Golf course management plan 2015 This document lists the various maintenance activities that are planned for the year 2015. Activities that are disruptive to play are planned to create minimum inference with the published competition program. The purpose of the document is to reduce the amount of input to the GDB spread sheets. Putting Greens November to March Mowing frequency will be 2 to 4 times per week Mowing height 7 mm Verticutting None Rolling None Top dressing None Hollow tinening with sand fill None Vertidrain 1 time in March Fertilization None Fertilizers Samples chemical analysis February Nitrogen Potassium Phosphate Trace elements Wetting agents April to October 6 times per week 5 mm 3 to 4 times 1 per week At three week intervals 1 time in September None. every two weeks 90 kg/ha 100 kg./ha As required by analysis “ “ “ As required by drought