Central Virginia Plan 2035 Projects Central Virginia Plan 2035 Constrained Projects Jurisdiction ProjectLocation Length (mi.) 1 Lynchburg Rt460/29(RichmondHwy)Ͳ Rt501(CampbellAve)toRt 29(MonacanPkwy) 1.67 2 Lynchburg Rt221(LakesideDr) IntersectionͲ0.25MWRt 501to1.15MERt501 1.40 3 Lynchburg Rt501Bus(RivermontAve) overBlackwaterCrk 0.25 GreenviewDrͲHermitageRd to0.22MSLeesvilleRd Rt29ͲͲNBLoverBuffalo River 4 Lynchburg 5 Amherst 6 Lynchburg MidtownConnectorͲRt29 Bus.toInt.Memorial/5th 7 Description/Notes EstYearof Expenditure TotalCost FundingPriorto (YOE) (inflatedtoYOE) 2011 Safety/TrafficOps/ TSM(Primary) 2015 $12,951,000 FundAllocation 2011Ͳ2035 $4,755,000 $8,196,000 Intersection improvement.Prelim. engineeringonly Rehabbridge.Fully funded,under construction ! 2015 $4,200,000 $4,200,000 $0 2010 $3,682,000 $3,763,000 $0 Widento4lanes 2012 $11,533,000 $2,193,000 $9,340,000 Replacebridge& approaches 2012 $5,971,000 $936,000 $5,036,000 1.1 Reconstruct2Ͳlncurb& gutterwithflushmedian 2011 $22,807,000 $24,488,000 $0 Amherst Rt652overGrahamCreek (Rt1401toRt675S.) 1.7 Bridgereplacement& roadwayreconstruction. Projectcomplete; fundingisforfinal payoff. 2010 $4,466,000 $4,466,000 $0 8 Bedford Rt621overIvyCreek 0.4 2016 $1,170,000 $0 $1,170,000 9 Amherst Rt659(UnionHillRd)over RutledgeCrkWofN&SRR XingtoRtTͲ606) 1.1 2017 $5,913,000 $1,119,000 $4,794,000 11 12 13 14 15 Bedford Rt622(LynbrookRd)over FlatCrk(Rt683toRt29) 2.53 Rt221(ForestRd)E.ofRt663 toW.ofN&SRRbridge Bedford Rt644(CoffeeRd)overElk Crk(Rt665S.toRt665N.) Bedford Rt668(GoodeRd)overN&S RR Amherst RiverWalkTr.Ext.ͲAmherst CountyGreenwayͲRt1005 &ParkEntranceto6,000' downstream Campbell MPOͲWide MPOͲWide MPOͲWide MPOͲWide Rt29ͲRt460InttoRt24 2.3 0.4 Rehabbridgeand approaches 1.14 Highest Intensity Development Industrial Development 9 41 2017 $12,355,000 $1,990,000 $10,365,000 ! ! 73 74 ! ! ! 45 ! 40 ! 72 ! ! ! ! ! !! ! ! ! ! 3 ! 12 ! 14 !6 !! ! ! ! ! 2 8 ! !! ! 1 ! ! ! !! 11 ! ! !! ! ! ! ! ! 4 !! !! ! ! ! ! ! ! 15 ! ! 10 ! 42 18 43 2010 $20,386,000 $20,386,000 $0 34 48 2011 $3,230,000 $2,610,000 $620,000 47 50 2013 $1,854,000 $606,000 $1,382,000 29 66 63 52 61 39 30 Newconstruction 27 38 26 36 62 37 ! 33 78 28 2011 $2,356,000 $2,020,000 $336,000 67 6 SpotImprovements: Safety,TrafficOps, TranspSystem Management ARRAFundingforBridge CulvertRehab n/a n/a 2016 60 32 2010 ongoing Projectssuchasbridge ordrainagestructure rehab,reconstruction, replacementon/ adjacenttoalignment $5,000,000 13 $5,000,000 $3,962,000 $3,962,000 $0 $10,687,559 $0 $10,687,559 $77,667 35 $17,522,800 $0 23 24 71 70 20 21 65 51 55 53 77(b) 77 56 58 ongoing 76 16 68 69 19 $77,667 $0 25 75 59 49 ongoing n/a BridgeRehab/Replace/ Reconstruct(CN) Urban 22 6.60 LynchburgDistrictDesignͲ BuildCulvertRehab Safety,TrafficOps,Transp SystemManagement(CN) RailCrossingSafety(CN) Lowest Intensity Rural Development ! Improveto4lanesw/ centerturnlane.Project complete;fundingisfor finalpayoff. Rehabbridgeand approaches 5 7 Rehabbridgeand approaches Replace/reconstruct bridge&roadway. Fundingforprelim. engineering,RW& construction Replacebridge& reconstructroadway. Fundingforprelim. engineering,RW& construction 0.3 Unfunded Projects Development Intensity 0.30 Campbell Six Year Improvement Plan and Financially Constrained Projects County Boundary 0.45 10 ! ! ! Map ID (Constrained and Vision Plan) 42 $17,522,795 57 54 ! MPOͲWide Transportation enhancements/byway/bike &ped/othernonͲtraditional transpprojects(CN) n/a MPOͲWide FederalLandsHighway(CN) n/a Projectsfundedand/or administratedbyFederal LandsHighwayDivision ongoing n/a $0 determinedonan annualbasis MPOͲWide RecreationalTrails(DCR) n/a Projectsfunded/ advancedthroughVA DptofConservation& Recreationrecreational trailsprogram ongoing n/a $0 determinedonan annualbasis MPOͲWide GeneralSystem Maintenance:Urban, Primary&Secondary Systems n/a PreventiveMaintenance, SystemPreservation, Traffic&SafetyOps, PreventiveMaintenance forBridges ongoing $1,630,111,243 $0 $1,630,111,243 77(a) ongoing $544,198 $0 $544,198 October 2010 October 2010 Central Virginia Plan 2035 Vision Projects Map ID Jurisdiction ProjectLocation 7 Amherst Rt652(CedarGateRd)ͲRt657toRt675 16 Lynchburg Rt501(CandlersMountainRd)ͲWoodallRdto MayflowerDr 2 Lynchburg Rt501(LynchburgExpwy)atRt221(LakesideDr) 18 19 20 Amherst Bedford Bedford Length (mi.) Description/Notes 2Ͳlnreconstruction(assocw/constr.plan 1.1 mapID7) IncreaseRdwaycapacity,replacebridges 0.5 overN&SRR CNfundingtoimproveintersection.PEin N/A ConstrainedPlanMapID#7. 0.8 ReconstructRdway 0.9 Widento4lanes 5.0 Widento4lanes Map ID Jurisdiction ProjectLocation Rt623(TurkeyFootRd)ͲRt811toCampbellCoCorp Limits Length (mi.) Description/Notes 1.2 Widenpvmtto24feet Rt621(CottontownRd)ͲRt644(CoffeeRd)toRt662 4.9 Reconstruct2laneRdway Campbell Rt29(WardsRd)ͲSofRt685toLynchburgCorpLimits 3.5 Accessmanagement,trafficoperationsand safetyimprovements(coordinatewithProject MapID2) 54 Campbell Rt501(CampbellHwy)ͲRt24toRt680(SuburbanRd) 2.2 Widento4lanes 55 Campbell Rt682(LeesvilleRd)ͲLynchburgCorpLimitstoRt460 0.9 Widento4lanes 56 Campbell 1.5 Widento24feet 57 Campbell 1.2 Widento24feet 58 Campbell 2.7 Reconstruct2ͲlaneRdway 51 Bedford 52 Bedford 53 23 Rt682(Woody'sLakeRd)ͲRt29BustoDeadEnd Rt622(WaterlickRd)ͲRt811toCampbellCoLine Rt811(ThomasJeffersonRd)ͲRt460toRt221 Rt622(WaterlickRd)ͲBedfordCoLinetoRt1520 Campbell (RainbowForest) Rt501(LynchburgExpwy)ͲRt221(LakesideDr)toOld Lynchburg GravesMillRd Lynchburg Rt460atOddFellowsRdExt 24 Lynchburg Rt670(OldCandlersMtnRd)ͲMayflowerDrtoRt460 0.7 Widento4lanes 25 26 27 28 Lynchburg Lynchburg Lynchburg Lynchburg 1.3 1.2 1.3 0.9 Widento4lanes MultiͲmodalcorridorimprovements MultiͲmodalcorridorimprovements MultiͲmodalcorridorimprovements NA Lynchburg/ Rt29(WardsRd)&Rt29/460BypassInterchange Campbell NA Rdwayimprovementsassoc.w/development ofSEQuardrant.PrivateFunding(Developer) RegionallySignificantProject 59 Lynchburg LynchburgExpwy(GravesMillRdtoKemperStreet) 4.1 RampandCapacityimprovements 29 Lynchburg LanghorneRd(Rt501Bus)ͲFortAvetoCranehilleDr 2.3 MultiͲmodalcorridorimprovements 60 Campbell 30 Lynchburg 3.1 MultiͲmodalcorridorimprovements 61 Amherst 32 Lynchburg Rt460Bus(FortAve)ͲMemorialAveto12thStreet 1 MultiͲmodalcorridorimprovements 62 Amherst 33 34 35 Lynchburg FortAveͲ12thStreettoParkAve Lynchburg RivermontAveͲLanghorneRdto5thSt Lynchburg WardsFerryRdͲWardsRdtoTimberlakeRd 63 Lynchburg 65 Campbell 36 Amherst Rt29atRt163 37 Amherst 38 Amherst 39 Amherst 40 41 Amherst Amherst Rt210(ColonyRd)ͲRt163toRt1034 Rt163(S.AmherstHwy)ͲRt685(RiverRd)to interchangeatRt29Expwy(29Bus) ParallelconnectorrdeastofRt29ͲRt29Busto LakeviewDr Rt130(ElonRd)ͲNSrailRdtracktoRt29Bus Rt675(WinesapRd)ͲRt652toRt795 42 Bedford Rt460ͲStudyAreaBoundary(GoodeRd)toRt811 43 44 Bedford Bedford 45 Bedford 47 Bedford 48 Bedford 49 50 Bedford Bedford Rt501(BoonsboroRd)atRt647 Rt501(BoonsboroRd)atJudithCrkRd Rt501(BoonsboroRd)LynchburgCorpLimitstoStudy AreaBoundary Rt659(HawkinsMillRd)ͲRt660toLynchburgCorp Limits Rt644(CoffeeRd)ͲRt665NorthtoLynchburgCorp Limits Rt622(EverettRd)ͲKensingtonPkwytoN&SRR Rt663(PerrowvilleRd)ͲRt1431toRt644 Rt726(MtAthosRd)t0US460(RichmondHwy) 1.6 Upgradeexisting2ͲlaneRd Rt677(DixieAirportRd)ͲRt699(AmelonRd)toRt622 1.2 Widento4lanes (GaltsMillRd) Rt622(NewWrightShopRd)ͲRt210(ColonyRd)toRt 2.3 Widento4lanes 677(DixieAirportRd) US501(LynchburgExpwy)ͲUS221(LakesideDr)toRt 1.3 Widento4lanes 620(WiggingtonRd) Rt622(WaterlickRd)ͲUS460Bus(TimberlakeRd)Rt 1 Widento4lanes 682(LeesvilleRd) 1.3 Accessmanagementimprovements OldForestRd(USͲ501toLinkRd) GravesMillRdRt1425(US221ͲForestRdtoLynchburg 1.6 Accessmanagementimprovements Expressway) OldGravesMillRd(US460ͲTimberlakeRdtoGraves 1.5 Accessmanagementandsafetyimprovements MillRdRt1425) US460ͲTimberlakeDr(OldGravesMillRdtoLynchburg TSM,accessmanagementimprovements,and 1.5 potentialwidening Expressway) LeesvilleRdRt682(GreenviewDrRt678toUS460Ͳ 2 Widento3lanes TimberlakeRd) WardsRdRt29(US460ͲRichmondHwytoLynchburg Pedestrianimprovementsandparallel 1.8 Expressway) capacity RiverRd(Rt685)Ͳ(Rt130toRt163) 3.7 Reconstruct2ͲlaneRdway IzaakWaltonRd(Rt663)Ͳ(Rt29toRt29B) 4.5 Reconstruct2ͲlaneRdway WinridgeRd(Rt795)Ͳ(Rt130toRt675) 1.25 Reconstruct2ͲlaneRdway Rt460/29(RichmondHwy)ͲͲFromRt501(Campbell 1.67 Improveto6lanelimitedaccessRdway Ave)toRt29(MonacanPkwy) 21 22 OddFellowsRdͲLynchburgExpwytoEnd 5thSt(Rt163)ͲLanghorneRdtoMainSt MemorialAveͲFortAvetoLanghorneRd OakleyAveͲLakesideDrtoMemorialAve Rt501Bus(BoonsboroRd)ͲLynchburgExpwy(Rt501) toLanghorneRd October 2010 1.1 Widento4lanes N/A Newinterchange N/A NewgradeͲseparatedinterchange 0.4 2.9 2.3 MultiͲmodalcorridorimprovements MultiͲmodalcorridorimprovements Widento3or4lanesw/bikelane Reconstructinterchangetoallowall N/A movements 0.3 Widento4lanes Rt738(EnglishTavernRd)ͲRt680(SuburbanRd)toRt 29(northintersection) Rt738(EnglishTavernRd)ͲRt29(southintersection)to Rt680(SuburbanRd) Rt681(SunburstRd)Rt460toRt622 66 Lynchburg 67 Lynchburg 68 Lynchburg 69 Lynchburg Widento4lanes Widenpavementto22feet Constructpavedshoulder&implement 2.9 accessmgmtrecommendations 0.3 Relocateintersection,constructturnlane N/A Bridgeimprovements Reconstructportionsasaclimbinglane(spot 4.8 locations) 70 Lynchburg 71 Lynchburg 72 73 74 Amherst Amherst Amherst 75 Lynchburg 1.5 Reconstruct2laneRdway 76 Lynchburg/ Rt460BypassͲWofairporttoRt501(CampbellAve) Campbell 3.6 Reconstruct2laneRdway 2.2 2.1 Reconstruct2laneRdway Reconstruct2laneRdway 1.6 Widento4laneswithbikelane 0.62 New2Ͳlanerd 1.9 3.1 77 Campbell (a+b) 78 Bedford 7.40 Increasetosixlanes Rt29Alt,newalignmentWofexistingRt29ͲSofRt24 (YellowBranch)toRt460 8.00 Constructnew4lanelimitedaccessfacility Rt621(CottontownRd)ͲͲRt662toRt660 1.7 October 2010 Reconstruct2laneRdway;PEinRightͲofͲWay, andaccrualtoconstruction Central Virginia Plan 2035 Projects by Type (Constrained and Vision Plan) Roadway Reconstruction: Improving roadway resiliency and safety with improvements such as reducing sharp angles at dangerous curves, re-grading hilly “blind spots,” and paving gravel shoulders. New Roadway: Adding roadway connections that reduce congestion on heavily traveled corridors and improve the efficiency of the regional network. Roadway Capacity Expansion: Adding and/or widening roadway lanes on congested corridors in order to accommodate increased numbers of vehicles. Multimodal Capacity Expansion: Adding facilities and services that encourage more walking, cycling, and transit use. This provides more travel choices for area residents and reduces the need to drive in congested urban areas. Access Management and Safety: Reducing the risk of crashes and improving traffic flow along major corridors with strategies such as consolidating multiple driveways, reducing the number of crossings, increasing the space between intersections, and coordinating traffic signals. Bridge/Intersection Reconstruction: Repairing and/or upgrading bridges and intersections to ensure safe passage for all types of vehicles. New Interchange: Improving regional accessibility by adding connections from local street networks to state highways. ! 17 l 0 October 2010