COVER PAGE REMEDIAL ACTION SYSTEM STATUS REPORT <LIST YEAR, QUARTER, ETC> SITE NAME ADDRESS FACILITY ID PREPARED BY: DATE: 1 REMEDIAL ACTION SYSTEM STATUS REPORT <DATE> <FACILITY NAME> <ADDRESS> <FDEP FACILITY ID> CERTIFICATION PAGE I hereby certify that in my professional judgment, the engineering components of this document satisfy the requirements set forth in Chapter 471, Florida Statutes, and other applicable rules and regulations of the state of Florida. I have completed and/or been in responsible charge of work completed by a qualified engineer working directly under my supervision. Prepared by: ________________________ Reviewed by: ________________________ NOTE: This page will be required only with Annual O&M reports. However, it is anticipated that remedy effectiveness will be evaluated at quarterly and semi-annual intervals. 2 TABLE OF CONTENTS SECTION PAGE NO 1.0 GENERAL INFORMATION Site Assessment Completion Date FDEP Decision Memo date, remedy, and goal of remedial action. RAP Approval date RAP Implementation date Modifications Groundwater Sampling-Last date 2.0 METHODOLOGY 2.1 Depth-to-Groundwater Measurements 2.2 Groundwater Sampling Monitor wells sampled and methodology Field analysis 3.0 RESULTS AND DATA EVALUATION 3.1 Groundwater Elevations and Hydraulic Gradient 3.2 Groundwater Quality-Evaluation of Sampling Results 3.3 Natural Attenuation-if applicable 4.0 REMEDIATION SYSTEM OPERATION AND MAINTENANCE 4.1 System Maintenance and Site Visit Data 4.2 Treatment System Operation and Performance Compare RAP Performance indicators to existing conditions If mechanical system-total hours run-time; operational time Contaminant mass removal 5.0 QUALITY ASSURANCE/QUALITY CONTROL 5.1 Laboratory Certification/Hold time evaluation/Method Detection 5.2 Duplicate Analysis 6.0 CONCLUSIONS AND RECOMMENDATIONS 6.1 Conclusions-General and Specific 6.2 Recommendations LIST OF TABLES TABLE 1 REMEDIAL SYSTEM SUMMARY TABLE 2 SYSTEM PERFORMANCE SUMMARY TABLE 3 GROUNDWATER EVALUATION TABLE TABLE 4 GROUNDWATER SYSTEM ANALYTICAL SUMMARY TABLE 4a GROUNDWATER MONITORING WELL ANALYTICAL SUMMARY TABLE 4b NATURAL ATTENUATION/ FIELD DATA TABLE 5 VES SYSTEM ANALYTICAL AND PERFORMANCE SUMMARY TABLE 5a VES WELL DATA TABLE 6 AIR SPARGING WELL DATA 3 TALBE 7 Table to be developed by contractor for other types of remediation. LIST OF FIGURES FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4 FIGURE 5 FIGURE 6 FIGURE 7 FIGURE 8 FIGURE 9 FIGURE 10 SITE MAP TREATMENT COMPOUND LAYOUT GROUNDWATER ELEVATION MAP-PREVIOUS REPORT GROUNDWATER ELEVATION MAP-NEW DATA GROUNDWATER CONCENTRATION MAP-PREVIOUS PERIOD GROUNDWATER CONCENTRATION MAP-THIS PERIOD MONITOR WELL CONCENTRATION CURVES-GRAPH QUARTERLY AND CUMULAITVE MASS RECOVERY-GRAPH PREDICTED SYSTEM OPERATIONAL TIMELINE-GRAPH (ACTUAL ESTIMATED MASS VS REMOVAL OF MASS) SYSTEMS-DESIGN STATUS-IE: Radius of influence-SVE APPENDICES APPENDIX A APPENDIX B APPENDIX C LABORATORY CERTIFICATION FOR DATA FDEP ACTIVE REMEDIATION STATUS SUMMARY REPORT S PREVENTATIVE MAINTENANCE CHECKLIST-SITE SPECIFIC-EACH VISIT; TELEMETRY INFORMATION 4 1.0 GENERAL INFORMATION AND INTRODUCTION 1.1 SITE LOCATION 1.2 ASSESSMENT APPROVAL DATE 1.3 FDEP DECISION MEMO DATE AND REMEDY SELECTION 1.4 REMEDIAL ACTION PLAN APPROVAL DATE 1.5 STARTUP DATE 1.6 LIST OF SYSTEM QUARTERLY MODIFICATIONS AND DATES (TABLE 1 SHOULD INCLUDE OTHER HISTORICAL MODIFICATIONS) 5 2. METHODOLOGY <TO BE USED FOR GROUNDWATER SAMPLING INCLUDED IN THE OPERATION AND MAINTENANCE REPORT> 2.1 DEPTH TO GROUNDWATER MEASUREMENTS 2.2 GROUNDWATER SAMPLING 2.2.1 LIST WELLS 2.2.2 DATE COLLECTED 2.2.3 SUMMARY OF SAMPLING PROTOCOL 2.2.4 FIELD ANALYSIS-LISTING 2.2.5 DOCUMENT LABORATORY CERTIFICATION AND NOTE APPENDIX A 6 3. RESULTS AND DATA EVALUATION-GROUNDWATER/SOIL INFORMATION. <Soil information can be included as a summary of present site conditions (ie: confirmatory soils were taken on <date>, <method>and data indicated that all soil samples were below the SCTLs.> 3.1 GROUNDWATER ELEVATIONS AND HYDRAULIC GRADIENT 3.2 GROUNDWATER QUALITY 3.3 AIR INFLUENT AND EFFLUENT 7 4.0 REMEDIATION SYSTEM OPERATION AND MAINTENANCE 4.1 SYSTEM MAINTENANCE AND SITE VISIT DATA MAINTENANCE INFORMATION SUMMARY OF SITE VISITS DURING PERIOD 4.2 GROUNDWATER/SOIL TREATMENT SYSTEM OPERATION AND PERFORMANCE DATA COMPARED TO DESIGN REQUIRMENTS IN THE RAP TO EXISITNG SYSTEM PERFORMANCE AVERAGE MONTHLY FLOW RATE-GROUNDWATER DESIGN FLOW RATE TOTAL TREATMENT SYSTEM OPERATION TIME-BY COMPONENT ACTIVE TIME DURING THIS QUARTER/SEMI-ANNUAL-Component MASS REMOVAL RATES RADIUS OF INFLUENCE 8 5.0 QUALITY ASSURANCE/QUALITY CONTROL PAGE 9 6.0 CONCLUSIONS AND RECOMMENDATIONS 6.1 CONCLUSIONS SYSTEM OPERATIONAL % SYSTEM INFORMATION-IE: ROI-SVE UNIT QUALITATIVE COMPARISON OF PLUME POSITION OTHER ASPECTS IE: INFILTRATION GALLERY GRAPHICAL ANALYSIS OF CONCENTRATIONS THROUGH TIME FOR SEVERAL MONITORING WELLS MASS RECOVERY DISCUSSION OF PREDICTED SYSTEM OPERATIONAL TIMELINE 6.2 RECOMMENDATIONS NOTIFICATION THAT ACTIVE REMEDIAL GOALS HAVE BEEN MET AND RECOMMENDATIONS TO TURN SYSTEM OFF; OR ENHANCEMENT TO SYSTEM; AND/OR OPERATE SYSTEM WITH NO CHANGES. 10