East Mill Dam Removal Engineered Design Approximately 1800 cubic yards will need to be excavated from the channel starting at the dam and going upstream approximately 500 feet. The target slope will be 3.4%. This slope should intersect and match the lower channel slope, so no excavation will be required below the dam (see figure 5). Figure 1 shows the extent of the HecRas model which includes about 270 feet of channel above the dam, or starting at our first cross section, XS 474. If possible a reduced excavation would occur upstream of XS 474, where the main objective would be to extend the target slope upstream until it is within 1-2 feet of the existing surface elevation. The low flow channel could be excavated here to approximately a six to eight foot wide channel, tapering to zero excavation upstream. Three surveyed cross sections are shown in figures 2-4, overlain with the design cross sections at each location. These can be used to shape the channel with interpolation between the cross sections. Pools and wood should be placed at outside of bends. The cross sections were designed to meet the target thalweg elevation and to carry the 2-year flow and the 100-year flow at approximately the same depth and width as the cross section 97 feet below the dam. Figure 5 shows the existing cross section 97 feet downstream of the dam. The sideslopes of this cross section are approximately 1:1 and the water surface width of the 2-year flow is approximately 8 feet wide. Excavated material can be used to lay against the existing steep banks on the left bank. Trees and permanent vegetation should be planted above the 2-year water surface elevation shown on the cross sections. East Mill Mattole Plan: 1) M3eastmill 4/19/2007 2) Oeastmill 4/19/2007 EastMill Dam 80 Legend WS 2yr 58 - M3eastmill WS 2yr 58 - Oeastmill Ground Ground 75 Elevation (ft) 70 65 60 55 50 0 100 200 300 400 500 Main Channel Distance (ft) Figure 1 Estimated 2-year water surface elevation before and after the dam removal. 600 East Mill Mattole Plan: 1) M3eastmill River = EastMill Reach = Dam 2) Oeastmill RS = 474 88 Legend WS 2yr 58 - Oeastmill WS 2yr 58 - M3eastmill - Oeastmill 86 - Oeastmill - Oeastmill - Oeastmill 2.0 ft/s - Oeastmill 84 2.5 ft/s - Oeastmill 3.0 ft/s - Oeastmill 3.5 ft/s - Oeastmill 4.0 ft/s - Oeastmill 4.5 ft/s - Oeastmill 82 5.0 ft/s - Oeastmill Ground - Oeastmill Bank Sta - Oeastmill - M3eastmill 80 Elevation (ft) - M3eastmill - M3eastmill - M3eastmill - M3eastmill 78 0 ft/s - M3eastmill 1 ft/s - M3eastmill 2 ft/s - M3eastmill 3 ft/s - M3eastmill 76 4 ft/s - M3eastmill 5 ft/s - M3eastmill 6 ft/s - M3eastmill 7 ft/s - M3eastmill 74 Ground - M3eastmill Bank Sta - M3eastmill 72 70 0 10 20 30 40 50 60 70 Station (ft) Figure 2 Existing and Design cross section at XS 474, 204 feet above the dam, a little upstream of well. East Mill Mattole Plan: 1) M3eastmill River = EastMill Reach = Dam 2) Oeastmill RS = 347 84 Legend WS 2yr 58 - Oeastmill WS 2yr 58 - M3eastmill - Oeastmill 82 - Oeastmill - Oeastmill - Oeastmill - Oeastmill 80 - Oeastmill 1.0 ft/s - Oeastmill 1.5 ft/s - Oeastmill 78 2.0 ft/s - Oeastmill 2.5 ft/s - Oeastmill 3.0 ft/s - Oeastmill 3.5 ft/s - Oeastmill 76 Ground - Oeastmill Elevation (ft) Bank Sta - Oeastmill - M3eastmill - M3eastmill 74 - M3eastmill 4 ft/s - M3eastmill 5 ft/s - M3eastmill 6 ft/s - M3eastmill 72 7 ft/s - M3eastmill 8 ft/s - M3eastmill Ground - M3eastmill 70 Bank Sta - M3eastmill 68 66 64 0 10 20 30 40 Station (ft) Figure 3 77 feet above the dam 50 60 70 East Mill Mattole Plan: 1) M3eastmill River = EastMill Reach = Dam 2) Oeastmill RS = 280 85 Legend WS 2yr 58 - Oeastmill WS 2yr 58 - M3eastmill - Oeastmill - Oeastmill - Oeastmill - Oeastmill - Oeastmill 80 - Oeastmill 0 ft/s - Oeastmill 1 ft/s - Oeastmill 2 ft/s - Oeastmill 3 ft/s - Oeastmill 4 ft/s - Oeastmill 5 ft/s - Oeastmill 75 Ground - Oeastmill Bank Sta - Oeastmill Elevation (ft) - M3eastmill - M3eastmill - M3eastmill 4 ft/s - M3eastmill 5 ft/s - M3eastmill 6 ft/s - M3eastmill 70 7 ft/s - M3eastmill 8 ft/s - M3eastmill Ground - M3eastmill Bank Sta - M3eastmill 65 60 0 20 40 60 Station (ft) Figure 4 10 feet above the dam 80 100 East Mill Mattole Plan: M3EastMill River = EastMill Reach = Dam .06 4/19/2007 RS = 173 .04 .06 72 Legend WS 2yr 58 0 ft/s 2 ft/s 4 ft/s 70 6 ft/s 8 ft/s 10 ft/s Ground Bank Sta 68 Elevation (ft) 66 64 62 60 58 0 5 10 15 20 Station (ft) Figure 5 Existing cross section 97 feet downstream of dam. 25 30 35 XS 347 (77 feet above the dam) East Mill Creek Dam XS 280 (10 feet above the dam) 100.00 XS 474 (204 feet above the dam) 90.00 Elevation (ft) 80.00 Elevation (ft) Series2 Series3 Linear (Series3) 70.00 60.00 50.00 40.00 0 200 400 600 800 Station (ft) Figure 6 Thalweg profile with target slope of -3.4% 1000 1200 1400 1600