Introduction

advertisement
Introduction
Power Sector Structure
• FMoP
• NERC
Policy
Regulation
Customers
Operations
• Residential
• Commercial
• Industrial
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
• PTFP
• GenCos
• TCN
• DisCos
• NDPHC
• NBET
• NELMCO
• EMS
• NAPTIN
• REA
• HYPERDEC
1
Introduction…Cont’d.
Focus on Activities of the Power Sector
Power stability, reliability &
sustainability
Diversification of energy mix
(large hydros, renewables &
coal)
Electricity market stabilization
Improving rural access to
electricity
Human capacity development
Improving policy and
regulatory environment for
rapid growth through private
investment
Reducing production cost and
making manufacturing sector
more competitive
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
Empowering SMEs with more
power supply and creating
employment
2
Power Generation.
Existing Power Stations Connected to Grid
NIGERIA
Shiroro
600MW
Kainji
760MW
Jebba
540MW
Egbin
1,320MW
Omotosho
304MW
Geregu
414MW
Okpai
450MW
lorunsogo
304MW
AES
294MW
Ibom
190MW
Sapele
720MW
Delta
900MW
Design
Installed
Capacity (MW)
Kainji
760
Jebba
540
Shiroro
600
Olorunsogo
304
Egbin
1320
Sapele - FGN
720
Delta
900
Afam I-V
726
Afam VI
(Shell)
650
450
Okpai
120
Omoku
Omotosho
304
Geregu
414
AES
294
Ibom Power
190
Afam VI
Afam I-V
MINISTRY OF726MW
POWER
Omoku FEDERAL
650MW
FEDERAL
MINISTRY
OF
POWER
120MW
3
Power Generation. Cont’d
Rehabilitation Works
• Shiroro: Repair works on Unit 2 which led to recovery of 150MW in 2012
Hydropower Plant.
• Jebba: Hydro Power Station preventive maintenance of 2G2 in 2012 to
ensure availability and sustainability of 96.4MW.
• Egbin: In 2012, several worn parts of the plant were replaced with new
ones. This has improved plant reliability from 60% to more than
70%.
• Kainji: Rehabilitation works on 1G5 & 1G12 Units to recover 220MW
capacity by Dec 2014.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
4
Power Generation. Cont’d
Rehabilitation Works – Kainji Hydro Power Station
Rehabilitation works on 1G5 & 1G12 Units to recover 220MW capacity by Dec 2014
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
5
Power Generation. Cont’d
Newly Completed/On-going Power Plants for Increased Generation
Installed Capacity
(MW)
Katsina
10
Kaduna
215
Zungeru
700
Gurara I
30
Mambilla
3,050
Olorunsogo -2
675
Katsina wind
10MW
Zungeru
700MW
Kaduna
215MW
Omotosho - 2
Geregu - 2
Kashimbilla
Ihovbor
Kashimbila Sapele
Gbarin
40MW
Omoku
Alaoji
Egbema
Calabar
Egbema
Mambilla
3050MW
Gurara
30MW
Omotosho-2
451MW
Olorusogo-2
675MW
Geregu-2
434MW
Ihovbor
450MW
451
434
40
450
450
225
225
960
338
563
338MW
Calabar
563MW
Sapele
450MW
Gbarain
225MW
FEDERALOmoku
MINISTRY OF POWER
FEDERAL MINISTRY
OF POWER
225MW
Alaoji
960MW
6
6
Power Generation. Cont’d
Completed Generation Projects in the period under review
S/No
Power Station
Date
MW
Cumulative MW
1
Olorunsogo
Jan-11
112.5
112.5
2
Olorunsogo
Feb-11
112.5
225.0
3
Olorunsogo
May-11
112.5
337.5
4
Sapele
Aug-11
112.5
450.0
5
Olorunsogo
Nov-11
112.5
562.5
6
Sapele
Feb-12
112.5
675.0
7
Alaoji
Apr-12
112.5
787.5
8
Omotosho
Apr-12
112.5
900.0
9
Olorunsogo
Jul-12
112.5
1,012.5
10
Sapele
Aug-12
112.5
1,125.0
11
Omotosho
Aug-12
112.5
1,237.5
12
Alaoji
Sep-12
112.5
1,350.0
13
Omotosho
Oct-12
112.5
1,462.5
14
Sapele
Oct-12
112.5
1,575.0
15
Omotosho
112.5
1,687.5
Dec-12
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
7
Energy Mix
In order to enhance the security of power supply, government is
assiduously working towards the diversification of the fuel mix. In this
regard, the nation’s vast resources of coal, wind, solar, biomass and
hydropower potentials are being fully exploited.
• Feasibility Studies on the development of coal to power are ongoing in five(5) coal blocks in Enugu axis and three (3) coal blocks in
Benue, Kogi and Gombe axis. Progress of work on the studies is at
25% and is expected to focus on clean coal technology.
• Feasibility Studies on ten (10) dams with small hydropower
potentials which commenced in Y2011 have been completed and
ready for concession.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
8
Hydro Power Development in Nigeria
• Zungeru project in Niger State…………………….700MW
• Mambilla project – Taraba State…………………..3,050MW
• Gurara II project – Niger State……………………...360MW
• Gurara I Project Niger State…………………………..30MW
• Itisi project – Kaduna State……………………………40MW
• Kashimbilla project – Taraba State…………………40MW
• Other Small/medium hydropower projects – Nationwide
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
9
Hydro Power Development in Nigeria
Small/Medium Hydropower studies completed by FMP from 2011 to date
S/N
1
2
3
4
5
6
7
8
9
10
DAM
Oyan
Ikere Gorge
Bakolori
Challawa
Tiga
Kampe
Owena
Doma
Zobe
Jibia
STATE
CAPACITY (MW)
Ogun
Oyo
Zamfara
Kano
Kano
Kogi
Ondo
Nasarawa
Katsina
Katsina
10
6
3
7.5
10
3
0.45
1
0.30
4
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
10
Hydro Power Development in Nigeria
360MW GURARA II Multi-purpose Project
Located
140km
downstream
of Gurara I
and 40km
from Abuja
Design basis:
360MW and
1,130GWhr of
energy per
annum
C.A. 2,510
km2
Gurara II
C.A. 2,840
km2
IRR = 8.9% at
MYTO tariff
Estimated
cost: US$800m
Irrigation
potential:
8,000Ha
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
11
Hydropower Development in Nigeria
(Zungeru)
The construction of the 700MW Zungeru hydropower project was approved by FEC in
2012 in favour of a consortium of Messrs. Sinohydro/CNEEC in the contract sum of
US$ 1.237 billion and a completion period of 48 months.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
12
Hydropower Project in Nigeria
Zungeru
•Ground breaking ceremony for the project was performed by His Excellency President
Goodluck Jonathan, GCFR on 28th May, 2013
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
13
Focus on Renewable Energy Resources Development
River Basins with Large and Small Scale Hydropower Potential
River Basins with Large and Small Scale Hydropower Potential
Solar Map
Hydro Potentials
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
14
Focus on Renewable Energy Resources Development
contd.
Wind Map
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
15
Focus on Renewable Energy Resources Development
contd.
The 10 MW Katsina Windfarm Power Project is at 98% completion and will
soon be commissioned
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
16
Nigeria’s Transmission Grid
• Transmission development activities are mainly carried out by Transmission
Company of Nigerian (TCN) and Niger/Delta Power Holding Company
(NDPHCN) under the National Independent Power Project (NIPP).
• TCN Projects are funded through the statutory budgets from the FGN.
• NIPP projects are funded by the 3-tiers of the government from the excess crude
account.
• For the period under review several transmission projects have been completed
which lead to modest increase in the nation’s transmission capacity as listed in
the following slides.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
17
Nigeria’s Transmission Grid
Nigeria 330kV Network
330kV
System
Capacity
(blue line)
6870 MW
5650 KM
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
18
Nigeria’s Transmission Grid
Completed Transmission Projects (Substations) - NIPP
PROJECT
LOT 9-A
LOT 9-B
LOT 10-A
LOT 10-B
LOT 10-C
LOT 10-D
LOT 11-A
LOT 11-B
LOT 11-C
LOT 11-D
LOT 13-A
LOT 13-B
LOT 24-1
LOT 26-1
LOT 27A
LOT 27B
DESCRIPTION
330/132/33KV Ganmo SS (New)
132/33KV Ayede SS (Ext.)
132/33KV Central Area SS (Ext.)
330/132KV Katampe SS (Ext.)
132/33KV Kumbotso SS (Ext.)
330/132/33KV Mando SS (Ext.)
132/33KV Agbara SS (Ext.)
132/33KV Ikeja West SS (Ext.)
132/33KV Ojo SS (Ext.)
132/33KV Oworonsoki SS (Ext.)
330/132KV Aja G.I.S. SS (Ext.)
132KV Aja G.I.S. SS (Ext.)
330/132KV Papalanto SS (New)
330/132KV Omotosho SS (New)
330KV Sapele SS (Rehab. & Ext.)
330KV Benin SS (Rehab.)
MVA
300
150
60
150
60
150
60
150
120
120
150
450
450
TOTAL
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
2,370
19
Nigeria’s Transmission Grid
Completed Transmission Projects (Lines) - NIPP
PROJECT
DESCRIPTION
LENGTH (KM)
LOT 9-C
330KV DC Ganmo-(Jebba/Osogbo SC - Turn in/Turn out)
12
LOT 9-D
132KV DC Ganmo-(Ilorin/Oshogbo SC Turn in/Turn out)
2
330KV DC Ihovbor-(Benin Main-Oshogbo) (Line A)
17
LOT22-2
330KV DC Ajaokuta-Lokoja-Gwagwalada
222
LOT 24-2
330KV DC Papalanto-(Ikeja West/Ayede)
16
LOT 26-2
330KV DC Omotosho - Ikeja West
5
LOT 19-3A
TOTAL
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
274
20
Nigeria’s Transmission Grid
Completed Transmission Projects - TCN
Completed Projects from 2011 to Date
S/N
Project
Location
Title of Project
Deliverables
1 Construction of 150MVA 330/132/33kV T/F and 330kV bays Edo & Anambra 150MVA increase in transformer capacity at 330kV Voltage
at Onitsha and Benin.
level at Onitsha
2 Calabar 2x150MVA, 330/132/33kV Substation and line bay at Cross River &
Alaoji Substation.
Abia
300MVA Transformer capacity at 330kV level in Calabar,
Cross River State
3 Construction of Alaoji-Umuahia 132kV DC line
Abia
50km of 132kV Transmission line. Increase wheeling
capacity to Umuahia, Abia State
4 Umuahia 2x30/40MVA, 132/33kV Substation
Abia
80MVA Transformer capacity at 132kV level in Umuahia,
Abia State
5 Gombe-Damaturu-Maiduguri 330kV line.
Gombe, Yobe & 376km of 330kV Transmission line. Increase wheeling
Borno
capacity to Yobe and Borno States
6 Jos - Kafanchan 132KV D/C Line .
Plateau &
Kaduna
80km of 132kV Transmission line. Increase wheeling
capacity to Kafachan & Environs, Kaduna State
7 2 x 30MVA 132/33KV S/S at Pankshin and Makeri
Plateau
60MVA Transformer capacity at 132kV level in Makeri &
Pankshin towns in Plateau State
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
21
Nigeria’s Transmission Grid
Completed Transmission Projects - TCN
Completed Projects from 2011 to Date
S/N
Title of Project
Project Location
Deliverables
8 3rd Benin - Onitsha 330KV DC Line
Edo, Delta & Anambra 131km of 330kV Transmission line. Increase wheeling
capacity to Onitsha & Environs, Anambra States
9 Rehabilitation of Sokoto – Talata Mafara 132KV DC line
Sokoto & Zamfara
Recovery of 125km of 132kV Transmission line
10 Transmission & Supply of Substation at Tamburawa Water
Facility
Kano
80MVA Transformer capacity at 132kV level in
Tamburawa
11 1X30 MVA 132/33 KV SS at Kwanar Dangora
Kano
30MVA Transformer capacity at 132kV level in Kwanar
Dangora
12 Reinforcement of Birnin Kebbi and Kumbotso Substations
with 1x150MVA, 330/132kV transformer each.
Kebbi and Kano States 150MVA transformer capacity increase at 330kV level
in both Birnin Kebbi and Kano
1 Kainji-New Bussa 330kV single-circuit transmission line
Kainji to New Bussa in 8.6km of 330kV transmission line to link Kainji and
Niger State
New Bussa
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
22
Nigeria’s Transmission Grid.
On-Going TCN Projects at advanced stages of Implementation
S/
Project Description
N
Name of Contractor
Project
Location
Project Total Cost
(Naira)
Project Deliverables
Status of
Implement
ation (%)
Impact of Project
1 Arochukwu
Omen International Ltd. Abia State
2x30/40MVA,
132/33kV substation
937,496,022.58
80MVA Transformer
capacity at 132kV level in
Arochukwu, Abia State
86%
Improvement of Power supply to
Arochukwu and environs and
enhancement of socio-economic
life of the people.
2 Mbalano-Okigwe
132kv SC line
Atlantic Engineering & Mbalano
Construction
(Abia) to
Okigwe
(Imo)
329,754,483.86
20km of 132kV
Transmission line.
100%
Improvement of Power supply to
Okigwe and environs and
enhancement of socio-economic
life of the people.
3 Okigwe
2x30/40MVA
132/33kV
Substation
Union Allied
Engineering Ltd.
1,839,789,715.03
80MVA Transformer
capacity at 132kV level in
Okigwe, Imo State
60%
Improvement of Power supply to
Okigwe and environs and
enhancement of socio-economic
life of the people.
4 Umuahia-Ohafia
132kv SC line
Harlesden Engineering Umuahia to 1,257,267,830.78
Ltd
Ohafia in
Abia State
49.5km of 132kV
Transmission line.
60%
Improvement of Power supply to
Ohafia and environs and
enhancement of socio-economic
life of the people.
Imo State
5 Ohafia 2x30/40MVA Union Allied
132/33kV
Engineering Ltd.
substation.
Abia State
1,972,613,202.90
80MVA Transformer
capacity at 132kV level in
Ohafia, Abia State
60%
Improvement of Power supply to
Ohafia and environs and
enhancement of socio-economic
life of the people.
6 Mbalano
2x30/40MVA
132/33kV
substation.
Abia State
1,409,011,316.42
80MVA Transformer
capacity at 132kV level in
Mbalano, Abia State
60%
Improvement of Power supply to
Mbalano and environs and
enhancement of socio-economic
life of the people.
Union Allied
Engineering Ltd.
FEDERAL MINISTRY OF POWER
23
Nigeria’s Transmission Grid.
On-Going TCN Projects at advanced stages of Implementation
S/N
Project Description
Name of Contractor
7 1x150MVA,330/132KV
MBH Power
Transformer at Birnin
Kebbi and Reinforcement
at 330/132KV substation at
Kumbotso
Project
Location
Kebbi and
Kano States
Project Total Cost
(Naira)
3,559,832,144.00
Project Deliverables
Status of
Implementation
(%)
Impact of Project
150MVA Transformer capacity at
330KV level in Birnin Kebbi
98%
Improvement of Power supply to
Birnin Kebbi, Kumbotso and
envirohancemens and enhance
ment of socio-economic
activities in the areas.
8 Kainji - New Bussa 132KV Dextron Engineering Ltd Kainji to New 308,108,608.00
DC Transmission line &
Bussa, Niger
330KV SC River crossing
State
132kV and 330KV transmission
lines to wheel more power to
Nerw Bussa.
98%
Improvement of Power supply to
New Bussa and environs and
enhancement of socio-economic
life of the people.
9 Katampe-National Stadium ABB Powerlines;
132kv DC line
Energo Nigeria Ltd
8.4km of 132kV double-circuit
underground cable and 4km of
132kV DC overhead transmission
line.
150MVA Transformer capacity in
kainji, Niger State.
55%
Improvement of Power supply to
the FCT.
89%
Improvement of Power supply to
New Bussa and environs and
enhancement of socio-economic
life of the people.
FCT
2,656,115,130.98
10 Kainji 1x150MVA,
MBH Power
330/132KV & 2x30/40MVA
substation at New Bussa
Niger State
4,599,287,900.00
11 2x60MVA, 132/33KV
LAGA CePower
Substation at Odogunyan
and Ayobo with 132KV DC
line Ikeja west - Ayobo.
Lagos State
3,657,155,630.00
120MVA Transformer capcity at
132kV level at Odogunyan and
Ayobo.
89%
Improvement of Power supply to
Odogunyan, Ayobo and environs
and improvement of socioeconomic activities in the areas.
12 Ikorodu - Odogunyan Shagamu 132KV DC
Transmission line
PPCL/ Westcom JV
Ikorodu to
Odogunyan,
Lagos State
3,192,097,186.00
132kV DC transmission line
from Ikorodu to Odogunyan
52%
13 Damaturu 330/132kV
Substation
Parsian High
VoltageDiv./ Cartlark
Int'l Ltd
Yobe State
2,502,960,280.52
150MVA Transformer capacity at
330kV level in Damaturu, Yobe
State
80%
Improvement of Power supply to
Odogunyan, Shagamu and
environs and improvement of
socio-economic activities in the
areas.
Improvement of Power supply to
Damaturu and environs and
improvement of socio-economic
activities in the areas.
FEDERAL MINISTRY OF POWER
24
Nigeria’s Transmission Grid.
On-Going TCN Projects at advanced stages of Implementation
S/N Project Description
Name of
Contractor
Project
Location
Project Total Cost
(Naira)
Project Deliverables
Status of
Implementati
on (%)
14 Nnewi 2x60 MVA 132kV
substation
Valenz Holdings
(Nig) Ltd.
Anambra State 735,801,070.00
120MVA Transformer capacity at
330kV level in Nnewi
65%
15 Kafanchan 132kv 2 x
60mva Substation
Valenz Holding Ltd
Kaduna State 1,407,774,049.57
120MVA Transformer capacity at
132kV level in Kafanchan
80%
16 Makeri - Pankshin 132KV
DC Line
Mogabs Nig. Ltd
Makeri to
1,295,611,365.16
Pankshin,
Plateau State
Rehabilitation of 122km of
132kV Transmission line.
75%
17 2 x 30MVA 132/33KV S/S North China/EESE
at Pankshin and Makeri
Plateau State 1,783,781,485.32
60MVA Transformer capacity at
132kV level in Makeri &
Pankshin towns in Plateau State
100%
18 Kano- Walalanbe 132KV GIT
Line (Turn in and out of
Dan agundi-Dakata 132KV
single Cct Line) and 2 x
30/40MVA S/S at
Walalambe
19 Yelwa - Yauri 2 x
Valenz/
30/40MVA S/S and 100KM Electromontaz
of 33KV Line
Kano Sate
1,783,781,485.32
132kV DC Transmission line &
80MVA Transformer capacity at
132kV level in Walalambe
55%
Kebbi State
1,242,074,910.89
100km of 33kV line & 80MVA
Transformer capacity at 132kV
level in Yelwa, Kebbi State
60%
20 Umuahia - Mbalano 132KV Santon Energy L:td
Line
Abia State
991,759,726.68
30km of 132kV DC Transmission
line.
67%
21 Ohafia - Arochukwu 132KV Mogabs Nig. Ltd
Line
Abia State
856,128,363.00
40km of 132kV DC Transmission
line.
45%
FEDERAL MINISTRY OF POWER
Impact of Project
Improvement of Power supply to
Nnewi and environs and
improvement of socio-economic
activities in the areas.
Improvement of Power supply to
Kafanchan and environs and
improvement of socio-economic
activities in the areas.
Improvement of Power supply to
Pankshin and environs and
improvement of socio-economic
activities in the areas.
Improvement of Power supply to
Makeri, Pankshin and environs
and improvement of socioeconomic activities in the areas.
Improvement of Power supply to
Kano and environs and
improvement of socio-economic
activities in the areas.
Improvement of Power supply to
Yelwa, Yauri and environs and
improvement of socio-economic
activities in the areas.
Improvement of Power supply to
Mbalano and environs and
improvement of socio-economic
activities in the areas.
Improvement of Power supply to
Arochukwu and environs and
improvement of socio-economic
activities in the areas.
25
Nigeria’s Transmission Grid.
On-Going TCN Projects at advanced stages of Implementation
S/N Project Description
Name of
Contractor
Project
Location
Project Total Cost
(Naira)
Project Deliverables
Status of
Implementati
on (%)
Impact of Project
22 Kukwaba 2x60MVA,
132/33kV substation
North China Power
Egnineering
FCT
2,568,846,118.51
120MVA Transformer capacity
at 132kV level in Kukwaba, FCT
40%
Improvement of Power supply to
the FCT.
23 2x60MVA, 132KV/33 at
Aboh -Mbaise S/S
Ashtavinayaka/Bran
Engineering
Imo State
1,480,777,014.45
120MVA Transformer capacity at
132kV level in Aboh Mbaise in
Imo State
65%
Improvement of Power supply to
Aboh Mbaise and environs and
improvement of socio-economic
activities in the areas.
24 2x60 MVA, 132/33 kV
Ashtavinayaka/Bran
substation at Ideato and 2 Engineering
x132KV Line Bays at
Okigwe
Imo State
1,739,004,381.00
120MVA Transformer capacity at
132kV level in Ideato in Imo
State
60%
Improvement of Power supply
toIdeato and environs and
improvement of socio-economic
activities in the areas.
25 2x60 MVA, 132/33 kV
substation at Oba and
2 x132KV Line Bays at
Nnewi
Xian/GIT Engineering
Anambra State 1,863,432,339.00
120MVA Transformer capacity
at 132kV level in Oba.
45%
Improvement of Power supply to
Oba and environs and
improvement of socio-economic
activities in the areas.
26 Oshogbo- Ede 132KV DC
Line
Aster Infrast/Aster
Teleservices
Osun State
1,490,085,721.56
15km of 132kV DC transmission
line
53%
Improvement of Power supply to
Ede and environs and
improvement of socio-economic
activities in the areas.
27 DC 132kV line from Alscon KEC International
to Ibom Power and
Limited
Switching Station to link
the GIS at Alscon with
associated bay extensions
at Ibom Power - Akwa
Ibom State
Akwa Ibom
State
747,246,322.01
2.5km of 132kV DC Transmission
line and 150km of 132kV DC
underground Cable
45%
Improvement of Power supply to
Akwa Ibom State and
improvement of socioeconomiclife of the people.
28 Reconductoring of AfamPort Harcourt 132kV line
Ricers State
290,000,000.00
Rehabilitation of 37.8km of
132kV Transmission line with
increased wheeling capacity
100%
Improvement of Power supply to
Port Harcourt and environs and
improvement of socio-economic
activities in the areas.
Electrical Solutions Ltd
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
26
Nigeria’s Transmission Grid
NIPP Completed Transmission Projects
LOT 10-B (Charnel/AkAy 150MVA 330/132kV Katampe SS (Extension) in full service
LOT 11-B (Charnel/AkAy 150MVA 330/132kV Ikeja West SS (Extension) in full service
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
27
Distribution Activities
To ensure availability of un-interrupted power supply to
the consumers, this administration executed various
distribution projects (maintenance/expansion) across the
country through the eleven (11) Electricity Distribution
Companies (DisCos)
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
28
NIPP Completed Distribution Projects
•
•
•
•
Abuja Zone –
- ABUJA - AIRPORT 33KV DC LINE
- APO 1 X 15MVA INJECTION S/S TRANSFORMER
Benin Zone –
- IHOVBOR 2 X 2.5MVA INJECTION S/S TRANSFORMER
- AKURE Main 1x15mva INJECTION TRANSFORMER
Eko –
- NEW IDUMAGBO 1 X 15MVA INJECTION S/S TRANSFORMER
- Beckely 1 X 15mva Injection S/S Transformer
- Alagbon 1 X 15mva Injection S/S Transformer
- Fowler 1 X 15mva Injection S/S Transformer
- Apapa Road 1 X 15mva Injection S/S Transformer
- Nitel 1 X 15mva Injection S/S Transformer
- Tincan 1 X 15mva Injection S/S Transformer
- Agbara 1 X 15mva Injection S/S Transformer
- Ajangbadi 1 X 15mva Injection S/S Transformer
Ibadan Zone
- Akobo 1 X 15mva Injection S/S Transformer
- Awe - Oyo 1 X 7.5mva Injection S/S Transformer
- Samanda 1 X 15mva Injection S/S Transformer
- Apata 1 X 15mva Injection S/S Transformer
- Ikiru Road 1 X 15mva Injection S/S Transformer
-Tinumola 1 X 7.5mva Injection S/S Transformer
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
29
NIPP Completed Distribution Projects contd.
•
Ikeja
- IPAKODO 1 X 15MVA INJECTION S/S TRANSFORMER
- IJEDE 1 X 15MVA INJECTION S/S TRANSFORMER
- AGBOWA 1 X 15MVA INJECTION S/S TRANSFORMER
- OWUTU 1 X 15MVA INJECTION S/S TRANSFORMER
- IMOTA 1 X 15MVA INJECTION S/S TRANSFORMER
- MAGODO 1 X 15MVA INJECTION S/S TRANSFORMER
•
Kaduna
- ZAMBIAN CRESCENT 1 X 2.5MVA INJECTION S/S TRANSFORMER
- KAGORO 1 X 7.5MVA INJECTION S/S TRANSFORMER
- NARAYI 2 X 2.5MVA INJECTION S/S TRANSFORMER
•
Jos
- PANKSHIN 1 X 7.5MVA INJECTION S/S TRANSFORMER
- SHENDAM 1 X 7.5MVA INJECTION S/S TRANSFORMER
- COMPLETED INJECTION S/S = 31
- CAPACITY = 492.5 MVA
- COMPLETED CSP TRANSFORMERS = 2514
- COMPLETED 11KV LINES = 1221KM, 33KV = 230KM
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
30
DisCos Completed Distribution Projects
ENUGU ELECTRICITY DISTRIBUTION COMPANY
PROJECTS COMPLETED FROM 2011 TO DATE
S/N
1
2
3
DisCos Installed Transformer Capacity from 2011 to date
Year
Description
33/11KV Injection Substation (MVA)
33/0.415KV Distribution Substation
(MVA)
11/0.415KV Distribution Substation
(MVA)
2011
2012
2013 (as at 31st May)
959.75
974.75
1,083.50
972.67
1,028.62
1,047.32
1,600.99
1,657.84
1,680.74
ENUGU ELECTRICITY DISTRIBUTION COMPANY
PROJECTS COMPLETED FROM 2011 TO DATE
DisCos Installed 33KV and 11KV Overhead Lines from 2011 to date
Year
S/N
Description
2011
2012
2013 (as at 31st
May)
1
33KV Overhead lines (Km)
6,596.50
6,651.95
6,924.80
2
11KV Overhead lines (Km)
3,464.80
3,504.00
3,522.90
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
31
DisCos Completed Distribution Projects contd.
Ikeja DisCo
SOME COMPLETED INJECTION SUBSTATION & SWITCH YARD in 2012
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
32
Rural Electrification Agency (REA)
 REA was reactivated in June, 2012, to improve rural access to electricity.
 The Ministry has developed a draft REA Strategy and Implementation Plan
and it is being finalized.
 REA will focus on increased exploitation of renewables and the facilitation
of rural electrification projects.
 The Agency carried out Survey, Design, Procurement and Award of
several rural electrification projects under 2012 capital appropriation.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
33
The Reform Process : Progress So Far
The Electric Power Sector Reform (EPSR) Act of 2005 provided the platform for the
reform of deregulating the Nigerian Electricity Supply Industry (NESI) from the
control, ownership and regulation of the sector by the Federal government to a
private sector-driven industry. The launching of the Roadmap by Mr. President in
August 2010 has led to significant progress in the implementation of the structural
reforms outlined in the Act.
The major achievements to date are as follows:
i. Bidding and selection of preferred bidders for the 10 Distribution Companies
and the 5 Generation Companies was concluded in November 2012, contracts
have been signed and bidders have already made initial payments of 25% of the
bid price.
ii. Presidential Power Reform Transaction signing and presentation of certificates
for payments of initial deposits to successful bidders of the DisCos and GenCos
by Mr. President was performed on 22nd April, 2013.
iii. Handing over of TCN to Manitoba Hydro International for management
contract concluded. Schedule of Delegated Authority (SODA) give to Manitoba
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
34
The Reform Process : Progress So Far contd.
iv.
The Nigerian Electricity Regulatory Commission (NERC) has been reconstituted, strengthened and
now is fully operational.
v.
NERC launched MYTO 2 cost-reflective tariff in June, 2012, which is now operational.
vi.
Nigeria Bulk Electricity Trading (NBET) PLC was incorporated in July, 2010 and is now in operation as
a credit-worthy off - taker.
vii. The Nigeria Electricity Liability Management Company (NELMCO) was established in 2010 to assume
and manage the assets, liabilities and other obligations that could not be earlier transferred from
PHCN to any successor company
viii. Resolution of Labour issues is almost completed, the severance pay to PHCN workers begins in 17th
June, 2013.
ix.
Investor confidence evidenced by increased investment and signing of MoUs. Most recent being
the MoU signed with Power China Corporation to develop 20,000 MW of Thermal Power Plants
with associated substations and transmission lines up to 10,000 km
x.
Sale of Ten (10) Power generating plants built by the Niger Delta Power holding Company (NDPHC).
The road-show programme commenced in Lagos on the 4th June, 2013. other locations include
London, UK, Hong Kong and New York, USA.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
35
The Reform Process : Progress So Far contd.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
36
The Reform Process : Progress So Far
iv. T
His Excellency, the Vice President , Arc. Namadi Sambo presenting certificates to one of the Core
investors in the on-going privatisation of the Power Sector.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
37
Reform Process:
Resolution of all labour issues
Seated from the left: The Honourable Minister of State for Finance, Yerima Ngama;
Honourable Minister of State for Power, Hajiya Zainab Ibrahim Kuchi; Honourable Minister
of Labour and Productivity, Emeka Wogu together with Labour Union in the sector.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
38
Capacity Building
National Power Training Institute (NAPTIN)
A robust Nigeria Electricity Supply Industry requires a well-trained work force. Hence,
strategies have been put in place to improve the competences of the existing work force
through skill enhancement and professional development programmes. Part of these
strategies include the establishment of the National Power Training Institute of Nigeria
(NAPTIN) to ensure that the human capital needs of the sector are met. Key achievements
include:
1.
Rehabilitated six(6) existing Regional Training Centres (RTC) inherited from PHCN and
building of 2 new ultra-modern training centres in Jos and Kano
2.
Commenced intensive training of 1,000 graduate engineers (Graduate Skill Development
Program)
3.
Trained 70 engineers across the power sector on renewable energy options (solar, wind
+ hybrid)
4.
Commissioned Power System Training Simulator at Ijora RTC in October, 2012
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
39
Capacity Building
National Power Training Institute (NAPTIN)
5.
Laid foundation for the development of NAPTIN’s permanent site at Idu Industrial
Layout, Abuja in October 2012
6.
Completed rehabilitation of mechanical workshop at Ijora Regional Training Center (RTC),
Lagos.
7.
8.
Installed / commissioned NAPTIN’s e-Learning platform in December, 2012
Installed / commissioned renewable hybrid solar PV + wind demonstration plants at
Kainji RTC in November 2012
9.
Completed Faculty profiling and curriculum development in December, 2012
10.Signed MoU
with PNN Nigeria Limited (an indigenous renewable energy company) on
the Training of 1,500 youths on installation and maintenance of solar PVs
11.Developed
and commissioned 60 and 36-room executive hostel / guest house for
trainees at Kainji and Akangba RTCs respectively.
12.Trained about 5,340 professionals to date since inception
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
40
Capacity Building
National Power Training Institute (NAPTIN)
EXECUTIVE HOSTEL AT
AKANGBA RTC
MECHANICAL WORKSHOP,
NAPTIN RTC IJORA
Electric Power System Simulator, Ijora
EXECUTIVE HOSTEL AT
AKANGBA RTC
ENGINEERING LABORATORY ,
KAINJI
Electric Power System Simulator, Ijora
Various Projects Completed and Commissioned by NAPTIN in 2012
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
41
Capacity Building
National Power Training Institute (NAPTIN)
Scheduled Training Undertaken
Various Training Courses Organized In 2012 Covering Technical And Administrative Skills
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
42
Stakeholder Engagements
•
•
•
•
•
•
•
•
•
•
•
•
Nigeria/Niger Joint Commission Meetings in Abuja & Niamey.
West African Power Pool Meetings.
ECREEE meeting at Cape Verde.
Engagements with Investors from international countries
Meetings with Development Partners.
Meetings with Manitoba Hydro International of Canada.
Meeting with AfDB, World Bank, JICA, EU, GIZ, USAID, USTDA, DFID, UNIDO, NAIF
etc.
Meeting with BOI on MoU for financial services for Public Private Partnership.
Bilateral Meetings with Reps of various countries on power sector development
(Sweden, Germany, Italy etc.)
Engagements with private investors (including FDI’s) in power sector
MYTO II tariff consultation with stakeholders
As part of advocacy, the Ministry had working visits and consultations with
traditional rulers.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
43
Stakeholders Engagements
As part of advocacy visits, HMP on working visit
to the HRH. Emir of Zazzau, Alh. Shehu Idiris.
Tariff consultation with Oba of Lagos in
May 2012
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
44
Stakeholders Engagements
From left: Vice Chairman Senate Committee on Power, Sen. Chris Ngige; Chairman, Sen. Philip Aduda; HMP,
Prof. Chinedu Nebo; HMSP, Hajiya Zainab Ibrahim Kuchi; Permanent Secretary Ministry of Power,
Amb. Godknows Igali, during Senate committee on Power’s visit to the Ministry.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
45
Summary of Key Output/Achievements
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
46
Key Output/Achievements.
Generation


Record Peak Generation of 4,517.6MW .
Record Average Energy Sent Out of 4,028.85MWh/h
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
47
Installed Generation Capacity MW
8,497
9,097
9,920
Available Generation Capacity MW
2010
2011
2012-2013
5,563
6,522
3,700
2010
FEDERAL MINISTRY OF POWER
2011
2012-2013
48
Key Output/Achievements.
Transmission
TCN Installed Transformer Capacity (MVA) at 330 and 132kV Transmission Voltage Levels
12000
10000
8000
MVA @330/132kV
6000
MVA @132/33kV
4000
2000
0
2007
Volt Level
2008
2009
2010
2011
2012
2007
2008
2009
2010
2011
2012
MVA
@330/132kV
6,098
6,398
6848
7,688
8,138
8,686
MVA
@132/33kV
8,244
8,350
8,590
9,130
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
9,800
10,792
2013
Being UpDated
49
Transmission Wheeling Capacity (MW)
Transmission Wheeling Capacity (MW)
4,527
3,640
2,800
2010
2011
FEDERAL MINISTRY OF POWER
2012
Summary of deliverables of completed
Transmission line Projects from 2011 to date
Substation
capacity (MVA)
Transmission
line coverage
(Km.)
NIPP
TCN
TOTAL
2,370
850
3,220 MVA
274
780.6
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
1,045.6 Km
51
Key Output/Achievements.
Distribution
Disco
Power
Distribution
Capacity at
33/11kV
(MVA)
Abuja:
Benin:
Eko:
Enugu:
Ibadan:
Ikeja:
Jos:
Kaduna:
Kano:
P/H:
Yola:
Total
YR 2011
MVA
YR 2012
MVA
568
529
844
668
960
935
397
368
397
550
144
6,360
633
625
1019
757
1057
1058
448
390
483
681
174
7,325
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
52
Average No of Hours of Power availability per day
Average no of hours of power availability per day
16
12
8
2010
2011
FEDERAL MINISTRY OF POWER
2012
53
Key Output/Achievements
Target Metric
Generation
Transmission
Distribution
Sector
Reforms
▪
▪
▪
▪
Installed Capacity
Available Capacity
Record Peak Generation
Average Energy Delivered
▪ Transmission capacity (nominal)
▪ Technical losses
2011
▪
▪
▪
▪
9,097MW
5,563MW
4,089 MW
27,692MWH
▪ 5515MW
▪ 12%
▪ Distribution capacity (nominal)
▪ 6360 MW
▪ Total Revenue Collection from the Market ▪ N151 Billion
•
•
•
•
May, 2013
▪
▪
▪
▪
9,920MW
6,522MW
4,517 MW
29,196MWH
▪ 6870MW
▪ 12%
▪ 7325 MW
▪ N189 Billion
All power reform institutions are established and in operation
FGN/Labour signed agreement and its implementation is at advanced stage
Privatization of 10 DisCos and 5 GenCos at advanced stage
TCN management has been handed over to Management Contractors
(Manitoba of Canada) and TCN Board Inaugurated.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
54
Projection for 2013 and beyond
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
55
Focus in 2013 and beyond
Going forward, the Ministry will pursue vigorously the following:
•
Restructuring of Ministry of Power and its Agencies to cope with the
evolving role in a privatised environment.
•
Private Investment - including Foreign Direct Investments (FDI) in
the Power sector (IPPs, distribution, renewable energy & capacity
building)
•
Transmission Grid Expansion (Super Grid)
•
Develop framework for alternative funding of transmission projects
that will allow recovery of investments.
•
Renewable Energy Resource Development .
•
Electricity Market Development.
•
Effective Monitoring & Evaluation.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
Focus in 2013 and beyond contd.
•
Conclusion of labour-related issues.
•
Develop Local Content framework in the power sector.
•
Promoting Energy Efficiency and Conservation.
•
Collaborate with other agencies to check vandalisation of
power infrastructure.
•
Improving rural access to electricity.
•
Divestment of NIPP sales now at bidding stage (EoI bid
submission closed July 19, 2013).
•
Conclude privatisation process by the end of 2013.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
Focus in 2013 and beyond contd.
•
Development of the major coal fields as this will contribute between 3000 - 4000 MW
power to the National grid towards improving energy mix and security of supply when
implemented.
•
Establishment of National Council on Power to harmonize the activities of different
players: Federal Government, State Governments, Local Governments etc. for effective
coordination of efforts in the Power Sector.
•
The Ministry will leverage on the abundant Renewable Energy sources in the country
which are environmentally friendly to increase power generation and guarantee security
of supply.
•
Graduate Trainee programme aimed at producing personnel equipped with the basic
skills required in the Power Sector.
•
The Ministry will consolidate the gains in the previous years performance and improve
availability of power supply between 16 – 24 hours per day for Nigerians.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
Future Plan for Transmission Expansion
(330kV and Super Grid Networks)
REPUBLIC
OF
CHAD
2015 : new
Niamey
NIGER
SOKOTO
Sokoto
Katsina
132 kV
2015 : new
YOBE
Hadejia
JIGAWA
Birnin
Kebbi
BORNO
Gusau
KATSINA
ZAMFARA
Damaturu
Potiskum
2015 : new
Kano
KEBBI
Maiduguri
KANO
2010 : new
Zaria
REPUBLIC
OF BENIN
KADUNA
2015 : 2nd Circuit
2015 :
3rd Circuit
Bauchi
2
3
SHIRORO
NIGER
KAINJI
BAUCHI
Kaduna
Jos
Gombe
ADAMAWA
GOMBE
2
SAPELE
P/ST.
2
KWARA
2
Minna
2010: new
JEBBA/GS
2015 : new
4
JEBBA/TS
Abuja
OYO
NASSARAWA
3
2015 : new
EKITI
MAKURDI
Mambila
Aliade
Okitipupa
EGBIN
P/ST.
ENUGU
EDO
Benin
Ikeja
2005 : new
Mambila Hydro
2
ONDO
2
Bali
BENUE
KOGI
Akure
2
ALAGBADO
REPUBLIC
OF CAMEROON
TARABA
Makurdi
AJAOKUTA
Geregu
Abeokuta
NIGERIA
2015 : new
Ado
Ekiti
OSUN
OGUN
Lafia
Lokoja
Osogbo
2
Yola
Jalingo
ABUJA
IIorin
Ibadan
PLATEAU
2015 : new
Enugu
Akwa
TRANSMISSION LINE LEGEND
EBONYI
700kV LINES – SUPER GRID
Asaba
LAGOS
2
ONITSHA
4
Abakaliki
AN AMBRAAgip
SAPELE
P/ST.
IMO
700 / 330kV SUBSTATION
CROSS
RIVER
Umuahia
330kV LINES - EXISTING
ABIA
DELTA
POWER ST.
Owerri
DELTA
330kV LINES – MULTIPLE CIRCUITS
2
330 kV
RIVERS
2
2
BAYELSA
H
Uyo
Port
Harcourt
BULK SUPPLY POINT
Calabar
AKWA
IBOM
HYDROELECTRIC POWER STATION
THERMAL POWER STATIONS
2015 : new
2015 : new
AFAM
POWER ST.
ATLANTIC OCEAN
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
59
Focus on Partnerships & Investment
Activities in 2013
•General Electric
•Siemens AG
•Daewoo E&C
•Electrobras
•EDF/ETDE
•Power China Corp.
These companies have all signed Memorandum of
Understanding with the Nigerian Government to support
Power Projects with a new approach of providing equity in
the investment
Investors from all over the world have shown commitment and keen interest in Nigeria’s
Power sector owing to the clearly defined programme set out by its government
-Asia (China, India, South Korea)
-Europe (Germany, Nordic Countries, UK)
-North America (United States, Canada)
-Africa (South Africa)
-South America (Brazil)
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
60
Conclusion
The Power Sector has recorded appreciable improvement in power delivery in the period
under review despite daunting challenges. The Ministry will intensify effort in the
implementation of the Roadmap and will ensure completion of key projects/programmes
with renewed vigour in 2013 and beyond. Consequently, we seek continuous support and
understanding from our numerous stakeholders.
The Ministry is committed to ensuring that improved service delivery level is maintained
during and after the transition to private ownership of the GenCos and DisCos.
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
61
Thank You
Lighting up
Nigeria 24/7
FEDERAL MINISTRY OF POWER
FEDERAL
MINISTRY OF POWER
62