CURRICULUM VITAE 1) 2) PERSONAL INFORMATION Name : Muhd Zaimi bin Abd Majid I.C. No. Citizenship Date of Birth Health Marital Status : : : : : 570415-05-5965 Malaysian 15-04-1957 Normal Married Office Address : Faculty of Civil Engineering Universiti Teknologi Malaysia 81310 UTM Skudai Johor Malaysia. Telephone (Off) : 07-5533114 / 07-5533105 Handphone : 019-7563142 / 019-7536100 Residence Address : 7, Jalan Meranti 8 Taman Sri Pulai 81110 Kangkar Pulai Malaysia. E-mail : mzaimi@utm.my drmzaimi@yahoo.com Fax : 07-5533106 QUALIFICATIONS 1997 Doctor of Philosophy (PhD) in Construction Management Loughborough University, United Kingdom. 1992 Master of Science in Construction Management, Loughborough University, United Kingdom. 1984 Bachelor of Science (Hons) in Civil Engineering, University of Glasgow, United Kingdom. 1980 Diploma in Civil Engineering, Institut Teknologi Mara, Malaysia. 1/24 3) PROFESSIONAL MEMBERSHIP Graduate Member : 4) PREVIOUS AND CURRENT POST i) ii) iii) iv) v) vi) vii) viii) 5) Board of Engineer Malaysia. Lecturer since November 1995 Head of Panel of Construction Management at Civil Engineering Faculty since 1998 until to-date. Manager of Continuing Education for Construction Technology and Management Centre (CTMC), UTM from July 1999 until June 2001 Director of CTMC, UTM from July 2001 until June 2007 Head of R&D Construction and Infrastructure Technologies Cluster since 2004 – 2008 Deputy Dean of Academics, Faculty of Civil Engineering, 2007 until 2008 Dean of School of Professional and Continuing Education, 2008 until March 2009 Research Dean of Construction Research Alliance, April 2009 till present ADMINISTRATIVE POSTS/ EXTENDED RESPONSIBILITIES Member of Faculty Examination Board (1998 - 1999) Ketua Makmal Pembinaan (1993 -1994) Ahli Lembaga Pentadbiran Jabatan Struktur dan Bahan (1998) Ketua Makmal Pembinaan (1998) Penyelaras Latihan Praktik 3SKA, menyelaras Projek Bekalan Air yang melibatkan 20 orang pensyarah dan 167 pelajar (1989-1990) Penyelaras Seminar 3 DKA (1993- 1994) Ketua Panel Pengurusan Pembinaan (1998- 2000) Wakil Fakulti ke Institut Kemahiran Mara bagi menyemak silabus Sekolah Vokasional (1989) Jawatankuasa Teknikal untuk Suruhanjaya DiRaja Keselamatan dan peraturan sekolah-sekolah Malaysia untuk Kementerian Pelajaran (1990 – 1991) Ahli Jawatankuasa Teknikal Bagi Modular Coordination Dalam Industri Pembinaan, menyediakan ‘Code of Practice on Large Pre-fabricated Concrete Panel’ (1993) Ahli Jawatankuasa Kurikulum dan Silabus Fakulti (1988-1989, 1998) Ahli Jawatankuasa Program Pembelajaran Cemerlang (1989-1990) Ahli Jawatankuasa Seminar Kebangsaan Masalah Geoteknik Dirantau Tropika (1990) Ahli Jawatankuasa bagi cadangan kursus Sarjana Pengurusan Teknologi untuk matapelajaran SPT 3263 (1988-89) Ahli Jawatankuasa Seminar RCCACE (1994) Ahli Jawatankuasa Buletin FKA (1994) Ahli Jawatankuasa Pengajian Siswazah (1998-2000) Ahli Jawatankuasa ‘Benchmarking’ Fakulti (1998 - 2002 ) Ahli Jawatankuasa Akreditasi Makmal (1998-2002) Ahli Jawatankuasa Penilai Kurikulum dan Silabus Pasca Ijazah, FKA (1998 - 2002) Ahli Jawatankuasa Penilai Silabus Diploma Institusi Pengajian Tinggi (1998- 2000) Ahli Jawatankuasa Khidmat Masyarakat (1998 - 2000) Pengerusi Kursus Pembinaan Modular (1999 - 2000) Ahli Jawatankuasa Seminar APSEC (1999 -2000) Ahli Jawatankuasa Akademik FKA (2001-sekarang) Naib Pengerusi Persidangan CIB, October 2003, KUALA LUMPUR Naib Pengerusi APSEC 2003 Technical Committee, APSEC 2003 Ahli Jawatankuasa Penyelidikan dan pembangunan FKA (2003-sekarang) Ahli Jawatankuasa Teknikal MICRA 2004 2/24 6) Jawatankuasa Penyelarasan Penyelidikan (FKA 2001-sekarang) Ahli Sidang Editor Journal Teknologi (Ogos 2003-Ogos 2005) Ahli Jawatankuasa Penyelaras Laporan Penilaian Tender (JPLPT) dan Jawatankuasa Tender IDB peringkat Fakulti. Juruaudit Dalaman Kelab Keluarga FKA (2003-2005) Technical Committee, APSEC 2006 Head of Construction Focus Group (2004-2006) Director, Construction Technology and Management Centre (2001-2007) Head of Construction of R&D Construction and Infrastructure Technologies Cluster (2006-2008) Deputy Dean of Academics, Faculty of Civil Engineering (2007-2009) Dean of School of Professional and Continuing Education (SPACE). PAST EXPERIENCES 6.1 Outside UTM Sept. 1986 - Nov. 1988 :Site Manager for GKM Dev. Bhd. Managing the site organisation in the construction of 7-storey car park and office block at Bangsar, Kuala Lumpur, Malaysia. (Project cost RM8.5 million) Oct. 1985 - Aug. 1986 : Civil Engineer at GKM Dev. Bhd. Involved in administration, tendering and co-ordination works Jan. 1985 - Oct. 1985 : Site engineer , involved in supervision, co-ordination and liaison work for 5-storey Telecommunication exchange at Dungun, Terengganu (Project cost RM2.8 million) July 1984 – Jan. 1985 : Site Engineer for Teamwork (M) Sdn. Bhd. Supervised a sub-structure works worth about RM3.0 million 6.2 Within UTM 1988 – 1992 : Assistant Lecturer A at the Fac. of Civil Engineering, UTM 1993 – 1994 : Head of Construction Laboratory 1991 – 1992 : Further studies (Master in Construction Management) 1995 - to date: Appointed as Lecturer 1995 – 1997 : Further Studies (PhD) 1999 - 2001 : Manager of Continuing Education for CTMC (Construction Technology and Management Centre) June 2000 Associate Professor : October 2006 : Professor 3/24 7) FIELD OF EXPERTISE Construction Management specifically the application of Artificial Intelligent and IT in construction. 8) TEACHING Teaching at Post Graduate Level (MSc. Construction Management by Taught Course) MID MID MID MID MID 1413 1113 1043 1253 1012 Site Management and Safety Control Construction Project Management Financial Management Project Planning and Scheduling Principle of Engineering Management Teaching at Undergraduate level, includes : SKA 4023 SAM 5113/SAA 4113 SKA 3012 SAA 4133 9) Amalan Pengurusan dan Pembinaan Pengurusan Projek dan Pembinaan Peraturan Kontrak dan Taksiran Teknologi Pembinaan dan Taksiran SUPERVISION Supervision at Doctorate level – Graduated 1) Implementation of Quality Management System, A Case Study Kuala Lumpur International Airport. Student: Eva Rita, 1999-2002. 2) Constructability Improvement of Project Design Student: Rosli Mohammad Zin, 2000-2003 3) Digitalizing the Construction Monitoring System Student: Zubair Ahmed Memon, 2003 – 2007 4) Knowledge Management (KM) Framework for the Malaysian Construction Consultant Companies Student: Ade Asmi, 2004-2007 5) Maximising the Effectiveness of Health and Safety Management System in Malaysian Construction Industry Student : Faridah Ismail (UiTM), 2003-2007 On going 1) Probabilistic Forecasting of Project Performance Siti Rashidah Mohd Nasir, 2006-2009 2) Communication in Construction Organisation Wan Zahran Wan Zakaria, 2004-2010 (Engineering Doctorate) 3) 4) Construction Delays Ibnu Abbas Majid, 2006 - 2009 Quantitative Build ability assessment for Building Design Shaik Hussein Bin Maidin, 2007-2010 4/24 5) Constructbility Implementation at Construction Erman Surya Bakti, 2007-2010 6) Design Consideration for Improving the Level Of User Comfort in Office Building Ali Keyvanfar 7) Labour Productivity Related To Safety In Construction Yulia Setiani 8) Constructibility Infrastructure in Jakarta Pito Sumarno 2011-2014 9) Green Index for Road Infrastructure Work Raja Faridah 2011-2014 10) Managing Labour in Construction Industry Leli Honesti 2011-2014 11) Critical Success Factor in Project Performance Pooria Rashvand 2010-2014 Co-Supervisor Graduated 1) Modelling of Non Conforance Cost in Construction Projects Student: Ammar Mohammed Salim Al-Ojaili, 2004-2006 2) Maximising the Effectiveness of Health and Safety Management System in Malaysian Construction Industry Student : Faridah Ismail (UiTM), 2003-2007 Supervision at Masters by Research – Graduated 1) Forecasting Low-Cost House Demand Using Artificial Neural Network. Student: Khairulzan Yahya, 1999-2001 2) Computerised Forecasting Model Based on Artificial Neural Networks for Low Income Group Housing in Urban Area. Student : Noor Yasmin Zainun, 2001 – 2003 3) Model on Sub Contractor Selection Using Fuzzy Logic Student : Efni Uslinda Syamsuri, 2001 – 2003 4) Safety Best Practices in Indonesia (A case study). Student : Inda Eka Permana, 2000 - 2007 Supervision at Masters by Taught Course 1) 2) 3) 4) 5) An investigation on payment system for construction project -Sesi I/1999 - Student: Ida Syuryanti Rinaldy Cost of delays for road construction in West Sumatra -Sesi I/1999 - Student: Radam Forecasting project completion dates -Sesi I/1999- Student: Bachan Singh Recovery of project delays -Sesi II/1998- Student: Shinta Adiwati Pengawalan projek pembinaan -Sesi II/1999- Student: Yutiar 5/24 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) 20) 21) 22) 23) 24) 25) 26) 27) 28) 29) 30) 31) 32) Application of Network Compression on projects -Sesi II/1998- Student : Putri Lyanna A. Luthan (Co-Supervisor) Monitoring Techniques for Road Projects -Sesi II/1998- Student : Khalawi (Co-Supervisor) Risk Management in Construction Tenders -Sesi I/1999-Student : Thavarajah a/l Munisamy Excusable Delays: A Case Study -Sesi II/1999-Student - Zubair Ahmed Leadership Qualities for Quantity Surveyor -Sesi II/1999-Student :Saravanan a/l Subramaniam Integrating Construction Scheduling and Knowledge-based System for Material Scheduling -Sesi II/1999-Student -Narimah binti Kasim (Co-Supervisor) Kajian terhadap Perlaksanaan ‘Design and Build’ -Sesi II/1999- Student :Faridah binte Ismail (Co-Supervisor) Determination of Factors of Delays in Construction Project by using linked bar chart planning method : A case study -Sesi 1/2000 – Student : Hew Kin Yoong Excusable Delays: A Case Study - Sesi 1/2000 – Student: Zubair Ahmed Leadership Qualities Necessary for Quantity Surveyor as a Successful Project Manager - Sesi 1/2000 – Student: Saravanan a/l Subramaniam Integrating Construction Scheduling and Knowledge Based Systems for Generating Material Scheduling -Sesi 1/2000 – Student: Narimah bt Kasim Kajian Terhadap Perlaksanaan ‘Design and Build’ bagi Projek Jambatan -Sesi 1/2000 – Student: Faridah bt Ismail Critical factors that influence the success of implementing value management in Malaysia construction industry -Sesi 1/ 2003 – Student : Chua Tee Khoon Refurnishment project management system for commercial highrise buildings in Malaysia -Sesi 1/ 2003 – Student : Seong Pick Choong Project success factors for design build system -Sesi 1/ 2003 – Student : Mohd Saupi Ab. Wahab Housing Contractor Problems and poor performance in Selangor housing project -Sesi 1/ 2003 – Student : Wong Ing Hua Pembaziran Bahan di Tapak Binaan -Sesi 1/ 2003 – Student : Khairunisa bt Abdullah @ Muthusamy Budaya Keselamatan dalam Pembinaan -Sesi 1/ 2004 – Student : Kumarason a/l V.Rasiah Project Management for Architects -Sesi I/ 2004 – Student : Normadiah Hj Kamal Sewarage Planning System -Sesi I/ 2004 – Student : Azuawati bt Zainal Design Consideration, Practices and Problems -Sesi I/ 2004 – Student : Neza Ismail The Effects of Delays in Construction Industry -Sesi I/ 2004 – Student : Azhan b. Seth Penggunaan Perisian Penjadualan Pegawai Penyelia Projek JKR Malaysia -Sesi I/ 2004 – Student : Mohd Shah Samsuri A Comparison Between Traditional Pavement Rehabilitation Method as Compared to Recycling Method -Sesi II/ 2004 – Student : Siti Mazzuana Shamsuddin Manpower needs in Construction Industry : Foreign Labour Issues and Implications -Sesi II/ 2004 – Student : Ling Sok Ping Factors affecting the ‘S’ Curve in Project Monitoring -Sesi II/ 2004 – Student : Callixtus Tamin Critical Success Factors For The Construction Organisation 6/24 33) 34) 35) 36) 37) -Sesi I/2005 – Student : Irma Azreen Mazri Introducing Environmental Management System Within Construction Sites -Sesi I/2005 – Student : Siti Fairuz Hj. Zakaria Maintenance Management System through Strategic planning for Public School in Malaysia -Sesi I/2005 – Student : Syamilah Yacob Causes and Effects of Delays in Aceh Construction Industry -Sesi II/2006 – Student : Ibnu Abbas Majid Masalah yang dihadapi dalam penyediaan perumahan Polis Diraja Malaysia -Sesi II/2006 – Student : Azizee Ismail The performance of FELDA Plantations Sdn. Bhd. Contractors - Sesi II/2006 – Student : Ramzi Ibrahim Supervision at Under-graduate level 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) 20) Pentadbiran Kontrak secara tradisional ‘BOT’ dan Pengurusan Projek Sesi 89/90 – Roslan Marjuki Masalah Berpunca dari Kekurangan Sumber - Sesi 90/91- Kam Ther Hwa Pemulihan dari Kelewatan - Sesi 90/91-Tan Kah Chai Ramalan Kegagalan Syarikat Dalam Industri Pembinaan -Sesi 93/94-Chan Yee Kong Mengurangkan Risiko Kegagalan dalam Syarikat Pembinaan - Sesi 93/94-Chai Yoke Fong Audit Keselamatan Projek Pembinaan -Sesi 98/99-Haryati Sulaiman Pengenalan dan Perlaksanaan Sistem Jaminan Kualiti ISO 9002 dalam Industri Pembinaan -Sesi 98/99-Che Kam Seng Peranan Pengurus Projek Dalam Menangani Masalah Pengawalan Masa dan Kos dalam Sektor Pembinaan - Sesi 98/99-Mohd Hazri Moh Khambali Model Logik Fuzzi Bagi Komunikasi diTapak Bina - Sesi 99/00-Kwong Yan Wen Masalah Berpunca dari Kekurangan Sumber -Sesi 99/00-Roswirza Mat Hassan Penilaian Prestasi Kontraktor di Peringkat Tender -Sesi 99/00-Lee Man Hong Demolition of Building Structure - Sesi 99/00-Teo Say Cheong Maintenance of High Rise Residential Buildings -Sesi 99/00-Fok Kok Liang Pengurusan Sumber Yang Efektif untuk Meningkatkan Produktiviti - Sesi 99/00-Chew Boon Cheong Pengurusan Keselamatan menurut kehendak CIDB dan OSHA dalam industri pembinaan -Sesi 99/00-Jawahar Nesan Kajian Kes Keberkesanan Program Rawatan Air Semburan Pendingin Tuangan Terus -Sesi 00/01 – Awang Abd Rahman Perlaksanaan dan Pemantauan Mengikut Akta Keselamatan dan Kesihatan Pekerja -Sesi 00/01 – Azman Umar Mengenalpasti Keberkesanan Penggunaan Jadual di dalam Projek Pembinaan -Sesi 00/01 – Mohd Reduan Bidin E-Commerce in Construction -Sesi 00/01 – Hoo Sze Yen Perisian Pengurusan dalam Pengurusan Pembinaan 7/24 21) 22) 23) 24) 25) 26) 27) 28) 29) 30) 31) 32) 33) 34) 35) 36) 37) 38) 39) 40) 41) 42) 43) 44) 45) -Sesi 00/01 – Ong Wei How Pengurusan Risiko bagi Usahasama Pembinaan Antarabangsa Dalam Industri Pembinaan -Sesi 00/01 – Toh Chin Koh Organisasi Usahasama dalam Industri Pembinaan -Sesi 00/01 – Gan Kok Leong Pengamalan Bahan Binaan di tapak Bina -Sesi 00/01 – Loh Eng Keng Kajian Kes Kos Penyelengaraan Sistem Automasi Bangunan TNB -Sesi 00/01 – Ku Haliza Ku Muhammad Keselamatan dan Kesihatan di dalam Industri Pembinaan dan Industri Petroleum (Kajian Kes) -Sesi 01/02 – Nur Aishah bt Rahim Amalan yang Sesuai di dalam Proses Susun Atur Tapak -Sesi01/02 – Tengku Nur Shahrul Ezami bt Tengku Zham Kepentingan Perancangan dan Pengurusan bagi Mengelakkan Kejadian Tanah Runtuh -Sesi01/02 – Norazlina bt Muhamad Kajian tentang beberapa projek sekolah sakit di Daerah Johor Bahru -Sesi 01/02-Muhammad Fitri Abd. Wahab Aplikasi Perisian Expedition (Primavera) -Sesi 01/02 – Chee Soon Cheong Sistem Membaik Paip dan Kesan Kes Sosial ke atas Penggunaan di Kawasan Jalanraya – Kajian Kes -Sesi 01/02 – Mohd Khir Abd Rahman Kajian Kes Amalan Keselamatan yang Baik di Tapak Binaan -Sesi 01/02 – Muhammad Alias Yusof Kajian Prestasi Pihak-pihak yang Terlibat di dalam Pengurusan Pembinaan di Rancangan Tebatan Banjir – JPS -Sesi 01/02 – Arifin Muhamad Penggunaan Microsoft Project 2000 dalam Pengurusan Kos Projek -Sesi 01/02 – Izwan Misni Penyelenggaraan Bangunan di Institut Kemahiran Belia Negara Dusun Tua -Sesi 01/02 – Churemi Seini Kajian Masalah Kelewatan di dalam Proses Mendapatkan Sijil Kelayakan Menduduki bagi Bangunan Peralatan Telekom Malaysia. -Sesi 01/02 – Murni Paiman Kajian Kelewatan dalam Proses Kelulusan Kebenaran Merancang – Kajian Kes -Sesi 01/02 – Mazlifah Hj. Isa Sistem Pengurusan Bahan Binaan di Tapak Bina – Kajian Kes -Sesi 01/02 – Shaharudin Musa Peranan Perunding Pengurusan Projek dan Masalah yang Dihadapi Dalam Pengurusan Projek -Sesi 02/03 – Tan Sir Ang Pembaziran Bahan Binaan di Tapak Bina -Sesi 02/03 – Chua Tee Siew Bank Sebagai Sumber Pembayaran Projek Perumahan – Kajian Kes -Sesi 02/03 – Wan Ahmad Suffian Wan Hassan Perbandingan di antara Perisian Microsoft Project 2002 dan Primavera -Sesi 02/03 – Noor Hisham Mohammad Pengawalan Pembaziran Bahan Binaan di Tapak Bina -Sesi 02/03 – Ng Kar Boon Kajian masalah antara kontraktor utama dengan sub kontraktor dalam industri pembinaan -Sesi 02/03-Nurlaila Abd. Jalil Pandangan Pihak Pengurusan tentang isu keselamatan dan kesihatan pekerjaan di tapak bina -Sesi 02/03 – Lee Yew Siong Kebolehsenggaraan di dalam Projek Pembinaan 8/24 46) 47) 48) 49) 51) 52) 53) 54) 55) 56) 57) 58) 59) 60) 61) 62) 10) -Sesi 03/04 – Aisyah bt Che Amran Masalah Penggunaan Loji dan Langkah Mengatasinya -Sesi 03/04 – Suhaizam Kamarudin Kajian Perbandingan di antara Penggunaan Kaedah Letupan dan Jentera dalam Kerja Meruntuhkan Bangunan -Sesi 03/04 – Mohd Sharul Afizee Mohd So’d Penyelenggaraan Bangunan Sultan Ibrahim, Bukit Timbalan, Johor Bahru -Sesi 03/04– Azahari Mamat Teknologi Maklumat dalam perancangan dan penjadualan projek -Sesi 03/04 – Rezuan Mohamed Application of Sustainable Construction Principles in Construction Industry -Sesi 04/05 – Siti Hawa Adila Mohd Yusof Anggaran Kadar Kos yang Diperuntukkan Dalam Program Keselamatan -Sesi 04/05 – Mohd Mujahid Mohd Kaedah Menganalisis Kelewatan Dalam Projek Pembinaan -Sesi 04/05 – Mohd Sharil Fazry Ibrahim Kehendak Klien Dalam Pemliihan Kontraktor -Sesi 04/05 – Mohd Yazee Mat Yatim Peranan Perunding Pengurusan Projek Dalam Industry Pembinaan di Malaysia -Sesi 04/05 – Md Nasir Mat Ali Pengswastaan Pengurusan Air di Selangor -Sesi 04/05 – Muzaitul Akma Musleh Kelewatan Projek oleh Kontraktor Kelas F -Sesi 04/05 – Mohd Ridzuan Yahaya Kepentingan Keselematan di Tapak Pembinaan -Sesi 04/05 – Azmi Osman Pengurusan Penyelenggaraan Bangunan: Kajian Kes Bangunan Asrama Baru di UTM Skudai, Johor -Sesi 05/06 – Irwan Ishak Masalah-masalah Pengubahsuaian rumah terhadap kontraktor - Sesi 05/06 – Mohamad Akram Seman Fire & Safety in High Rise Building -Sesi 05/06 – Logendran A/L Subramaniam Comparing material wastage levels between conventional and prefabrication construction - Sesi 05/06 – Chua Ai Wei RESEARCH 1. Kajian Keselamatan Sekolah-Sekolah Malaysia untuk Suruhanjaya Diraja Malaysia. Funding RM200,000, Appointed as the technical investigator for one year in 1990. (Vot 95192) 2. Life cycle cost for low-cost residential building throughout Malaysia for Ministry of housing. Funding approximately RM375,000 (appointed as a researcher for a period of 1999-2000) 3. An alternative indicator to assess site communication. RM15,000, 1998-1999 (Project Leader) 4. Research and Development needs in construction industry of Malaysia. Funded by RMC RM20,000 – 1998-99 (Researcher) 5. Improving material scheduling for construction industry in Malaysia. Fund obtained from RMC for RM20,000 – 1998-99 (Researcher) 6. Non-Excusable Delays, European Construction Institute, UK. 1995-1996 (International Level) (Project Leader) 9/24 11) 7. Artificial Neural Networks Model to Determine the Needs of Housing for Low Income Group in Urban Area. Funded by RMC for RM20,000 2000 -2001 (Project Leader) 8. Forecasting Low Cost Housing Demand In Malaysia Using an Artificial Neural Networks for RM176,000. Funded by IRPA-2000-2003 (Project Leader) 9. Teleconstruction for Construction Industry for RM 227,900. Funded by IRPA 2002-2005 (Project Leader) 10. Knowledge Management (KM) Framework for the Malaysian Construction Consultant Companies (Researcher) RM147,616.00. Funded by IRPA 2004-2006. 11. Projek Pembinaan Rumah di bawah Program Bantuan Rumah Kementerian Luar Bandar dan Wilayah. (Researcher), 2006, RM130,000 Funded by UTM. 12. Computerized Work Elements Extraction from the Approved Structural Digital Drawing (Project Leader) RM1,100,000,000 Funded by CIDB 2007-2009. 13. Future Buildeing Performance Factors In Regional Development Towards Energy Efficient Travel Plan, (Project Leader) RM43,000.00 Funded by MOHE 2010-2011 14. Assessment Analysis Model for Energy Efficiency and Environmental Quality in Road Infrastructure, (Project Leader) RM300,000.00 Funded by UTM 2011-2013 CONSULTANCY 1. Jabatan Parit dan Saliran: Feasibility study and investigation on coastal erosion at Morib, Selangor and Penang in 1990. Cost of investigation RM100,000. 2. Preliminaries Environmental Impact Assessment for resort project (Marina, golf courses, residential and commercial uses), Pengerang, Kota Tinggi, Johor in 1993 for Dunlop Estates Bhd. Project cost RM60,000 (1994). 3. Preliminaries Environmental Impact Assessment for Mixed development consists of golf course, hotel condominium and bungalows at Pulau Besar, Melaka, Malaysia (1994) For Pembangunan Pulau Bertuah Sdn. Bhd. 4. Preliminaries Environmental Impact Assessment for Condominium and Hotel project at Desaru, Johor, Malaysia (1994). For Ghahas Sdn. Bhd. 5. Preliminaries Environmental Impact Assessment for Hotel development at 2, Jln. Skudai, Johor Bahru, Johor, Malaysia (1994). For Yayasan Pelajaran Johor Hotels and Resorts Sdn. Bhd. 6. Engineering survey on Skudai – Johor Bahru Highways for Jabatan Kerja Raya (1993). 7. Preparation of tender document on ‘Flood mitigation project at Muar’ for Department of Irrigation and Drainage, Malaysia (1993-1994). 10/24 12) 8. Consultation Services to Provide Plan Submission Services of Development Plan to Local Council For Radio Base Transceiver Station with DIGI Telecommunication Sdn. Bhd. (2004). 9. Cadangan Menaiktaraf dan analisis struktur tangki air konkrit milik Syarikat Air Johor Sdn. Bhd. (SAJ) (2006). PUBLICATION 12.1 International Journal 12.1.1 M.Z. Abd Majid and Ronald McCaffer, “Factors of Non-excusable delays that influence Contractors’ Performance”, Journal of Management in Engineering, ASCE, Vol. 14, No. 3, 1998. 12.1.2 M.Z. Abd Majid and Ronald McCaffer, Discussion of ‘Assessment of Work Performance of Maintenance Contractors in Saudi Arabia’, Journal of Management in Engineering, ASCE, Vol. 13, No. 5, 1997. 12.1.2 Zubair A. Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar, ‘An integrated Model for Digitalizing the Construction Monitoring by implementing Information Technology’. Journal of Quality and Management Technology, Punjab University, Pakistan Vol. 1 2005. 12.1.3 Amran Rasli, Ade Asmi and M.Z. Abd. Majid, “The Identification and Classification of the Implementation of Knowledge Management Factors in Malaysian Construction Consulting Companies : An Exploratory Study”, International Journal of Management Studies, UUM Vol. 13 Special Issue, Sept 2006. 12.1.4 Zubair Ahmed Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar (2007), “A Systematic Procedure for Developing the 3D Model to evaluate the Construction Project Progress”, The Journal of Construction Innovation (JCI), UK. (Vol. 7, 2007). 12.1.5 Ade Asmi, Amran Rusli, Muhd Zaimi Abd Majid, Ismail Abdul Rahman, “Malaysian Practitioners Perception on Knowledge Management in Construction Consulting Companies,” The Journal of Modern Applied Science, (Volume 3, Number 7) July 2009. 12.1.6 Faridah Ismail, Ahmad Ezanee Hashim, Razidah Ismail, Muhd Zaimi Abd Majid, “The Operationalisation of Safety Culture for the Malaysia Construction Organisation International”, Journal of Business and Management. (Volume 4, Number 9) September 2009. 12.1.7 Muhd Zaimi Abd Majid, Hasannudin Bin Lamit, Ali Keyvanfar, Arezou Shafaghat, 2011, CONCEPTUAL INTELLIGENT BUILDING (IB) DESIGN FRAMEWORK TO IMPROVE THE LEVEL OF USER COMFORT TOWARDS SUSTAINABLE ENERGY EFFICIENT STRATEGIES: PROPOSAL VALIDATION, International Journal of Sustainable Development, proceeding of International Conference on Sustainable Development OIDA 2011, ISSN 1923-6654, (ISI Index) 12.1.8 Muhd Zaimi Abd Majid, Hasannudin Bin Lamit, Ali Keyvanfar, Arezou Shafaghat, 2011, Executive Information Site Management System for Monitoring Project Performance: System Requirement Study, International Journal of Sustainable Development, proceeding of 11/24 International Conference on Sustainable Development OIDA 2011, Malaysia, ISSN 1923-6654, (ISI Index) 12.1.9 Hasannudin Bin Lamit, Muhd Zaimi Abd Majid, Arezou Shafaghat, Ali Keyvanfar, SIDEWALK DESIGN DECISIONMAKING MODEL BASED ONWALKING BEHAVIOUR PATTERN RECOGNITION: PROPOSAL VALIDATION, International Journal of Sustainable Development, proceeding of International Conference on Sustainable Development OIDA 2011, Malaysia, ISSN 1923-6654, (ISI Index) 12.1.10 Journal of Engineering, Construction and Architectural Management (accepted) "Constructability Improvement in Sea Water Intake Structure" Erman Surya Bakti, Muhd Zaimi bin Abdul Majid and Rosli Muhamad Zin Construction Technology and Management Centre, Faculty of Civil Engineering, University Teknologi Malaysia, Johor Bahru, Malaysia and Bambang Trigunarsyah School of Urban Development, Queensland University of Technology, Brisbane, Australia 12.2 12.3 NATIONAL JOURNAL 12.2.1 Nooryasmin Zainun and Muhd Zaimi Abd. Majid, ‘Techniques to Develop Forecasting Model on Low Cost Housing in Urban Area, Jurnal Fakulti Kejuruteraan Awam, Vol 14, N0. 1, 2002. 12.2.2 Rosli M.Z, M.Z.A Majid, C.W.F Che Wan Putra and Abd Hakim Mohammad. “Neural Network Model for Design Constructability Assessment”. No. 40, June 2004, Jurnal Teknologi, UTM, 2004. 12.2.3 Zubair A. Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar, ‘An integrated Model for Progress Monitoring and Developing As-built Schedule for Construction Projects. Jurnal Kejuruteraan, Universiti Kebangsaan Malaysia (UKM) (Vol.18, 2006). 12.2.4 Zubair A. Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar (2006), “The use of Photogrammetry Techniques to Evaluate the Construction Project Progress”, The Journal of Technology UTM, Malaysia. 12.2.5 Zubair Ahmed Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar, “A Systematic Approach for Monitoring and Evaluating The Construction Project Progress”, The Journal of The Institution of Engineers (IEM) Malaysia, Vol 67 No. 3, September 2006. Publication of Papers 12.3.1 M.Z. Abd Majid and Ronald McCaffer, Critical Factors that influence Schedule Performance. Productivity in Construction – International Experience Presented in 2nd International Congress in Construction, Singapore, 1996. 12.3.2 M.Z. Abd. Majid, Methods for Recovery from Non-excusable Delays. M.Sc. dissertation, Department of Civil Engineering, Loughborough University of Technology, Leicestershire, United Kingdom, 1992. 12/24 12.3.3 M.Z. Abd. Majid, Investigation and Method of Evaluation of NonExcusable Delays Factors, Presented to the European Construction Institute’s Productivity Task Force Committee, Heathrow, London, 1995. 12.3.4 M.Z. Abd. Majid, Project Overrun Records and Root-causes. Presented to the European Construction Institute’s Productivity Task Force Committee, Heathrow, London, 1996. 12.3.5 M.F. Mohd Amin and M.Z. Abd. Majid, ‘Rippability Assessment on Hard Material : Case study at Pasir Gudang’, Johor, Geological Congress at Pulau Langkawi, Kedah (1993). 12.3.6 M.Z. Abd. Majid, ‘Application on the Theory of Inventive Problem Solving’ Presented at SEMKA, Alor Star, Kedah, 1998. 12.3.7 M.Z. Abd. Majid, M.Z. Mohd. Yunus and A.A.Saim, ‘Application of Fuzzy Logic Theory in Developing an Indicator to Assess Site Communication’, World Congress, Universiti Putra Malaysia, Kuala Lumpur, Sept. 1999. 12.3.8 A.A. Saim, D. Anderson and M.Z. Abd. Majid, ‘Bond Strength of Encased Steel Section’, World Congress, Universiti Putra Malaysia, Kuala Lumpur, Sept. 1999. 12.3.9 F.T. Edum-Fotwe, R. McCaffer and M.Z. Abd. Majid, ‘Sub-contracting or Co-contracting: Construction Procurement in Perspective’, Construction Industry Development in the New Millennium, National University of Singapore, Oct. 1999. 12.3.10 S.A. Mansur, R. Zain, M. Z. Abd. Majid, PM A.H. Mohamad, ‘Mengenalpasti Keperluan Penyelidikan dan Pembangunan Industri Pembinaaan Di Malaysia : Kajian Awal’, Seminar on Construction, Materials and Environmental Technology, Anjuran Research Management Centre (RMC), UTM, March 1999. 12.3.11 M.Z. Abd. Majid, ‘Introduction to project and Construction Management’, Seminar Construction Site Management, FKA, UTM, Sept. 1999. 12.3.12 M.Z. Abd. Majid, ‘Managing Factors that Influence Contractors Performance’, Seminar Construction Site Management, FKA, UTM, Sept. 1999. 12.3.13 M.Z. Abd. Majid, ‘Management of Steel Construction’, Seminar on Steel Industry, Pulai Spring Resort, Johor, Oct. 1999. 12.3.14 M.Z. Abd. Majid, ‘Introduction of Project Management’, Professional Development Seminar, Kuala Lumpur, Nov. 1999. 12.3.15 M.Z. Abd. Majid, ‘Project Planning Using PDM’, Professional Development Seminar, Kuala Lumpur, Nov. 1999. 12.3.16 M.Z. Abd. Majid, ‘Monitoring and Control’, Professional Development Seminar, Kuala Lumpur, Nov. 1999. 12.3.17 M.Z. Abd. Majid, ‘Pengurusan Masa’, Program Pembangunan Pelajar Cemerlang, Mersing, Johor, Dis. 1999. 12.3.18 M.Z. Abd. Majid, ‘Pengurusan Kewangan’, Kursus Pengurusan Projek, UTM, Kolej Tun Hussein Onn dan Pusat Khidmat Kontraktor, April 2000. 13/24 12.3.19 Muhd Zaimi Abd. Majid, Che Wan Fadhil Che Wan Putra and Narimah Kasim, ‘IntegratingConstruction Scheduling and Knowledge-based Systems for Generating Material Scheduling’, APSEC 2000, 13-15 September 2000. 12.3.20 Che Wan Fadhil Che Wan Putra, Muhd ZaimiAbd. Majid and Narimah Kasim ‘Alternative Approach to Assess Communication Performance at Construction Sites’, APSEC 2000, 13-15 September 2000. 12.3.21 Eva Rita, Abdul Hakim Mohamad and M.Z.A. Majid, ‘Pembangunan Budaya Kualiti Dalam Firma Binaan’, Research Seminar on Construction, 12 – 13 September 2001. 12.3.22 M.Z.A. Majid and Nooryasmin Zainun ‘An Overview of Various Techniques to Develop Needs Model on Housing to Low Income Group’, Persidangan Kebangsaan Industri Pembinaan 2001, 29-31 October 2001. 12.3.23 M.Z.A. Majid and Khailrulzan Yahya ‘Ramalan Permintaan Rumah Kos Rendah, Kawasan Bandar Bagi Negeri Selangor – Satu Pendekatan Siri Masa’, Persidangan Kebangsaan Industri Pembinaan 2001, 29-31 October 2001. 12.3.24 Rosli Mohamad Zin, M.Z. A. Majid and Che Wan Putra C.W.F “Constructability Improvement of Project Designs”, Persidangan Kebangsaan Kedua Kejuruteraan Awam (AWAM), 6- 8 February 2002. 12.3.25 M.Z.A. Majid, ‘Introduction to Project Planning and Scheduling Technique’, Short Course on Project Planning and Scheduling, 25-28 February 2002, Johor Bahru. 12.3.26 M.Z.A. Majid, ‘Importance of Network Planning’, Short Course on Project Planning and Scheduling, 25-28 February 2002, Johor Bahru. 12.3.27 M.Z.A. Majid, ‘Work Progress Monitoring’, Short Course on Project Planning and Scheduling, 25-28 February 2002, Johor Bahru. 12.3.28 M.Z.A. Majid and Bachan Singh ‘Role of PMC’, Persidangan Pengurusan Projek bersama Bahagian Perkhidmatan Kejuruteraan, Kementerian Kesihatan Malaysia, 6-9 March 2002, Century Mahkota Hotel, Melaka (Invited speaker). 12.3.29 M.Z.A. Majid and Noor Yasmin Zainun “Technique to develop needs model on housing for low income groups : a literature and Malaysia experience”, The Second International Conference on Systems Thinking in Management (ICSTM – 2002), UK, 3 – 5 April 2002. 12.3.30 M.Z.A. Majid and Khairulzan Yahya “Forecasting Of Low Cost Housing Demand in Urban Areas – Artificial Neural Network and Arima Model Approach” The Second International Conference on Systems Thinking in Management (ICSTM – 2002), UK, 3 –5 April 2002. 12.3.31 M.Z.A. Majid and Khairulzan Yahya “Comparative Study on Forecasting Demand of Low Cost House in Urban Areas using Artificial Neural Networks and ARIMA Model” First International Conference on Construction in the 21st Century, Miami Florida, USA, 25 –26 April 2002. 12.3.32 Zainun, N. Y and.Z. A. Majid “An Overview of Model Using Artificial Neural Networks (ANN)”, Research Seminar on Construction, 30 – 31 October 2002, Johor Bahru, Malaysia. 14/24 12.3.33 Ir. Rosli Mohamad Zin, Che Wan Putra C.W.F, M.Z.A.Majid and Abdul Hakim Mohamad “Development of a Neural Network Model to Assess Design Constructability”, Research Seminar on Construction, 30 – 31 October 2002, Johor Bahru. 12.3.34 Zainun, N.Y. and Abd. Majid, M.Z. “Evaluation on Various Forecasting Models Using Artificial Neural Networks (ANN) 2nd International Conference on Innovation in Architecture, Engineering and Construction (AEC), 25-27 June 2003, Loughborough University, UK. 12.3.35 R.M. Zin , M.Z. Abd. Majid, M.Z., & Che Wan Putra, C.W.F. “A framework for the Assessment of Design Constructability”, 2nd International Conference on Innovation in Architecture, Engineering and Construction (AEC), 25-27 June 2003, Loughborough University, UK. 12.3.36 M.Z.A. Majid ‘ Managing Resources – Construction Machineries and Equipment’ Kursus Pengurusan Projek, 23-24 July 2003, Johor Bahru, Malaysia. 12.3.37 M.Z.A. Majid ‘ Managing Resources – Construction Material’ Kursus Pengurusan Projek, 23-24 July 2003, Sri Malaysia, Johor Bahru. 12.3.38 M.Z.A. Majid ‘Labour Resource Management’ Kursus Pengurusan Projek, 23-24 July 2003, Sri Malaysia, Johor Bahru. 12.3.39 Rosli Md. Zin, Che Wan Putra, C.W.F and Muhd Zaimi Abd. Majid ‘Design Constructibility Assessment’, APSEC 2003, 26 – 28 August 2003. 12.3.40 Rosli Md. Zin, Muhd Zaimi Abd. Majid, Che Wan Putra C.W.F, L.jawahar-Nesan and Abdul Hakim Mohammed ‘Constructibility Assessment Framework’, MICRA 2nd, 8 October 2003, Shah Alam. 12.3.41 Efni Uslinda Syamsuri, M.Z.A. Majid, and Mohamad Ibrahim Mohamad, Bahrul Anif‘ A Review of Sub-Contractors Selection and Using Fuzzy Logic As An Alternative Support’, The Ninth East Asia-Pacific Conference on Structural Engineering and Construction, 16 – 18 December 2003, Bali Indonesia. 12.3.42 Noor Yasmin Zainun and M.Z.A Majid, , ‘Forecasting Demand on Low Cost Housing in Urban Area In Malaysia : Artificial Neural Network (ANN) Approach’ The Ninth East Asia-Pacific Conference on Structural Engineering and Construction, 16 – 18 December 2003, Bali Indonesia. 12.3.43 Zubair Memon, M.Z.A Majid, ‘Utilization of Photogrammetry Techniques to Digitalize the Construction Site Progress’ International Conference on Construction Information Technology 2004 (INCITE 2004), 18 – 21 Feb 2004. 12.3.44 Mohammad Zin R, M.Z A. Majid and Mansur S.A, “Design – Related Problems in Construction – A Survey in the Malaysian Construction Industry” SEPKA 2004. 12.3.45 Efni Uslinda Syamsuri, M.Z.A. Majid, M.I. Mohammad,’A Pilot Study on Sub-Contractors Selection using Fuzzy Logic Algorithm’, MICRA 3rd Langkawi, 4-5 May 2004. 12.3.46 Faridah Ismail, Victor Torrence Abdullah & M. Z. A. Majid,.’An Exploratory for Investigating the Safety Culture in Malaysian Construction Organization’, MICRA 3rd Langkawi, 4-5 May 2004. 15/24 12.3.47 Zubair Ahmed, M.Z.A.Majid, Mushairry Mustaffar.,’A Strategy for Monitoring the Construction Stage’, MICRA 3rd Langkawi, 4-5 May 2004. 12.3.48 Muhd Zaimi Abd Majid, Z. A. Memon and Mushairry Mustaffar “Conceptual Digital Monitoring Model for Evaluating the Progress of Work” Conference ADETTI, Edificio, ISCTE, Lisbon Portugal, 13-15 September 2004. 12.3.49 Z.A.Memon, M.Z.Abd. Majid and Mushairry Mustaffar, “Systematizing the construction project evaluation and monitoring”, 3rd Scientific Conference on Project Management, Thessaloniki Greece, 24-25 September 2004. 12.3.50 Amran Rasli, M.Z. Abd. Majid & Ade Asmi, “Factors That Influences Implementation of Knowledge Management and Information Technology Infrastructure to Support Project Performance in the Construction Industry”, International Business Conference, UNITEN, Kuantan, 6-7 December 2004. 12.3.51 Danial Mohamed, Othman Che Puan, Muhd Zaimi Abd. Majid and Mohd Warid Hussin,‘The Progression of Civil Engineering Faculty and the Advancement of Civil Engineering Study Programmes,’ Conference on Engineering Education, 14-15 December 2004, Kuala Lumpur. 12.3.52 M.Z.Abd. Majid and M.S. Jamiah, ‘Engineering Doctorate (EngD) Programme at Universiti Teknologi Malaysia’, Conference on Engineering Education, 14- 15 December 2004, Kuala Lumpur. 12.3.53 M.Z.Abd. Majid, Zubair Ahmed Memon and Mushairry Mustaffar, ‘The DCM Model : A System for Monitoring and Evaluating the Physical Progress’, 3rd International Conference on Innovation in Architecture, Engineering and Construction (AEC), 15 – 17 June 2005, Rotterdam, The Netherlands. 12.3.54 M.Z.Abd. Majid, Ade Asmi and Amran Rasli, ‘Identification and ranking of critical components of knowledge management principles for the Malaysian Construction consulting Companies’, 3rd International Conference on Innovation in Architecture, Engineering and Construction (AEC), 15 – 17 June 2005, Rotterdam, The Netherlands. 12.3.55 Zubair A. Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar, ‘The DCM Model : An Expert System for Evaluating the Construction Progress’, SEPKA 2005, 5 – 6 July 2005, Sofitel Palm Resort, Johor Bahru. 12.3.56 Abd. Majid M.Z, Rasli A and Asmi A, ‘Classification of Information Technology Inftrastructure Capability Framework in Malaysian Construction Consulting Companies, SEPKA 2005, 5 – 6 July 2005, Sofitel Palm Resort, Johor Bahru. 12.3.57 M.Chitrakala and Muhd Zaimi Abd Majid, ‘Tele-Construction design architecture to support Tele-Construction’, SEPKA 2005, 5 – 6 July 2005, Sofitel Palm Resort, Johor Bahru. 12.3.58 Abdul Rahim Abdul Hamid and Muhd Zaimi Abd. Majid, ‘Safe Working in A Confined Space’, Brunei International Conference On Engineering and Technology 2005, 15- 18th August 2005, Brunei. 12.3.59 Rasli A, Asmi A and Abd. Majid M.Z., M.I Mohamad, ‘A Research Framework : The Implementation of Knowledge Management and IT 16/24 Infrastructures Companies, Brunei International Conference On Engineering and Technology 2005, 15- 18th August 2005, Brunei. 12.3.60 Zubair A. Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar, ‘ The DCM Model : A Strategy for implementing the Information Technology Techniques at the Construction Phase”, 3rd International Conference on Construction in the 21st Century (CITC-III), 15- 17 September 2005, Athens, Greece. 12.3.61 Zubair A. Memon, Muhd Zaimi Abd Majid, and Mushairry Mustaffar (2006), “Investing the Issue of Project Progress Performance and Proposing a Prototype Software: A Case Study of Malaysian Construction Industry”, Joint International Conference on Computing, Decision Making in Civil and Building Engineering 14th –16th June, 2006, Montreal, Canada. 12.3.62 Muhd Zaimi Abd. Majid, Amran Rasli and Ade Asmi (2006), “A Framework Study : Knowledge Management and Project Performance in Malaysian Construction Consulting Companies”, Joint International Conference on Computing, Decision Making in Civil and Building Engineering 14th –16th June, 2006, Montreal, Canada. 12.3.63 Zubair Ahmed Memon, Muhd Zaimi Abd. Majid and Mushairry Mustaffar, “Digitalizing Construction Monitoring (DCM) : An Overview of Malaysian Construction Industry and Proposing Prototype Software” The 6th Asia Pacific Structural Engineering and Construction Conference 2006 (APSEC 2006), 5-6 September 2006, Malaysia. 12.3.64 Siti Rashidah Mohd Nasir and Muhd Zaimi Abd. Majid, “Project Cost Performance Forecasting System”, The 6th Asia Pacific Structural Engineering and Construction Conference 2006 (APSEC 2006), 5-6 September 2006, Malaysia. 12.3.65 Siti Rashidah Mohd Nasir and Muhd Zaimi Abd. Majid, “The Factors that effect a Successful Completion of Construction Project, SEPKA 2006 National Seminar of Civil Engineering Research, 19-20 December 2006, Rumah Alumni, UTM. 12.3.66 Siti Rashidah Mohd. Nasir and Muhd. Zaimi Abd. Majid, “Factors Influencing Project Success : Perspective from Client, Consultant & Contractors”, 4th International Conference in the 21st Century, Gold Coast, Australia, 11 – 14 July 2007. 12.3.67 Abdul Rahim Abdul Hamid, Muhd. Zaimi Abd. Majid and Bachan Singh, “Risiko Kesihatan Dalam Kerja Pembinaan”, Persidangan Kebangsaan Awam 2007, Langkawi, 29 – 31 May 2007. 12.3.68 Siti Rashidah Mohd. Nasir and Muhd. Zaimi Abd. Majid, “The Influential of Cost Overrun on Types of Project and Stages of Construction”, Persidangan Kebangsaan Awam 2007, Langkawi, 29 – 31 May 2007. 12.3.69 Muhd Zaimi Abd Majid “The Effect of Delays in Construction Industry”, The monograph, UTM, 2008. 12.3.70 Muhd Zaimi Abd Majid “Design Considerations, Practices and Problems : A Survey of Private Consultant Firm Perspective”, The Monograph, UTM, 2008. 12.3.71 Muhd Zaimi Abd Majid “Factors Affecting the “S” Curve in Determining the Project Completion, The Monograph, UTM, 2008. 17/24 12.3.72 Siti Rashidah Mohd Nasir, Muhd Zaimi Abd Majid, Ismail Mohamad, “Using Factor Analysis of Assets the Key factors Influencing the Success Completion of a Public School Project in Malaysia”, USM, Penang, 3-4 December 2008. 12.3.73 Siti Rashidah Mohd Nasir, Muhd Zaimi Abd Majid, “The Effect of Constructor’s Financial and Management. Factors on Project Completion,” Petaling Jaya, Malaysia, 18-20 November 2008. 12.3.74 Citrakala M., Abdul Hakim Mohammed, Muhd Zaimi Abd Majid, “An Automated Quantities Estimating Model, Through Entities Extraction From the Structural 2D drawing Proceeding of the 6th Regional Symposium on Infrastructure Development, RSID6”, Bangkok, Thailand, 19-20 January 2009. 12.3.75 Citrakala M., Muhd Zaimi Abd Majid, Abdul Hakim Mohammed, “An Automated Entities Extraction Model for Elements Recognition from the Structural 2D Drawing,” Page 1152-1158, Proceedings of the 5th International Conference, CITC-V, Istanbul, Turkey, 20 May 2009. 12.3.76 Yulia Setani, Muhd Zaimi Abd Majid, “Forecasting for Labour Planning in Construction Industry”, International Conference on Construction Industry 2009, Padang Indonesia, 30 July-1 August 2009. 12.3.77 Siti Rashidah Mohd Nasir, Muhd Zaimi Abd Majid , Ismail Mohamad, “Innovative Method in Determining Factors that Influence Project Success” GICC, September 2009. 12.3.78 Muhd Zaimi Abd Majid, Citrakala M., Atefeh Mohammadpour, “A Framework as an Alternative to BIM Environment for 2D and 3D Conventional Drawings”, Proceeding of GICC, Loughborough, Uk, 13-16 September 2009. 12.4 Refereed for Papers (International Level) 12.4.1 “Causes of delays in the Construction Industry” for an International Journal of Engineering Construction and Architectural Management, Blackwell, Oxford, United Kingdom (1997). 12.4.2 “International Expansion of Malaysian Contractors” for an International Journal of Engineering Construction and Architectural Management, Blackwell, Oxford, United Kingdom (1996). 12.4.3 “Construction Delays and Overrun: Analysis and Time Optimization” for An International Journal of Engineering Construction and Architectural Management, Blackwell, Oxford, United Kingdom (1998). 12.4.4 “Organisational Culture of Large Malaysian Construction Contractors” for an International Journal of Engineering Construction and Architectural Management, Blackwell, Oxford, United Kingdom (1998). 12.4.5 “Time Cost relationship of Public Sector Projects in Malaysia” for an International Journal of Engineering Construction and Architectural Management, Blackwell, Oxford, United Kingdom (1997). 12.4.6 Foreign Labour Utilisation in the Malaysian Construction Industry: The Myth of Transience for an International Journal of Engineering 18/24 Construction and Architectural Management, Blackwell, Oxford, United Kingdom (1997). 12.4.7 “The Crisis Preparedness of Construction Companies” for an International Journal of Engineering Construction and Architectural Management, Blackwell, Oxford, United Kingdom (1999). 12.4.8 “Investigation of the potential for Applying Freeform processes to Construction”, for 3rd International Conference on Innovation in Architecture, World Trade Centre, Rotterdam, 15-17 June 2005 (December 2004). 12.4.9 “A Decision Support Model for Procurement of IT for Construction Organisations”, for 3rd International Conference on Innovation in Architecture, World Trade Centre, Rotterdam, 15-17 June 2005 (December 2004). 12.4.10 Theoretical and Conceptual Aspects of Innovation: Supply Chain Management of Automobile Textile Manufacturing Industry”, for 3rd International Conference on Innovation in Architecture, World Trade Centre, Rotterdam, 15-17 June 2005 (December 2004). 12.4.11 “Systems Integration in Road Construction”, for 3rd International Conference on Innovation in Architecture, World Trade Centre, Rotterdam, 15-17 June 2005 (December 2004). 12.4.12 “Government-linked construction companies and construction industry development”, Paper no. 758, Journal of Engineering Construction and Architectural Management. Blackwell, Oxford, United Kingdom (April 2005). 12.4.13 Evaluation on Performance level of Design-Build and Design-Bid-Build (Focused on Multi-Family Housing Projects), Paper No. 172, CCIM Dubai Conference (2006). 12.4.14 Factors affecting the Selection of the appropriate Construction Management at Risk Contractor, Paper No. 014, CCIM Dubai Conference (2006). 12.5 Refereed for Papers (National Level) 12.5.1 “Identifying the Managers Philosophy in Malaysian Construction Workplace Using McGregor’s Assumption” for Journal Faculty of Civil Engineering UTM (1998). 12.5.2 “Behaviour of Uplift Forces of Straight-shafted Short Pile in Sand” or Proceeding of Construction, Materials and Environmental Technology Seminar, UTM (1999). 12.5.3 “Using Aggregate Impact Value to Predict Other Strength Parameters” for Proceeding of Construction, Materials and Environmental Technology Seminar, UTM (1999). 12.5.4 “High Strength Wastewater Treatment Using Biofilm Reactors” for Proceeding of Construction, Materials and Environmental Technology Seminar, UTM (1999). 19/24 12.5.5 “Strength Test on Trapezoid Web Plate Girder” for Proceeding of Construction, Materials and Environmental Technology Seminar, UTM (1999). 12.5.6 “The Impact of IT in Integrating Design and Construction” for Proceeding of Construction, Materials and Environmental Technology Seminar, UTM (1999). 12.5.7 Construction Project Delivery & Industry Skill : Crafting a better fit – Jurnal Teknologi B – UTM, 2000. 12.5.8 A study on variations in Severage Construction Project for Journal Teknologi B, UTM. (Dec 2001). 12.5.9 Time Schedule Planning for Road Project Using Rainy Day factor in West Sumatera for Journal Teknologi B, UTM (June 2001). 12.5.10 Application of Unvaried Neural Network in Forecasting Demand of Low Cost House in Urban Area, Journal Technology B, UTM (April 2004). 12.6 Others 12.6.1 Proposal paper to develop an Institute of Construction Management and Technology at UTM, 1998-99, approved by the Board of Universiti Teknologi Malaysia. 12.6.2 Memorandum of Establishment for the Institute of Construction Management and Technology of UTM. 12.6.3 Report on Environmental Impact Assessment for the following projects: a) Mixed development at Pulau Besar, Melaka (1994); b) Condominium project at Desaru, Johor (1994); c) Mixed Development at Kota Tinggi, Johor; and d) Hotel development at Johor Bahru (1994) 12.6.4 Contract documents for ‘ Flood mitigation project at Muar (1994). 12.6.5 Report on school safety for the Royal Commission (1991). 12.6.6 Technical note: ‘Non-excusable Delays in Construction’ by M.Z. Abd. Majid ,Civil Engineering Bulletin, 1998. 12.6.7 Prepared working paper for Engineering Doctorate Programme to be implemented at CTMC, 2003. 12.6.8 Prepared draft working paper for Memorandum of Understanding (MoU) between JKR and UTM, 2003. 12.6.9 Prepared working paper for Memorandum of Understanding (MoU) between Loughborough University and UTM, 2004. 12.6.10 Manual / Handbook Engineering Doctorate, 2005. 12.6.11 Prepared Working Paper for New Programme Master of Project Management, 2007. 20/24 14) 13) EXTERNAL EXAMINER 1. Constructability in the Malaysian Construction Industry – Phd. Candidate: Mekdam A. Nima, November 2000 (Universiti Putra Malaysia) 2. Industrialised Building System and Its application in The Housing Production in Malaysia – Masters Thesis: Wa’el Abdul Moghni Moh’d Alaghbari, February 2005 (Universiti Putra Malaysia) 3. Knowledge-Based Lessons Learned Corrective Actions under Preliminary Control Dalam Proses Pengendalian Biaya Proyek dengan Pendekatan Expert System : Yusuf Latief, July 2006 (Universitas Indonesia), Indonesia. INTERNAL EXAMINER THESIS DOCTORATE LEVEL 1. A Quality Management Framework for Architectural Design Phase Best Practices, PhD.Candidate: Abdullah Sani Ahmad, May 2001 2. Productivity Assessment and Schedule Compression Index for Project Planning, PhD. Thesis : Shaiful Amri Mansur, Jun 2004 3. Assessment of the Consultancy Fee for Structural Design Changes on Reinforced Concrete Buildings in Oman. PhD Thesis : Amur Salim Hamood Al-Harthy, February 2006 4. Universitas Indonesia PhD Thesis : Yusuf Latief, July 2006 5. The Diffusion of Technological Innovations in the Malaysian Construction Industry. Eng. Doctorate Thesis : Lau Sing Hian, November 2006 MASTER LEVEL 1. Penyediaan Pelan Kualiti Projek untuk Perundingan Penyelia dalam Projek Norhanim bt Zakaria – 10 April 2000. 2. Contractors’ Approaches to Risk Identification at the Tendering stage Thavarajah a/l Munisamy – 4 April 2000. 3. Pre-Estimating of School Building using Knowledge-Based System. Kamaruddin b Md Ali – 4 April 2000. 4. Penentuan Anggaran Harga Berpatutan bagi Turapan Jalan Blok Konkrit NorHafizi b Md Lani – 4 April 2000. 5. Optimizations in Organisation Management Study of Organisations Management in Financial & Strategic Aspect 21/24 Lim Kee Loy – 4 April 2000 6. Planning & Scheduling Hew Koh Yoong – 16 Oct 2000. 7. Pengurusan Pemulihan dari Kelewatan di dalam Industri Pembinaan. Jamiran b Rabu – 16 Oct 2000. 8. Construction Risk management Wong Keng Lian – 16 Oct 2000. 9. Strategi Menender Azahar Ahmad – 16 Oct. 2000. 10. Analysis of factors of Non Excusable Delays that influence contractors performance Ng Weng Seng – 28 Mac 2001. 11. Worker’s Viewpoints on Occupational Safety & Health Issues at Construction Sites in Johor Ruziah Husin – 28 Mac 2001. 12. Measuring Labour Productivity on Construction Site in Malaysia Chin Kuie Too – 5 Sept. 2001. 13. Reviewing the Construction Process using Business Process Re-engineering (BPR) Philosophy Anthony Martin – 5 Sept 2001. 13. Cost Analysis for School Building Through Design & Build Wahida bt. Ismail – 20 Feb 2002. 14. Material Constant for Shop Houses Rafidah bt Mokhtar – 20 Feb 2002. 15. Comparison Between Project Completion Period Ahmad Ridhuan Mohd Nordin – 27 Ogos 2002. 16. Online Survey on Current Trends in IT for Local Construction Industry Yeo Khee Seng -– 27 Ogos 2002. 17. Legal Rights of Construction Workers at Site in Accordance with the Legislations Yusmady Md Junus – 27 Ogos 2002. 18. Kajian Keberkesanan Penggunaan Kaedah ‘Critical Path Management’ di dalam Projek Pembinaan di Malaysia Yusof A.Bakar @ Md Talib – 27 Ogos 2002. 19. Analisa Anggaran Harga Tender Rafiza Mohammed – 27 Ogos 2002. 20. An Evaluation of the preliminary Stage of a New College University Project Development. Noraida Attan – 27 Ogos 2002. 21. Tentative Management Problem Solving for Conventional Housing Project. Chong Voon Yaw –17 Sept. 2003. 22. Alternative Sewerage System in Malaysia – A New Construction Technology. Goh Hong Chun –17 Sept. 2003. 22/24 15) 23. Construction Claims Saiful Rizan Sanusi –17 Sept. 2003. 24. Pembinaan Padang Golf dan Kemudahan Berkaitan. Mohammad Radzif Taharin –17 Sept. 2003. 25. Cabaran-cabaran yang Perlu Dihadapi oleh Pengurus Projek di Masa Kini. Rozline Mohd Khalid –16 Feb. 2003. 26. Penswastaan dalam Bidang Pembinaan di Malaysia. Wan Hasitinaziah Mohd Hassan –16 Feb. 2003. 27. Tentative Management Problem Solving for Conventional Housing Project. Chong Voon Yaw –16 Feb. 2003. 28. 3D Interactive Design Practice in Construction Industries from CE Perspective. Chong Ken Huat – Sept 2003. 29. The Effectiveness of Design and Build (D&B) Procurement Method in Malaysia Jeffry Yap Boon Hui – Sept 2003. 30. Challenges Faced by a Developer in a Housing Development in the Construction Stage of the Project Life Cycle in a Traditional Lump Sum Procurement System. Patrick Tan Paik Kuan – Sept 2003. 31. Problems Faced by Local Sub-contractors in Public Works. Goh Shui Wei – Sept 2003. 32. Control of Materials on Site. Chiew Seng Khoon – Sept 2003. 33. Steel Structure Management. Chiu Chee Kwong – Sept 2003. 34. VEWA : An Integrated Value Engineering Web-Based Application, Ho Boon Kit, May 2003. 35. An Application Model For Effective Implementation of Quality Management System in Construction Project, Mat Naim Abdullah @ Mohd Asmoni, Mac 2005. EXTERNAL APPOINTMENT 1. Penilai luar bagi Jawatan Prof. Madya di Kolej Universiti Teknologi Tun Hussein Onn, Batu Pahat, Johor – Oktober 2003 2. Advisory Panel INCITE (2003-2004) 3. EUROCODE Committee (2002-2003) –IEM. 4. Penilai luar bagi jawatan Prof. Madya di UPSI, Tanjung Malim, Perak. (Julai 2004). 5. Chairman for one of the conference on ‘World IT Conference for Design & Construction”, INCITE – Appointed by CIDB Malaysia (Langkawi, Feb 2004). 6. Chairman for one of the conference session on Innovation in Architecture, Engineering and Construction (AEC), June 2003, Loughborough UK. 23/24 16) 7. International Scientific Committee AEC, Conference June 2005, Delf University, Rotterdam. 8. International Scientific Committee CIB-CTBUH International Conference on Tall Building Oct. 2003, Kuala Lumpur. 9. Technical Evaluation Committee 2005, ‘Program Penerbitan Modul Mata Pelajaran Aliran Vokasional (MPAV) Tingkatan 4 & 5’, Bahagian Buku Teks, Kementerian Pelajaran Malaysia. 10. International Scientific Committee, Conference on Construction Culture, Innovation and Management “Sustainable Development through Culture and Innovation” Dubai until 2007. 11. External Examiner VIVA, Yusuf Latief, July 2006 (Universitas Indonesia), Indonesia. 12. Member of Editorial Panel of Journal Engineering, Construction and Architectural Management AMERALD UK, August 2006 13. Technical Member ‘Organisation of Information about Construction Works under International Standards Ccommittee ISC‘D’, SIRIM INTERNAL APPOINTMENTS 1. 2. 3. 17) Evaluate 3 IRPA proposal at Institutional level – Mac 2001. Panel of judges for Industrial Art & Technology Exhibition (INATEX) 2004, UTM. Panel of judges for Industrial Art & Technology Exhibition (INATEX) 2006, UTM AWARDS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. Anugerah Dekan, ITM, 1979. Penyelia Pelajar yang memenangi hadiah Pertama Penulisan bagi InstitusiInstitusi Pengajian Tinggi di Asia Pacific dan telah membentangkan kertas ini di Singapura. Ajuran American Institute of Construction, Nanyang University of Technology and CI- Premier of Singapore (1990). Anugerah Kepujian Universiti, UTM, 1997. Hadiah Pergerakan Gaji, UTM, 1997. Anugerah Kualiti Staf Cemerlang, Fakulti Kejuruteraan Awam, UTM, 1998. Surat makluman prestasi sangat baik 2001 secara menegak (dihadkan oleh kuota). Anugerah Perkhidmatan Cemerlang, UTM, 2002. Anugerah Pingat Emas Penyelidikan (ITEX) 2004 – the Minds. Special Award Korean Invention Academy 2004. Memenangi tempat ketiga dalam pertandingan PECIPTA Malaysia 2007 yang telah diadakan pada 10 – 12 Ogos 2007 di KLCC. Best International Solution of Formwork System Organise by PERI, Germany. Supervisor for group of student and presented at Weissenhorn, Germany, December 2007. Silver Award, ITEX May 2009 Anugerah Kecemerlangan Industri Pembinaan Malaysia (MCIEA 2009) – Penerimaan Anugerah Pengiktirafan Khas MCIEA 2009, CIDB R&D Award, 2009 R&D Competition Invention Innovation Design FSPU 2009 1st Runner-up (Staff) Silver Medal, SCFIC : Safety Culture Framework In Construction 2010 Anugerah Harta Intelek Negara 2010 – Pemenang Saguhati Dua Ribu Ringgit Malaysia Kategori Individu 24/24 18) CO-CURRICULUM 18.1 Societies 18.1.1 Exco Committee for Islamic Society of University of Loughborugh (1996-1997) 18.2 Community Services 18.2.1 Committee member for Kawasan Rukun Tetangga Jalan Meranti, Taman Sri Pulai (1999 - 2000). 18.2.2 Committee member for Kawasan Rukun Tetangga Jalan Meranti, Taman Sri Pulai (2000 - 2001). 18.2.3 Committee member for Kawasan Rukun Tetangga Jalan Meranti, Taman Sri Pulai (2001 – 2004). 18.2.4 Committee member for Kawasan Rukun Tetangga Jalan Meranti, Taman Sri Pulai (2004 – 2005). 18.2.5 Committee member for Kawasan Rukun Tetangga Jalan Meranti, Taman Sri Pulai (2005 – 2006). 18.2.6 Committee member for Kawasan Rukun Tetangga Jalan Meranti, Taman Sri Pulai (2006 – 2008). 18.2.7 Committee Persatuan Ibu Bapa dan Guru (PIBG) Sek. Keb. Taman Sri Pulai 2001- 2002. 18.2.8 Committee Persatuan Ibu Bapa dan Guru (PIBG) Sek. Agama Taman Sri Pulai 2003 – 2004. 18.2.9 Committee ‘Persatuan Ibu Bapa dan Guru (PIBG) Sek. Keb. Taman Sri Pulai 2000-2005. 25/24