REQUEST FOR QUALIFICATIONS LSU PROPERTY FOUNDATION NICHOLSON GATEWAY DEVELOPMENT PROJECT AT LOUISIANA STATE UNIVERSITY Issued: July 24, 2015 Baton Rouge, LA The LSU Property Foundation is soliciting responses from interested parties to enter into a unique public-private partnership agreement to design, build, finance, and maintain new on-campus student residence facilities and other amenities on LSU’s flagship campus in Baton Rouge, LA, as further specified herein. This Request for Qualifications (RFQ) contains statements, descriptions and analyses of LSU and other project background information. Such statements, descriptions and analyses are for informational purposes only. The LSU Property Foundation does not guarantee or represent and warrant the completeness or accuracy of such information, and any respondent to this RFQ should complete its own due diligence with respect to such information. If you are interested in submitting a response to this RFQ, please note that the response must be submitted no later than 3:00 p.m. CT, August 21, 2015. Brailsford & Dunlavey, Inc. and CSRS, Inc. have been engaged as a collaborative team to serve as the Development Advisor (Development Advisor) for the LSU Property Foundation. Any questions concerning this RFQ should be directed in writing to the Development Advisor at the email address info@nicholsongateway.com. TABLE OF CONTENTS 1. Request for Qualifications 1.1. Overview of the Opportunity 1.2. Overview of the Selection Process 2. Project Team 2.1. LSU Property Foundation 2.2. Intent to Lease Agreement Between the LSU Property Foundation and Louisiana State University 2.3. Project Management Committee 2.4. Development Advisors 3. Louisiana State University and Agricultural and Mechanical College 3.1. Louisiana State University Background 3.2. Enrollment 3.3. Vision Statement 3.4. Mission Statement 3.5. Flagship 2020 and Additional University Information 4. LSU Residential Life 4.1. Residential Life Vision Statement 4.2. Residential Life Mission Statement 4.3. Department Goals 4.4. Existing LSU Housing Inventory 4.5. Themed Housing 4.6. Occupancy 4.7. Rental Rates 5. Description of the Development Opportunity 5.1. Project History 5.2. Nicholson Gateway Master Plan & Addendum 5.3. Overall Project Goals & Objectives 5.4. Student Housing Program 5.5. Non-Housing Program 5.6. Site Description 5.7. Design Objectives 5.8. Timeline 5.9. Maintenance & Operations Objectives 5.10. Financial & Credit Impact Objectives 2 of 26 6. RFQ PROCEDURE & RESPONSE REQUIREMENTS 6.1. Overview of the RFQ Process 6.2. RFQ Schedule 6.3. Optional Pre-Submittal Conference Call 6.4. Addenda 6.5. Qualification Requirements 7. SUBMITTAL REQUIREMENTS 7.1. Background & Team Information 7.2. Technical Capability 7.2.1. Maintenance Experience 7.2.2. Student Services 7.2.3. Capital Improvements 7.3. Financial Capability 7.4. Relevant Experience & References 7.5. Approach 7.6. Required Submittals 7.7. Quantity of Proposals 7.8. Submittal Instructions 7.9. Disclaimer 3 of 26 1. REQUEST FOR QUALIFICATIONS (RFQ) 1.1 Overview of the Opportunity The LSU Property Foundation (Property Foundation) is issuing this Request for Qualifications (RFQ) to solicit responses from interested parties (Private Entity or Private Entities) to enter into a public-private partnership with the Property Foundation to develop mixed-use residential communities (Project) on Louisiana State University’s (LSU) flagship campus. The Property Foundation is seeking a Private Entity to design-build-finance-maintain (DBFM) the Project in a manner consistent with the Property Foundation’s objectives, which are described further within this document. The Project includes mandatory development at the Nicholson Gateway site and the option to redevelop some existing residence halls (Residence Hall Project) on other parts of the LSU campus, as described herein. 1.1.1. The Nicholson Gateway portion of the Project includes residential housing units and retail space on the west side of LSU’s flagship campus along Nicholson Drive, in close proximity to Tiger Stadium, the LSU Pete Maravich Assembly Center, and a key roadway linking LSU to the Louisiana State Capitol and the Baton Rouge downtown area. Preliminary plans for the Project include approximately 1,640 student housing beds and between 30,000 to 50,000 square feet of retail space, all with associated parking. The Project is primarily aimed at meeting the needs of LSU students and visitors. The Project will address some portion of the related infrastructure needs, including removal of hazardous materials from and demolition of approximately 200 existing apartments located on the development site. 1.1.2. The Residence Hall Project is an optional development opportunity. In December 2014, LSU issued a Request for Information (RFI) to developers to analyze the opportunity to use a publicprivate partnership to accelerate its housing master plan. The RFI provided specific parameters for the replacement of six (6) 1960s-era residence halls (Miller, Herget, McVoy, Acadian, Broussard and Kirby Smith Halls) with approximately 2,100 new beds. Renovating the Pentagon Barracks (comprising 400 beds in Jackson, Lejeune, Taylor and Beauregard Halls) was also analyzed by LSU during the RFI process. LSU reported to the Board of Supervisors that, per the specifications in the RFI and the corresponding developer responses, a public-private partnership for accelerating these projects would not provide favorable terms for the University. A copy of the RFI can be found on the website: www.nicholsongateway.com. The Property Foundation is interested in determining if there may be a different configuration that supports the acceleration of the housing master plan by combining the development from the Nicholson Gateway Project and the replacement Residence Hall Project. In an effort to drive the best overall outcome for the LSU community, the Property Foundation will allow Private Entities to offer creative solutions for addressing these housing objectives. 4 of 26 1.1.3. Submitting a solution for the replacement Residence Hall Project will not be a requirement. The decision to submit on the Nicholson Gateway project exclusively, to propose on the Nicholson Gateway project and the Residence Hall Project collectively, or to submit on the Project in both configurations, will be at the sole discretion of the Private Entities. 1.2 Overview of the Selection Process Through this RFQ process, the Property Foundation is seeking to identify Private Entities with the best qualifications, experience, financial capacity, and proven track records of executing similar projects. Following a review of submittals, the Property Foundation will establish a shortlist of the most qualified Private Entities for invitation to a Request for Proposals (RFP) process to further develop the framework and structure for a public-private partnership with the Property Foundation. A response to this RFQ is a prerequisite to participate in subsequent steps. Two (2) or more Private Entities may collaborate in submitting a response to this RFQ, however, a single Private Entity must be designated to contract with the Property Foundation and be responsible for performance under any future contract. Private Entities should not contact any officials of the Property Foundation, the LSU Foundation, the University, the Department or Residential Life, or advisors of the University with regard to this opportunity, other than the Development Advisors (Brailsford & Dunlavey, Inc. and CSRS, Inc.) through the channels described within. Private Entities are advised that unauthorized contact with officials, related parties, or advisors of the Property Foundation may result in elimination of a Private Entity from this RFQ process. 5 of 26 2. PROJECT TEAM 2.1 LSU Property Foundation The Property Foundation is a private, nonprofit, Louisiana corporation, exempt from federal income tax under Section 501(1) of the Internal Revenue Code, as an organization described in Section 501(c)(3) of the Code, affiliated with the LSU Foundation and established for the purpose of providing private financial support for the flagship campus of LSU and the LSU AgCenter. The Property Foundation is governed by a Board of Directors composed of business and professional leaders interested in fostering private support for LSU. Over the past several years, the Property Foundation, in association with the LSU Foundation, LSU, and others, has privately financed, planned, and constructed numerous facilities benefitting LSU and its academic programs, including: the University Laboratory School Gym and Performing Arts Facility; the Petroleum Engineering Research and Technology Transfer Lab; the LSU Rural Life Museum Visitors Center; and the LSU School of Veterinary Medicine Equine ICU. 2.2 Intent to Lease Agreement between the Property Foundation and LSU The LSU Board of Supervisors and the LSU Property Foundation have entered into an Intent to Lease Agreement, through which the Foundation will select a Private Entity to implement the master plan for the Nicholson Gateway Development which the LSU Board approved in March 2013 and October 2014. As an Agreement is being drafted with a Private Entity (Private Entity Agreement), LSU and the Property Foundation will simultaneously draft a Ground Lease Agreement to lease the affected property to the Property Foundation. In the end, LSU will lease the land to the Property Foundation, who will then sublease, with LSU’s express approval, to the Private Entity pursuant to the Private Entity Agreement. The Property Foundation will form a single-member limited liability company or other special purpose entity for this project, in which case the Private Entity Agreement and the Lease from LSU will be with the limited liability company or other special purpose entity. 2.3 Project Management Committee The Project will be steered by a Project Management Committee of the Property Foundation (Committee), consisting of seven (7) members appointed by the Property Foundation and six (6) members appointed by LSU. The Committee will be responsible for making final recommendations to the Property Foundation and to LSU regarding all contracts, designs, and other issues relating to the Project. 2.4 Development Advisors The Committee has engaged the collaborative services of Brailsford & Dunlavey, Inc. and CSRS, Inc. to serve as the Development Advisor and Program Manager (Development Advisor) for the Project. The Development Advisor will help the Property Foundation engage and monitor the development partnership. 6 of 26 3. LOUISIANA STATE UNIVERSITY AND AGRICULTURAL AND MECHANICAL COLLEGE 3.1 Louisiana State University Background Louisiana State University (LSU or the University) is the flagship institution of the Louisiana State University system and the premier research university in the state of Louisiana. Since 1860, LSU has served the people of Louisiana, the region, the nation, and the world through extensive, multipurpose programs encompassing instruction, research, and public service. LSU is: The flagship institution of the State of Louisiana; One of only 25 universities nationwide holding both land-grant and sea-grant status; A provider of annual research expenditures of more than $145 million, a significant factor for the Louisiana economy; Home to a community of more than 34,000 faculty, staff, and students from every state and more than 120 countries; and is A contributor of more than a half-billion dollars to the Baton Rouge economy annually. The University offers degrees in 12 different academic schools, including 69 baccalaureate, 74 masters, and 50 doctoral degree programs. 3.2 Enrollment LSU’s fall 2014 enrollment consisted of 25,577 undergraduate students and 4,574 graduate students for a total enrollment of 30,451 students. Class Freshman Sophomore Junior Senior Graduate Total Enrollment 7,212 5,942 5,772 6,651 4,874 30,451 7 of 26 3.3 Vision Statement As the flagship institution of the state, the vision of Louisiana State University is to be a leading research-extensive university, challenging undergraduate and graduate students to achieve the highest levels of intellectual and personal development. Designated as a land-, sea-, and spacegrant institution, the mission of Louisiana State University (LSU) is the generation, preservation, dissemination, and application of knowledge and cultivation of the arts. 3.4 Mission Statement In implementing its mission, Louisiana State University is committed to: Offering a broad array of undergraduate degree programs and extensive graduate research opportunities designed to attract and educate highly qualified undergraduate and graduate students; Employing faculty who are excellent teacher-scholars, nationally competitive in research and creative activities, and who contribute to a world-class knowledge base that is transferable to educational, professional, cultural, and economic enterprises; and Using its extensive resources to solve economic, environmental, and social challenges. 3.5 Flagship 2020 and Additional University Information LSU is dedicated to excellence and accountability to pursue a path grounded in decades of tradition and guided by the foundation of the initial Flagship Agenda. With its latest strategic plan, Flagship 2020, LSU focuses on the goals of learning, discovery, diversity, and engagement. The Flagship 2020 plan can be found at the following website - http://www.lsu.edu/flagshipagenda. Additional information about the University is available at http://www.lsu.edu/about/index.php. 8 of 26 4. LSU RESIDENTIAL LIFE 4.1 Residential Life Vision Statement The department strives to be a premier residential life program that embodies the highest standards of campus housing. 4.2 Residential Life Mission Statement The mission of Residential Life is to provide dynamic student-focused learning communities that support development and academic success in clean, safe, and sustainable facilities that meet the needs of the campus community. 4.3 Department Goals The Department of Residence Life focuses on five goals, as described below. Learning: Strengthen and further integrate Living-Learning components in residential communities Communication: Communicate the value of our people, programs, facilities, and services to our stakeholders Sustainability: Promote stewardship of resources within our community in support of global environmental sustainability Development: Seek creative alternatives for funding and support of residential programs and services Improvement: Use assessment, evaluation, and implementation for continuous improvement of our people, programs, facilities, and services. 4.4 Existing LSU Housing Inventory LSU’s housing system currently consists of 6,254 beds (non-Greek-affiliated) in a total of 21 residence halls and 4 apartment complexes. The number of revenue-generating beds fluctuates by academic year as a result of the rotational building and facility improvements conducted by the LSU Department of Residential Life. Within the existing inventory, LSU provides a spectrum of unit-type configurations, including traditional units and suite units available in single- and multipleoccupancy (double, triple, and quadruple) bedrooms and apartment units available in single bedrooms. The Department of Residence Life at LSU is continually enhancing its existing inventory. The number of available revenue-generating beds is adjusted each academic year in accordance with an improvement schedule, resulting in some residence halls being fully or partially offline. Within the last 10 years, the following residence halls have been newly constructed: Residential College 9 of 26 One Complex (North, South, and West) and Cypress Hall. The following properties have undergone significant renovation in the last 10 years: Kirby Smith Hall, Annie Boyd Hall, Blake Hall, Pentagon, and East and West Laville Halls. Below is a chart of the current Housing Master Plan’s progress in improving the housing system. 4.5 Themed Housing Themed housing comprises a significant portion of LSU’s housing. Discipline-based themed housing accommodates students of the same major, college, or program. Interest-based themed housing accommodates students of different majors or colleges that are interested in a specific living experience. Residence Hall Blake Hall Evangeline Hall Residential College West Residential College North Residential College South Cypress Hall Broussard Hall Herget Hall Lejeune Hall East Laville Hall West Laville Hall Acadian Hall East Campus Apartments Discipline‐Based Agriculture Residential College Science Residential College Business Residential College Engineering Residential College Mass Communication Residential College Global Connections Residential College Human Sciences & Education Residential College Interest‐Based Career Discovery Freshmen Residential College Leadership & Service Learning Honors Honors Tiger Bridge Program Sophomore Gold Note: Cypress Hall is currently under construction and is scheduled to be open in the Fall of 2015. 10 of 26 4.6 Occupancy Overall, the LSU housing system had an occupancy of 95.9% for the 2014-15 academic year. On average, the occupancy of the undergraduate housing components was above 96.3%, while graduate housing averaged an occupancy of 89.9%. LSU has maintained a high level of occupancy throughout the past 15 years, as demonstrated by the Residence Hall and Single Student Apartment occupancy numbers listed below, despite that it does not have a “live-on campus” requirement. 2000 2001 2002 2003 2004 2005* 2006* 2007 2008 2009 2010 2011 2012 2013 2014 95.7% 96.7% 94.8% 97.2% 98.9% 100.2% 83.9% 98.3% 97.8% 97.6% 99.4% 95.5% 98.3% 96.2% 96.3% *2005 and 2006 were impacted by Hurricane Katrina The majority of the current on-campus residents are freshmen. The chart below shows occupancy levels for the Fall of 2014. Class Freshman Sophomore Junior Senior Graduate Total Enrollment 7,212 5,942 5,772 6,651 4,874 30,451 Living on Campus 3,734 952 476 233 422 5,817 Please note that the Property Foundation does not make any representations or assumptions regarding future occupancy levels. 11 of 26 4.7 Rental Rates Residence Halls Demonstrated below are the per-student, per-semester residence hall rental rates for the 201415 academic year. Name 1‐student Blake Hall Blake Hall Residential College Miller Hall McVoy Hall Kirby Smith Hall Beauregard Hall Jackson Hall Taylor Hall LeJeune Hall Louise Garig Hall Annie Boyd Hall Highland Hall Evangeline Hall Res. College West Res. College North Res. College South Broussard Hall Herget Hall East Laville Hall West Laville Hall Hall/Community Bath 2‐student 3‐student $3,175 $2,885 $2,885 $2,720 4‐student Suite Bath 2‐student 3‐student $3,365 $3,640 1‐student $2,720 Private Bath 2‐student 3‐student $4,590 $3,060 $2,885 $2,885 $2,885 $2,885 $2,885 $2,885 $3,160 $3,160 $3,450 $3,450 $3,160 $3,160 $3,450 $3,450 $3,060 $3,365 $3,060 $3,335 $3,640 $3,640 $3,640 $2,720 $2,995 $2,885 $3,160 $3,365 $3,060 $2,885 $3,640 $3,640 $3,640 $2,995 $2,995 $3,450 $3,450 Apartment Rental Rates Demonstrated below are the per-student, per-semester apartment rental rates for the 2014-15 academic year. Name East Campus Apartments West Campus Apartments Edward Gay Apartments Nicholson I Nicholson II Efficiency $4,360 1BR 1BA 2BR 1BA $3,995 $3,365 $2,940 Apartment 2BR 2BA $3,995 3BR 1BA 3BR 2BA $3,830 4BR 2BA $3,725 $3,725 $728 $3,215 12 of 26 5. DESCRIPTION OF DEVELOPMENT OPPORTUNITY 5.1 Project History The Project began in 2012 with a Nicholson Gateway Master Plan, which included several public forums and a market analysis. As was the case then, the Project is expected to be a mix of primarily student residential space (geared toward sophomores, juniors, seniors and graduate students) with student-centric retail. A revised master plan for the area, prepared in 2014 at LSU’s request, includes more housing and less retail than was originally proposed, but the primary goal of addressing housing needs and creating a new gateway district remain intact. 5.2 Nicholson Gateway Master Plan & Addendum The Nicholson Gateway Master Plan was issued in March 2013 and revised via addendum in October 2014. Full volumes of the Master Plan and the Addendum can be found within the RFQ portion of the project website: www.nicholsongateway.com 5.3 Overall Project Goals & Objectives The goal of the Nicholson Gateway Master Plan is to transform the Nicholson Drive corridor into a Gateway district. Underlying goals are to: Establish a coherent public face that defines LSU’s presence along Nicholson Drive; Provide an appropriate vista for a major campus entrance that reinforces the LSU brand; Define a recognizable entrance that introduces the unique and transformative LSU experience; Provide a sufficient scale to create a comprehensive gateway that establishes a sense of place; Establish a district, or sense of place unto itself, with a distinct albeit familiar architectural style; Embrace the timeless aesthetics consistent with the beauty of campus and prominence of the institution; Utilize exterior materials that are consistent with existing campus facilities; and Extend the LSU environment to the edge of the campus. As summarized in the Master Plan, the Nicholson Gateway Development will turn what has traditionally been a secondary entrance to campus into a primary gateway district. It will become a place that feels like a part of campus, rather than a service-oriented bypass. This site and other underutilized sites in the precinct will accommodate new campus facilities and an improved 13 of 26 landscape that will create a sense of arrival. The change will be dramatic. Upon entering the campus a visitor will be struck with a powerful impression, a sense of entry, and a feeling of “Wow, I have arrived.” 5.4 Student Housing Program The Property Foundation has completed market and financial research to create marketresponsive programs and to confirm the feasibility of the Project. The Project’s competitive advantage is the location, LSU’s communities, and the overall campus experience. A detailed program will be provided to Private Entities invited to the RFP process. Current plans for the Project at the Nicholson site are to provide approximately 1,640 beds of student housing along Nicholson Drive, including approximately 870 beds in apartments for undergraduates, 400 beds in a residence hall that will be used to accommodate some of LSU’s undergraduate student athletes, and 370 beds in apartments for graduate students. Should Private Entities also decide to pursue the development of the Residence Hall Program, current plans are to provide the replacement of 2,700 beds of on-campus residence halls. The Project will provide amenities to the extent that amenities generate positive developmental outcomes, but providing amenities for the sole purpose of competing with the high-end off-campus market is not required. The Project should utilize a balanced approach that responds to the importance of quality and the sensitivity to affordability, meaning that the Project quality should not be reduced to drive pricing down and rental rates should not be increased in order to add unnecessary amenities to compete with the off-campus market. 5.5 Non - Housing Program To enhance the student experience within the community, as well as the broader area of this portion of the flagship campus, the Property Foundation is seeking to provide additional qualityof-life services such as parking, retail, and associated infrastructure. These additional components are to be delivered as part of the Project and will be further defined in the RFP. Parking: An appropriate amount of parking, as specified by the Property Foundation, is expected to be provided by the Private Entity. Parking will be inclusive of replacement of any displaced parking due to the development of the Project. Retail: The Property Foundation has conducted market research to determine the viability of the retail program. The Project’s retail space is expected to total approximately 30,000 to 50,000 square feet and to be allocated for convenience-based campus retail spaces. The Private Entity will be responsible for lease-up, operations, and maintenance of any retail spaces. 14 of 26 Existing Structures: Abatement and demolition of existing facilities on the site will be the responsibility of the Private Entity. Additionally, the Private Entity will be responsible for the provision of utilities to the site. The Property Foundation has conducted detailed site investigation, and a detailed “site package” will be provided to Private Entities invited to participate in the RFP. Public Funded Infrastructure / Garage: A five-level, cast-in-place parking garage sized at 298,855 square feet and designed to accommodate 983 spaces will be provided at the Nicholson site through a publicly-funded improvement project. Construction on the garage is scheduled to commence in March 2016 with an anticipated completion date of April 2017. Expansion of the parking garage will be possible as part of the Project. A new gravity sewer line along the west side of the site draining south to a new pump station anticipated to be completed March 2016 is also included through public funding. Lastly, improvements to the Nicholson Drive roadway complete with repositioning of vehicular travel lanes and the addition of pedestrian crossings and amenities will be provided through public funding. More detail on the publicly-funded projects will be provided in a “site inventory package” as part of the RFP. 5.6 Site Description The overall Nicholson site is approximately 28 acres situated in the northwest quadrant of the flagship campus. The site is bounded by Nicholson Drive (LA Highway 30) on the east, Skip Bertman Drive on the south, a single rail track (Canadian National Railway) on the west, and West Chimes Street on the north. The site is owned by the State of Louisiana. There are three new buildings in varying stages of design/construction on the site: A. LSU Foundation Building (LSUF) at the southeast corner of the site; B. Tiger Athletic Nutrition Center (TANC) at the southwest corner of the site; and C. Nicholson Gateway Parking Garage (NGPG) on the west side of the site. Other projects in varying stages of design/construction on or near the site include: D. An access drive on west side of site connecting Skip Bertman Drive to the new parking garage; E. A surface parking lot on south side of site, serving the LSUF and TANC buildings; F. Improvements to the Nicholson Drive roadway corridor, including new pedestrian crossings; and G. A gravity sewer line on the west side of the site draining south to a new sewer pump station (by others). 15 of 26 The parking garage (C) is part of an in-progress “infrastructure project” that includes items D through G above. Each of these projects are located on assigned parcels within the overall site; the residual parcel comprises the “Private Entity site.” Detailed information regarding these projects will be provided to Private Entities that are invited to participate in the RFP process. Please note that the image below is a master plan level rendering of the site. There are currently buildings on the site totaling approximately 230,000 square feet (13 two-story apartment buildings and accessory buildings) that will be removed by the Private Entity as part of this Project. Information regarding required hazardous material abatement and demolition of these buildings will be provided to Private Entities that are invited to participate in the RFP process. Lastly, there are other existing features remaining on the site including subsurface foundation elements of a previously-demolished baseball stadium, concrete slabs of previously-demolished apartment buildings, parking lots, drives and walks, site lighting fixtures, fencing and limestonesurfaced temporary parking lots. Detailed information related to the disposition of these items will be provided to Private Entities that are invited to participate in the RFP Process. 16 of 26 5.7 Design Objectives The expectation is that this Project will demonstrate the design tenets adopted by the Association of College and University Housing Officers – International (ACUHO-I) 21st Century Project focused on sustainability, flexibility, community, and technology. The Project should be configured in a “village-style” concept incorporating unified architectural themes and materials throughout each building and in outdoor common areas. The village-style concept will be realized with vibrant, centrally located community spaces that will serve as hubs of residential and campus life. In keeping with optimal community design and institutional criteria from ACUHO-I 21st Century Project standards, the buildings will likely be a mid-rise development with ample green space and pedestrian connections. The Project will be expected to be designed in accordance with LSU’s design standards, including: OFS Standards Wayfinding Standards Exterior Architecture Standards Site Standards Sustainability Standards IT Standards Retail Standards Residential Life Standards LSU’s design standards, as listed above, will be provided during the RFP process. LSU’s design standards are intended to be guidelines for development, but unless expressed as requirements, the design standards are not intended to be prescriptive. Provided that the Property Foundation’s objectives are satisfied, the Private Entities will have some design flexibility towards programming the amended master site plan and its buildings. The selected Private Entity should recognize that the Project’s final designs will be negotiated with the Property Foundation through a rigorous plan review process, including a review for approval of Schematic Design performed by LSU’s Board of Supervisors. 5.8 Timeline The Project at the Nicholson site is scheduled to be completed and opened in one phase by the Fall of 2018. Should the Private Entity determine to develop the Residence Hall Project, the schedule and phasing for these 2,700 beds will be determined in coordination with the Property Foundation and the LSU Department of Residential Life. 17 of 26 5.9 Maintenance & Operations Objectives In alignment with the stated objectives, the delivery of operations and maintenance for the Project must be consistent with services currently provided on campus. There are four (4) options that the Property Foundation will consider from Private Entities for the delivery of operations and maintenance: 1. Property Foundation will maintain and operate the Project and will be reimbursed for all costs by the Private Entity; 2. Private Entity will self-operate the development in alignment with LSU standards; 3. Private Entity will outsource to a third-party operator at the sole cost of the Private Entity. The third-party operator will provide a level of service consistent with LSU standards; or 4. A combination of any two (2) options listed above. If maintenance and operations are to be delivered by the Private Entity or third-party operator, the Property Foundation will work with the Private Entity to develop an agreement that delineates the standards for the operations and maintenance responsibilities within and around the Project. Additional coordination will be required to ensure that the delivery of services is consistent with the Property Foundation’s vision for the Project. It is important to note, however, that the Property Foundation seeks to retain the responsibility for custodial services, residence life and programming, marketing, student billings, collections and room assignments for the Project through LSU’s Department of Residential Life. Therefore, these duties will not be included in the operations delivery approach provided by the Private Entity in response to this RFQ. 5.10 Financial & Credit Impact Objectives Respondents to this RFQ should understand that the University’s credit ratings and credit condition are important to the Property Foundation. The Property Foundation expects that any agreement for the development of the Project will be structured with the priority of minimizing and ideally eliminating any credit and financial impact to the Property Foundation and the University. 18 of 26 6. RFQ PROCEDURE & RESPONSE REQUIREMENTS 6.1 Overview of the RFQ Process The purpose of the RFQ is to identify interested parties that demonstrate the best qualifications, experience, and financial capacity necessary to assume the responsibilities of the Private Entity. The Property Foundation’s evaluation of each RFQ response will be based upon the information provided, additional information requested by the Property Foundation, information obtained from references and independent sources, and formal presentations, if requested. Private Entities that are deemed the most qualified by the Property Foundation in the RFQ process will be invited to participate in the RFP process and will be provided with additional information concerning the proposed development and provided an opportunity to conduct due diligence. 6.2 6.3 RFQ Schedule RFQ PROJECTED SCHEDULE DATE Release of RFQ July 24, 2015 Optional Pre-Submittal Conference Call August 4, 2015 Deadline for Questions August 7, 2015 Response Addendum Posted August 14, 2015 RFQ Responses Due August 21, 2015 Optional Pre-Submittal Conference Call An optional pre-submittal conference call will be conducted. Topics to be covered during the conference call will be: A general description of the Project; An overview of the selection process; and Questions and answers. The call is scheduled on August 4, 2015 at 1:00pm central time. Conference Call-In Number: (630) 424-2334 Passcode: 8885664# 19 of 26 6.4 Addenda The Property Foundation, through its Development Advisor, may issue written addenda prior to the RFQ submission date, supplementing, modifying or interpreting any portion of this RFQ. No verbal or written information from any source other than the Development Advisor is authorized as representing the Property Foundation. It is solely the Private Entity’s responsibility to check the Nicholson Gateway website at www.nicholsongateway.com forty-eight (48) hours before the closing time of this solicitation process to verify that the Private Entities have received any addenda that may have been issued. 6.5 Qualification Requirements This RFQ is open to all prospective parties who seek qualification to pursue the development of the Project at the flagship campus. Qualification will be based on a determination by the Property Foundation at its sole and complete discretion. The Private Entity must meet the requirements highlighted in Section 7 – Submittal Requirements. Upon receipt, all RFQ submissions will be reviewed for completeness in accordance with the submission requirements and assessed in the areas of technical and financial capability, relevant project experience, and references, with respect to the standards set forth in this RFQ. After reviewing all submissions, the University intends to issue a shortlist of the most qualified Private Entities to be invited to the RFP process. The Property Foundation will not consider any response to the RFQ that does not completely fulfill these requirements. The Property Foundation reserves the right to accept or reject any or all submissions. 20 of 26 7. SUBMITTAL REQUIREMENTS The following constitutes the submittal requirements and evaluation criteria for the Property Foundation to evaluate the RFQ responses. The RFQ response must follow the order provided below to facilitate evaluation of the responses. In addition, the RFQ response must provide tabs correlating to each of the following criteria numbers below. It is critical that responses to the RFQ are consistent in order to ensure accuracy in the Property Foundation’s review process. Failure to submit proposals in the requested order poses risk that all Submittal Requirements may not be included and may hinder the Property Foundation’s ability to accurately compare submittals. Your proposal must respond to each criterion in the following order: Cover Page Cover Letter Table of Contents Tab 1.1: Background and Team Information Tab 1.2: Technical Capability Tab 1.3: Financial Capability Tab 1.4: Relevant Experience Tab 1.5: Approach A description of Tabs 1.1, 1.2, 1.3, 1.4, and 1.5 is included below in further detail. 7.1 Tab 1.1 - Background and Team Information Description of Private Entity: Provide a description of the Private Entity or Private Entities and the anticipated legal relationship (governance and capital structure) for the proposing Private Entity or Private Entities. Include in the description of the Private Entity or Private Entities the year founded, description and approximate value of real estate developed and currently under control, number of employees by function, and an organizational chart. All equity investors should be identified. Role of Private Entity’s Key Personnel: Briefly outline the roles of the key personnel for each Private Entity proposing. Contact Person: Provide a single contact person for all future communication with the Property Foundation. Disclose the contact person’s name, title, organization, address, telephone number, and email address. Controlling Interest: Identify the individuals or companies who hold a major or controlling interest in each Private Entity proposing. Expected Advisors: Identify the companies and individuals who are expected to act as legal, financial, or other advisors for each Private Entity proposing. 21 of 26 7.2 Tab 1.2 - Technical Capability 7.2.1 Maintenance Experience As noted in Section 5.9 Maintenance and Operations Objectives, Private Entities may have four (4) options available regarding the delivery of maintenance and operations for the Project. The four (4) options are as follows: 1. Property Foundation will maintain and operate the Project and will be reimbursed for all costs by the Private Entity; 2. Private Entity will self-operate the development in alignment with LSU standards; 3. Private Entity will outsource to a third-party operator at the sole cost of the Private Entity. The third-party operator will provide a level of service consistent with LSU standards; or 4. A combination of any two (2) options listed above. If the Private Entity would consider self-maintaining the Project, submittals must include evidence demonstrating the Private Entity’s ability to maintain a project of this nature and scope. Specifically, if the Private Entity would consider self-maintaining, the Private Entity or Private Entities should demonstrate that it possesses: a. Substantial university facility maintenance experience; b. Advanced knowledge of campus facilities maintenance, repair, construction, and practical application of equipment and materials; c. Demonstrated understandings in facility aging behavior to assess and determine the applicability of remedial maintenance action and lifecycle management; and d. All capabilities necessary to successfully operate and maintain the campus project including routine maintenance, operations and management. Regardless of the maintenance delivery option selected by the Private Entity, the proposal must indicate the option envisioned for this Project. 7.2.2 Student Services The Private Entities must demonstrate their commitment to achieving the highest standards of student service and satisfaction. Specifically, the Private Entities must highlight its experience and qualifications for providing excellent customer service to university students. The Private Entities may, at their option, include additional information concerning its experience in maintaining productive ongoing relationships with universities. 22 of 26 7.2.3 Capital Improvements Teams must demonstrate their ability to efficiently undertake required capital improvements to the Project during the term of the proposed ground lease and/or concession agreement. 7.3 Tab 1.3 - Financial Capability Proposing Private Entities must demonstrate their financial capacity to complete and maintain the Project over the term of the agreement. To demonstrate their financial strength and evidence that funding can be provided, proposing Private Entities must provide copies of audited financial statements for the past three (3) years together with any other relevant financial information. If audited financial statements cannot be provided, proposing Private Entities should provide sufficient financial information to demonstrate that they have the financial resources to successfully execute a project of this nature and scope. Except as required by applicable law, materials marked as proprietary or confidential will be considered as such. Proposing Private Entities must provide specific evidence that they have available the appropriate financial resources to complete all aspects of the Project, or demonstrate their capability to raise financing for a project of this nature and scope. Factors that must be provided, in addition to the requested financial audited statements, include: a. Available financial resources; b. Capability of raising capital (public placement debt, private placement debt, equity, other) in the current capital market; c. The number and size of past relevant university transactions; and d. Specific experiences on past relevant university transactions. Note: The Property Foundation will not approve any financing proposal which the Property Foundation believes in its sole discretion will result in the selected Private Entity’s financing being considered indirect debt of the University by any national rating agency currently rating University debt. 7.4 Tab 1.4 - Relevant Experience & References Provide a list, in order of relevance to the Project, of at least four (4) recent comparable housing projects that include public-private partnerships in which the proposing Private Entities have participated, preferably projects that were developed within the past ten (10) years. Private Entities should specify how each of these comparable housing projects relates to the proposed Project outlined in this RFQ. If possible, Private Entities should specify housing projects 23 of 26 that include 1,000 or more beds developed in either a single or multiple phases. Alternative case studies may be submitted for consideration if Private Entities do not have representative projects with more than 1,000 beds, but public-private partnership experience must be exhibited. Include information on the proposing Private Entity’s role, the size of the project, and which proposing Private Entity’s key personnel worked on the project. Evidence should include brief project descriptions, a statement regarding the duration of your financial and operational involvement with each such project following completion, and the name, address, and telephone number of a primary contact with knowledge of the project. Project examples should include capital budget information and number of beds to allow comparison of the cost of various levels of student housing quality. Relevant projects will demonstrate an ability to design, build, finance, and maintain the project while maintaining a long-term relationship with the institution. Project examples should demonstrate familiarity with on-campus student housing development. Private Entities should demonstrate that their role in the project added substantive value to the institution. Examples should also include the project’s performance including and any other factual indications of success (facility operating standards, housing occupancy, operating performance, lifecycle management, alignment with financial requirements, etc.). Except as required by applicable law, materials marked as proprietary or confidential will be considered as such. 7.5 Tab 1.5 - Approach Realizing that the Project approach will be solidified during the RFP process, please include a description of your anticipated Project approach. Discuss how you will advance the Project’s requirements, build on work completed to date, or otherwise add distinctive value to the University. With your approach, include a preliminary and conceptual Project schedule depicting major milestones, durations, and dependencies that would lead to a delivery date of the Nicholson portion of the Project in the Fall of 2018. 7.6 Required Submittals It is the Private Entity’s sole responsibility to submit information in fulfillment of the requirements of this RFQ. If pertinent information or required submittals are not included within your submittal, it may cause your submittal to be rejected or have an adverse impact on evaluation. 7.7 Quantity of Submittals Please submit thirteen (13) hard copies of your submittal plus one (1) original hard copy with no holes punched in it. The hard copies should be submitted on 8.5” x 11” sized paper to make reproduction feasible as needed by the University and should not exceed 40 single-sided pages, including pictures, charts, graphs, tables, and text that the Private Entities deem appropriate to be part of the review of the response. Additionally, please submit one (1) electronic copy of your submittal on a thumb/flash drive. 24 of 26 Resumes of key personnel should be appended to the end of your response. Resumes of key personnel along with the cover letter, table of contents, front and back covers, and blank section/numerical dividers, etc. will not be counted in the 40-page limit. No supplemental information to the 40-page RFQ submittal will be allowed. The original hard copy should contain an original signature of an officer of the Private Entity or Private Entities with authority to commit the firm(s), and should be marked “Original” on front cover. As noted above, submittal contents should be presented in the same order as the requirements listed in Section 7 – Submittal Requirements of this RFQ. 7.8 Submittal Instructions RFQ submittals should be addressed to the Property Foundation and delivered to the address shown below no later than 3:00 pm CT on August 21, 2015. 6767 Perkins Road, Suite 200 Baton Rouge, LA 70808 Any questions concerning this RFQ should be directed in writing to the Development Advisors at info@nicholsongateway.com. Private Entities should not contact any officials of the University, its Student Housing program, or advisors of the University with regard to this opportunity, other than the Development Advisors as previously stated. Private Entities are advised that unauthorized contacts with officials, related parties or advisors of the University may result in elimination of a Private Entities from this RFQ process. 7.9 Disclaimer Any representations or statements made within this RFQ shall not be considered a contractual obligation by the Property Foundation and the Private Entities shall not be entitled to rely upon them. The Property Foundation reserves the right to reject any and all submittals and to identify and select the Private Entity which the Property Foundation, in its sole and absolute discretion, deems most qualified. The Private Entity shall be solely and totally responsible for all costs associated with responding to this RFQ, and the Property Foundation accepts no responsibility with regard thereto. Submissions will become the property of the Property Foundation. The Property Foundation reserves all rights available to it by law in administering this RFQ, including without limitation, the right, in its sole discretion, to: Reject any or all submittals at any time; Terminate evaluation of any or all submittals at any time; Suspend, discontinue and/or terminate negotiations with any Private Entities at any time prior to the actual authorized execution of Private Entity Agreement; 25 of 26 Negotiate with a Private Entity without being bound by any provision in its submittal; Accept and review a nonconforming submittal; Request or obtain clarifications, revisions or additional information from any source; Issue addenda to and/or cancel this RFQ; Issue a new request for qualifications; Decline to financially participate in a proposed Project; Extend any deadline or time and waive or permit the correction of minor deficiencies or irregularities in a submittal and minor or technical violations of this RFQ; Change the scope and the range of services from what is defined in this RFQ at any time; and Select any submitted P3 structure. This RFQ does not commit any of the Property Foundation to enter into a contract. In no event shall any of the Property Foundation be bound by, or liable for, any obligations with respect to a Project until such time (if at all) as a Private Entity Agreement, in form and substance satisfactory to the Property Foundation, has been executed and properly authorized, and then only to the extent set forth therein. Under no circumstances shall any of the Property Foundation be liable for, or reimburse, the costs incurred by Respondents, whether or not selected for negotiations, in developing submittals or in negotiating agreements. Each Respondent, by submitting qualifications, thereby accepts all risk of adverse public notice, damages, financial loss, criticism or embarrassment that may result from any disclosure or publication of any material or information required or requested by any of the Property Foundation in connection with the submission of qualifications. In submitting qualifications, the Respondent expressly waives, on behalf of itself, its partners, joint venture members, officers, employees and agents, any claim against any of the Property Foundation, and their respective officers and employees, for any damages that may arise therefrom. Any and all information any of the Property Foundation makes available to Private Entities shall be as a convenience to the Private Entity and without representation or warranty of any kind. 26 of 26