Installation Instructions TB3Q and TDO-4 Copyright © 2007 by Bunn-O-Matic Corporation Table of Contents Overview.........................................................................................................4 Proper Placement of Brewer and Urn.............................................................5 Installation Procedures....................................................................................9 Setup...............................................................................................................10 Adjusting Brew Volumes................................................................................12 Additional Information...................................................................................13 Final Checklist................................................................................................14 Overview This instruction will explain what needs to occur when installing the TB3Q machine at all Taco Bell restaurants. What You Will Leran In this instruction, you will learn: The preferred and alternate locations for brewer and urns Plumbing and electrical requirements How to verify correct volume of brewed tea The prefered placement of additional TDO-4 Urns BUNN Equipment List Store Serving Sweet and Unsweet Tea TB3Q Tea Machine...................1 (Qty.) TDO-4 Urn...............................5 (Qty.) (1 backup) Store Serving Unsweet Tea TB3Q Tea Machine...................1 (Qty.) TDO-4 Urn...............................3 (Qty.) (1 backup) Additional Supplies Needed 4 qt. pitcher...............................1 (Qty.) (at Taco Bell site) Timer or watch..........................1 (Qty.) Volt meter.................................1 (Qty.) Wrench......................................1 (Qty.) Screwdriver...............................1 (Qty.) Misc. Plumbing Proper Placement of Brewer and Urn Placement of the TDO-4 Urns must be accessible for both the Drive-Thru employees and walk-up customers. Using the store layout diagrams identify the layout you are currently in and locate the preferred location for the tea brewer and urn(s). Remember that when selecting the brewer placement you must consider the electrical and plumbing requirements. Orange outlets are not to be used. If power cannot be located at any of the placement locations call in a Utility Construction Delay to BUNNserve immediately. M-Series Layout (D,E,F,G) 1 1A Preferrred brewer and urn drive-thru location only if the table is large enough for a register and brewer. Alternative brewer and urn drive-thru location. You may need to run the water line from the drive-thru drink system along the drive-thru wall. 1B Alternative brewer and urn drive-thru and walk-up location. 1A 1 1B or 3 2 2 Preferred urn walk-up location. 3 Alternative urn walk-up location. M-Series Layout (H/HD) 1 1A Alternative brewer and urn drive-thru location. You may need to run the water line from the drive-thru drink system along the drive-thru wall. 1B Alternative brewer and urn drive-thru and walk-up location. 1A 1 Preferrred brewer and urn drive-thru location only if the table is large enough for a register and brewer. 1B or 3 2 2 Preferred urn walk-up location. 3 Alternative urn walk-up location. K-Series Layout 1 1A Preferrred brewer and urn drive-thru location only if the table is large enough for a register and brewer. Alternative brewer and urn drive-thru location. You may need to run the water line from the drive-thru drink system along the drive-thru wall. 1B Alternative brewer and urn drive-thru and walk-up location. 1A 2 1B or 3 1 2 Preferred urn walk-up location. 3 Alternative urn walk-up location. L-Series Layout 1 1A Preferrred brewer drive-thru location. Alternative brewer and urn drive-thru location. You may need to run the water line from the drive-thru drink system along the drive-thru wall. 1B Preferred urn drive-thru location. 1A or 1B 3 2 1 2 Preferred urn walk-up location. 3 Alternative brewer and urn walk-up location. The store will be responsible for providing a filtered non-carbonated water line. Installation Procedures When the placement of the equipment has been decided remove the brewer from the box and place in the preferred location. With the brewer out of the box, remove any packing material and the shipping cap from the water inlet fitting at the back of the brewer. Remove all the parts from the parts box before beginning the installation. Plumbing Installation Process 1: Locate the non-carbonated water line Locate the non-carbonated water line from the filtration system in the back room of the kitchen. This is usually found over the Bag in the Box Rack. All locations should have a previously installed water filtration system. Be sure to always use the non carbonated line after the carbon filter. This line will split off and enter the carbonator, so be sure to trace the correctly numbered water line. Note: If the non-carbonated filtered water line cannot be identified in the back of the kitchen, locate the line underneath of the drive-thru table. Process 2: Check the flow rate of the water line Step 1: Locate the 4 quart container at the store. Step 2: Place the water line into the container. Step 3: Get your timer or watch ready to time the water flow for 30 seconds. Step 4: Start your timer and turn on the water at the same time. Time the water for 30 seconds then turn off the water. Step 5: Measure the water volume in the container. Note: Y ou must have a minimum of 3 quarts (3/4 gallon) in the container. If you do not have the minimum requirement, find an alternative water source. Process 3: Hooking up the water line Step 1: Flush the entire water line. Step 2: Securely attach the line to the bulkhead fitting at the rear of the brewer. Step 3: Turn on the water supply and look for leaks. Electrical Installation Step 1: Remove the top cover form the brewer. Step 2: Verify that the control thermostat knob is in the off position (fully counterclockwise), and place the top lid back onto the brewer. Step 3: Connect the brewer to the power source. The unit requires 120 volt plus grounded service with a dedicated 15 amp circuit. This needs to be within 6 feet of the brewer. Note: O range outlets are not to be used. If power cannot be located at any of the placement locations call in a Utility Construction Delay to BUNNserve immediately. Notify the store manager of the need to install at a later date to be determined. Setup Step 1: Place an empty urn on the brewer base. Be prepared to empty the urn during these initial steps. Step 2: Place the on/off switch in the on position, and momentarily press the start switch. Water will flow into the tank and urn at the same time. When the first cycle stops, empty the urn and press the start switch again. During the second cycle, the tank will fill to its capacity and the excess water will flow from the sprayhead into the urn. Empty the urn when this second cycle is complete. Step 3: Unplug the brewer from the power source. Step 4: Remove the top lid and rotate the control thermostat knob fully clockwise to the on position and replace the top lid. Step 5: Plug in the brewer and allow for the water in the tank to heat to the correct brewing temperature (approximately 20 minutes) before brewing another batch. Note: S ome water will drip from the sprayhead during this time. This is due to the expansion of water inside the tank, and will occur after the initial heat up. Step 6: Begin another brew cycle and measure the total water volume from the dispenser. Step 7: The total water volume should be 399 ounces. Note: T he hot water concentrate should be between 90 and 96 ounces. The cold water dilution should be between 303 and 309 ounces. If not, adjust the timer as required. For information on how to adjust the timer refer to the Adjusting Brew Volumes section of the instruction set. Step 8: Empty the dispenser and allow water in the tank to heat to the proper temperature. Step 9: The brewer is now ready to be calibrated with finished Brewed Tea product. 10 Verify the Correct Volume of Brewed Tea Step 1: Place a 3 ounce tea bag, seam side down, into the brew basket. Step 2: Slide the brew basket into the guide rails on the brewer. Step 3: Begin a brew cycle and prepare to measure the brewed tea with the measuring containers. Step 4: Ensure the finished brewed batch is between the marks identified on the TDO-4 Urn. The target volume is 384 ounces (3 gallons). Note: If the volumes are not at the desired amount adjust the timer as needed. For information on how to adjust the timer referto the Adjusting Brew Volumes section of this instruction set. If adjust is needed make sure that the set/lock switch on the timer board is left in the lock position. Step 5: Place the stainless steel drip tray in front of the brewer. Placement of Additional TDO-4 Urn Place the urn(s) in the proper placement location(s) as identified from the layout location(s) and align the drip tray properly. Make sure to place the lid and clamp on the top of the unit. 11 Adjusting Brew Volumes CAUTION: Disconnect the power source from the brewer prior to the removal of any panel for the replacement or adjustment of any component. Note: Prior to setting or modifying batch sizes, check that the brewer is connected to water supply, the tank is properly filled, and a funnel and server are in place. Step 1: Modifying batch sizes. To modify a batch volume, first check that the SET/LOCK switch is in the “SET” position on the circuit board. To increase a batch size. Press and hold the START or BREW switch until three clicks are heard. Release the switch (Failure to release the switch within two seconds after the third click causes the volume setting to be aborted and previous volume setting will remain in memory) and press it again one or more times. Each time the switch is pressed, two seconds are added to the brew time period. Allow the brew cycle to finish in order to verify that the desired volume has been achieved. To decrease a batch size. Press and release the START or BREW switch once for every two-second interval to be removed from the total brew time period; then immediately press and hold down the START or BREW switch until three clicks are heard. Release the switch. (Failure to release the switch within two seconds after the third click causes the volume setting to be aborted and previous volume setting will remain in memory). Allow the brew cycle to finish in order to verify that the desired volume has been achieved. Step 2: Setting batch sizes. To set a batch volume, first check that the SET/LOCK switch is in the “SET” position on the circuit board. Press and hold the START or BREW switch until three distinct clicks are heard, and then release the switch. (Failure to release the switch within two seconds after the third click causes the volume setting to be aborted and previous volume setting will remain in memory). View the level of the liquid being dispensed. When the desired level is reached, turn the ON/OFF (UNSWEET/OFF/SWEET) switch to “OFF”. The brewer remembers this volume and will continue to brew batches of this size until the volume setting procedure is repeated. Note: When brewing tea, batch volumes will decrease due to absorption by the tea leaves. Step 3: Setting programming disable feature. If it becomes necessary to prevent anyone from changing brew times once programmed, you can set the SET/LOCK switch to the “LOCK” position. This will prevent any programming to be done until switch is once again placed in the “SET” position. 12 Additional Information Placement Layout Location 1 and 1A Drive Thru Note: I f counter space is available, but blocked by a cup dispenser, condiment stand, etc. relocate to another area. If existing tea equipment is present, remove and place in back. Layout Location 1 Example Layout Location 1 TB3Q will fit if the rack were moved. Layout Location 1 Example Layout Location 1A Example Placement Layout Location 1B Front Counter Area Front counter area layout location 1B. Alternate location for brewer and urn. Location 1B Example 13 Placement Layout Location 2 Self Serve Urn Note: If counter space is available, but blocked by condiment stand, work with the manager to relocate the condiments. Location 2 Example Location 2 Example Final Checklist Remove and discard BUNN literature: Brewing/Cleaning Instructions...37244.0000 Provide the manager on duty the following items found in the TB3Q brewer box: Taco Bell Start-up Kit.................39611.0000 Taco Bell Mini Menu Boards......39612.0000 Tongs (2).....................................39610.0000 If the documentation is not found contact BUNNserve at (800) 426-2866. All other documentation found inside the boxes should not be left on-site. Instruct employess and managers on operation and cleaning of all equipment. Have the manager on duty sign the service order and the installation guidelines document. Contact BUNNserve at (800) 426-2866 from the location to confirm completion of the installation. Provide the Taco Bell store number and or SV number, along with the model and serial number and store layout with placement of all installed items. 14