Risk Assessment No: Issue: Task: Signature & Position: Company Name: Probability Severity 5 4 3 2 1 5 4 3 2 1 Relevant legislation This list is not exhaustive The following guidelines should be applied to risk factors after control measures have been applied: Risk Factor = Probability x Severity Low Risk = 1 to 6 Medium = 7 to 11 High = 12 + Fatality Major Injury Medical Injury Minor Injury No Injury Risk factor after control measures: 1 – 6 OK to proceed Risk factor after control measures: 7 – 11 Further control measures should be applied. Seek further advice if unsure. Risk factor after control measures: 12+ Unacceptable – Do not proceed Health and Safety at Work Etc. Act 1974 Management of Health and Safety at Work Regulations 1999 (as amended) Manual Handling Operations Regulations 1992 (as amended) Control of Substances Hazardous to Health Regulations 2002 (as amended) Risk Factor Before Control: Probability Risk: Date: Control Measure Provision and Use of Work Equipment Regulations 1998 Lifting Operations and Lifting Equipment Regulations 1998 Personal Protective Equipment Regulations 1992 Workplace (Health, Safety, Welfare) Regulations 1992 (as amended) Risk Factor After Control: 5 5 4 4 Probability Very Likely Likely Probable Possible Very Unlikely Hazard: ©Cope Safety Management 2012 www.jwcope.co.uk Risk Assessment RAF4 Rev2 3 2 1 0 3 2 1 1 2 3 4 5 0 1 2 Severity Risk Factor Before Control: Control Measure 5 5 4 4 3 2 1 0 4 5 4 5 Risk Factor After Control: Probability Risk: Probability Hazard: 3 Severity 3 2 1 1 2 3 Severity 4 5 0 1 2 3 Severity Page 1 of 4 Risk Factor Before Control: Control Measure Risk Factor After Control: 5 5 4 4 Probability Risk: Probability Hazard: 3 2 1 0 3 2 1 1 2 3 4 5 0 1 2 Severity Control Measure 5 4 4 3 2 1 1 2 3 4 5 0 1 2 Control Measure 4 Probability 5 4 3 2 2 3 4 5 0 1 2 3 5 Severity Control Measure Risk Factor After Control: 5 5 4 4 Probability Probability 4 2 1 1 Risk Factor Before Control: 3 2 1 0 5 3 Severity Risk: 4 Risk Factor After Control: 1 Hazard: 3 Severity 5 0 5 2 1 Risk Factor Before Control: Probability Risk: 4 3 Severity Hazard: 5 Risk Factor After Control: 5 0 4 Severity Risk Factor Before Control: Probability Risk: Probability Hazard: 3 3 2 1 1 2 3 Severity 4 5 0 1 2 3 Severity Page 2 of 4 Risk Factor Before Control: Control Measure Risk Factor After Control: 5 5 4 4 Probability Risk: Probability Hazard: 3 2 1 0 3 2 1 1 2 3 4 5 0 1 2 Severity Control Measure 5 4 4 3 2 1 1 2 3 4 5 0 1 2 3 4 5 Severity Control Measure Risk Factor After Control: 5 4 4 Probability 5 3 2 1 0 5 2 1 Risk Factor Before Control: Probability Risk: 4 3 Severity Hazard: 5 Risk Factor After Control: 5 0 4 Severity Risk Factor Before Control: Probability Risk: Probability Hazard: 3 3 2 1 1 2 3 4 5 0 1 2 Severity 3 Severity This risk assessment accurately defines the work, identifies Health and Safety risks and the appropriate controls required. This risk assessment will be taken as approved by the Company unless the author is advised to the contrary before work commences and in any event a period not exceeding 7 days from receipt. This risk assessment must be communicated to all personnel concerned. Signatures confirming receipt and understanding of information are required. CSM027/01 Page 3 of 4 RAF4 Risk Assessment Progress and Review Sheet Risk Assessment No: Company Name: Issue: Task: Date: Details of Progress Made: Initials: Date: Details/Reason for Review: Initials: Page 4 of 4