Tf04 TIMBER FRAME WALLS BETWEEN STUDS AND TO EXTERIOR OF SARKING P10 SUNDRY INSULATION/ PROOFING WORK/ FIRE STOPS To be read with Preliminaries/General conditions. The details contained within this proposal are based on information available at the time of writing and covers the installation of Knauf Insulation products. Knauf Insulation cannot be held responsible for unknown site conditions or for the performance of materials within the system other than those manufactured, supplied or branded by Knauf Insulation. The requirements of all relevant British Standards and Industry Codes of Practice should be complied with at all times. All clauses that are not applicable should be deleted. TYPES OF INSULATION 210 INSULATION FITTED BETWEEN STUDS Material: Unfaced glass wool to BS EN 13162 Manufacturer: Knauf Insulation Ltd, PO Box 10, Stafford Road, St Helens, Merseyside, WA10 3NS, Tel: 01744 766600, Web: www.knaufinsulation.co.uk E-mail: tech@knaufinsulation.com. Product reference: Earthwool FrameTherm Roll 40 Thickness: 90mm/140mm Product reference: Earthwool FrameTherm Slab 38 Thickness: 90mm/140mm Product reference: Earthwool FrameTherm Roll/Slab 35 Thickness: 90mm/140mm Product reference: Earthwool FrameTherm Roll/Slab 32 Thickness: 90mm/140mm Installation requirements: Joints: Butted, no gaps. Fasteners: Used to prevent slumping/ displacement 310 VAPOUR CONTROL LAYER FIXED TO TIMBER STUDS/ JOISTS/ FRAMING Material: _______ Manufacturer: ________ Product reference: ________ Minimum vapour resistance: _______. Moisture content of timber at time of fixing (maximum): 20% Installation requirements: Setting out: Joints minimized Method of fixing: Staples at 250 mm centres maximum along all supports. Membrane not sagging Joints: At supports only, lapped 150 mm minimum Openings: Membrane fixed to reveals Joints and edges: Sealed with double sided tape with vapour resistivity not less than the vapour control layer KNAUF INSULATION LTD. PO BOX 10, STAFFORD ROAD, ST HELENS, MERSEYSIDE, WA10 3NS, UK. TEL: 01744 24022 FAX: 01744 612007 www.knaufinsulation.co.uk TECHNICAL ADVISORY CENTRE TEL 01744 766666 FAX 01744 766667 E MAIL tech@knaufinsulation.com REGISTERED OFFICE: STAFFORD ROAD, ST HELENS, MERSEYSIDE WA10 3NS, UK, REGISTERED IN ENGLAND, COMPANY NUMBER 1926842 P10/NBS Version/March 2008 Penetrations: Sealed 320 BREATHER MEMBRANE Material: Manufacturer: Product reference: Installation requirements: Setting out: Method of fixing: Joints: Bottom edges: Penetrations: 410 FLEXIBLE CAVITY BARRIERS Manufacturer: Product reference: Material: Fire resistance rating: Installation requirements: Spacing: Installed in void so the maximum unobstructed dimension in any direction is _______ Fixing: Secure at perimeters and joints with no gaps, to provide a complete barrier to smoke and flame 420 SLEEVED MINERAL WOOL SMALL CAVITY BARRIERS Manufacturer: Knauf Insulation Ltd, PO Box 10, Stafford Road, St Helens, Merseyside, WA10 3NS, Tel: 01744 766600, Web: www.knaufinsulation.co.uk E-mail: tech@knaufinsulation.com Product reference: Earthwool Cavity Barrier Material: Glass mineral wool sleeved in polyethylene with flanges Fire resistance rating: To BS 476-8, 60 stability/ integrity/ insulation Cavity size: 50mm - 65mm Colour: Yellow Cavity size: 66mm - 80mm Colour: Blue Cavity size: 81mm - 100mm Colour: White Installation requirements: Fasteners: Staples at maximum 150 mm centres Vertical barriers: Fixed by both flanges Horizontal barriers: Fixed by upper flange only Joints and intersections: Butted, with barriers compressed along full length to give complete seal KNAUF INSULATION LTD. PO BOX 10, STAFFORD ROAD, ST HELENS, MERSEYSIDE, WA10 3NS, UK. TEL: 01744 24022 FAX: 01744 612007 www.knaufinsulation.co.uk TECHNICAL ADVISORY CENTRE TEL 01744 766666 FAX 01744 766667 E MAIL tech@knaufinsulation.com REGISTERED OFFICE: STAFFORD ROAD, ST HELENS, MERSEYSIDE WA10 3NS, UK, REGISTERED IN ENGLAND, COMPANY NUMBER 1926842 P10/NBS Version/March 2008 430 WIRED MINERAL WOOL SMALL CAVITY BARRIERS Material: Wire reinforced mineral wool minimum 50 mm thick Fire resistance rating: ________ Installation requirements: Fasteners: Staples at maximum 150 mm centres. Fold cavity barrier if necessary to ensure a tight fit Joints and intersections: Butted, no gaps F30 ACCESSORIES/ SUNDRY ITEMS FOR BRICK/ BLOCK/ STONE WALLING To be read with Preliminaries/General conditions. The details contained within this proposal are based on information available at the time of writing and covers the installation of Knauf Insulation products. Knauf Insulation cannot be held responsible for unknown site conditions or for the performance of materials within the system other than those manufactured, supplied or branded by Knauf Insulation. The requirements of all relevant British Standards and Industry Codes of Practice should be complied with at all times. All clauses that are not applicable should be deleted. CAVITIES 120 CLEANLINESS Cavity base and faces, ties, insulation and exposed dpcs: Free from mortar and debris. 130 PERPEND JOINT WEEP HOLES Form: Open perpend joint Locations: Through outer leaf immediately above base of cavity, at cavity trays, stepped dpcs and external openings. 75 mm above top of cavity fill at base of cavity Provision: At not greater than 1000 mm centres and not less than two over each opening 150 FULL FILL CAVITY INSULATION Insulation: Glass mineral wool Standard: BS EN 13162 Product certification: British Board of Agrement (BBA) Certificate number 95/3212 Manufacturer: Knauf Insulation Ltd, PO Box 10, Stafford Road, St Helens, Merseyside, WA10 3NS, Tel: 01744 766600, Web: www.knaufinsulation.co.uk E-mail: tech@knaufinsulation.com. Product reference: Earthwool DriTherm Cavity Slab 32 Face size (nominal length x width): 1200mm x 455mm Thickness (nominal): 50mm/65mm/75mm/85mm/100mm Thermal conductivity: 0.032W/mK Reaction to fire class: Euroclass A1 Additional requirements: None Placement: Continuous and free of mortar and debris KNAUF INSULATION LTD. PO BOX 10, STAFFORD ROAD, ST HELENS, MERSEYSIDE, WA10 3NS, UK. TEL: 01744 24022 FAX: 01744 612007 www.knaufinsulation.co.uk TECHNICAL ADVISORY CENTRE TEL 01744 766666 FAX 01744 766667 E MAIL tech@knaufinsulation.com REGISTERED OFFICE: STAFFORD ROAD, ST HELENS, MERSEYSIDE WA10 3NS, UK, REGISTERED IN ENGLAND, COMPANY NUMBER 1926842 P10/NBS Version/March 2008 155 PARTIAL FILL CAVITY INSULATION Insulation: Glass mineral wool Standard: BS EN 13162 Product certification: British Board of Agrement (BBA) Certificate number 95/3212. Manufacturer: Knauf Insulation Ltd, PO Box 10, Stafford Road, St Helens, Merseyside, WA10 3NS, Tel: 01744 766600, Web: www.knaufinsulation.co.uk E-mail: tech@knaufinsulation.com Product reference: Earthwool DriTherm Cavity Slab 32 Face size (nominal length x width): 1200mm x 455mm Thickness (nominal): 50mm/65mm/75mm/85mm/100mm Thermal conductivity: 0.032W/mK Reaction to fire class: Euroclass A1 Additional requirements: None. Placement: Secure against face of inner leaf Residual cavity: Clear and unobstructed Joints between boards, at closures and penetrations: No gaps and free from mortar and debris REINFORCING/ FIXING ACCESSORIES 210 CAVITY WALL TIES Standard: ________ Type: _______ Material/ finish: _______ Sizes: ________ FLEXIBLE DAMP PROOF COURSES/ CAVITY TRAYS 390 SITE FORMED DPC/ CAVITY TRAY JUNCTIONS/ STOP ENDS Three dimensional changes in shape: Form to provide a free draining and watertight installation. Seal laps Alternative use of preformed junction cloaks/ stop ends: Submit proposals INSTALLATION OF DPCS/ CAVITY TRAYS 415 HORIZONTAL DPCS Placement: In continuous lengths on full even bed of fresh mortar, with 100 mm laps at joints and full laps at angles Width: At least full width of leaf unless otherwise specified. Edges of dpc not covered with mortar or projecting into cavity Overlying construction: Immediately cover with full even bed of mortar to receive next masonry course Overall finished joint thickness: As close to normal as practicable KNAUF INSULATION LTD. PO BOX 10, STAFFORD ROAD, ST HELENS, MERSEYSIDE, WA10 3NS, UK. TEL: 01744 24022 FAX: 01744 612007 www.knaufinsulation.co.uk TECHNICAL ADVISORY CENTRE TEL 01744 766666 FAX 01744 766667 E MAIL tech@knaufinsulation.com REGISTERED OFFICE: STAFFORD ROAD, ST HELENS, MERSEYSIDE WA10 3NS, UK, REGISTERED IN ENGLAND, COMPANY NUMBER 1926842 P10/NBS Version/March 2008 425 GROUND LEVEL DPCS Joint with damp proof membrane: Continuous and effectively sealed 435 STEPPED DPCS IN EXTERNAL WALLS External walls on sloping ground: Install dpcs not less than 150 mm above adjoining finished ground level 445 SILL DPCS Form and placement: In one piece and turned up at back when sill is in contact with inner leaf 455 COPING/ CAPPING DPCS Placement: Bed in one operation to ensure maximum bond between masonry units, mortar and dpc. Dpcs crossing cavity: Provide rigid support to prevent sagging 475 SITE FORMED CAVITY TRAYS Requirements to prevent downward ingress of water: Profiles: To match those shown on drawings. Firmly secured Joint treatment: Use unjointed wherever possible, otherwise lap at least 100 mm and seal to produce a free draining and watertight installation Horizontal cavity trays: Support using cavity closer Sloping cavity trays: Prevent sagging Cleanliness: Free from debris and mortar droppings 485 CAVITY TRAYS OVER OPENINGS AND OTHER CAVITY BRIDGINGS Length: To extend not less than 150 mm beyond ends of lintels/ bridgings 495 GAS RESISTANT DPCS/ CAVITY TRAYS Joint treatment: Use unjointed wherever possible, otherwise lap at least 150 mm and seal to form a gas and watertight installation Joint with damp proof membrane: Overlap dpc/ cavity tray not less than 150 mm 560 VERTICAL DPCS GENERALLY Form: In one piece wherever possible Joints: Upper part overlapping lower not less than 100 mm 570 JAMB DPCS AT OPENINGS Joint with cavity tray/ lintel at head: Full underlap Joint with sill/ horizontal dpc at base: Full overlap Projection into cavity: Not less than 25 mm Relationship with frame: In full contact 580 JAMB DPCS TO BUILT IN TIMBER FRAMES Fixing: Securely fastened to back of frame Fasteners: Galvanized clout nails or staples KNAUF INSULATION LTD. PO BOX 10, STAFFORD ROAD, ST HELENS, MERSEYSIDE, WA10 3NS, UK. TEL: 01744 24022 FAX: 01744 612007 www.knaufinsulation.co.uk TECHNICAL ADVISORY CENTRE TEL 01744 766666 FAX 01744 766667 E MAIL tech@knaufinsulation.com REGISTERED OFFICE: STAFFORD ROAD, ST HELENS, MERSEYSIDE WA10 3NS, UK, REGISTERED IN ENGLAND, COMPANY NUMBER 1926842 P10/NBS Version/March 2008 JOINTS 650 POINTING IN FLASHINGS Joint preparation: Free of debris and lightly wetted Pointing mortar: As for adjacent walling Placement: Fill joint and finish flush 660 PINNING UP TO SOFFITS Top joint of loadbearing walls: Fill and consolidate with mortar MISCELLANEOUS ITEMS 840 OPENINGS FOR FRAMES Formation: Use accurate, rigid templates to required size 850 WALL PLATES Placement: On full bed of mortar to correct horizontal level KNAUF INSULATION LTD. PO BOX 10, STAFFORD ROAD, ST HELENS, MERSEYSIDE, WA10 3NS, UK. TEL: 01744 24022 FAX: 01744 612007 www.knaufinsulation.co.uk TECHNICAL ADVISORY CENTRE TEL 01744 766666 FAX 01744 766667 E MAIL tech@knaufinsulation.com REGISTERED OFFICE: STAFFORD ROAD, ST HELENS, MERSEYSIDE WA10 3NS, UK, REGISTERED IN ENGLAND, COMPANY NUMBER 1926842 P10/NBS Version/March 2008