1 COURSE OVERVIEW Data Center Operational Management (DCOM) DAY 1 SESSION Introduction 9.00 – 9.30 Understanding the green agenda and metrics 9.30 – 10.30 Building Management Systems and monitoring CONTENTS ● Introduction to the subject ● Why do data centers fail? A review of published data center failure tables and Capitoline’s own analysis of failure modes ● PUE and DCiE ● The Green Grid ● Energy Star ● LEED/BREEAM schemes ● US Environmental Protection Agency ● EU Code of Conduct & Best Practice ● TUI and CADE ● Power and CO2 relationships ● What is a BMS? ● What should be monitored and when ● EU Code of conduct requirements ● Bringing it all together with a Control Room CLASS ACTIVITIES Exercise 1 Calculate DCiE, PUE and UPS efficiency? What is the Tier rating? 10.45 – 11.45 Improving rack ● Ideal rack layouts and hot aisle/cold aisle models and floor ● Optimizing equipment layout within a rack layout ● Cabling: how not to make a mess ● Correcting layout to improve energy efficiency 11.45 – 12.45 Improving ● Amps, volts, kW, kVA and power factor Power ● What is 3 Phase? Efficiency ● Balancing your phases! ● How to make energy savings in the power system. 1.45 – 2.30 ● Why does power factor matter? Understanding the power flow 2.30 – 3.30 Capacity Management Exercise 2 What’s wrong? Fault in real examples? Exercise 3 Is this 3 phase load Balanced? ● The energy train from mains input to the rack, in block diagram form ● Essential block diagram items e.g. generators, UPS, batteries, PDU etc ● N, N+1 and 2N models ● Typical power problems and how to avoid them ● Understanding Capacity Management ● How does poor capacity management effect resilience? ● What can happen if you get it wrong? Exercise 4 How long until my room overheats? 3.45 – 5.00 *BREAKFAST 8.15am | LUNCH 12.45pm | HI-TEA 3.30pm MASTERPLAN MYCENTER SDN BHD (838045-H) COMPUTER EXCHANGE 2 (CX2) 3552, JALAN TEKNOKRAT 6, 63000 CYBERJAYA SELANGOR MALAYSIA T : 603-83181591 | F : 603-83182458 | E : training@mymmc.net | W : www.mymmc.net 2 Data Center Operational Management (DCOM) DAY 2 SESSION Correct operational procedures and documentation ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 9.00 – 10.30 Security requirements 10.45 – 11.30 Data Center Audits CONTENTS CLASS ACTIVITIES IT technical policies & Asset register Visitor and security policy Building operational settings Critical alarms and settings Maintenance plans & Incident management Call list & Permit to work Site H&S manual & Change control and work orders Fire safety plans, detection and alarms Staff and contractor proof of competence Disaster recovery plan Housekeeping & Responsibilities in the Data Center Labeling & Signs TIA 942 security definitions British Government Policy framework BICSI 002 standard Payment Card Industry security standard Access control CCTV Visitor and security policy How do you manage external audits internally? What do we audit against? What do you want to achieve through audit? Exercise 5 Analyzing the results of an audit 11.30 – 12.30 Business Continuity and Disaster Recovery 2.00 – 2.45 Consolidation & moves/upgrades 2.45 – 3.30 ISO 27000 series ● BS25777 ● NFPA 1600 ● Combining good design and procedures to ensure business continuity ● Defining DR requirements ● Defining a DR plan and rehearsing it ● Communicating with customers and stakeholders ● Sizing the DR facility ● Why consolidate? ● What are the benefits? Feedback ● What are the problems? Final exam ● What to consider. *BREAKFAST 8.15am | LUNCH 12.30pm | HI-TEA 3.30pm MASTERPLAN MYCENTER SDN BHD (838045-H) COMPUTER EXCHANGE 2 (CX2) 3552, JALAN TEKNOKRAT 6, 63000 CYBERJAYA SELANGOR MALAYSIA T : 603-83181591 | F : 603-83182458 | E : training@mymmc.net | W : www.mymmc.net