Golf course management plan 2015 This document lists

advertisement
Golf course management plan 2015
This document lists the various maintenance activities that are planned for the year 2015.
Activities that are disruptive to play are planned to create minimum inference with the
published competition program.
The purpose of the document is to reduce the amount of input to the GDB spread sheets.
Putting Greens
November to March
Mowing frequency will be 2 to 4 times per week
Mowing height
7 mm
Verticutting
None
Rolling
None
Top dressing
None
Hollow tinening with sand fill
None
Vertidrain
1 time in March
Fertilization
None
Fertilizers
Samples chemical analysis
February
Nitrogen
Potassium
Phosphate
Trace elements
Wetting agents
April to October
6 times per week
5 mm
3 to 4 times
1 per week
At three week intervals
1 time in September
None.
every two weeks
90 kg/ha
100 kg./ha
As required by analysis
“
“
“
As required by drought