IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT COMMITTEE OF TESTING LABORATORIES TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING IEC 60730-2-3:2006-10, Edition 2.0 Automatic electrical controls for household and similar use Part 2-3: Particular requirements for thermal protectors for ballasts for tubular fluorecent lamps R = Required by Lab S = May be subcontracted 3PPS = Three Phase Power Supply required NA = Not applicable Clause 3 4 5 6 7 Measurement/testing General requirements General notes on tests Rating Classification Information 8 Protection against electric shock 9 Provision of protective earthing 10 Terminals and terminations May 2009 Testing / measuring equipment / material needed None None None None None Test finger (Fig. 2 of IEC 60730-1), force gauge, test pin (Fig. 1 of IEC 60730-1), milliampmeter, voltmeter, ruler, micrometer Ammeter, voltmeter, corrosion resistance analysis materials According to IEC60998, Torque tester, force gauge tester, screwdriver, micrometer, ruler, flexing tester 1/5 Subcontracting R R R IEC 60730-2-3, ed 2.0 IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT Clause Measurement/testing 11 Construction requirements 12 Moisture and dust resistance 13 Electric strength and insulation resistance 14 Heating 15 Manufacturing deviation and drift 16 Environmental stress 17 Endurance 18 Mechanical strength 19 Threaded parts and connections 20 Creepage distances, clearances and distances through solid insulation May 2009 COMMITTEE OF TESTING LABORATORIES Testing / measuring equipment / material needed Subcontracting Electric strength tester, HV test supply, isolation transformer, insulation tester, DC voltage supply, flexing tester, voltmeter, ammeter, freezer chamber, temperature recorder, torque tester, force R gauge, time clock, test fingernail, vernier callipers or suitable measuring instrument, micrometer, pressure gauge According to IEC60529, electric strength tester, conditioning R chambers: heater humidity, leakage current meter Insulation tester, electric strength tester, leakage current tester R Temperature meter/recorder, fine wire thermocouples, winding resistance measurement system, environmental chambers (heat, NA freeze), current loads per ratings, voltmeter, ammeter Environmental chamber (heat, cold, humidity), voltmeter, ammeter, temperature meter/recorder, humidity meter, pressure meter, R recorders, oscilloscope. Environmental chambers – heat, freeze, humidity R Environmental chambers – heat, freeze, humidity. Voltmeter, R ammeter, power analyzer meter, oscilloscope, inductive loads, 3PPS resistive loads, pilot duty loads, motor loads. Apparatus in IEC60068-2-75, impact tester (Fig. 4 of IEC 60730-1), tumbling barrel (Fig. 5 of IEC 60730-1), force tester, torque tester, R pull tester. Screwdrivers, torque tester R Measuring ruler, force tester, test finger (Fig. 2 of IEC 60730-1), impulse voltage tester, electric voltage tester, insulation resistance R meter, oscilloscope, electric strength tester, micrometer, vernier calipers 2/5 IEC 60730-2-3, ed 2.0 IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT Clause Measurement/testing 21 Resistance to heat, fire and tracking 22 Resistance to corrosion 23 EMC requirements – emission 24 Components 25 26 27 28 Normal operation EMC requirements – immunity Abnormal operation Guide of the use of electronic disconnection Annex A Annex B Annex C Indelibility of Marking Measurement Guide Cotton for Mercury Switch Test Annex D Heat, fire, and tracking (informative) Annex E Circuit for measurement leakage current Annex F Heat-Fire Resistance Categories (informative) May 2009 COMMITTEE OF TESTING LABORATORIES Testing / measuring equipment / material needed Subcontracting Ball pressure test apparatus in accordance with figure 6 of IEC 60730-1, horizontal burning test apparatus (Annex G of IEC 60730-1) and needle flame apparatus, glow wire test apparatus, environmental R chamber or heating cabinet, tracking test apparatus, voltmeter, ammeter Humidity chamber, heating cabinet R Apparatus in accordance with CISPR14-1. Equipment in accordance S with Clause 17 of IEC 60730-1, oscilloscope Test apparatus in accordance with IEC60742 and other IEC S component standards Refer to Annex H of IEC 60730-1 Refer to Annex H of IEC 60730-1 Voltmeter, ammeter, electric strength tester R Refer to Annex H of IEC 60730-1 - Refer to IEC 60730-1 None Common as described in Annex C of IEC 60730-1 Arc-tracking resistance apparatus High voltage-arc resistance apparatus Aging chambers, tensile tester, electric strength tester, flexural strength tester, izod impact tester, flame test burner, insulation resistance measuring apparatus, CTI testing apparatus, apparatus for tests in Table D2 of IEC 60730-1. Circuit apparatus according to Figure E1 of IEC 60730-1 None R R R NA - 3/5 IEC 60730-2-3, ed 2.0 IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT Clause Measurement/testing Annex G Heat-Fire Resistance Tests Annex H H8 H11 H13 H17 H18 H21 H22 H23 Requirements for Electronic Controls Protection against electric shock Constructional requirements Electric strength and insulation resistance Endurance Mechanical Strength Creepage distance, clearance and distance through insulation Resistance to heat, fire and tracking EMC requirements – emission Normal Operation H26 EMC requirements – immunity H20 H27 H28 Annex J Annex K (informative) Annex L Annex M (informative) Annex N May 2009 COMMITTEE OF TESTING LABORATORIES Testing / measuring equipment / material needed Needle flame apparatus, glow-wire test apparatus, PTI Test apparatus Refer to Annex H, sub-clauses below: Leakage current meter, capacitance measuring instrument Ammeter, voltmeter, chart recorder Same as Clause 13 above Thermal cycling test apparatus Refer to Clause 18 above Refer to Clause 20 above Subcontracting R R R R R R R R S R Abnormal Operation Guide on use of electronic disconnection Requirements for controls using thermistors Refer to Clause 21 above Refer to Clause 23 above Oscilloscope, ammeter, voltmeter Environmental chamber, voltage dips and short voltage interruption apparatus, variable voltage supply, 3-phase auto-transformer, surge test apparatus, fast transient/burst test apparatus, ring wave surge test apparatus, conducted radiofrequency test apparatus radiated EM field test apparatus, programmable logic controllers or similar equipment. Voltmeter, ammeter, oscilloscope, temperature meter None Same which are used for clauses 8 through 28 Nominal voltages None - Overvoltage categories None - Typical usage None - Pollution degree None - 4/5 S R R IEC 60730-2-3, ed 2.0 IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT Clause Annex P Annex Q Measurement/testing Printed circuit board coating performance test Printed circuit board coating performance test Annex R Explanatory notes for surge immunity test (informative) Annex S Guidance for applying Clause 20 (informative) Annex T Requirements for SELV and PELV Requirements for relays when used as Annex U controls in IEC 60335 appliances May 2009 COMMITTEE OF TESTING LABORATORIES Testing / measuring equipment / material needed Subcontracting Heating chamber, humidity chamber, environmental cycling chamber, R electric strength tester. Freezing chamber, environmental cycling chamber, electric strength R tester, freezing chamber None - None - None R 3PPS Same which are used for clauses 7 through 28 5/5 IEC 60730-2-3, ed 2.0