H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic POST-PAID METERING AND BILLING: CHALLENGES AND PERSPECTIVES ELECTROGAZ-RWANDA MUYANGE Yves Commercial Director Organised by .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic Content Electrogaz presentation summary F Post-paid Metering F Post-paid Billing F Issues and challenges: Metering F Issues and challenges: Billing F Current projects and perspectives F .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic I. Electrogaz presentation: Summary n n Electrogaz: Utility company of Rwanda for Electricity and Water n Rwanda info: 26,340 square meters, 8,500,000 people Number of electricity customers: 82,000 n Kigali: 49,000 n Up country: 33,000 n Prepayment customers: 52,000(48,000 in Kigali and 4,000 up country) .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic I. Electrogaz presentation: Summary n n n Total Electricity Demand: 65MW Current supply: National 45MW(60% thermal) Number of Water customers: 44,000 Total Water Demand: 30 Millions m3 Current supply: 14 Millions m3 .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic II. Post-paid Metering n n n n n n Meters are electromechanical (conventionnal) Readings collected manually For big customers as well as MV, no electronic meters installed Network meters installed to monitor the distribution (as well as losses) both in water and electricity - Recent Existing metering workshops for calibration, accuracy verification and repairing Special structure for metering (approved) to be put in place in the Commercial department; existing ones under technical departments .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic III. Post-paid Billing n n n Customers organized per administrative regions or provinces corresponding to branches/stations n The capital Kigali has sub-branches/antennas n Each (sub) branch has commercial cabins with walks for readers System in use: Custima 2.38, installed at the Headoffice All branch offices(21) are connected to Head office via leased lines through a frame relay to allow online transactions(New connections, Meter readings entry, pre-billing an billing, cash receipting and offline payments, customer information update, …) .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic III. Post-paid Billing(Next) n n n n n n All operations(up to bill printing and adjustments) decentralized in branches At Head office, existing special structure in the commercial department managing big and special customers (big consumers, MV customers, government and public services, diplomats,…). Bill is both for water and electricity Bill content compliant to standards Manual distribution of bills Existing product « Bills@mobile » or « EBill » allowing customers to access their bills via mobile phones SMS .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic IV. Issues and challenges: Metering n n n n n A lot of cases of water meters tampering n Regular replacements incuring purchasing costs of meters or spare parts Need for modular or electronic metering as well as AMR in water Need to reduce losses(Current: 22,5% in electricity, 30% in water) Meter box installations for water meters conducted to prevent tampering Need to implement electronic and online metering for big consumers in electricity(prepayment policy applied successfully to normal customers) .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic IV. Issues and challenges: Metering n n Need to match distribution figures: technical cabins to commercial cabins Need to introduce detecting systems for loss reduction .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic V. Issues and challenges: Billing n n n n n Need for business processes documentation Billing cycle to be reduced Unreliable data due to company historical background affecting billing and revenue operations n Data hygiene targeted to end max. in the next 6 months Need to re-design bill and receipt formats for a small layout(currently A4) Need for a state-of-the art CIS/Billing system. n Need to improve billing and revenue collection services using modern technologies(ICTs) .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic VI. Current projects and perspectives n n n n n Tender for modular meters in water awarded; delivery expected soon Campaign for water meter boxes installation going on Tender for electronic meters in electricity (for big customers) awarded; delivery expected soon Sample equipments for detection purchased/acquired for testing Introduction of systems/tools for AMR both in electricity and water .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic VI. Current projects and perspectives n n n n Tendering process (Two stage bidding) for a new CIS/Billing going on n First stage completed/Non objection awaited Tender for manual procedures to be launched soon Tendering for portable meter reading and billing devices going on: Bids evaluation about to be completed Introduce prepayment in water .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic VI. Current projects and perspectives n n n n Introduce a GPS solution and a GIS platform supporting the CIS/Billing Introduce an MIS integrating installed systems for corporate data management and decision making Outsourcing of revenue collection: Request of interest under preparation Introduce new Points of sales (POS) for account information enquiries and electronic payments (ATMs, SMS systems,…) .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c H F-XC A N GE H F-XC A N GE c u-tr a c k N y bu to k lic Thank you… Questions and Answers .d o o .c m C m w o .d o w w w w w C lic k to bu y N O W ! PD O W ! PD c u-tr a c k .c