Central Virginia Plan 2035 Projects
Central Virginia Plan 2035 Constrained Projects
Jurisdiction
ProjectLocation
Length
(mi.)
1
Lynchburg
Rt460/29(RichmondHwy)Ͳ
Rt501(CampbellAve)toRt
29(MonacanPkwy)
1.67
2
Lynchburg
Rt221(LakesideDr)
IntersectionͲ0.25MWRt
501to1.15MERt501
1.40
3
Lynchburg
Rt501Bus(RivermontAve)
overBlackwaterCrk
0.25
GreenviewDrͲHermitageRd
to0.22MSLeesvilleRd
Rt29ͲͲNBLoverBuffalo
River
4
Lynchburg
5
Amherst
6
Lynchburg
MidtownConnectorͲRt29
Bus.toInt.Memorial/5th
7
Description/Notes
EstYearof
Expenditure
TotalCost
FundingPriorto
(YOE)
(inflatedtoYOE)
2011
Safety/TrafficOps/
TSM(Primary)
2015
$12,951,000
FundAllocation
2011Ͳ2035
$4,755,000
$8,196,000
Intersection
improvement.Prelim.
engineeringonly
Rehabbridge.Fully
funded,under
construction
!
2015
$4,200,000
$4,200,000
$0
2010
$3,682,000
$3,763,000
$0
Widento4lanes
2012
$11,533,000
$2,193,000
$9,340,000
Replacebridge&
approaches
2012
$5,971,000
$936,000
$5,036,000
1.1
Reconstruct2Ͳlncurb&
gutterwithflushmedian
2011
$22,807,000
$24,488,000
$0
Amherst
Rt652overGrahamCreek
(Rt1401toRt675S.)
1.7
Bridgereplacement&
roadwayreconstruction.
Projectcomplete;
fundingisforfinal
payoff.
2010
$4,466,000
$4,466,000
$0
8
Bedford
Rt621overIvyCreek
0.4
2016
$1,170,000
$0
$1,170,000
9
Amherst
Rt659(UnionHillRd)over
RutledgeCrkWofN&SRR
XingtoRtTͲ606)
1.1
2017
$5,913,000
$1,119,000
$4,794,000
11
12
13
14
15
Bedford
Rt622(LynbrookRd)over
FlatCrk(Rt683toRt29)
2.53
Rt221(ForestRd)E.ofRt663
toW.ofN&SRRbridge
Bedford
Rt644(CoffeeRd)overElk
Crk(Rt665S.toRt665N.)
Bedford
Rt668(GoodeRd)overN&S
RR
Amherst
RiverWalkTr.Ext.ͲAmherst
CountyGreenwayͲRt1005
&ParkEntranceto6,000'
downstream
Campbell
MPOͲWide
MPOͲWide
MPOͲWide
MPOͲWide
Rt29ͲRt460InttoRt24
2.3
0.4
Rehabbridgeand
approaches
1.14
Highest Intensity
Development
Industrial Development
9
41
2017
$12,355,000
$1,990,000
$10,365,000
!
!
73
74
!
!
!
45
!
40
!
72
! !
!
!
! !!
!
!
!
!
3 !
12
!
14
!6
!!
!
!
! !
2
8
!
!!
!
1
! ! ! !!
11
! !
!!
!
! !
!
!
4
!!
!! !
! !
!
!
!
15
!
!
10
!
42
18
43
2010
$20,386,000
$20,386,000
$0
34
48
2011
$3,230,000
$2,610,000
$620,000
47
50
2013
$1,854,000
$606,000
$1,382,000
29
66
63
52
61
39
30
Newconstruction
27
38
26
36
62
37
!
33
78
28
2011
$2,356,000
$2,020,000
$336,000
67
6
SpotImprovements:
Safety,TrafficOps,
TranspSystem
Management
ARRAFundingforBridge
CulvertRehab
n/a
n/a
2016
60
32
2010
ongoing
Projectssuchasbridge
ordrainagestructure
rehab,reconstruction,
replacementon/
adjacenttoalignment
$5,000,000
13
$5,000,000
$3,962,000
$3,962,000
$0
$10,687,559
$0
$10,687,559
$77,667
35
$17,522,800
$0
23
24
71
70
20
21
65
51
55
53
77(b)
77
56
58
ongoing
76
16
68 69
19
$77,667
$0
25
75
59
49
ongoing
n/a
BridgeRehab/Replace/
Reconstruct(CN)
Urban
22
6.60
LynchburgDistrictDesignͲ
BuildCulvertRehab
Safety,TrafficOps,Transp
SystemManagement(CN)
RailCrossingSafety(CN)
Lowest
Intensity
Rural
Development
!
Improveto4lanesw/
centerturnlane.Project
complete;fundingisfor
finalpayoff.
Rehabbridgeand
approaches
5
7
Rehabbridgeand
approaches
Replace/reconstruct
bridge&roadway.
Fundingforprelim.
engineering,RW&
construction
Replacebridge&
reconstructroadway.
Fundingforprelim.
engineering,RW&
construction
0.3
Unfunded Projects
Development Intensity
0.30
Campbell
Six Year Improvement Plan and Financially Constrained Projects
County Boundary
0.45
10
!
!
!
Map
ID
(Constrained and Vision Plan)
42
$17,522,795
57
54
!
MPOͲWide
Transportation
enhancements/byway/bike
&ped/othernonͲtraditional
transpprojects(CN)
n/a
MPOͲWide
FederalLandsHighway(CN)
n/a
Projectsfundedand/or
administratedbyFederal
LandsHighwayDivision
ongoing
n/a
$0
determinedonan
annualbasis
MPOͲWide
RecreationalTrails(DCR)
n/a
Projectsfunded/
advancedthroughVA
DptofConservation&
Recreationrecreational
trailsprogram
ongoing
n/a
$0
determinedonan
annualbasis
MPOͲWide
GeneralSystem
Maintenance:Urban,
Primary&Secondary
Systems
n/a
PreventiveMaintenance,
SystemPreservation,
Traffic&SafetyOps,
PreventiveMaintenance
forBridges
ongoing
$1,630,111,243
$0
$1,630,111,243
77(a)
ongoing
$544,198
$0
$544,198
October 2010
October 2010
Central Virginia Plan 2035 Vision Projects
Map
ID Jurisdiction
ProjectLocation
7
Amherst
Rt652(CedarGateRd)ͲRt657toRt675
16
Lynchburg
Rt501(CandlersMountainRd)ͲWoodallRdto
MayflowerDr
2
Lynchburg Rt501(LynchburgExpwy)atRt221(LakesideDr)
18
19
20
Amherst
Bedford
Bedford
Length
(mi.)
Description/Notes
2Ͳlnreconstruction(assocw/constr.plan
1.1
mapID7)
IncreaseRdwaycapacity,replacebridges
0.5
overN&SRR
CNfundingtoimproveintersection.PEin
N/A
ConstrainedPlanMapID#7.
0.8 ReconstructRdway
0.9 Widento4lanes
5.0 Widento4lanes
Map
ID Jurisdiction
ProjectLocation
Rt623(TurkeyFootRd)ͲRt811toCampbellCoCorp
Limits
Length
(mi.)
Description/Notes
1.2
Widenpvmtto24feet
Rt621(CottontownRd)ͲRt644(CoffeeRd)toRt662
4.9
Reconstruct2laneRdway
Campbell
Rt29(WardsRd)ͲSofRt685toLynchburgCorpLimits
3.5
Accessmanagement,trafficoperationsand
safetyimprovements(coordinatewithProject
MapID2)
54
Campbell
Rt501(CampbellHwy)ͲRt24toRt680(SuburbanRd)
2.2
Widento4lanes
55
Campbell
Rt682(LeesvilleRd)ͲLynchburgCorpLimitstoRt460
0.9
Widento4lanes
56
Campbell
1.5
Widento24feet
57
Campbell
1.2
Widento24feet
58
Campbell
2.7
Reconstruct2ͲlaneRdway
51
Bedford
52
Bedford
53
23
Rt682(Woody'sLakeRd)ͲRt29BustoDeadEnd
Rt622(WaterlickRd)ͲRt811toCampbellCoLine
Rt811(ThomasJeffersonRd)ͲRt460toRt221
Rt622(WaterlickRd)ͲBedfordCoLinetoRt1520
Campbell
(RainbowForest)
Rt501(LynchburgExpwy)ͲRt221(LakesideDr)toOld
Lynchburg
GravesMillRd
Lynchburg Rt460atOddFellowsRdExt
24
Lynchburg Rt670(OldCandlersMtnRd)ͲMayflowerDrtoRt460
0.7
Widento4lanes
25
26
27
28
Lynchburg
Lynchburg
Lynchburg
Lynchburg
1.3
1.2
1.3
0.9
Widento4lanes
MultiͲmodalcorridorimprovements
MultiͲmodalcorridorimprovements
MultiͲmodalcorridorimprovements
NA
Lynchburg/
Rt29(WardsRd)&Rt29/460BypassInterchange
Campbell
NA
Rdwayimprovementsassoc.w/development
ofSEQuardrant.PrivateFunding(Developer)
RegionallySignificantProject
59
Lynchburg
LynchburgExpwy(GravesMillRdtoKemperStreet)
4.1
RampandCapacityimprovements
29
Lynchburg LanghorneRd(Rt501Bus)ͲFortAvetoCranehilleDr
2.3
MultiͲmodalcorridorimprovements
60
Campbell
30
Lynchburg
3.1
MultiͲmodalcorridorimprovements
61
Amherst
32
Lynchburg Rt460Bus(FortAve)ͲMemorialAveto12thStreet
1
MultiͲmodalcorridorimprovements
62
Amherst
33
34
35
Lynchburg FortAveͲ12thStreettoParkAve
Lynchburg RivermontAveͲLanghorneRdto5thSt
Lynchburg WardsFerryRdͲWardsRdtoTimberlakeRd
63
Lynchburg
65
Campbell
36
Amherst
Rt29atRt163
37
Amherst
38
Amherst
39
Amherst
40
41
Amherst
Amherst
Rt210(ColonyRd)ͲRt163toRt1034
Rt163(S.AmherstHwy)ͲRt685(RiverRd)to
interchangeatRt29Expwy(29Bus)
ParallelconnectorrdeastofRt29ͲRt29Busto
LakeviewDr
Rt130(ElonRd)ͲNSrailRdtracktoRt29Bus
Rt675(WinesapRd)ͲRt652toRt795
42
Bedford
Rt460ͲStudyAreaBoundary(GoodeRd)toRt811
43
44
Bedford
Bedford
45
Bedford
47
Bedford
48
Bedford
49
50
Bedford
Bedford
Rt501(BoonsboroRd)atRt647
Rt501(BoonsboroRd)atJudithCrkRd
Rt501(BoonsboroRd)LynchburgCorpLimitstoStudy
AreaBoundary
Rt659(HawkinsMillRd)ͲRt660toLynchburgCorp
Limits
Rt644(CoffeeRd)ͲRt665NorthtoLynchburgCorp
Limits
Rt622(EverettRd)ͲKensingtonPkwytoN&SRR
Rt663(PerrowvilleRd)ͲRt1431toRt644
Rt726(MtAthosRd)t0US460(RichmondHwy)
1.6 Upgradeexisting2ͲlaneRd
Rt677(DixieAirportRd)ͲRt699(AmelonRd)toRt622
1.2 Widento4lanes
(GaltsMillRd)
Rt622(NewWrightShopRd)ͲRt210(ColonyRd)toRt
2.3 Widento4lanes
677(DixieAirportRd)
US501(LynchburgExpwy)ͲUS221(LakesideDr)toRt
1.3 Widento4lanes
620(WiggingtonRd)
Rt622(WaterlickRd)ͲUS460Bus(TimberlakeRd)Rt
1 Widento4lanes
682(LeesvilleRd)
1.3 Accessmanagementimprovements
OldForestRd(USͲ501toLinkRd)
GravesMillRdRt1425(US221ͲForestRdtoLynchburg
1.6 Accessmanagementimprovements
Expressway)
OldGravesMillRd(US460ͲTimberlakeRdtoGraves
1.5 Accessmanagementandsafetyimprovements
MillRdRt1425)
US460ͲTimberlakeDr(OldGravesMillRdtoLynchburg
TSM,accessmanagementimprovements,and
1.5
potentialwidening
Expressway)
LeesvilleRdRt682(GreenviewDrRt678toUS460Ͳ
2 Widento3lanes
TimberlakeRd)
WardsRdRt29(US460ͲRichmondHwytoLynchburg
Pedestrianimprovementsandparallel
1.8
Expressway)
capacity
RiverRd(Rt685)Ͳ(Rt130toRt163)
3.7 Reconstruct2ͲlaneRdway
IzaakWaltonRd(Rt663)Ͳ(Rt29toRt29B)
4.5 Reconstruct2ͲlaneRdway
WinridgeRd(Rt795)Ͳ(Rt130toRt675)
1.25 Reconstruct2ͲlaneRdway
Rt460/29(RichmondHwy)ͲͲFromRt501(Campbell
1.67 Improveto6lanelimitedaccessRdway
Ave)toRt29(MonacanPkwy)
21
22
OddFellowsRdͲLynchburgExpwytoEnd
5thSt(Rt163)ͲLanghorneRdtoMainSt
MemorialAveͲFortAvetoLanghorneRd
OakleyAveͲLakesideDrtoMemorialAve
Rt501Bus(BoonsboroRd)ͲLynchburgExpwy(Rt501)
toLanghorneRd
October 2010
1.1
Widento4lanes
N/A Newinterchange
N/A NewgradeͲseparatedinterchange
0.4
2.9
2.3
MultiͲmodalcorridorimprovements
MultiͲmodalcorridorimprovements
Widento3or4lanesw/bikelane
Reconstructinterchangetoallowall
N/A
movements
0.3 Widento4lanes
Rt738(EnglishTavernRd)ͲRt680(SuburbanRd)toRt
29(northintersection)
Rt738(EnglishTavernRd)ͲRt29(southintersection)to
Rt680(SuburbanRd)
Rt681(SunburstRd)Rt460toRt622
66
Lynchburg
67
Lynchburg
68
Lynchburg
69
Lynchburg
Widento4lanes
Widenpavementto22feet
Constructpavedshoulder&implement
2.9
accessmgmtrecommendations
0.3 Relocateintersection,constructturnlane
N/A Bridgeimprovements
Reconstructportionsasaclimbinglane(spot
4.8
locations)
70
Lynchburg
71
Lynchburg
72
73
74
Amherst
Amherst
Amherst
75
Lynchburg
1.5
Reconstruct2laneRdway
76
Lynchburg/
Rt460BypassͲWofairporttoRt501(CampbellAve)
Campbell
3.6
Reconstruct2laneRdway
2.2
2.1
Reconstruct2laneRdway
Reconstruct2laneRdway
1.6
Widento4laneswithbikelane
0.62 New2Ͳlanerd
1.9
3.1
77
Campbell
(a+b)
78
Bedford
7.40 Increasetosixlanes
Rt29Alt,newalignmentWofexistingRt29ͲSofRt24
(YellowBranch)toRt460
8.00 Constructnew4lanelimitedaccessfacility
Rt621(CottontownRd)ͲͲRt662toRt660
1.7
October 2010
Reconstruct2laneRdway;PEinRightͲofͲWay,
andaccrualtoconstruction
Central Virginia Plan 2035 Projects by Type
(Constrained and Vision Plan)
Roadway Reconstruction: Improving roadway resiliency and safety with improvements such as
reducing sharp angles at dangerous curves, re-grading hilly “blind spots,” and paving gravel shoulders.
New Roadway: Adding roadway connections that reduce congestion on heavily traveled
corridors and improve the efficiency of the regional network.
Roadway Capacity Expansion: Adding and/or widening roadway lanes on congested
corridors in order to accommodate increased numbers of vehicles.
Multimodal Capacity Expansion: Adding facilities and services that encourage more
walking, cycling, and transit use. This provides more travel choices for area residents and reduces
the need to drive in congested urban areas.
Access Management and Safety: Reducing the risk of crashes and improving traffic flow
along major corridors with strategies such as consolidating multiple driveways, reducing the
number of crossings, increasing the space between intersections, and coordinating traffic signals.
Bridge/Intersection Reconstruction: Repairing and/or upgrading bridges and intersections
to ensure safe passage for all types of vehicles.
New Interchange: Improving regional accessibility by adding connections from local street
networks to state highways.
!
17
l
0
October 2010