensland University of Technology, Brisbane, Australia
12.2
12.3
NATIONAL JOURNAL
12.2.1
Nooryasmin Zainun and Muhd Zaimi Abd. Majid, ‘Techniques to
Develop Forecasting Model on Low Cost Housing in Urban Area, Jurnal
Fakulti Kejuruteraan Awam, Vol 14, N0. 1, 2002.
12.2.2
Rosli M.Z, M.Z.A Majid, C.W.F Che Wan Putra and Abd Hakim
Mohammad. “Neural Network Model for Design Constructability
Assessment”. No. 40, June 2004, Jurnal Teknologi, UTM, 2004.
12.2.3
Zubair A. Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar, ‘An
integrated Model for Progress Monitoring and Developing As-built
Schedule for Construction Projects. Jurnal Kejuruteraan, Universiti
Kebangsaan Malaysia (UKM) (Vol.18, 2006).
12.2.4
Zubair A. Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar
(2006), “The use of Photogrammetry Techniques to Evaluate the
Construction Project Progress”, The Journal of Technology UTM,
Malaysia.
12.2.5
Zubair Ahmed Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar,
“A Systematic Approach for Monitoring and Evaluating The Construction
Project Progress”, The Journal of The Institution of Engineers (IEM)
Malaysia, Vol 67 No. 3, September 2006.
Publication of Papers
12.3.1
M.Z. Abd Majid and Ronald McCaffer, Critical Factors that influence
Schedule Performance. Productivity in Construction – International
Experience Presented in 2nd International Congress in Construction,
Singapore, 1996.
12.3.2
M.Z. Abd. Majid, Methods for Recovery from Non-excusable Delays.
M.Sc. dissertation, Department of Civil Engineering, Loughborough
University of Technology, Leicestershire, United Kingdom, 1992.
12/24
12.3.3
M.Z. Abd. Majid, Investigation and Method of Evaluation of NonExcusable Delays Factors, Presented to the European Construction
Institute’s Productivity Task Force Committee, Heathrow, London, 1995.
12.3.4
M.Z. Abd. Majid, Project Overrun Records and Root-causes.
Presented to the European Construction Institute’s Productivity Task
Force Committee, Heathrow, London, 1996.
12.3.5
M.F. Mohd Amin and M.Z. Abd. Majid, ‘Rippability Assessment on Hard
Material : Case study at Pasir Gudang’, Johor, Geological Congress at
Pulau Langkawi, Kedah (1993).
12.3.6
M.Z. Abd. Majid, ‘Application on the Theory of Inventive Problem
Solving’ Presented at SEMKA, Alor Star, Kedah, 1998.
12.3.7
M.Z. Abd. Majid, M.Z. Mohd. Yunus and A.A.Saim, ‘Application of Fuzzy
Logic Theory in Developing an Indicator to Assess Site
Communication’, World Congress, Universiti Putra Malaysia,
Kuala Lumpur, Sept. 1999.
12.3.8
A.A. Saim, D. Anderson and M.Z. Abd. Majid, ‘Bond Strength of Encased
Steel Section’, World Congress, Universiti Putra Malaysia, Kuala
Lumpur, Sept. 1999.
12.3.9
F.T. Edum-Fotwe, R. McCaffer and M.Z. Abd. Majid, ‘Sub-contracting or
Co-contracting: Construction Procurement in Perspective’, Construction
Industry Development in the New Millennium, National University of
Singapore, Oct. 1999.
12.3.10 S.A. Mansur, R. Zain, M. Z. Abd. Majid, PM A.H. Mohamad,
‘Mengenalpasti Keperluan Penyelidikan dan Pembangunan Industri
Pembinaaan Di Malaysia : Kajian Awal’, Seminar on Construction,
Materials and Environmental Technology, Anjuran Research
Management Centre (RMC), UTM, March 1999.
12.3.11 M.Z. Abd. Majid, ‘Introduction to project and Construction
Management’, Seminar Construction Site Management, FKA, UTM, Sept.
1999.
12.3.12 M.Z. Abd. Majid, ‘Managing Factors that Influence Contractors
Performance’, Seminar Construction Site Management, FKA, UTM, Sept.
1999.
12.3.13 M.Z. Abd. Majid, ‘Management of Steel Construction’, Seminar on Steel
Industry, Pulai Spring Resort, Johor, Oct. 1999.
12.3.14 M.Z. Abd. Majid, ‘Introduction of Project Management’, Professional
Development Seminar, Kuala Lumpur, Nov. 1999.
12.3.15 M.Z. Abd. Majid, ‘Project Planning Using PDM’, Professional
Development Seminar, Kuala Lumpur, Nov. 1999.
12.3.16 M.Z. Abd. Majid, ‘Monitoring and Control’, Professional Development
Seminar, Kuala Lumpur, Nov. 1999.
12.3.17 M.Z. Abd. Majid, ‘Pengurusan Masa’, Program Pembangunan Pelajar
Cemerlang, Mersing, Johor, Dis. 1999.
12.3.18 M.Z. Abd. Majid, ‘Pengurusan Kewangan’, Kursus Pengurusan Projek,
UTM, Kolej Tun Hussein Onn dan Pusat Khidmat Kontraktor, April 2000.
13/24
12.3.19 Muhd Zaimi Abd. Majid, Che Wan Fadhil Che Wan Putra and Narimah
Kasim, ‘IntegratingConstruction Scheduling and Knowledge-based
Systems for Generating Material Scheduling’, APSEC 2000, 13-15
September 2000.
12.3.20 Che Wan Fadhil Che Wan Putra, Muhd ZaimiAbd. Majid and Narimah
Kasim ‘Alternative Approach to Assess Communication Performance at
Construction Sites’, APSEC 2000, 13-15 September 2000.
12.3.21 Eva Rita, Abdul Hakim Mohamad and M.Z.A. Majid, ‘Pembangunan
Budaya Kualiti Dalam Firma Binaan’, Research Seminar on
Construction, 12 – 13 September 2001.
12.3.22 M.Z.A. Majid and Nooryasmin Zainun ‘An Overview of Various
Techniques to Develop Needs Model on Housing to Low Income Group’,
Persidangan Kebangsaan Industri Pembinaan 2001, 29-31 October
2001.
12.3.23 M.Z.A. Majid and Khailrulzan Yahya ‘Ramalan Permintaan Rumah Kos
Rendah, Kawasan Bandar Bagi Negeri Selangor – Satu Pendekatan Siri
Masa’, Persidangan Kebangsaan Industri Pembinaan 2001, 29-31
October 2001.
12.3.24 Rosli Mohamad Zin, M.Z. A. Majid and Che Wan Putra C.W.F
“Constructability Improvement of Project Designs”, Persidangan
Kebangsaan Kedua Kejuruteraan Awam (AWAM), 6- 8 February 2002.
12.3.25 M.Z.A. Majid, ‘Introduction to Project Planning and Scheduling
Technique’, Short Course on Project Planning and Scheduling, 25-28
February 2002, Johor Bahru.
12.3.26 M.Z.A. Majid, ‘Importance of Network Planning’, Short Course on
Project Planning and Scheduling, 25-28 February 2002, Johor Bahru.
12.3.27 M.Z.A. Majid, ‘Work Progress Monitoring’, Short Course on Project
Planning and Scheduling, 25-28 February 2002, Johor Bahru.
12.3.28 M.Z.A. Majid and Bachan Singh ‘Role of PMC’, Persidangan Pengurusan
Projek bersama Bahagian Perkhidmatan Kejuruteraan, Kementerian
Kesihatan Malaysia, 6-9 March 2002, Century Mahkota Hotel, Melaka
(Invited speaker).
12.3.29 M.Z.A. Majid and Noor Yasmin Zainun “Technique to develop needs
model on housing for low income groups : a literature and Malaysia
experience”, The Second International Conference on Systems Thinking
in Management (ICSTM – 2002), UK, 3 – 5 April 2002.
12.3.30 M.Z.A. Majid and Khairulzan Yahya “Forecasting Of Low Cost Housing
Demand in Urban Areas – Artificial Neural Network and Arima Model
Approach” The Second International Conference on Systems Thinking in
Management (ICSTM – 2002), UK, 3 –5 April 2002.
12.3.31 M.Z.A. Majid and Khairulzan Yahya “Comparative Study on Forecasting
Demand of Low Cost House in Urban Areas using Artificial Neural
Networks and ARIMA Model” First International Conference on
Construction in the 21st Century, Miami Florida, USA, 25 –26 April
2002.
12.3.32 Zainun, N. Y and.Z. A. Majid “An Overview of Model Using Artificial
Neural Networks (ANN)”, Research Seminar on Construction, 30 – 31
October 2002, Johor Bahru, Malaysia.
14/24
12.3.33 Ir. Rosli Mohamad Zin, Che Wan Putra C.W.F, M.Z.A.Majid and Abdul
Hakim Mohamad “Development of a Neural Network Model to Assess
Design Constructability”, Research Seminar on Construction, 30 – 31
October 2002, Johor Bahru.
12.3.34 Zainun, N.Y. and Abd. Majid, M.Z. “Evaluation on Various Forecasting
Models Using Artificial Neural Networks (ANN) 2nd International
Conference on Innovation in Architecture, Engineering and Construction
(AEC), 25-27 June 2003, Loughborough University, UK.
12.3.35 R.M. Zin , M.Z. Abd. Majid, M.Z., & Che Wan Putra, C.W.F. “A
framework for the Assessment of Design Constructability”, 2nd
International Conference on Innovation in Architecture, Engineering and
Construction (AEC), 25-27 June 2003, Loughborough University, UK.
12.3.36 M.Z.A. Majid ‘ Managing Resources – Construction Machineries and
Equipment’ Kursus Pengurusan Projek, 23-24 July 2003, Johor Bahru,
Malaysia.
12.3.37 M.Z.A. Majid ‘ Managing Resources – Construction Material’ Kursus
Pengurusan Projek, 23-24 July 2003, Sri Malaysia, Johor Bahru.
12.3.38 M.Z.A. Majid ‘Labour Resource Management’ Kursus Pengurusan Projek,
23-24 July 2003, Sri Malaysia, Johor Bahru.
12.3.39 Rosli Md. Zin, Che Wan Putra, C.W.F and Muhd Zaimi Abd. Majid
‘Design Constructibility Assessment’, APSEC 2003, 26 – 28 August
2003.
12.3.40 Rosli Md. Zin, Muhd Zaimi Abd. Majid, Che Wan Putra C.W.F,
L.jawahar-Nesan and Abdul Hakim Mohammed ‘Constructibility
Assessment Framework’, MICRA 2nd, 8 October 2003, Shah Alam.
12.3.41 Efni Uslinda Syamsuri, M.Z.A. Majid, and Mohamad Ibrahim Mohamad,
Bahrul Anif‘ A Review of Sub-Contractors Selection and Using Fuzzy
Logic As An Alternative Support’, The Ninth East Asia-Pacific
Conference on Structural Engineering and Construction, 16 – 18
December 2003, Bali Indonesia.
12.3.42 Noor Yasmin Zainun and M.Z.A Majid, , ‘Forecasting Demand on Low
Cost Housing in Urban Area In Malaysia : Artificial Neural Network
(ANN) Approach’ The Ninth East Asia-Pacific Conference on Structural
Engineering and Construction, 16 – 18 December 2003, Bali Indonesia.
12.3.43 Zubair Memon, M.Z.A Majid, ‘Utilization of Photogrammetry Techniques
to Digitalize the Construction Site Progress’ International Conference on
Construction Information Technology 2004 (INCITE 2004), 18 – 21 Feb
2004.
12.3.44 Mohammad Zin R, M.Z A. Majid and Mansur S.A, “Design – Related
Problems in Construction – A Survey in the Malaysian Construction
Industry” SEPKA 2004.
12.3.45 Efni Uslinda Syamsuri, M.Z.A. Majid, M.I. Mohammad,’A Pilot Study on
Sub-Contractors Selection using Fuzzy Logic Algorithm’, MICRA 3rd
Langkawi, 4-5 May 2004.
12.3.46 Faridah Ismail, Victor Torrence Abdullah & M. Z. A. Majid,.’An
Exploratory for Investigating the Safety Culture in Malaysian
Construction Organization’, MICRA 3rd Langkawi, 4-5 May 2004.
15/24
12.3.47 Zubair Ahmed, M.Z.A.Majid, Mushairry Mustaffar.,’A Strategy for
Monitoring the Construction Stage’, MICRA 3rd Langkawi, 4-5 May 2004.
12.3.48 Muhd Zaimi Abd Majid, Z. A. Memon and Mushairry Mustaffar
“Conceptual Digital Monitoring Model for Evaluating the Progress of
Work” Conference ADETTI, Edificio, ISCTE, Lisbon Portugal, 13-15
September 2004.
12.3.49 Z.A.Memon, M.Z.Abd. Majid and Mushairry Mustaffar, “Systematizing
the construction project evaluation and monitoring”, 3rd Scientific
Conference on Project Management, Thessaloniki Greece, 24-25
September 2004.
12.3.50 Amran Rasli, M.Z. Abd. Majid & Ade Asmi, “Factors That Influences
Implementation of Knowledge Management and Information
Technology Infrastructure to Support Project Performance in the
Construction Industry”, International Business Conference, UNITEN,
Kuantan, 6-7 December 2004.
12.3.51 Danial Mohamed, Othman Che Puan, Muhd Zaimi Abd. Majid and Mohd
Warid Hussin,‘The Progression of Civil Engineering Faculty and the
Advancement of Civil Engineering Study Programmes,’ Conference on
Engineering Education, 14-15 December 2004, Kuala Lumpur.
12.3.52 M.Z.Abd. Majid and M.S. Jamiah, ‘Engineering Doctorate (EngD)
Programme at Universiti Teknologi Malaysia’, Conference on
Engineering Education, 14- 15 December 2004, Kuala Lumpur.
12.3.53 M.Z.Abd. Majid, Zubair Ahmed Memon and Mushairry Mustaffar, ‘The
DCM Model : A System for Monitoring and Evaluating the Physical
Progress’, 3rd International Conference on Innovation in Architecture,
Engineering and Construction (AEC), 15 – 17 June 2005, Rotterdam,
The Netherlands.
12.3.54 M.Z.Abd. Majid, Ade Asmi and Amran Rasli, ‘Identification and ranking
of critical components of knowledge management principles for the
Malaysian Construction consulting Companies’, 3rd International
Conference on Innovation in Architecture, Engineering and Construction
(AEC), 15 – 17 June 2005, Rotterdam, The Netherlands.
12.3.55 Zubair A. Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar,
‘The DCM Model : An Expert System for Evaluating the Construction
Progress’, SEPKA 2005, 5 – 6 July 2005, Sofitel Palm Resort, Johor
Bahru.
12.3.56 Abd. Majid M.Z, Rasli A and Asmi A, ‘Classification of Information
Technology Inftrastructure Capability Framework in Malaysian
Construction Consulting Companies, SEPKA 2005, 5 – 6 July 2005,
Sofitel Palm Resort, Johor Bahru.
12.3.57 M.Chitrakala and Muhd Zaimi Abd Majid, ‘Tele-Construction design
architecture to support
Tele-Construction’, SEPKA 2005, 5 – 6 July
2005, Sofitel Palm Resort, Johor Bahru.
12.3.58 Abdul Rahim Abdul Hamid and Muhd Zaimi Abd. Majid, ‘Safe Working in
A Confined Space’, Brunei International Conference On Engineering and
Technology 2005, 15- 18th August 2005, Brunei.
12.3.59 Rasli A, Asmi A and Abd. Majid M.Z., M.I Mohamad, ‘A Research
Framework : The Implementation of Knowledge Management and IT
16/24
Infrastructures Companies, Brunei International Conference On
Engineering and Technology 2005, 15- 18th August 2005, Brunei.
12.3.60 Zubair A. Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar, ‘
The DCM Model : A Strategy for implementing the Information
Technology Techniques at the Construction Phase”, 3rd International
Conference on Construction in the 21st Century (CITC-III), 15- 17
September 2005, Athens, Greece.
12.3.61 Zubair A. Memon, Muhd Zaimi Abd Majid, and Mushairry Mustaffar
(2006), “Investing the Issue of Project Progress Performance and
Proposing a Prototype Software: A Case Study of Malaysian
Construction Industry”, Joint International Conference on Computing,
Decision Making in Civil and Building Engineering 14th –16th June,
2006, Montreal, Canada.
12.3.62 Muhd Zaimi Abd. Majid, Amran Rasli and Ade Asmi (2006), “A
Framework Study : Knowledge Management and Project Performance in
Malaysian Construction Consulting Companies”, Joint International
Conference on Computing, Decision Making in Civil and Building
Engineering 14th –16th June, 2006, Montreal, Canada.
12.3.63 Zubair Ahmed Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar,
“Digitalizing Construction Monitoring (DCM) : An Overview of Malaysian
Construction Industry and Proposing Prototype Software” The 6th Asia
Pacific Structural Engineering and Construction Conference 2006
(APSEC 2006), 5-6 September 2006, Malaysia.
12.3.64 Siti Rashidah Mohd Nasir and Muhd Zaimi Abd. Majid, “Project Cost
Performance Forecasting System”, The 6th Asia Pacific Structural
Engineering and Construction Conference 2006 (APSEC 2006), 5-6
September 2006, Malaysia.
12.3.65 Siti Rashidah Mohd Nasir and Muhd Zaimi Abd. Majid, “The Factors that
effect a Successful Completion of Construction Project, SEPKA 2006
National Seminar of Civil Engineering Research, 19-20 December 2006,
Rumah Alumni, UTM.
12.3.66 Siti Rashidah Mohd. Nasir and Muhd. Zaimi Abd. Majid, “Factors
Influencing Project Success : Perspective from Client, Consultant &
Contractors”, 4th International Conference in the 21st Century, Gold
Coast, Australia, 11 – 14 July 2007.
12.3.67 Abdul Rahim Abdul Hamid, Muhd. Zaimi Abd. Majid and Bachan Singh,
“Risiko Kesihatan Dalam Kerja Pembinaan”, Persidangan Kebangsaan
Awam 2007, Langkawi, 29 – 31 May 2007.
12.3.68 Siti Rashidah Mohd. Nasir and Muhd. Zaimi Abd. Majid, “The Influential
of Cost Overrun on Types of Project and Stages of Construction”,
Persidangan Kebangsaan Awam 2007, Langkawi, 29 – 31 May 2007.
12.3.69 Muhd Zaimi Abd Majid “The Effect of Delays in Construction Industry”,
The monograph, UTM, 2008.
12.3.70 Muhd Zaimi Abd Majid “Design Considerations, Practices and Problems :
A Survey of Private Consultant Firm Perspective”, The Monograph, UTM,
2008.
12.3.71 Muhd Zaimi Abd Majid “Factors Affecting the “S” Curve in Determining
the Project Completion, The Monograph, UTM, 2008.
17/24
12.3.72 Siti Rashidah Mohd Nasir, Muhd Zaimi Abd Majid, Ismail Mohamad,
“Using Factor Analysis of Assets the Key factors Influencing the Success
Completion of a Public School Project in Malaysia”, USM, Penang, 3-4
December 2008.
12.3.73 Siti Rashidah Mohd Nasir, Muhd Zaimi Abd Majid, “The Effect of
Constructor’s Financial and Management. Factors on Project
Completion,” Petaling Jaya, Malaysia, 18-20 November 2008.
12.3.74 Citrakala M., Abdul Hakim Mohammed, Muhd Zaimi Abd Majid, “An
Automated Quantities Estimating Model, Through Entities Extraction
From the Structural 2D drawing Proceeding of the 6th Regional
Symposium on Infrastructure Development, RSID6”, Bangkok,
Thailand, 19-20 January 2009.
12.3.75 Citrakala M., Muhd Zaimi Abd Majid, Abdul Hakim Mohammed, “An
Automated Entities Extraction Model for Elements Recognition from the
Structural 2D Drawing,” Page 1152-1158, Proceedings of the 5th
International Conference, CITC-V, Istanbul, Turkey, 20 May 2009.
12.3.76 Yulia Setani, Muhd Zaimi Abd Majid, “Forecasting for Labour Planning in
Construction Industry”, International Conference on Construction
Industry 2009, Padang Indonesia, 30 July-1 August 2009.
12.3.77 Siti Rashidah Mohd Nasir, Muhd Zaimi Abd Majid , Ismail Mohamad,
“Innovative Method in Determining Factors that Influence Project
Success” GICC, September 2009.
12.3.78 Muhd Zaimi Abd Majid, Citrakala M., Atefeh Mohammadpour, “A
Framework as an Alternative to BIM Environment for 2D and 3D
Conventional Drawings”, Proceeding of GICC, Loughborough, Uk, 13-16
September 2009.
12.4
Refereed for Papers (International Level)
12.4.1
“Causes of delays in the Construction Industry” for an International
Journal of Engineering Construction and Architectural Management,
Blackwell, Oxford, United Kingdom (1997).
12.4.2
“International Expansion of Malaysian Contractors” for an International
Journal of Engineering Construction and Architectural Management,
Blackwell, Oxford, United Kingdom (1996).
12.4.3
“Construction Delays and Overrun: Analysis and Time Optimization” for
An International Journal of Engineering Construction and Architectural
Management, Blackwell, Oxford, United Kingdom (1998).
12.4.4
“Organisational Culture of Large Malaysian Construction Contractors”
for an International Journal of Engineering Construction and
Architectural Management, Blackwell, Oxford, United Kingdom (1998).
12.4.5
“Time Cost relationship of Public Sector Projects in Malaysia” for an
International Journal of Engineering Construction and Architectural
Management, Blackwell, Oxford, United Kingdom (1997).
12.4.6
Foreign Labour Utilisation in the Malaysian Construction Industry: The
Myth of Transience for an International Journal of Engineering
18/24
Construction and Architectural Management, Blackwell, Oxford, United
Kingdom (1997).
12.4.7
“The Crisis Preparedness of Construction Companies” for an
International Journal of Engineering Construction and Architectural
Management, Blackwell, Oxford, United Kingdom (1999).
12.4.8
“Investigation of the potential for Applying Freeform processes to
Construction”, for 3rd International Conference on Innovation in
Architecture, World Trade Centre, Rotterdam, 15-17 June 2005
(December 2004).
12.4.9
“A Decision Support Model for Procurement of IT for Construction
Organisations”, for 3rd International Conference on Innovation in
Architecture, World Trade Centre, Rotterdam, 15-17 June 2005
(December 2004).
12.4.10 Theoretical and Conceptual Aspects of Innovation:
Supply Chain
Management of Automobile Textile Manufacturing Industry”, for 3rd
International Conference on Innovation in Architecture, World Trade
Centre, Rotterdam, 15-17 June 2005 (December 2004).
12.4.11 “Systems Integration in Road Construction”, for 3rd International
Conference on Innovation in Architecture, World Trade Centre,
Rotterdam, 15-17 June 2005 (December 2004).
12.4.12 “Government-linked construction companies and construction industry
development”, Paper no. 758, Journal of Engineering Construction and
Architectural Management. Blackwell, Oxford, United Kingdom (April
2005).
12.4.13 Evaluation on Performance level of Design-Build and Design-Bid-Build
(Focused on Multi-Family Housing Projects), Paper No. 172, CCIM Dubai
Conference (2006).
12.4.14 Factors affecting the Selection of the appropriate Construction
Management at Risk Contractor, Paper No. 014, CCIM Dubai Conference
(2006).
12.5
Refereed for Papers (National Level)
12.5.1
“Identifying the Managers Philosophy in Malaysian Construction
Workplace Using McGregor’s Assumption” for Journal Faculty of Civil
Engineering UTM (1998).
12.5.2
“Behaviour of Uplift Forces of Straight-shafted Short Pile in Sand” or
Proceeding of Construction, Materials and Environmental Technology
Seminar, UTM (1999).
12.5.3
“Using Aggregate Impact Value to Predict Other Strength Parameters”
for Proceeding of Construction, Materials and Environmental Technology
Seminar, UTM (1999).
12.5.4
“High Strength Wastewater Treatment Using Biofilm Reactors” for
Proceeding of Construction, Materials and Environmental Technology
Seminar, UTM (1999).
19/24
12.5.5
“Strength Test on Trapezoid Web Plate Girder” for Proceeding of
Construction, Materials and Environmental Technology Seminar, UTM
(1999).
12.5.6
“The Impact of IT in Integrating Design and Construction” for
Proceeding of Construction, Materials and Environmental Technology
Seminar, UTM (1999).
12.5.7
Construction Project Delivery & Industry Skill : Crafting a better fit –
Jurnal Teknologi B – UTM, 2000.
12.5.8
A study on variations in Severage Construction Project for Journal
Teknologi B, UTM. (Dec 2001).
12.5.9
Time Schedule Planning for Road Project Using Rainy Day factor in West
Sumatera for Journal Teknologi B, UTM (June 2001).
12.5.10 Application of Unvaried Neural Network in Forecasting Demand of Low
Cost House in Urban Area, Journal Technology B, UTM (April 2004).
12.6
Others
12.6.1
Proposal paper to develop an Institute of Construction Management
and Technology at UTM, 1998-99, approved by the Board of Universiti
Teknologi Malaysia.
12.6.2
Memorandum of Establishment for the Institute of Construction
Management and Technology of UTM.
12.6.3
Report on Environmental Impact Assessment for the following
projects:
a) Mixed development at Pulau Besar, Melaka (1994);
b) Condominium project at Desaru, Johor (1994);
c) Mixed Development at Kota Tinggi, Johor; and
d) Hotel development at Johor Bahru (1994)
12.6.4
Contract documents for ‘ Flood mitigation project at Muar (1994).
12.6.5
Report on school safety for the Royal Commission (1991).
12.6.6
Technical note: ‘Non-excusable Delays in Construction’ by M.Z.
Abd. Majid ,Civil Engineering Bulletin, 1998.
12.6.7
Prepared working paper for Engineering Doctorate Programme to
be implemented at CTMC, 2003.
12.6.8
Prepared draft working paper for Memorandum of Understanding
(MoU) between JKR and UTM, 2003.
12.6.9
Prepared working paper for Memorandum of Understanding
(MoU) between Loughborough University and UTM, 2004.
12.6.10 Manual / Handbook Engineering Doctorate, 2005.
12.6.11 Prepared Working Paper for New Programme Master of Project
Management, 2007.
20/24
14)
13)
EXTERNAL EXAMINER
1.
Constructability in the Malaysian Construction Industry
– Phd. Candidate: Mekdam A. Nima, November 2000 (Universiti Putra
Malaysia)
2.
Industrialised Building System and Its application in The Housing
Production in Malaysia – Masters Thesis: Wa’el Abdul Moghni Moh’d Alaghbari,
February 2005 (Universiti Putra Malaysia)
3.
Knowledge-Based Lessons Learned Corrective Actions under Preliminary Control
Dalam Proses Pengendalian Biaya Proyek dengan Pendekatan Expert System :
Yusuf Latief, July 2006 (Universitas Indonesia), Indonesia.
INTERNAL EXAMINER THESIS
DOCTORATE LEVEL
1.
A Quality Management Framework for Architectural Design Phase Best Practices,
PhD.Candidate: Abdullah Sani Ahmad, May 2001
2.
Productivity Assessment and Schedule Compression Index for Project Planning,
PhD. Thesis : Shaiful Amri Mansur, Jun 2004
3.
Assessment of the Consultancy Fee for Structural Design Changes on Reinforced
Concrete Buildings in Oman.
PhD Thesis : Amur Salim Hamood Al-Harthy, February 2006
4.
Universitas Indonesia
PhD Thesis : Yusuf Latief, July 2006
5.
The Diffusion of Technological Innovations in the Malaysian Construction
Industry.
Eng. Doctorate Thesis : Lau Sing Hian, November 2006
MASTER LEVEL
1.
Penyediaan Pelan Kualiti Projek untuk Perundingan Penyelia dalam Projek
Norhanim bt Zakaria – 10 April 2000.
2.
Contractors’ Approaches to Risk Identification at the Tendering stage
Thavarajah a/l Munisamy – 4 April 2000.
3.
Pre-Estimating of School Building using Knowledge-Based System.
Kamaruddin b Md Ali – 4 April 2000.
4.
Penentuan Anggaran Harga Berpatutan bagi Turapan Jalan Blok Konkrit
NorHafizi b Md Lani – 4 April 2000.
5.
Optimizations in Organisation Management Study of Organisations Management
in Financial & Strategic Aspect
21/24
Lim Kee Loy – 4 April 2000
6.
Planning & Scheduling
Hew Koh Yoong – 16 Oct 2000.
7.
Pengurusan Pemulihan dari Kelewatan di dalam Industri Pembinaan.
Jamiran b Rabu – 16 Oct 2000.
8.
Construction Risk management
Wong Keng Lian – 16 Oct 2000.
9.
Strategi Menender
Azahar Ahmad – 16 Oct. 2000.
10.
Analysis of factors of Non Excusable Delays that influence contractors
performance
Ng Weng Seng – 28 Mac 2001.
11.
Worker’s Viewpoints on Occupational Safety & Health Issues at Construction
Sites in Johor
Ruziah Husin – 28 Mac 2001.
12.
Measuring Labour Productivity on Construction Site in Malaysia
Chin Kuie Too – 5 Sept. 2001.
13.
Reviewing the Construction Process using Business Process Re-engineering
(BPR) Philosophy
Anthony Martin – 5 Sept 2001.
13.
Cost Analysis for School Building Through Design & Build
Wahida bt. Ismail – 20 Feb 2002.
14.
Material Constant for Shop Houses
Rafidah bt Mokhtar – 20 Feb 2002.
15.
Comparison Between Project Completion Period
Ahmad Ridhuan Mohd Nordin – 27 Ogos 2002.
16.
Online Survey on Current Trends in IT for Local Construction Industry
Yeo Khee Seng -– 27 Ogos 2002.
17.
Legal Rights of Construction Workers at Site in Accordance with the Legislations
Yusmady Md Junus – 27 Ogos 2002.
18.
Kajian Keberkesanan Penggunaan Kaedah ‘Critical Path Management’ di dalam
Projek Pembinaan di Malaysia
Yusof A.Bakar @ Md Talib – 27 Ogos 2002.
19.
Analisa Anggaran Harga Tender
Rafiza Mohammed – 27 Ogos 2002.
20.
An Evaluation of the preliminary Stage of a New College University Project
Development.
Noraida Attan – 27 Ogos 2002.
21.
Tentative Management Problem Solving for Conventional Housing Project.
Chong Voon Yaw –17 Sept. 2003.
22.
Alternative Sewerage System in Malaysia – A New Construction Technology.
Goh Hong Chun –17 Sept. 2003.
22/24
15)
23.
Construction Claims
Saiful Rizan Sanusi –17 Sept. 2003.
24.
Pembinaan Padang Golf dan Kemudahan Berkaitan.
Mohammad Radzif Taharin –17 Sept. 2003.
25.
Cabaran-cabaran yang Perlu Dihadapi oleh Pengurus Projek di Masa Kini.
Rozline Mohd Khalid –16 Feb. 2003.
26.
Penswastaan dalam Bidang Pembinaan di Malaysia.
Wan Hasitinaziah Mohd Hassan –16 Feb. 2003.
27.
Tentative Management Problem Solving for Conventional Housing Project.
Chong Voon Yaw –16 Feb. 2003.
28.
3D Interactive Design Practice in Construction Industries from CE Perspective.
Chong Ken Huat – Sept 2003.
29.
The Effectiveness of Design and Build (D&B) Procurement Method in Malaysia
Jeffry Yap Boon Hui – Sept 2003.
30.
Challenges Faced by a Developer in a Housing Development in the Construction
Stage of the Project Life Cycle in a Traditional Lump Sum Procurement System.
Patrick Tan Paik Kuan – Sept 2003.
31.
Problems Faced by Local Sub-contractors in Public Works.
Goh Shui Wei – Sept 2003.
32.
Control of Materials on Site.
Chiew Seng Khoon – Sept 2003.
33.
Steel Structure Management.
Chiu Chee Kwong – Sept 2003.
34.
VEWA : An Integrated Value Engineering Web-Based Application,
Ho Boon Kit, May 2003.
35.
An Application Model For Effective Implementation of Quality Management
System in Construction Project,
Mat Naim Abdullah @ Mohd Asmoni, Mac 2005.
EXTERNAL APPOINTMENT
1.
Penilai luar bagi Jawatan Prof. Madya di Kolej Universiti Teknologi Tun Hussein
Onn, Batu Pahat, Johor – Oktober 2003
2.
Advisory Panel INCITE (2003-2004)
3.
EUROCODE Committee (2002-2003) –IEM.
4.
Penilai luar bagi jawatan Prof. Madya di UPSI, Tanjung Malim, Perak. (Julai
2004).
5.
Chairman for one of the conference on ‘World IT Conference for Design &
Construction”, INCITE – Appointed by CIDB Malaysia (Langkawi, Feb 2004).
6.
Chairman for one of the conference session on Innovation in Architecture,
Engineering and Construction (AEC), June 2003, Loughborough UK.
23/24
16)
7.
International Scientific Committee AEC, Conference June 2005, Delf University,
Rotterdam.
8.
International Scientific Committee CIB-CTBUH International Conference on Tall
Building Oct. 2003, Kuala Lumpur.
9.
Technical Evaluation Committee 2005, ‘Program Penerbitan Modul Mata
Pelajaran Aliran Vokasional (MPAV) Tingkatan 4 & 5’, Bahagian Buku Teks,
Kementerian Pelajaran Malaysia.
10.
International Scientific Committee, Conference on Construction Culture,
Innovation and Management “Sustainable Development through Culture and
Innovation” Dubai until 2007.
11.
External Examiner VIVA, Yusuf Latief, July 2006 (Universitas Indonesia),
Indonesia.
12.
Member of Editorial Panel of Journal Engineering, Construction and Architectural
Management AMERALD UK, August 2006
13.
Technical Member ‘Organisation of Information about Construction Works under
International Standards Ccommittee ISC‘D’, SIRIM
INTERNAL APPOINTMENTS
1.
2.
3.
17)
Evaluate 3 IRPA proposal at Institutional level – Mac 2001.
Panel of judges for Industrial Art & Technology Exhibition (INATEX) 2004, UTM.
Panel of judges for Industrial Art & Technology Exhibition (INATEX) 2006, UTM
AWARDS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Anugerah Dekan, ITM, 1979.
Penyelia Pelajar yang memenangi hadiah Pertama Penulisan bagi InstitusiInstitusi Pengajian Tinggi di Asia Pacific dan telah membentangkan kertas ini di
Singapura. Ajuran American Institute of Construction, Nanyang University of
Technology and CI- Premier of Singapore (1990).
Anugerah Kepujian Universiti, UTM, 1997.
Hadiah Pergerakan Gaji, UTM, 1997.
Anugerah Kualiti Staf Cemerlang, Fakulti Kejuruteraan Awam, UTM, 1998.
Surat makluman prestasi sangat baik 2001 secara menegak (dihadkan oleh
kuota).
Anugerah Perkhidmatan Cemerlang, UTM, 2002.
Anugerah Pingat Emas Penyelidikan (ITEX) 2004 – the Minds.
Special Award Korean Invention Academy 2004.
Memenangi tempat ketiga dalam pertandingan PECIPTA Malaysia 2007 yang
telah diadakan pada 10 – 12 Ogos 2007 di KLCC.
Best International Solution of Formwork System Organise by PERI, Germany.
Supervisor for group of student and presented at Weissenhorn, Germany,
December 2007.
Silver Award, ITEX May 2009
Anugerah Kecemerlangan Industri Pembinaan Malaysia (MCIEA 2009) –
Penerimaan Anugerah Pengiktirafan Khas MCIEA 2009, CIDB R&D Award, 2009
R&D Competition Invention Innovation Design FSPU 2009 1st Runner-up (Staff)
Silver Medal, SCFIC : Safety Culture Framework In Construction 2010
Anugerah Harta Intelek Negara 2010 – Pemenang Saguhati Dua Ribu Ringgit
Malaysia Kategori Individu
24/24
18)
CO-CURRICULUM
18.1
Societies
18.1.1
Exco Committee for Islamic Society of University of Loughborugh
(1996-1997)
18.2
Community Services
18.2.1
Committee member for Kawasan Rukun Tetangga Jalan Meranti,
Taman Sri Pulai (1999 - 2000).
18.2.2
Committee member for Kawasan Rukun Tetangga Jalan Meranti,
Taman Sri Pulai (2000 - 2001).
18.2.3
Committee member for Kawasan Rukun Tetangga Jalan Meranti,
Taman Sri Pulai (2001 – 2004).
18.2.4
Committee member for Kawasan Rukun Tetangga Jalan Meranti,
Taman Sri Pulai (2004 – 2005).
18.2.5
Committee member for Kawasan Rukun Tetangga Jalan Meranti,
Taman Sri Pulai (2005 – 2006).
18.2.6
Committee member for Kawasan Rukun Tetangga Jalan Meranti,
Taman Sri Pulai (2006 – 2008).
18.2.7
Committee Persatuan Ibu Bapa dan Guru (PIBG) Sek. Keb. Taman
Sri Pulai 2001- 2002.
18.2.8
Committee Persatuan Ibu Bapa dan Guru (PIBG) Sek. Agama
Taman Sri Pulai 2003 – 2004.
18.2.9
Committee ‘Persatuan Ibu Bapa dan Guru (PIBG) Sek. Keb.
Taman Sri Pulai 2000-2005.
25/24
Download