New Technologies Implementation at Delta TechOps

advertisement
New Technology Implementation
at Delta TechOps
Eri Hokura
RFID Program Manager
Cabin Maintenance
IATA 10th Maintenance Cost Conference
Athens, Greece
September 11, 2014
Contents
1. Delta Air Lines Overview
2. Delta TechOps - Cabin Maintenance
3. RFID & Maintenance Program - A Match Made in Heaven
4. What’s Next
5. Q & A
2
New Technology Implementation
09/11/2014
DELTA AIR LINES, INC.
Delta Air Lines
Who we are
Delta began flying passengers 85 years ago, and has been committed
to innovation and climbing to new heights ever since.
• Headquarters: Atlanta, Georgia, USA
• Nearly 80,000 Employees Worldwide
• Aircraft: 17+ fleet types, 700+ Aircraft
• Daily Flights: Over 2,950 Mainline Flights
• On-Time Performance: 86.3%
• Serving nearly 165m customers each year
• Recent partnership addition - Virgin Atlantic
3
New Technology Implementation
09/11/2014
DELTA AIR LINES, INC.
Delta TechOps - Cabin Maintenance
Mission: Protect the Brand
Mission Objectives:
•
Quickly (Fast)
•
Lowest Cost (Competitive)
•
SEA
BOS
MSP
DTW
SFO
LAS
Minimal Inconvenience (Good)
IND
SLC
JFK
LGA
CVG
LAX
BNA
ATL
MCO
HNL
NRT
HKG
TPE
MNL
LHR
AMS
CDG
SIN
4
New Technology Implementation
09/11/2014
DELTA AIR LINES, INC.
Why RFID?
What is RFID?
• RFID: Radio Frequency Identification
• 1D/2D Barcode: Line of Sight Communication
• RFID: Non-Line of Sight Communication
1. Compliance & Configuration:
• Presence
• Expiration
2. Material Yield:
• Material Life on Shelf
• Predictability: Just in Case vs. Just in Time
3. Labor Savings:
• Reduce Time Spent on Date Checks
• Reduce Human Factors Errors
5
New Technology Implementation
09/11/2014
DELTA AIR LINES, INC.
Compliance & Configuration
RFID Benefits:
TIME LIMIT OVERRUNS
BY COMPONENT 2010-2013
Various
2%
Squib
15%
EE
18%
Slide
4%
6
New Technology Implementation
•
Quickly check presence and
expiration of life-limited
components
•
Check security and tamper
evidence to comply with TSA
regulations
LIFE VEST
SLIDE
Life Vest
54%
Reduce risk of overrun on life
limited parts
EE
O2 GEN/Mask
O2 Gen
7%
•
APU/CARGO/ENGINE
BTL SQUIB
VARIOUS
09/11/2014
DELTA AIR LINES, INC.
Material Yield
O2 Generators
On Shelf
Life Limit: 12 Years
On Aircraft
Replace
On Shelf - Buffer stock for the unknown demand
• High inventory count
• Reduced material life on shelf (avg. 12 months)
Replace - Early replacement
• Replace at avg. 14 months remaining
Example - Waste
• Avg. Cost: $400 /pc
• Avg. Waste: $78 /pc
• Fleet Waste: $130K (*$13K/AC x 10 A/C)
Potential Fleet Waste Reduction:$110K
*Estimate: life on shelf 3 month in Inventory & 2 month life remaining
7
Just in Case to Just In Time
New Technology Implementation
09/11/2014
DELTA AIR LINES, INC.
Data Sample
Aircraft
AREA
684
First Class
O2 Generators
684
First Class
684
8
Equipment Type Location
TAG ID
Part Number
DMF
L1 FA
DAN28999
117003-12
11/2002
11/2014
12
O2 Generators
1AB
DAN4100
803000-04
12/2002
12/2014
12
First Class
O2 Generators
2AB
DAN4099
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
2CD
DAN4102
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
3AB
DAN4101
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
3CD
DAN4103
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
4AB
DAN4104
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
4CD
DAN4105
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
5AB
DAN4106
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
5CD
DAN4107
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
6AB
DAN4109
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
6CD
DAN4108
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
7AB
DAN4111
803000-04
12/2002
12/2014
12
684
First Class
O2 Generators
7CD
DAN4110
803000-04
12/2002
12/2014
12
684
Economy Class
O2 Generators
L2 FA
DAN28705
117080-02
09/2009
09/2024
15
684
Economy Class
O2 Generators
19DE
DAN28623
117080-02
10/2009
10/2024
15
684
Economy Class
O2 Generators
L2 FA AFT
DAN4150
117080-02
10/2009
10/2024
15
684
Economy Class
O2 Generators
20ABC
DAN4114
803000-04
12/2002
12/2014
12
684
Economy Class
O2 Generators
20DEF
DAN4115
117080-02
04/2011
04/2026
15
684
Economy Class
O2 Generators
21ABC
DAN4117
803000-04
12/2002
12/2014
12
684
Economy Class
O2 Generators
21DEF
DAN4116
803000-04
12/2002
12/2014
12
684
Economy Class
O2 Generators
22ABC
DAN4118
803000-04
12/2002
12/2014
12
684
Economy Class
O2 Generators
22DEF
DAN4119
117080-02
04/2011
04/2026
15
New Technology Implementation
09/11/2014
Expiry Date Life Limit
DELTA AIR LINES, INC.
Visual Inspection vs. RFID Scan (B777)
Presence, Expiration Status
Hrs
14
12
Life Vests
• Visual: 12 hrs
• RFID: 35 min (2 min to scan)
95%
Improvement
10
93%
Improvement
8
6
83%
Improvement
4
62%
Improvement
2
0
Life Vest
Life Vest
Security
Seals
O2
Emergency
Generator Equipment
Visual
Potential:
9
RFID
Life Vest Security Seals
• Visual: 45 min
• RFID: 17 min (2 min to scan)
O2 Generators
• Visual: 8 hrs
• RFID: 32 min (2 min to scan)
Emergency Equipment
• Visual: 4 hrs
• RFID: 40 min (10 min to scan)
22.7 Labor Hrs/ Aircraft!
New Technology Implementation
09/11/2014
DELTA AIR LINES, INC.
Human Factors Errors
•
Delta is required to visually check the presence, condition,
security, and expiration of all life limited parts
•
Each part may have manufacture, expiration, service, or packaging
dates, etc. which can introduce human factors errors and
increase labor required
ELT
Water Fire Ext
First Aid Kit
10
New Technology Implementation
Halon Fire Ext
EEMK
09/11/2014
DELTA AIR LINES, INC.
OEM vs. Legacy RFID Tagging
ELT
EEMK
11
New Technology Implementation
Legacy
Tagging
OEM
Tagging
09/11/2014
ELT
EEMK
DELTA AIR LINES, INC.
O2 Generator RFID Scan
12
New Technology Implementation
09/11/2014
DELTA AIR LINES, INC.
Program Timeline
1st Airline to receive FAA approval on RFID
Maintenance Program
2016
2014
34K+ tags flying
and increasing
daily!
800+ Aircraft will
be fully RFID
tagged!
2013
2011
RFID Mtc. program
approved by FAA
1st RFID Induction
on B757
13
New Technology Implementation
09/11/2014
DELTA AIR LINES, INC.
So, What’s Next?
14
New Technology Implementation
09/11/2014
Continue Our Climb
Next RFID Targeted Items:
Current
Next
Life Vest
A/C Registration Certificate
Life Vest Container Security
Seal
Galley Cart/Carriers/Waste
Container
O2 Generator
Chillers/Coffee Makers/Oven
Emergency Equipment
Cushion & Leather
APU/Cargo/Engine Squibs
Rotable Parts
Crew O2 Masks
Tablet Solution: Paperless operation, Information at your fingertip!
• e-document
• e-signature
15
New Technology Implementation
09/11/2014
DELTA AIR LINES, INC.
Thank You
16
New Technology Implementation
09/11/2014
Questions?
17
New Technology Implementation
09/11/2014
For more Information
Please contact:
Eri Hokura
RFID Program Manager
eri.hokura@delta.com
Download