Required Inspections New Residential Homes Sewer & Water Connection, Footings, o Prior to any concrete being poured, o Forms complete, o Column footings excavated. Pre-backfill, o After foundation walls are poured, o Stone and Weeping tile installed, o Drainage and Damp-proofing installed. Underground Plumbing, o Before any basement floors have been poured, o Water test required, o Ball test required. Framing, o Before insulation is installed, o Framing complete with roof shingled, o Windows & Doors Installed, o Mechanical Rough In (HVAC) complete. Above ground Plumbing, o Mechanical Rough In (HVAC), o Pressure Test required. HVAC plans must be on site. Insulation and Air Barrier, o Before any walls have been boarded, o Framing deficiencies corrected, o Plumbing & Upper HVAC inspections complete. Final Plumbing, o Pressure Test - 100psi test on potable water system, Required Inspections o Smoke or Rim Test. Final Mechanical (HVAC), Occupancy/Final, o Building envelopes must be weather tight, o Electrical, mechanical (HVAC) & plumbing systems must be inspected and operational, o All life safety items must be complete. Plumbing and HVAC inspections are required only where plumbing and HVAC is part of the design. All electrical work is inspected by the Electrical Safety Authority (ESA) and a separate permit must be obtained by them. Additions Footings o Prior to any concrete being poured o Forms complete o Column footings excavated (if required) Pre-backfill o After foundation walls are poured o Stone and Weeping tile installed o Drainage and Dampproofing installed Underground Plumbing o Before any basement floors have been poured o Water test required o Ball test required Framing o Before insulation is installed o Framing Complete with roof shingled o Window & Doors installed o Mechanical Rough In (HVAC) complete Above ground Plumbing o Pressure test required Mechanical Rough In (HVAC) Page 2 of 3 Required Inspections o HVAC plans must be on site Insulation and Air Barrier o Before any walls have been boarded o Framing deficiencies completed o Plumbing & Upper HVAC inspections complete Final Plumbing o Pressure Test - 100psi test on potable water system o Smoke or Rim Test Final Mechanical (HVAC) Occupancy/Final o Building envelopes must be weather tight o Electrical, mechanical (HVAC) & plumbing systems must be inspected and operational o All life safety items must be complete Plumbing and HVAC inspections are required only where plumbing and HVAC is part of the design All electrical work is inspected by the Electrical Safety Authority (ESA) and a separate permit must be obtained by them. Accessory Buildings Footings/Foundations Frame Final Decks Footings o Prior to concrete being poured Framing Final Page 3 of 3