INDUSTRY-ACADEMIA WORKSHOP On “Upstream Petroleum Technology” 30th May-1st June,2011 WELL PROGNOSIS “PLANNING & MONITORING OF A DRILLING WELL” Nababrot Gogoi Dy. Suptdg. Geologist Geology & Reservoir Dept EXPLN & DEV E&P CYCLE Spudding Drilling & Casing of Conductor hole (17.1/2”) Rig-up & Installation of all Rig Equipments, Infrastructure Drilling & Casing of Intermediate hole; Intermediate OH Logging (12.1/4”) Initial tests, Perforation, Unloading by NPU / CTU /Gaslifts Drilling of Oil string/Production hole; Convetional Coring (8.1/2”) Cased Hole Logging (CBL_VDL_USIT) Well Completion (Casing setting, Cementation) Open Hole Logging (Resistivity, Density-neutron, Sonic, MDT, Open Hole DST, SWC) Drilling Flow Chart Released Locations Exploratory Generally first well on a new structure/ new fault closure to probe HC prospects in different geological formations. Appraisal Wells drilled on a discovered structure for ascertaining reservoir limit, OWC/GWC, HC vol LOCATIONS Development Wells drilled for production purpose from a known reservoir and limited up production potential as per FDP. WHY WE DRILL A WELL? BOTTOMHOLE BEHAVIOUR Depth Data & Drilling Policy GEOLOGICAL INFORMATIONS (STRUCTURE, PROSPECT, SUBSURFACE POSITION, POSSIBLE FORMATION TOPS) CASING POLICIES (SIZE, SETTING DEPTH, TYPE, CEMENTATION) MUD POLICIES (PARAMETERS, COMPOSITIONS etc.) DEVIATIONS {PROPOSED PLAN (BUILD-UP/HOLDING/DROPPING)} INFORMATION OF POREPRESSURE / FOMATION PRESSURE FROM NEIGHBOURING WELLS EXPECTED SUBSURFACE DRILLING COMPLICATIONS (LOSS ZONE, STUCK PIPE , TIGHT SPOTS) SAMPLE COLLECTIONS , GAS LOGGING, CONVENTIONAL CORING WIRELINE SERVICES WELL COMPLETION AND PRODUCTION TESTING WELL PROGNOSIS (DDDP / GTO) BASEMAP SURFACE LOCATION MAP DISTANCE & BEARINGS W.R.TO NEIGHBOURING WELLS/STRUCTUERES ISOPAY MAP STRUCTURAL MAP -STRUCTURAL CONFIGURATION -CLOSURE (4 WAY/ FAULT) -PROSPECT AREA -FLUID MARGINS Geological Information GEOLOGICAL SECTION LITHOLOGY FORMATION Alluvium + Dhekiajuli Namsang Girujan Tipam+Surma Barail Kopili -PROSPECT LEVEL -UPDIP/DOWNDIP W.R.TO NEIGHBOURING WELLS -PRESSURE-PRODUCTION BEHAVIOUR OF NEIGHBOURING WELLS -LITHOCOLUMN INDICATING EXPECTED FORMATION TOPS (BASED ON SEISMIC DATA & NEIGHBOURING WELLS) Prang Narpuh Lakadong + Therria Langpar Basement Geological Information CASING IS LOWERED & SET TO : PROTECT & MAINTAIN THE HOLE FACILITATE FLOW OF OIL/GAS FOR LONG PERIODS OF TIME CASING POLICY FACTORS TO CONSIDER FOR CASING DESIGN: Total depth of well Pore pressure, fracture gradients, geothermal gradient Presence of shallow gas pockets / Boulder, Pebble bed Critical zones Depth of potential prospect zones Time limits on open hole drilling Casing program compatibility with existing wellhead systems Casing program compatibility with planned completion programme on production wells Casing availability: size, grade and weight Economics – drilling time, casing lowering time, cost of materials & other equipments Casing Policy Vertical Well J-Bend S-Bend Well Horizontal Well WELL PROFILE 17.1/2˝ (13.3/8˝) Alluvium/ Namsang 26˝ (20˝) All/Nam 26˝ (20˝) 17.1/2˝ (13.3/8˝) 12.1/4˝ (9.5/8˝) 36˝ (30˝) Girujan Girujan 12.1/4˝ (9.5/8˝) 17.1/2” (13.3/8˝) Barail/Kopili 12.1/4˝ (9.5/8˝) 8.1/2˝ (5.1/2˝) Lk+Th/Langpar 8.1/2˝ (5.1/2˝) Lk+Th/Langpar/ 8.1/2˝ (5.1/2˝) Basement TD: < 4000 m TD: > 4000 m TD: > 5000 m CASING DESIGN: VERTICAL & DEVIATED WELLS HORIZONTAL WELL 17.1/2˝ (13.3/8˝) Alluvium/ Namsang 1000-1500 m 12.1/4˝ (9.5/8˝) 400 m Girujan 8.1/2˝ (7” Liiner) Prospect 6˝ (4.1/2” Slotted LIiner CASING POLICY Drilling Fluid Policy DRILLING FLUID IT’S A SYSTEM TO PROVIDE A SUITABLE MEDIUM FOR CARRYING OUT EFFECTIVE AND EFFICIENT DRILLING OPERATIONS AND TO IMPART BOREHOLE STABILITY FUNCTIONS OF DRILLING FLUID: PROTECT HOLE FROM COLLAPSE CUTTINGS REMOVAL FROM THE BIT TO THE SURFACE CONTROL FORMATION PRESSURE COOLING AND LUBRICATION AID IN FORMATION EVALUATION DRILLING FLUID FUNCTIONS OF DRILLING FLUID: HOLD CUTTINGS AND WEIGHT MATERIALS IN SUSPENSIONS, WHEN CIRCUALTION STOPPED SUPPORTING A PART OF THE WEIGHT OF DRILL PIPE AND CASING (i.e. BOUYANCY) IN TRANSMITTING HYDRAULIC HORSEPOWER TO THE BIT ACTING AS MEDIUM FOR WIRELINE LOGGING ENSURING MAXIMUM INFORMATION ABOUT THE FORMATIONS PENETRATED ACTING AS A MEDIUM FOR HORIZONTAL DRILLING SIGNAL IN PULSES DRILLING FLUID TYPES OF DRILLING FLUID OIL BASE PNEUMATICS WATER BASE OIL BASE MUD (OBM): Oil the continuous phase with other chemicals WATER BASE MUD (WBM): Water the continuous phase with Bentonite PNEUMATICS: Used predominantly air or gas as the circulating medium PROPERTIES OF DRILLING FLUID Weight, Temperature, Funnel viscosity, Plastic viscosity, Yield point, Gel strengths, Water losses, Filter cake, Sand content, Solids content, Oil content, Calcium content, Salinity DRILLING FLUID DEVIATION POLICY DEVIATION CRITERIA FOR DEVIATED WELLS LOGISTICS, LAND ACQUISITION, CLUSTER PLINTH DEVIATION METHODS SS READING, MWD READING DEVIATION CALIBRATION METHODS AVERAGE ANGLE METHOD RADIUS OF CURVATURE METHOD MINIMUM CURVATURE METHOD TANGENTIAL METHOD BALANCED TANGENTIAL METHOD DEVIATION WELLBORE STABILITY & FLUID LOSS/KICK PORE PRESSURE ANALYSIS STUCK PIPE EVENTS/ DRILLING EVENTS LOSS CIRCULATION, PIPE STUCK AND OTHER EVENTS GTO (Geo Technical Order) It’s a glimps: GEOLOGICAL DATA PORE PRESSURE PREDICTION FORMATIONS DEPTHS vs DAYS WELLHEAD DATA CASING SEAT MUD DATA etc. GEO TECHNICAL ORDER SELECTION, COLLECTION, PREPARATION, EXAMINATION, DESCRIPTION OF DRILL-CUTTINGS, SIDE WALL CORE AND CONVENTIONAL CORE SAMPLES LITHOLOGICAL DESCRIPTION: COLOUR, HARDNESS, FRAMEWORK GRAIN IDENTIFICATION, MATRIX, GRAIN SIZE, SORTING, ANGULARITY HYDROCARBON INDICATION: GAS DETECTION: GAS CHART INTERPETATION (ZERO GAS, BACKGROUND GAS, TRIP GAS, GAS SHOWS, CONNECTION GAS, RECYCLE GAS OIL SHOWS: ODOR, STAIN, BLEEDING, COLOUR (Dark brown to Pale), FLUORESCENCE (Dark brown, Golden yellow, Light yellow, Bluish) RECORDING OF GAS READING & GAS CHROMATOGRAPHY PREPARE & MAINTAIN FLUSH SAMPLE LOGS/ CUTTINGS LOGS/ MASTER LOGS CORRELATE WITH NEIGHBOURING WELLS SAMPLE COLLECTION, GAS LOGGING, CONVENTIONAL CORING Typical Flush Sample/Cuttings Log/ Master Log “IT’S A PICTORIAL PRESENTATION OF DIRECT OBSRVATIONS OF LITHOLOGY FLUSHED OUT FROM BOTTOM HOLE & IT’S FLUORESCENCE ALONG WITH GAS READING, ROP, HYDRULICS, DRILLING EVENTS W.R.TO DEPTH” THE FIRST INFORMATION OF SUBSURFACE GEOLOGY FLUSH SAMPLE LOG “GEOPREMIUM SOFTWARE” MASTER LOG COMPOSITE LOG DRILLING DYNAMIC LOG ROP, GAS READING, BIT INFORMATIONS, LITHOLOGICAL DESCRIPTION, FLUORESCENCE etc. ONLINE MONITORING OF DRILLING, GEOLOGICAL & MUD PARAMETERS IN “MLU’ FLUSH SAMPLE LOG WIRELINE LOGS OPEN HOLE CASED HOLE • Resistivity Logs • Density-Porosity Logs • GR-CCL • GR, GR Spectrometry • GR-NEUTRON-CCL • Sonic Tools • VSP • Vertical Seismic Profiling (VSP) • CBL-VDL • Dipmeter, Inclinometer (Strike, Dip) • USIT / CAST-V • Borehole Imaging Tool (XRMI / FMI) • TTP / HSC • Caliper • BP, RP, TTBP • Wireline Testing & Sampling (MDT/ • RMT / RST • WFL • PLT RDT) • Neutron Tools • NMR /MRIL • Tool Pusher Logging WIRELINE LOGS RECOMMENDING CORING During Drilling By Wireline (CST) SideWall Core Petrology & Conventional Core Mineralogical study, Permeability (Vertical, Lateral), Capillary Sedimentological Study (Grain size, Shape, Study, Sedimentary Structures, Environment Sorting), Petrographic Study (Thin Section, of Deposition including all studies as in XRD, SWC/CST SEM), (Palaoentology, Mechanics, Biostratigraphic Study Playnology), Rock Geochemistry, Reservoir Characteristics (porosity, Permeability, oil saturation, Oil content, Water content) RESPONSIBILITY ELAN Interpretation Why we need CBL-VDL-USIT logs? Open Hole Composite CBL_VDL PERFORATIONS: Selection of 3893.0 Perforation Range 3900.0 3901.0 Gun type, Perforation Density SPF), Phasing, 3919.0 3920.5 Total Depth Of Penetration 3941.0 Fluid uncertain: Perforation: SWC, Perforation ROLE OF OPERATION GEOLOGIST EXAMINATION OF DRILLCUTTINGS IN HAND SPECIMEN & UNDER MICROSCOPE FOR IDENTIFICATION & DESCRIPTION OF LITHOLOGY IDENTIFICCATION OF HC BEARING ZONES BY EXAMINING SAMPLES UNDER FLUOROSCOPE FOR FLUORESCENCE ( YELLOW, YELLOWISH WHITE etc. INDICATE OIL / BLUISH WHITE INDICATE GAS / NO FLURORESCENCE INDICATE WATER ) CORRELATION & SECTION PREPARATION GEOLOGISTS’ RESPONSIBILTY ROLE OF OPERATION GEOLOGIST OIL STRING CASING POLICY (SHOE, FLOAT COLLAR, SHORT JOINTS, CENTRALISER, SCRATCHERS) OIL STRING CEMENTATION POLICY (OVERGAUGE, TRUE GAUGE, UNDERGAUGE, VOLUME OF CEMENT REQUIRED, CEMENT TOP etc.) INITIAL TESTING POLICY (ZONE TO BE TESTED, PRODUCTION STRING, PACKER, GLVs etc.) BULLET PERFORATION NOTIFICATION (BPN)- DETAILS ON PERFORATIONS GUN TYPE, SPF, CHARGES etc. GEOLOGISTS’ RESPONSIBILTY GEOLOGICAL CROSS SECTION GEOLOGICAL CORRELATION GEOLOGISTS PLAYS PIVOTAL ROLE DURING DRILLING OF A WELL, FROM SPUDDING TILL INITIAL TESTING / RIG DOWN. ALL MAJOR DECISIONS ARE TAKEN BY G&R DEPT. DRILLING OPERATION ACTIVITIES ARE AN INTEGRATED TEAM EFFORT INCLUDING G&R, DRILLING, CHEMICAL, PRDUCTION DEPTS Perforation: CONCLUSIONS THANK YOU Sunset in Libya @ nababrot gogoi Perforation: