Document:
H2.2.0 – TA / PDA – Cylinders
Involved
Incident Type:
Not
Protectively
Marked
Cylinders Involved
Descriptor:
Incidents where unrecognised cylinders are reported as
being involved in / on fire, leaking or damaged.
Planning Assumption Cylinder(s) located in a single storey premises in a
residential area e.g. garden shed or domestic garage.
Indicates simultaneous
actions. These are safety
critical requirements.
Indicates tasks that should be
completed to support the safety
critical phase of the incident
Indicates tasks that are
completed after the
safety critical stage
Sequence of Tasks and Activities (non-persons reported)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Incident command, information gathering, dynamic risk
assessment, establish hazard zone, crew briefing, and liaison.
Identify water supplies and provide water to pump.
Pump operation.
Establish cordon (initial).
Immediate fire fighting / Cooling in BA
Assist IC to identify the objectives, appropriate PPE,
decontamination procedures and response plan.
BAECO
Command Support.
BA Emergency Team.
Environment protection / containment.
Close down FRS operations and handover control of incident site.
Post incident liaison with relevant agencies if required
Make up equipment
Debrief
IRS / Investigation details
1 x ICS L1
1 x FF
1 x FF
2 x FF
2 x FF
1 x HMEPA
1 x FF
1 x FF
2 x FF
2 x FF
1 x ICS L1
1 x ICS L1
All
All
1 x ICS L1
Additional Tasks and Activities (persons reported)
16. Incident ground liaison, tactical adviser, operational assurance.
17. Casualty handling
1 x ICS L2
2 x FF
Additional Tasks for Multi-Lane Carriageways
18. Secondary fend-off / casualty care
19. Additional scene safety equipment and coning off
20. Safety observer
1 x FF
1 x FF
1 x FF
Total Resources
Pastel red shaded area indicates simultaneous actions. These are safety critical
requirements.
Non-persons reported
1 x ICS L1
7 x FF
Persons reported
Multi-Lane Carriageways - Non-persons reported
Multi-Lane Carriageways - Persons reported
1 x HMEPA
1 x ICS L2
(Tactical
Adviser)
1 x ICS L1
7 x FF
1 x HMEPA
1 x ICS L1
10 x FF
1 x HMEPA
1 x ICS L2
(Tactical
Adviser)
1 x ICS L1
10 x FF
1 x HMEPA
Equipment Required (as part of PDA):
Main pump, hose, branches, ground monitor, communications equipment, BA,
BAECB, thermal imaging camera, First aid kit, standpipe key and bar.
Additional Equipment Considerations:
Lighting, cordon tape, Environmental Agency grab pack.
Additional Equipment (multi-lane carriageways):
Additional main pump / fend off vehicle, additional cones and signs.